01
Toilet renovation cost: first decide on complete demolition and partial renovation
There are generally two paths to toilet renovation. The first one is to completely dismantle and redo: remove the wall tiles, floor tiles and sanitary ware, and then redo the waterproofing, plastering, paving, water pipes and sanitary ware if you see the mud bottom or even concrete. The second item is partial renovation: the brick surface is intact and there is no water seepage. Only the toilet, wash basin, shower head, and bath screen are replaced, or the seams are made and the ceiling is removed from mold. The price of the two roads can differ several times, so the first step is not to ask the price, but to judge the current situation.
How to judge? If there are water stains on the ceiling downstairs, the joints between the bricks have been blackened for a long time, there is a hollow sound when knocking the bricks, there is water on the floor, or the unit has been used for many years and the waterproofing has never been replaced, it is usually safer to completely demolish and redo it. Common causes of water seepage listed by the Buildings Department include leaking drain pipes, leaking water pipes, and improper or damaged floor waterproofing or bathtub edge sealing[3]. If the problem lies in the waterproof layer, replacing the sanitary ware cannot solve it.
Another consideration is that the purpose of the unit is the same as the budget period. If you plan to live in the house for more than ten years, or plan to renovate the whole house at once, it will be more cost-effective in the long run to dismantle the house to the bottom, replace the vents and waterproof it all at once than to do it year by year. If it is only for short-term rental or waiting for a major renovation, you can do partial work first and concentrate the budget on dealing with the really damaged parts.
If the style is old and the sanitary ware is broken, partial renovation is enough. When we come to take measurements, we will first look at the ceiling, bricks, water and pipes downstairs, and then suggest that you should go to a different route instead of asking you to tear it all down at the beginning.
- Check the ceiling downstairs for water stains
- Knock bricks and listen to see if there is any hollow voice
- Check whether there is water accumulation on the floor and whether the cracks in the bricks have been blackened for a long time.
- Decided to completely dismantle and redo partial renovation

02
Demolition and waterproofing: the most expensive but the least economical option
The published price list offers two ways to calculate this work. The first prices the items separately: A10 bathroom strip-out and removal costs HK$9,950 per bathroom, including carrying out the debris, plus C02 bathroom waterproofing at HK$4,850 per bathroom of around 30–40 sq ft. C02 covers two coats across the floor, up the walls to 6 ft and to full height in the shower, plus a 24-hour flood test. Together the two items cost HK$14,800. Alternatively, C05 costs HK$13,000 per bathroom for tile removal down to the substrate, substrate repairs, two coats of waterproofing and flood testing. It excludes tiling. A10, C02 and C04 are not charged again for the same work under C05. (see published rates).
The Buildings Department's 2005 "Guidelines on Preventing Water Seepage in New Buildings" recommends that waterproofing membranes or waterproofing materials should cover the entire floor and extend to 300mm on each wall. The walls around bathtubs and shower rooms should extend at least 1,800mm, and verification tests such as flooding tests should be conducted.[1]. Although the guidelines are for new buildings, they are useful as a reference when renovating: the waterproofing range included in the quotation should at least not exceed this standard.
The Consumer Council also notes that waterproofing is an aspect of Masonry and tiling that is particularly easy to overlook. Quotes should state the areas to be treated, the material, the height of the waterproofing and whether a leak test is included. Fewer than half the contractors surveyed specified the material, height and testing details[2]. Therefore, it is not enough to see the word "waterproof". You must also see the range, number of layers, height and water test time.
- Compare A10+C02 with C05, which one is right for you?
- Waterproof range: entire floor + wall height
- Indicate the turn-up height around the shower seat and bathtub
- The closed water test time is the same as the recording method
03
Tile paving: area and minimum charge are the same as beautiful joints
Tiling is charged per square foot. D01 floor tiling and D02 wall tiling cost HK$78 per sq ft for straight-laid tiles up to 600 × 600 mm, with a minimum charge of HK$3,250 for each item. D04 large-format tiling costs HK$120 per sq ft and D06 mosaic or hexagonal tiling costs HK$130 per sq ft. D09 is HK$2,050 per shower base with kerb, and D08 epoxy grouting is HK$21 per sq ft (see published rates). Diagonal and herringbone layouts carry a surcharge under D01–D06.
The floor area of the toilet is small, usually 30 to 40 feet. In many cases, the floor tiles are not enough for the minimum fee, so the minimum fee must be used when calculating the budget. For wall bricks, you need to measure the perimeter of the four walls multiplied by the height, and then add the height to the door. For example: the circumference is 20 feet, the shop is 9 feet high, and the door is about 18 feet, which is about 162 feet.
When picking bricks, you should also consider anti-slip and cleanliness. It is recommended to choose non-slip tiles for the bathroom floor. The tile joints should not be too wide. The shower seat can be sloped with fine tiles to make the water drain more smoothly. Wall bricks can be selected in different sizes to reduce brick joints and make them easier to care for.
The Consumer Council reminds us that many times the mud and water quotations only include labor and base materials, and the owners have to choose and purchase the tiles themselves. If it says "joint labor and materials", you need to ask clearly what style is included. If you choose other models, there may be extra money.[2]. We recommend stating the size and laying method of the bricks in the quotation, as the labor required for large bricks, thin bricks and diagonal laying is different.
- The floor tile area is the same as the minimum charge, whichever is higher
- The wall bricks are tied according to the perimeter x height and then the doors and windows are
- Indicate the brick size and laying method. Bricks on the same surface will be supplied by Bianguo.
- Beautifully stitched microphone bags, what materials are used?

04
The water pipe must be drained at the same time: sufficient preparations must be made when changing the pipe or moving the toilet.
Bathroom plumbing generally covers the water supplies and waste connections for the shower, toilet and basin. G04 costs HK$13,300 for a full set of hot and cold bathroom pipework, including pressure testing. G07 toilet relocation with waste rerouting starts at HK$9,300, subject to a site assessment. (see published rates). The position of the soil pipe and the available floor height determine whether the toilet can be moved.
The Water Supplies Department points out that specified plumbing works for the construction, installation, alteration, repair or removal of internal water supply systems must be carried out by designated persons such as licensed plumbers and registered plumbers.[7]. The Consumer Council also reminds that when replacing pipes in old buildings, it is necessary to make it clear that the first water pipe gate to enter the house is activated and the split water meter is set to start. At the same time, it is necessary to indicate the source of the pipe materials.[2].
For the drain part, special attention should be paid to the drain slope of the platform and the location of the drain outlet. The Buildings Department's guidelines mention that ground drainage facilities should be installed at appropriate locations to minimize the distance to the water.[1]. When the disassembly reaches the bottom, it is the best time to re-check the water outlet and slope.
We use copper for drinking-water pipework and exclude galvanised iron. Common choices include Wednesbury (supplied by CYH, BS EN 1057), Kembla (Kempress), LAWTON, OTTO and OPAL. We use Pegler (Pegler Yorkshire), Tectite and ENDEX fittings, including push-fit and silver-brazed connections. The pipes and fittings carry product certification and meet Water Supplies Department requirements. Our partner licensed plumber handles the replacement and we coordinate the application.
- Decide whether to complete a complete throat replacement (G04)
- Before moving the toilet, first assess the location of the water pipe.
- Pipe material and starting point stated
- The location of the water outlet and the slope of the floor need to be reviewed
05
Water heaters: statutory requirements for gas and electric water heaters
Units using gas water heaters should be especially careful. The Electrical and Mechanical Department pointed out that all residential gas water heaters supplied or sold in Hong Kong must be approved by the Gas Safety Supervision of the Electrical and Mechanical Department and bear the "GU" mark; according to the Gas Safety Regulations, sealed (counterbalanced) water heaters are the only option for new installations of gas water heaters. Ordinary flue-type water heaters cannot be newly installed for bathroom or shower use.[4].
Installation and testing must be carried out by a registered gas installation technician employed by a registered gas works contractor. Users should also arrange for safety inspections every 18 months; installation by yourself or by non-registered persons is illegal.[4]. If your property has an old water heater, you should also consult a registered gas contractor when renovating the toilet.
When using an electric water heater, you must pay attention to electricity. The Electrical and Mechanical Department's Household Electrical Safety Manual points out that the electric lights, exhaust fans and electric water heater switches in the bathroom should be installed outside the bathroom, and the bathroom sockets should be at least 0.6 meters away from the bathtub and shower tank.[5]. If the water heater needs its own circuit, H06 is HK$3,350 per new dedicated circuit. (see published rates).
- The gas water heater has the "GU" mark and is a sealed (counterbalanced) type.
- Installation and testing by a registered gas installation technician
- The electric water heater switch is installed outside the bathroom
- The bathroom socket should be at least 0.6 meters away from the bathtub showerhead
Demonstration 1: Assume that the 35-foot bathroom is completely demolished and redone.
Assumptions
- Hypothetical examples, not actual cases or quotes.
- The floor is 35 square feet, the wall bricks are about 180 square feet, and the bricks are 600×600mm or less.
- Use C05 for disassembly and waterproofing; add tub, bath screen, 2-foot bathroom cabinet and 2-foot mirror cabinet.
- Bricks, sanitary ware itself, and hot water heaters are not included.
How to calculate quantities
- "C05" bathroom including demolition, redoing and waterproofing: HK$13,000/room × 1 = HK$13,000
- "D01" floor tile: HK$78/square foot × 35 = HK$3,250 (based on the minimum charge)
- "D02" wall tile: HK$78/square foot × 180 = HK$14,040
- "D08" Epoxy sewing: HK$21/square foot × 215 = HK$4,515
- "D09" double cylinder with nozzles: HK$2,050/set × 1 = HK$2,050
- "G04" toilet complete set of hot and cold water pipes: HK$13,300/item × 1 = HK$13,300
- "F05" Kitchen and toilet aluminum false ceiling: HK$3,650/room × 1 = HK$3,650
- "K06" Complete installation of toilet sanitary ware hardware: HK$5,650/set × 1 = HK$5,650
- "K05" bathroom screen installation: HK$860/set × 1 = HK$860
- "FUR25" bathroom base cabinet with seamless stone surface: HK$3,250/straight sq ft × 2 = HK$6,500
- "FUR26" bathroom mirror cabinet: HK$1,150/straight sq ft × 2 = HK$2,300
- Subtotal HK$69,115; it is also recommended that the owner reserves a 20% planning buffer (non-company fee) ≈ HK$13,823.
The example full renovation costs about HK$69,115, or HK$82,938 including a 20% planning allowance.
The actual area, water level and pipe conditions need to be confirmed on site; K06 already includes toilet installation, so there is no additional K01; the gas water heater must be handled by a registered gas engineering contractor. (see published rates)

06
Sanitary ware and shower head: installation fee and water saving label
Installation can be priced per fitting or as a package. Published labour prices are HK$1,300 for a toilet (K01), HK$1,150 for a basin and tap (K02), HK$970 for a shower mixer (K03) and HK$860 for a shower screen (K05), rising to HK$1,400 or more for thick frameless glass. K06 costs HK$5,650 for a full set of bathroom fittings, covering installation of taps, a bathroom heater, an extractor fan, a toilet and accessories. (see published rates). Count either the package or the individual installation items once.
When choosing a shower head, you can refer to the water efficiency label of the Water Supplies Department: a nominal flow rate of 9.0 liters per minute or less is classified as Class 1, 9.0 to 12.0 is Class 2, 12.0 to 16.0 is Class 3, and above 16.0 is Class 4.[6]. However, the Water Supplies Department also reminds that if the building has low water pressure (for example, the top three floors do not have a pressurization device), you should choose a shower head that still has a large flow rate under low water pressure to avoid affecting the operation of the water heater.[6].
The Water Supplies Department provides a simple method: turn on the cold water in the shower to the maximum, fill it with a bucket for 10 seconds, then multiply the measured liters by 6 to get the flow rate per minute.[6]. If you do this before replacing the shower head, you will know that the old shower head itself has a low flow rate.
The choice of sanitary ware should also match the space. When choosing a toilet in a bathroom, you should pay attention to the distance between the pit and the space in front of the toilet. You should consider whether the wash basin will be hit by the door when opening the door. The width of the bath screen should be the same as the width of the shower seat and the direction of the door. We recommend that after the owner selects the model of the sanitary ware, submit the specifications and dimensions to the master, and then mark the outlet and water inlet locations on site. In this way, you can avoid discovering that the pipe is not clamped when installing sanitary ware, and then have to cut the wall or modify the pipe, which will increase the time and cost.
You normally choose your own sanitaryware and taps. We charge for installation. Before buying, send us the model numbers so we can check the dimensions and the positions of the water and waste connections.
- The complete set (K06) is ordered piece by piece to avoid duplication.
- Choose a shower head to check the water efficiency level
- Low water pressure units choose shower heads suitable for low water pressure
- Measure existing flow using the 10-second bucket method
07
False ceiling, bathroom cabinet and mirror cabinet
Bathroom suspended ceilings generally use removable aluminium panels for maintenance access. F05 costs HK$3,650 per kitchen or bathroom, including two LED lights and an access hatch. The published rate for areas over 40 sq ft is HK$90 per sq ft (see published rates). Waste pipes and extractor ducting often run above the ceiling, so the hatch needs to line up with the parts that require servicing.
For bathroom cabinets, FUR25 is HK$3,250 per linear foot for a base cabinet with a seamless stone top. FUR26 is HK$1,150 per linear foot for a mirrored cabinet, and FUR27 is HK$2,900 per linear foot for a tall cabinet with moisture-resistant board. (see published rates). A minimum measurement of 2 linear feet applies to each item.
In a small bathroom, check how far cabinet doors open, the clearance in front of the toilet and how far water splashes from the shower. Our Custom furniture service includes design and a full set of drawings for the home: floor plans, ventilation, fire services, plumbing and electrical drawings, furniture designs, VR visualisations and furniture production drawings. These show how the cabinets fit around the sanitaryware before you order.
- Align the false ceiling inspection opening with the water pipe and exhaust fan
- Moisture-proof panels for bathroom cabinets
- Pay attention to the minimum measurement when counting cabinets
- Check the VR rendering to confirm the opening of the door and the activity space
You can swipe left or right on your phone to view the complete table.
| Property | request | Source department |
|---|---|---|
| Waterproof range | Full floor + wall 300mm; bathtub and shower surround at least 1,800mm[1] | Buildings Department |
| gas water heater | Must have "GU" mark; new installation can only be sealed (counterbalanced) type; inspected every 18 months[4] | Electrical and Mechanical Department |
| bathroom electricity | The socket should be at least 0.6 meters away from the bathtub showerhead; the switch should be installed outside the bathroom[5] | Electrical and Mechanical Department |
| Plumbing works | Specified plumbing works are carried out by designated persons such as licensed plumbers[7] | Water Supplies Department |
| shower head | Water efficiency label level 1 is 9.0 liters per minute or less[6] | Water Supplies Department |
The Buildings Department's guidelines are for newly built buildings and should be used as a reference during renovation [1]; other requirements are subject to the latest information from relevant departments. [1][4][5][6][7]

08
The toilet quotation should clearly indicate the location
The most common disputes over toilet quotations include: dismantling to the side (the brick surface is determined by concrete), the waterproof range is the same height, the water test time, the bricks are supplied from both sides, the sanitary ware system is installed continuously, and the hot water heater is installed from both sides. Each item should be stated in the quotation, it is not good to just write "renovation of one toilet".
A Consumer Council study pointed out that 19% of respondents with actual renovation experience had had disputes with renovation companies. The most common disputes were delayed completion (61%), defective projects (39%) and failure to comply with omissions (30%).[8]. The toilet is the place where defects and disputes are most likely to occur, so the quotation, acceptance and maintenance arrangements must be clearly written.
In addition, the Consumer Council's research also mentioned that nearly 30% of the respondents believe that there is no need to revise the quotation when the project changes. This idea should not be encouraged.[8]. For example, if you decide to add a tank or replace a large brick after starting construction, you should first have a written order.
- State the extent of dismantling
- Waterproof range, number of layers, height, water test time
- Bricks, sanitary ware, and hot water heaters are supplied and installed by both parties.
- Change the order in writing and specify the maintenance period
09
Acceptance: Check the waterproofing, slope and gluing one by one
Before the waterproofing is done and the tiles are laid, this is the only time when the waterproofing layer can be seen. It is recommended that the owner request to take photos of the waterproof coating and view the water level and the ceiling downstairs during the water test period. When testing the water, seal the floor drain and fill it with water. Observe the water level changes and see if there is water seepage downstairs. Lay the tiles first.
After laying the bricks, you can test the floor drain with water: pour a bucket of water and see if the water system flows smoothly to the drain outlet and whether there is water level. You can tap the bricks on the wall to see if there is any large hollow sound. The brick joints should be even and the corners of the bricks should be neatly closed.
The last step is to apply glue: the toilet, washbasin, bath screen and the edge of the bathtub should be applied with anti-mold glue, and the glue lines should be continuous. The Buildings Department mentioned that improper sealing of bathtub edges is one of the causes of water seepage[3], so don’t be careless about this step. After we finish the work, we will remove the trash, sweep up, and do basic cleaning. If deep cleaning is needed, we can contact a professional cleaning company to follow up.
We finish bathroom joints with DOWSIL mould-resistant silicone. At handover, check that each bead is continuous and free of gaps.
- Photos of the waterproof layer and water test records of the closed water
- Pour water test platform to remove water and accumulate water
- Knock bricks to check hollowness, seams and closing
- Continuous gluing of sanitary ware, bath screens, and bathtub edges

10
Counting water seepage downstairs: Know more about the legal procedures
If there is already a water seepage problem before renovation, it is best to find out the source first. The Buildings Department website states that if you encounter water seepage problems, you can first seek help from the property management company. If you cannot negotiate a solution, you can call 1823 to seek help from the Joint Office of the Food and Environmental Hygiene Department and the Buildings Department.[3].
The Joint Office will implement new procedures in the form of a pilot plan starting from July 16, 2026. Infrared thermal imaging analysis will be added to the first phase of the investigation; if there is reason to believe that the water seepage is caused by the upper-level unit, a "Recommended Maintenance Notice" will be issued to the upper-level owner, requiring self-inspection and completion of repairs within 28 calendar days.[3]. For simple cases, it is estimated that notification will be issued in approximately 14 working days.[3].
If you fail to comply with the "nuisance notice", the fine will be increased to $25,000 and $450 per day starting from August 17, 2025[3]. In other words, bathroom waterproofing is not only a matter for your own home, but also concerns your neighbors and legal responsibilities. Waterproofing and water testing during renovation are the most practical precautions.
- Contact the management office first. If the problem is not resolved, call 1823.
- Understand the recommended maintenance notice 28 calendar day period
- Treat the source of water seepage before renovation
- Keep records of waterproofing and water testing
Demonstration 2: No demolition of bricks, only replacement of sanitary ware and renovation of ceiling
Assumptions
- Hypothetical examples, not actual quotes.
- There is no problem with the brick surface and waterproofing, and there is no water seepage downstairs.
- Replace the toilet, wash basin, shower head, and bath screen; make 60 feet of epoxy joints on the old bricks; remove mold and heavy oil on one side of the ceiling; add a 2-foot mirror cabinet.
How to calculate quantities
- "K01" toilet installation: HK$1,300/piece × 1 = HK$1,300
- "K02" Installation of wash basin and faucet: HK$1,150/set × 1 = HK$1,150
- "K03" shower faucet installation: HK$970/set × 1 = HK$970
- "K05" bathroom screen installation: HK$860/set × 1 = HK$860
- "D08" Epoxy sewing: HK$21/square foot × 60 = HK$1,400 (based on the minimum charge)
- "E05" Partial mildew removal with heavy oil: HK$1,250/noodle × 1 = HK$1,250
- "FUR26" bathroom mirror cabinet: HK$1,150/straight sq ft × 2 = HK$2,300
- The subtotal is HK$9,230, which is HK$59,885 less than Demonstration 1.
A partial renovation costs about HK$9,230 in this example and suits a bathroom where the existing waterproofing is in good condition.
If there are signs of water seepage, partial renovation will not solve the waterproofing problem; the minimum fee will be charged depending on the size of the seams. (see published rates)
11
The process sequence is the same as common mistakes: spotting to avoid rework
The process of toilet renovation is roughly as follows: protecting public areas and other parts of the unit, cutting off water and electricity, demolishing old ones, inspecting concrete pipes and pipes, changing pipes and electricity, leveling and draining, two layers of waterproofing, closing water and testing, laying bricks, caulking, installing false ceilings, installing bathroom cabinets and sanitary ware, gluing, and cleaning. Each step has its own sequence. For example, the pipes must be modified before waterproofing. No holes should be drilled after the waterproofing is completed. If you want to add a showerhead or towel rack later, you must know where the waterproof layer and pipes are before drilling.
There are several most common mistakes: first, in order to rush the work, laying bricks before the waterproofing is completely dry; second, there is not enough time to close the water to test the water, or no one went downstairs to look at the ceiling during the water test; third, decide to add a tank or water tank first after laying the bricks. If you want to change the position of the bathroom screen, you have to remove some bricks; the sanitary ware and hardware of the fourth series were not selected in advance, and the water level did not match the reserved throat on the wall; the wrong glue was used for the fifth series glue or the glue line was disconnected, and water seeped from the edge in the future. These mistakes are not a matter of material quality, but a matter of arrangement and supervision.
We photograph each stage before the work is covered so you can see the pipe routes and waterproofed areas. You receive the photos and flood-test record for future repairs or resale. The illustrated renovation comes to about HK$59,190. It covers strip-out, waterproofing and flood testing, wall and floor tiling, plumbing, a vanity unit, installation of sanitaryware and a shower screen, and an aluminium suspended ceiling. Supply of the screen and toilet is priced separately. The final price is confirmed in writing after measurement. (see published rates)
- Pipe wires are completed before waterproofing
- Waterproofing must be done thoroughly before laying tiles according to product requirements.
- Select the sanitary ware model first and then reserve the throat position.
- Take photos and archive each hidden process


12
Let us help you calculate the cost of toilet renovation
HK Create Design (HK CREATE DESIGN) takes on jobs big and small, from replacing a toilet or grouting to full demolition with re-waterproofing and custom bathroom cabinets. Our designers and tradesmen with over 15 years' experience will discuss plans with you for free; you can first WhatsApp 5243 7747 photos of your bathroom and the ceiling of the flat below.
For a closer estimate, book an on-site measurement. Until 31 December 2026, this is free for two or more work items, with no deposit required. After that, the HK$500 fee is credited against your order. (see published rates). The AI quotation assistant and calculator covering 117 published items can help you estimate an initial budget. The final price is confirmed in writing after an on-site measurement.
All 117 price items are disclosed. You can count the item numbers in this article by yourself, and then compare them item by item with the written quotation.
- WhatsApp 5243 7747 Free consultation
- HK$500 for on-site measurement (rebate upon order placement)
- AI quotation/calculator is for reference only
- Check item by item with written quotation
FAQ
8 practical questions answered
01How much does it cost to completely dismantle and rebuild a small toilet?
Using our published rates, a full renovation of an example 35 sq ft bathroom comes to about HK$69,115, including waterproofing, tiling, plumbing, installation of sanitaryware and a vanity unit. The figure excludes tile and sanitaryware supply and a planning allowance (see published rates). The final price is confirmed in writing after an on-site measurement.
02What is the difference between C05 and A10 plus C02?
A10 plus C02 totals HK$14,800. C05 is HK$13,000 per bathroom, covering tile removal down to the substrate, substrate repairs, two coats of waterproofing and flood testing. It excludes tiling. A10, C02 and C04 are not charged again for the same area under C05. (see published rates).
03How high should the waterproofing be?
Buildings Department guidelines recommend covering the entire floor and extending up to 300mm on each wall, and at least 1,800mm around bathtubs and shower cubicles.[1]. The actual range should be written into the quote.
04Can an old water heater be reinstalled and put into a new bathroom?
Newly installed gas water heaters can only be of the sealed (counterbalanced) type. Ordinary flue types cannot be newly installed for bathroom use and must be installed by a registered gas installation technician.[4].
05Is it possible to just do waterproofing without removing the bricks?
Adding a waterproof coating to the brick surface has limited effect because the original waterproof layer is at the bottom of the brick. If there is water seepage, it is usually necessary to dismantle it until it reaches the bottom before confirming and repairing it. This is the method for C05 {P}.
06If I choose a water-saving shower head, will the water be too fine?
The Water Supplies Department reminds that units with low water pressure should choose shower heads that still have a large flow rate under low water pressure. You can first use a bucket to collect the current flow rate for 10 seconds multiplied by 6 meters.[6].
07How long does it take to renovate a toilet?
Depends on scope. Complete demolition and redoing involves dismantling old ones, changing pipes, waterproofing, closing the water for water testing, laying bricks and installing sanitary ware. There is a waiting time for each step; partial replacement of sanitary ware can be completed in one or two days. The actual construction period is subject to the construction time arrangement between the site and the management office, which we will state in the written quotation.
08Can I add a socket in the bathroom?
Yes, but the Electrical and Mechanical Department points out that bathroom sockets must be at least 0.6 meters away from the bathtub and shower tank, and lights, exhaust fans and electric water heater switches must be installed outside the bathroom.[5].
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Buildings Department: Guidelines on Preventing Water Seepage in New Buildings (2005) Accessed: 2026-11-01
- [2]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-01
- [3]Buildings Department: Frequently Asked Questions on Water Seepage Problems Accessed: 2026-11-01
- [4]Electrical and Mechanical Services Department: How to correctly choose and use residential gas water heaters Accessed: 2026-11-01
- [5]Electrical and Mechanical Services Department: Household Electrical Safety Manual - General Installation Instructions Accessed: 2026-11-01
- [6]Water Supplies Department: Tips on choosing the right shower head Accessed: 2026-11-01
- [7]Water Supplies Department: Licensed Plumber Accessed: 2026-11-01
- [8]Consumer Council: Home Improvement Services Research Report Press Release Accessed: 2026-11-01
- PricesHK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-01