Sika · Waterproofing
Sika SikaTop-300 Seal highly elastic waterproofing slurry
SikaTop-300 Seal(SikaTop-300 Seal)
You can buy materials separately from HK Create Design. Tell us the quantity and district to check unit prices, lead times and charges for kerbside delivery or delivery to your floor.
SikaTop-300 Seal is a two-part, highly elastic polymer-modified cementitious slurry for concrete and mortar. It bridges fine cracks, seals hairline cracks and reduces carbon dioxide ingress, so it can also protect repaired concrete. Sika lists balconies, podiums, bathrooms, kitchens, showers, utility rooms and window surrounds among its applications. This low-VOC product can be applied by roller or brush. Reported tensile strength is about 1.32 MPa, tensile bond strength is above 1 MPa and water penetration is 0 mm under a 50 m head of water. Dampen the substrate without leaving puddles and work the first coat firmly into it. At 25°C allow 2–4 hours between coats. Apply a reinforcing stripe coat at cracks and wall-to-floor junctions, where movement is likely. Sika recommends SealTape F at these details. Allow at least 3 days of curing before flood testing, then tile or render once the test passes. The flexible coating is suited to Hong Kong balconies and window surrounds subject to small movements and thermal changes.

Buy materials: kerbside handover or delivery to your floor
Your quote lists the material price, transport and any charge for carrying the goods to your floor separately. Choose a delivery option to enquire.
Add other materials (optional)
Waterproofing balconies and podiums before tiling
HK Create Design · Materials and delivery quotations: 5243 7747
Sika SikaTop-300 Seal highly elastic waterproofing slurry · Application illustration
How do you treat the wall-to-floor junction before tiling a balcony?


Illustration of the work sequence. Colour, finish and drying conditions vary on site.
- Material features
- Crack-bridging capability suits waterproofing systems where the substrate may move slightly.
- Where to use it
- Concrete or mortar surfaces on balconies, podiums and in wet areas.
- Application method
- Mix the two specified components, detail the corners and joints, then apply coats to the specified thickness.
SikaTop-300 Seal application steps

- Shake Part A, pour all of it into a clean container and gradually add Part B while mixing at low speed (about 500 rpm). Mix for about 3 minutes until smooth and lump-free.
- Dampen the substrate without leaving standing water. Use a brush, roller or squeegee to apply the first coat, working it firmly into the substrate for good adhesion.
- Apply a reinforcing stripe coat at cracks and wall-to-floor junctions. Sika recommends SealTape F at these details.
- At 25°C, allow 2–4 hours before applying the next coat. Apply at least two coats, or three in critical areas.
- Protect freshly applied material from direct sun, wind, rain and frost.
- Cure for at least 3 days before flood testing. Tile or render only after the test passes.
Manufacturer’s specifications
View SikaTop-300 Seal Manufacturer's information and sources
| Property | Specification |
|---|---|
| Components | Two parts: Part A liquid polymer and Part B Portland cement and aggregates [1] |
| Packaging | 45 kg per set (25 kg powder and 20 kg liquid) [1] |
| Colour | Dark grey when mixed [1] |
| Tensile strength | About 1.32 MPa [1] |
| Tensile bond strength | > 1 MPa [1] |
| Water penetration under pressure | 0 mm under a 50 m head of water [1] |
| Wet density | About 1.5 kg/L [1] |
| Working time | About 80 minutes at +20°C, shorter at higher temperatures [1] |
| Time between coats | About 2–4 hours at 25°C [1] |
| Consumption | About 1 kg/m² per coat. Apply at least 2 coats and a third in critical areas. [1] |
| Curing | Cure for at least 3 days before flood testing, then tile or render [1] |
| Shelf life | 9 months from manufacture [1] |
Suitable applications
- Waterproofing balconies and podiums before tiling
- Bathrooms, shower enclosures, kitchens and laundry areas
- Waterproofing around window frames
- Concrete surfaces with hairline cracks
Applications to avoid
- Roof surfaces exposed to prolonged weathering and direct foot traffic. Use a coating suitable for exposure or provide a protective covering.
- Unsound substrates or surfaces with standing water
How we use this material on site
On balconies and in bathrooms, we reinforce cracks and wall-to-floor junctions with a stripe coat and waterproofing tape. We then apply two to three coats of flexible waterproofing, allow 3 days of curing and flood-test.
View the work details Hong Kong aluminium window services: leaks and repairsAfter replacing aluminium windows and grouting the frames, we apply flexible waterproofing around the frames to reduce rain ingress at the corners.
View the work details Masonry, tiling and floor renovation in Hong KongTile or render only after the flood test passes, to protect the waterproofing layer.
View the work detailsApplication notes
- Pot life shortens at higher temperatures. Mix smaller batches in summer.
- Clean tools immediately with water.
Sika products
Specifications are drawn from manufacturers' websites or technical data sheets. Refer to the manufacturer's latest data sheet for updates. HK Create Design is independent of the brands shown. Brand names and trademarks belong to their owners.
