2026 renovation cost calculator: get a free estimate and check the scope of work
Two 500 sq ft flats can have very different budgets. One may only need painting and flooring, while the other includes a new kitchen and bathroom. Start with the work you need and check each item.
Calculated using our price list No phone number required Contingency allowance shown separately
Quick plan for 1–50,000 sq. ft.; paint example expands area by area × 3.
Basic whole-home renovation · Estimate for selected workHK$100,700 – HK$120,840The lower limit is an itemized subtotal; the upper limit includes 20% planning reservation, not company charge.
Remove wall or floor tiles: 500 sq ft
Floor screeding and levelling: 500 sq ft
Floor tiling (straight-laid tiles up to 600 × 600 mm): 500 sq ft
Local filler repairs, moisture-resistant primer, sanding and repainting: 1,500 sq ft
Construction waste removal (per truckload): 1 truckload
We are calculating your estimate. You can send us your requirements in the meantime.
Enter a saleable floor area between 1 and 50,000 sq ft.
Formaldehyde emission ≤0.050mg/m³ (national standard E0 grade)
Upgraded throughout to ENF-grade board from 2026
Replaced by ENF-grade board
VS Designer's PickCurrent standard
ENF-grade eco board
★★★★★Move-in Ready
80%or more: top choice for families with expectant mothers and children
Highest grade of national standard GB/T 39600: formaldehyde emission ≤0.025mg/m³, just half of E0 grade
With zero-formaldehyde edge banding, it cuts formaldehyde at the source for homes with pregnant women, babies or sensitive family members
Standard from 2026 at no extra charge
Percentages are from our 2026 client records; star ratings are our designers' advice for typical Hong Kong homes, subject to site conditions. Ask about board specifications on WhatsApp
NEXT STEP · FULL CATALOG
Need to select projects item by item?
Express plans are examples of common ranges and are not all-inclusive. You can go to the detailed computer to select items one by one from the complete 117 projects, adjust the quantity and check the minimum consumption.
How does a free online renovation estimate differ from an on-site quotation?
Use the calculator to budget for the work you select, then share site photos and your requirements for review. When comparing quotations, check the total alongside the scope and exclusions.
Illustration of quotation planning and material selection. It does not show a completed project or a fixed package.
From an online estimate to a formal renovation quotation
Method
What you receive
What to prepare
Fees and scope
Free online estimate
Subtotal for selected work, planning allowance and exclusions
Saleable floor area and the work you want to carry out
Free and no phone number required. The result is an estimate.
Free enquiry on WhatsApp
Organise your requirements and find out what information is still needed
Estimate, site photos, district and intended start date
The initial enquiry is free. Unmeasured details still need verification.
On-site measurement and renovation quotation
We check dimensions, site constraints and who supplies materials before confirming the itemised written quotation.
Property location, times available for a visit and list of work
The site visit policy below and the arrangements confirmed when booking apply.
Site measurement policy: Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.
01 · Choose the workDecide what you want to change and what to keep
02 · Calculate your budgetCheck quantities, minimum charges and the planning allowance
03 · Share your detailsReview the prefilled WhatsApp result and send it when ready
04 · Confirm your quotationAfter site verification, agree the scope of work in writing
Renovation quotation FAQs
Will the calculator automatically send my estimate to your company on WhatsApp?
You control when the message is sent. The button beside the result opens WhatsApp with your selected work and budget already filled in. Check the draft and tap Send when ready. You can also add site photos.
Does an online renovation estimate include all work?
The estimate covers only the items you select. Finishes, equipment, concealed deterioration, site constraints and items awaiting prices must be checked individually. The planning allowance is money you set aside, not an automatic company charge.
How do I compare two renovation quotations?
Use the same list of work to compare units, quantities, materials, waste disposal, protection, payment schedules and exclusions. Ask for written confirmation before approving extra work, and compare the scope as well as the totals.
Is an on-site renovation quotation always free?
Online estimates and initial enquiries are free. A site measurement is arranged separately under the policy on this page. We confirm the applicable conditions with you when booking your visit.
Already have a list of work or site photos?
Tell us the district, scope and timing so we can follow up on your requirements.
Look at the scope of the project first, then compare renovation quotes
The same total may include different processes, fabrics or clearing arrangements. Read the company's price list and 500-foot example, check what's included, what's not included, and the minimum consumption, and then sort out the next step of enquiry.
Browse our project photos or book a meeting at our Wong Tai Sin showroom and bring your plans. Check the written agreement for acceptance and warranty details.