A kitchen may be small, but it brings together more trades than any other room. Strip-out, plumbing, wiring, gas, waterproofing, tiling, ceilings, cabinets, worktops and appliances all depend on the work that comes before them. At HK Create Design, we measure and prepare drawings before pricing each item against our published rates. Base cabinets are HK$1,300 per linear ft and wall cabinets are HK$1,250. ENF-grade cabinet boards are standard at no extra charge. Below you'll find our full price list, work sequence, materials, worked examples and project photos. Adjust the figures to estimate your budget, then send us photos of your kitchen on WhatsApp.
Data verification date:2026-11-04・Numbers are accompanied by sources
Design renderings and plan reference
WHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
REAL PROJECT PHOTOS
Photographs of our completed projects
These photographs were taken on actual HK Create Design projects. Client details have been removed.
These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.
Design rendering · Small single-wall kitchen in a public rental flat (design concept)
Design rendering · L-shaped kitchen with a tall appliance unit in a Home Ownership Scheme flat (design concept)
Design rendering · Open-plan kitchen with a breakfast bar in a private flat (design concept)
Design rendering · A small single-wall kitchen before and after renovation. The space between the sink and hob provides a food preparation area.
Design rendering · Full strip-out and refit of an older building's kitchen (design concept)
WORKED EXAMPLE
How much will your kitchen renovation cost? Adjust the figures to find out.
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
Full strip-out and refit of a single-wall kitchen, including waterproofing, plumbing, electrics, tiles, ceiling, cabinets and quartz worktop
Illustrative estimate. Assumes a 30 sq ft floor, 60 sq ft of wall tiles and no change to the hob position.
Base and wall cabinets are the same length, with a quartz worktop.
Add one dedicated circuit and three 13 A sockets.
Gas work, appliance supply and the tiles themselves are excluded.
FUR14 Base cabinetsLinear ft × HK$1,300HK$10,400
FUR15 Wall cabinetsLinear ft × HK$1,250HK$10,000
FUR20 Quartz worktopLinear ft × HK$1,200HK$9,600
A09 Kitchen strip-out and waste removal1 kitchen × HK$9,950HK$9,950
H06 Dedicated circuit and three H02 socketsHK$3,350 + 3 × HK$640HK$5,270
K04 Cooker hood installation1 unit × HK$860HK$860
Estimated full kitchen refit (about HK$75,260 for 8 linear ft)HK$75,260
Final quantities depend on site measurements. If strip-out reveals problems with old pipes or walls, the scope may change. We suggest allowing around 20% as a contingency. The written quotation sets out the agreed price. [1]
Replace only the cabinets and solid-surface worktop, keeping the tiles, plumbing and electrics
Illustrative example. Assumes the existing base and wall cabinets are the same length and are removed together.
The new solid-surface worktop has two additional cut-outs. One pull-out basket is included.
Assumes the plumbing, electrics, waterproofing and tiles are in good condition and can be retained.
FUR45 Remove existing base and wall cabinetslinear ft × 2 × HK$170HK$2,720
FUR14 Base cabinetsLinear ft × HK$1,300HK$10,400
FUR15 Wall cabinetsLinear ft × HK$1,250HK$10,000
FUR19 Solid-surface worktopLinear ft × HK$830HK$6,640
FUR24 Two additional cut-outs2 × HK$330HK$660
FUR34 One pull-out basket1 × HK$1,000HK$1,000
K04 Cooker hood installation1 unit × HK$860HK$860
Estimated cabinet and worktop replacement (about HK$32,280 for 8 linear ft)HK$32,280
This option leaves existing pipes, waterproofing and electrics in place. If pipes are deteriorating or there are too few sockets, opening up the walls later can cost more. Before deciding, consider a G01 plumbing inspection with exploratory opening-up (HK$930) or an H01 electrical inspection (HK$770). [1]
L-shaped kitchen cabinet replacement (base cabinets by total length, 8 linear ft of wall cabinets and 2 linear ft of tall appliance units)
Illustrative example. Add the lengths of both base cabinet runs. Count the corner once, following the actual design.
Wall cabinets run along the longer side only, for 8 linear ft. Add 2 linear ft of tall appliance units for an oven and microwave.
Includes a quartz worktop, two pull-out baskets and two TANDEMBOX drawer sets. Existing plumbing, electrics and tiles are retained.
FUR45 Remove existing base cabinetsLinear ft × HK$170HK$2,040
FUR14 Base cabinetsLinear ft × HK$1,300HK$15,600
FUR20 Quartz worktopLinear ft × HK$1,200HK$14,400
FUR45 and FUR15 Remove and replace 8 linear ft of wall cabinets8 × (HK$170 + HK$1,250)HK$11,360
FUR16 Tall appliance unit, 2 linear ft2 × HK$3,350HK$6,700
FUR34 Two pull-out baskets and FUR32 two TANDEMBOX drawer sets2 × HK$1,000 + 2 × HK$1,500HK$5,000
K04 Cooker hood installation and FUR42 deliveryHK$860 + HK$660HK$1,520
Estimated L-shaped kitchen cabinet replacement (about HK$56,620 with 12 linear ft of base cabinets)HK$56,620
Corner baskets, appliances, gas work and changes to plumbing or electrical positions are excluded. For walk-up buildings, add HK$300 per floor (FUR43). The furniture drawings and written quotation issued after measuring set out the final scope. [1]
6 ft custom kitchen cabinet package for HK$28,200
Cabinets and worktop Includes 6 linear ft of wall cabinets, 6 linear ft of base cabinets and a 6 linear ft quartz worktop. Cabinet carcasses use premium moisture-resistant ENF-grade boards.
Site measurement and design A Hong Kong designer measures your kitchen on site. VR renderings and design drawings are included.
To work out an itemised budget, use the Public price list. At the published rates of HK$1,250 per linear ft for wall cabinets, HK$1,300 for base cabinets and HK$1,200 for quartz, 6 ft of each gives a subtotal of HK$22,500. The custom package described above is HK$28,200. Your written quotation after the survey will confirm the materials and scope.
Your quote lists strip-out, waterproofing, plumbing, electrics, tiling, ceilings, cabinets, worktops and hardware separately. Use the item codes to check the figures.
Site measurement and drawings before quotation
Free site measurement until 31 December 2026 for projects with two or more work items, with no deposit required. After that, the survey is HK$500, credited against your order. We calculate cabinet lengths and hardware quantities from the drawings and start production after you approve them.
We coordinate qualified tradespeople
Qualified tradespeople handle the plumbing, a registered electrical worker tests the electrical installation and issues the WR1, and a registered gas contractor handles the gas work. We coordinate these trades for you.
ENF-grade boards as standard, with a one-year warranty
Moisture-resistant ENF-grade cabinet boards are included at no extra charge. Damage not caused by the user is covered for one year.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept: replacement cabinets and worktop in an L-shaped kitchen
KEY NUMBERS
Kitchen renovation costs and figures to know before work starts
key figures
company public price
HK$1,300/straight feet
Kitchen base cabinets (FUR14) — indicative rate
Includes a moisture-resistant cabinet carcass, doors, soft-close hinges, adjustable legs and plinth. ENF-grade boards are standard. The worktop is priced separately.
The Electrical and Mechanical Services Department recommends arranging a safety check of all gas installations by a registered gas contractor every 18 months. Gas cooking appliances must carry the GU mark and be installed by a registered gas installer.
After additions or alterations, a registered electrical worker must inspect and test the installation before it is energised and issue a WR1 certificate. The owner should keep the certificate.
8 linear ft single-wall kitchen: cabinet replacement or a full refit(Unit:HK$)
Cabinet replacement with a solid-surface worktop
HK$32,280
Full refit with a quartz worktop
HK$75,260
Illustrative estimates based on our published prices. Gas work, appliance supply and the tiles themselves are excluded. [1]
Worktop price comparison for 8 linear ft(Unit:HK$)
Seamless stone
HK$6,640
quartz stone
HK$9,600
stainless steel
HK$9,600
rock slab
HK$13,600
Unit price × 8 linear ft. Includes one sink cut-out and one hob cut-out. [1]
FULL GUIDE
Kitchen renovation guide: planning, sequence of work and checks
Plan your kitchen budget in five parts
Even a small kitchen brings together more trades than any other room. Split the budget into five parts: strip-out and waste removal, waterproofing and masonry, plumbing, electrics and gas, cabinets and worktops, and appliance and hardware installation. State the unit for each item, such as per kitchen, linear foot, square foot or set, so you can compare individual rates as well as totals.
In a Consumer Council study, 58% of respondents found different quotation formats difficult to compare and 49% were concerned about a lack of detail. Five common omissions in kitchen quotes are waste removal, waterproofing coverage and testing, pipe materials and starting points, circuit and socket counts, and cabinet hardware and cut-outs.
Full refit or cabinet replacement? Three things to check
Cabinet and worktop replacement (about HK$32,280 for 8 linear ft) suits kitchens with sound pipes, wiring and tiling. A full refit (about HK$75,260) also covers waterproofing, pipework and sockets. Much of the difference comes from pipework at HK$13,300 and strip-out at HK$9,950.
First, check for rusty or leaking pipes and low pressure. Next, check whether you have enough sockets and dedicated circuits for the induction hob and oven. Finally, look for hollow tiles or evidence of leaks into the flat below. If any need attention, it generally costs less to tackle them while replacing the cabinets than to open up the walls again later.
The Electrical and Mechanical Services Department says domestic gas cooking appliances must carry the GU mark and be installed and tested by a registered gas installer. Check the flexible gas hose for damage and its expiry date. Arrange for the gas supply to be isolated before demolition. Do not ask the strip-out contractor to cut the gas line.
High-power appliances should have dedicated sockets. Keep sockets away from taps, gas valves and hobs, and protect the circuits with a residual current device. On completion, a registered electrical worker inspects and tests the installation and issues a WR1 Work Completion Certificate.
Small kitchen design: making the most of a 6 to 8 ft run
Many Hong Kong public rental and Home Ownership Scheme kitchens have only 6 to 8 linear ft to work with. For a single-wall kitchen, decide the washing machine, fridge and hob positions first. Ceiling-height wall cabinets, base-unit drawers or pull-out baskets in place of fixed shelves, and a pull-out corner basket can make better use of the available storage.
Small kitchens often have too little tile area to reach the HK$3,250 minimum charge. Budget for the higher of the price per square foot times the area and the minimum charge. Select appliance models at the design stage and check their width, height, depth and power requirements so they fit and sockets remain accessible.
Kitchen renovation price list (our published 2026 rates)
Property
No.
Unit price
What is included
Kitchen strip-out and waste removal
A09
HK$9,950/room
Remove wall and floor tiles and kitchen cabinets, including handling and removal
Remove old cabinets
FUR45
HK$170/straight feet
Remove and dispose of old cabinets (for cabinet-only replacement with existing tiles retained)
Dismantling kitchen cabinets/bathroom cabinets
A06
HK$170/straight feet
Remove base and wall cabinets and worktop, and safely cap off plumbing and electrical points
Kitchen waterproofing
C03
HK$4,300/room
Two coats of Sika 107 across the floor and 150 mm up adjoining walls
Straight-lay floor or wall tiling
D01/D02
HK$78/square foot
A minimum charge of HK$3,250 applies to each
Kitchen and toilet aluminum false ceiling
F05
HK$3,650/room
Aluminium clip-in ceiling panels with two LED lights and provision for an access hatch
Kitchen complete set of hot and cold water pipes
G03
HK$13,300/item
Sink and washing machine water supply and drainage, including pressure testing
Change the hot and cold water pipe position
G02
HK$1,700/person
Chase the wall, install new copper pipework, pressure-test and reinstate the plaster
Washing machine drain and cold water supply
G06
HK$1,550/item
Install a new drain point and cold tap
Dedicated circuit
H06
HK$3,350/circuit
For high-power appliances such as induction hobs and ovens
13 A socket
H02
HK$640/group
Wall chasing, wiring, back box and faceplate
Kitchen base cabinet (without countertop)
FUR14
HK$1,300/straight square feet
Moisture-resistant ENF-grade carcass boards, doors, soft-close hinges, cabinet legs and plinth
kitchen wall cabinet
FUR15
HK$1,250/straight square feet
Moisture-resistant ENF-grade carcass boards, doors and soft-close hinges
Tall electrical cabinet/cupboard
FUR16
HK$3,350/straight square feet
Allow space for appliances and ventilation
stainless steel cabinet
FUR17
HK$2,600/straight square feet
Grade 304 stainless steel carcass and doors
Ducted cooker hood installation
K04
HK$860/unit
Mount the hood, fit the exhaust duct, form an opening and test the unit
These indicative rates come from our published list of 117 work items. Quantities are confirmed by site measurement and written quotation. Gas alterations require a separate assessment by a registered gas contractor and are outside the published price list. [1]
Choosing a kitchen worktop (prices per linear ft)
Countertop
No.
Unit price
8 direct feet amount
suitable for
Seamless stone
FUR19
HK$830
HK$6,640
Want an integrated basin with fewer interfaces?
quartz stone
FUR20
HK$1,200
HK$9,600
Scratch-resistant and suitable for daily cooking
rock slab
FUR21
HK$1,700
HK$13,600
Heat-resistant, thin appearance
stainless steel
FUR22
HK$1,200
HK$9,600
Easy cleaning for frequent cooking
All four options include a straight edge, one sink cut-out and one hob cut-out. A rounded bullnose edge adds HK$90 per linear ft. Each additional cut-out (FUR24) costs HK$330. [1]
Kitchen materials: cabinet carcasses, worktops, hardware and waterproofing
Component
Standard materials
Upgrade options
Pay attention to
Cabinet carcass
Moisture-resistant ENF-grade boards (standard at no extra charge)
FUR17 Grade 304 stainless steel cabinet, HK$2,600 per linear ft
ENF-grade boards have very low formaldehyde emissions. Some emissions remain, so ventilate the flat before moving in.
Cabinet doors and hinges
Doors and soft-close hinges (included in FUR14 and FUR15)
FUR31 Blum or Hettich hinge, HK$380 each
View door samples before placing the order
Drawers
—
FUR32 Blum TANDEMBOX HK$1,500 per set. FUR33 LEGRABOX HK$2,250 per set.
Full pull out, buffer
Pull-out storage accessories
—
FUR34 standard pull-out basket HK$1,000 each. FUR35 premium accessories up to HK$2,900 each.
Corner baskets, rice bins and similar accessories are priced by model
Countertop
FUR19 Solid-surface worktop, HK$830 per linear ft
Quartz, sintered stone or stainless steel
Confirm the models and sizes of the sink and hob before preparing production drawings
Waterproofing
Two coats of Sika 107 (included in C03)
C04 Ponding test, HK$1,400 per test
Start tiling only after testing confirms there are no leaks
Prices are from our published price list. The ENF-grade formaldehyde emission limit is ≤0.025 mg/m³. [1][11][10]
Kitchen renovation in public rental, Home Ownership Scheme and private flats
Unit of measure
Work you can carry out directly
Prior approval or other conditions
Alterations that are not permitted
Public rental housing
Replace kitchen cabinets and base units, or repaint (Category C)
Kitchen floor and wall tiles, sinks, stove platforms, branch pipes, wiring and sockets (Category B). Apply to the estate office first.
Kitchen fire doors, structural walls and kitchen or bathroom partition walls (Category A)
Home Ownership Scheme flats
Follow the Housing Authority's Schedule of Decoration Conditions and your estate's renovation guidelines
Apply to the management office before renovation and check working hours and arrangements for construction waste
Kitchen doors must be fire-resistant. Do not cut into structural walls.
Private flats
Follow the building's deed of mutual covenant and the management office's rules
Qualified tradespeople must handle alterations to gas pipes, mains pipework or the distribution board
Do not alter structural walls or communal pipework without authorisation
Public rental housing categories are based on the Housing Authority's classification of fixtures. Individual estates also have their own rules. Check the applicable arrangements with your estate or management office. [9]
MATERIAL LIBRARY
Material analysis library
All specifications come from the manufacturer's public technical data; the numbers of different models in the same series may be different. Before placing an order, refer to the technical documents of the actual materials used.
HK Create Design standard specification · Cabinet board materialMoisture-resistant ENF-grade cabinet carcassesFrom 2026, all our custom furniture, including kitchen cabinets, comes with ENF-grade boards at no extra charge. The ENF formaldehyde emission limit is ≤0.025 mg/m³, compared with ≤0.050 mg/m³ for E0.
Formaldehyde release limit
≤0.025 mg/m³ (ENF grade)
Included in
FUR14 base cabinet and FUR15 wall cabinet prices
Warranty
One year for damage not caused by the user, such as detached hinges, loose runners or swollen doors
Suitable for:Families with children or older adults, and small enclosed spaces such as kitchens
Not suitable for:Areas frequently exposed to standing water (consider a grade 304 stainless steel cabinet under the sink)
[1][11]Sika · WaterproofingSikaTop®-107 Seal HKKitchen waterproofing item C03 includes two coats of Sika 107 across the whole floor, extending 150 mm up adjoining walls, with reinforcement around the sink. A ponding test can be carried out afterwards.
practice
Two coats
range
Whole floor and 150 mm up adjoining walls
Prices
C03 HK$4,300 per kitchen. C04 ponding test HK$1,400 per test.
Suitable for:Full kitchen refits and flats with the washing machine in the kitchen
Not suitable for:Partial cabinet replacements where the existing tiles stay in place
[10][1]Blum/Hettich · HardwareSoft-close hinges, TANDEMBOX and LEGRABOX drawersSoft-close hinges are included in the standard price. You can upgrade individual items to branded hardware. The quotation specifies the model and quantity.
Blum or Hettich hinges
FUR31 HK$380 each
Blum TANDEMBOX
FUR32 HK$1,500 per set (full extension, soft-close)
Blum LegraBox
FUR33 HK$2,250 per set (metal sides)
Suitable for:Frequent cooks who open and close drawers often and want long service life
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Company Site Code
Kitchen renovation sequence, from concealed work to finishes
Site survey, appliance selection and drawingsshutdown checkpoint
We measure on site and confirm the models and dimensions of the hob, sink, cooker hood, oven and fridge before drawing the floor plan, building services layout and cabinet elevations. Work begins after the owner approves the drawings and written quotation.
Isolate the gas supply and strip out the kitchen
A registered gas contractor first isolates the supply. We remove the old cabinets and tiles (A09 for a full strip-out), protect corridors and lifts, and remove waste in line with building rules.
Concealed plumbing and electrical workshutdown checkpoint
Relocate hot and cold water points, replace pipes and add dedicated circuits and sockets. Pressure-test the pipes and photograph the pipe and cable routes before closing up the walls. Keep sockets away from taps, gas valves and hobs.
Waterproofing and ponding testshutdown checkpoint
Apply two coats of Sika 107 across the floor and 150 mm up adjoining walls. Start tiling after the ponding test confirms there are no leaks.
Plastering, tiling and suspended ceiling
Lay wall and floor tiles in a straight pattern and check the falls to the drain. Fit the aluminium suspended ceiling with provision for an access hatch.
Recheck dimensions and manufacture the cabinets
Once the masonry work is complete, take final measurements and send the production drawings to the factory. ENF-grade boards are used.
Install cabinets, worktop and appliances
Fit the base and wall cabinets, cut the worktop, and install the sink, tap and cooker hood. A registered gas installer fits and tests the gas cooking appliance.
Electrical testing, cleaning and handovershutdown checkpoint
A registered electrical worker tests the installation and issues a WR1 certificate. We remove the remaining waste, carry out basic cleaning and check each handover item with the owner.
Measure the kitchen, confirm appliance models and prepare a floor plan, building services layouts and cabinet drawings
Remove the old cabinets or strip out the entire kitchen, then remove waste in line with building management requirements
Alter the plumbing, add dedicated circuits and sockets, pressure-test and photograph the work before closing the walls
Waterproof and pond-test the kitchen, lay the tiles and install an aluminium suspended ceiling
Make custom cabinets, cut worktop openings and fit the sink, tap and cooker hood
Arrange for a registered gas installer to connect the hob and obtain the WR1 certificate on electrical completion
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
01
Roughly how many linear feet of cabinets do you have? Is the kitchen single-wall, L-shaped or open-plan?
02
Are you considering a full refit or just replacing the cabinets and worktop?
03
Will the hob, fridge or washing machine change position?
04
Do you need to allow space and dedicated circuits for an oven, steam oven or dishwasher?
FAQ
FAQs
How much does a kitchen renovation cost?
At our published rates, replacing the cabinets and solid-surface worktop in an 8 ft single-wall kitchen costs about HK$32,280. A full strip-out and refit costs about HK$75,260, including demolition, waterproofing, new plumbing throughout, tiling, a suspended ceiling, a dedicated circuit and a quartz worktop. The final price is confirmed in writing after measurement.
How are kitchen cabinets priced?
We measure cabinet length along the wall and charge per linear foot. Base units (FUR14) cost HK$1,300 per linear foot, wall units (FUR15) HK$1,250 and tall appliance units (FUR16) HK$3,350. Worktops are priced separately. We measure each run of an L-shaped kitchen separately and count the corner once.
What board do you use for kitchen cabinets?
From 2026, moisture-resistant ENF-grade board is standard at no extra charge. Its formaldehyde emissions are very low, but still measurable. Ventilate the flat before moving in. Consider 304 stainless steel for a cabinet that stays damp under the sink.
How long does a kitchen renovation take?
Replacing just the cabinets and worktop takes less time on site, but cabinet production starts after measurement and drawings. A full refit also involves demolition, plumbing, wiring, waterproofing and testing, tiling and ceiling installation before the cabinets go in. We specify the schedule in the quotation, taking account of the scope, permitted working hours and production lead time.
What kitchen alterations are allowed in public rental housing?
Under the Housing Authority classification, replacing kitchen base cabinets is Category C and needs no prior approval. Floor and wall tiles, sinks, cooking benches, branch pipes, wiring and sockets are Category B. Apply to the estate office first. The kitchen fire door and structural walls are Category A and cannot be altered.
Can I fit or move a gas hob myself?
No. The Electrical and Mechanical Services Department (EMSD) says domestic gas cooking appliances must bear the GU mark. A registered gas installer employed by a registered gas contractor must install and test the appliance. Have the contractor assess any proposed move first. Gas work is outside our published rates.
Should I replace the pipes in an older kitchen?
If the building is old, the water pressure is low or the pipes are rusty, consider replacing them with the cabinets. A later leak could mean taking the new units out. Item G01 (HK$930) covers opening up for a pipe inspection. A complete set of hot and cold water pipes (G03) costs HK$13,300.
Do induction hobs and ovens need dedicated circuits?
High-power appliances should have dedicated sockets, with socket circuits protected by a residual current device. A dedicated circuit (H06) costs HK$3,350 per circuit and a 13A socket (H02) costs HK$640 per set. On completion, a registered electrical worker tests the installation and issues the WR1 certificate.
Should I choose quartz or solid surface for the worktop?
Solid surface costs HK$830 per linear foot, has few visible joints and can incorporate a sink. Quartz costs HK$1,200 per linear foot and resists everyday scratches. Sintered stone (HK$1,700) is heat resistant and stainless steel (HK$1,200) is easy to clean. All four include one sink cut-out and one hob cut-out.
Is there a charge for a site measurement?
Until 31 December 2026, site measurement is free for two or more work items, with no deposit. After that, the fee is HK$500, credited against your order. You can also WhatsApp kitchen photos and approximate measurements to 5243 7747 for advice on a full or partial refit.
Is there a warranty?
Our kitchen cabinets have a one-year warranty covering damage other than deliberate damage. Examples include detached hinges, loose runners, screws coming loose and swollen doors.
AFTER RENOVATION
RenoClean | Specialist cleaning and aerospace-grade air purification
After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.
Cleaning and testing are listed separately
The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.
The kitchen is where most of the work in the house intersects: demolition, waterproofing, plumbing, electricity, gas, kitchen cabinets, countertops and electrical appliances are all intertwined. This article uses the public price list to demonstrate how to calculate the 2026 kitchen renovation budget item by item, and lists the official requirements and the parts that need to be written clearly in the quotation.
What should you budget for floors and painting in a 500 sq ft flat? Four worked examples break down stripping out, levelling, tiling labour, wall refurbishment and waste removal. You can then add the kitchen, bathroom, plumbing, electrical work and bespoke furniture item by item.
Check the exact dishwasher model first. Mark the cabinet opening, door swing, water supply, drain and power point on one drawing. The guide includes a table of responsibilities and a quotation checklist. Confirm the dimensions on site.
Check approved plans, fire resistance requirements and the structure before removing a kitchen wall. The guide also covers cooking fumes, design options and worked cost examples.
Use the Housing Authority's Categories A, B and C to plan a kitchen or bathroom update in public rental housing, with ways to keep existing tiles, approval steps and worked examples at our published rates.
Want to discuss this project? First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.
Browse our project photos or book a meeting at our Wong Tai Sin showroom and bring your plans. Check the written agreement for acceptance and warranty details.