香港裝修仔設計公司HK CREATE DESIGN · Home renovation, interior design and custom furniture

Hong Kong renovation company.
Plan your budget before you start.

Hong Kong interior design and renovation. From our 2026 price list and saleable area to an itemised budget, see the full scope first, then discuss the plan that suits you.

2026 price list · Hong Kong residential & commercial works

Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.

Our designers and craftsmen with 15+ years of renovation experience will talk through your plan with you free of charge.

  • 117 prices, fully publishedClear prices, instant online estimate
  • Free on-site measurement (limited time)Until 31 December · Two or more items of work · No deposit
  • RenoClean Move-in Ready170°C steam + photocatalyst formaldehyde removal
  • Real people on WhatsAppNo sign-up, no hard sell
Completed flat at Melody Garden, Tuen Mun, with full-height white cabinets, a recessed timber-tone worktop and ceiling lights
Whole-home renovation at Melody Garden, Tuen Mun. Project photo of the finished full-height cabinets, open timber-tone shelves and ceiling lighting.

Our main trades, from individual jobs to complete renovations

Tell us which areas need tiling, demolition or reinstatement.

Send photos if you have them. You can still make a free enquiry before you know the measurements or start date.

FREE ONLINE ESTIMATE

Enter 1 area and look at 3 reference plans first

Free to use, no need to leave a phone number first; fees are listed item by item.

Free online estimates and inquiriesCalculation results are for reference only
View calculation assumptions and engineering details
2026 ONLINE ESTIMATE

For preliminary reference only, no contact information is required; the final project will be confirmed with measurements and written quotation.

Quick plan for 1–50,000 sq. ft.; paint example expands area by area × 3.

Value-added options: Check and add to your budget
Basic whole-home renovation · Estimate for selected workHK$100,700 – HK$120,840The lower limit is an itemized subtotal; the upper limit includes 20% planning reservation, not company charge.
  • Remove wall or floor tiles: 500 sq ft
  • Floor screeding and levelling: 500 sq ft
  • Floor tiling (straight-laid tiles up to 600 × 600 mm): 500 sq ft
  • Local filler repairs, moisture-resistant primer, sanding and repainting: 1,500 sq ft
  • Construction waste removal (per truckload): 1 truckload

We are calculating your estimate. You can send us your requirements in the meantime.

Enter a saleable floor area between 1 and 50,000 sq ft.

Send this estimate on WhatsApp for a free enquirySend your requirements on WhatsApp for a free enquiryView itemized details Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.

This opens WhatsApp with your selected work and budget filled in. Review the message and tap Send to make an enquiry.

This is not an all-inclusive price: See items not included
  • Kitchen or bathroom reconstruction, waterproofing and repiping or rewiring
  • Furniture, surface tiles, sanitaryware and other finish materials
  • Works insurance, management-office deposits and renovation administration fees

The company's original price list for 2026 PDF:Renovation project price list · Customized Furniture Price List

MATERIAL OPTIONS

Compare materials and finishes

Compare our previous and current board specifications, paint options and post-renovation cleaning options.

Previous standard

Previous standard: E0-grade multilayer solid wood board

Upgraded
  • Formaldehyde emission ≤0.050mg/m³ (national standard E0 grade)
  • Upgraded throughout to ENF-grade board from 2026

Replaced by ENF-grade board

Designer's PickCurrent standard

ENF-grade eco board

Move-in Ready
  • Highest grade of national standard GB/T 39600: formaldehyde emission ≤0.025mg/m³, just half of E0 grade
  • With zero-formaldehyde edge banding, it cuts formaldehyde at the source for homes with pregnant women, babies or sensitive family members

Standard from 2026 at no extra charge

Percentages are from our 2026 client records; star ratings are our designers' advice for typical Hong Kong homes, subject to site conditions. Ask about board specifications on WhatsApp

What to ask about quotes, timing and warranties before work starts

Looking for three major pain points in renovation

Shocked, annoyed, confused?
WhatsApp asks first, it’s free.

From the design and customization of the entire house to the removal of one or two cabinets, we handle all projects, large or small. If you haven't decided whether to do it or not, you can always ask. It won't be a hard sell.

  • Surprise?

    There is a written quotation before the start of work, and the process, materials and payment stages are clearly listed one by one. Each master is responsible for it, and when the samples will be made, you can ask about the progress at any time via WhatsApp.

  • So annoying?

    A WhatsApp provides a one-stop service from design, demolition, water and electricity, muddying, painting to custom-made furniture, so you don’t have to find a master one by one and waste time one by one.

  • Don’t know?

    It doesn't matter if you don't know how to look at pictures or the market. First use the computer to understand the budget with the AI ​​quotation assistant, and then ask the master for free. Make a decision first after asking clearly.

How many people have fallen victim to renovation in Hong Kong? Speak with numbers

  • 1,205 casesHome Improvement Complaints 2017–2023

    The total amount involved exceeds NT$270 million, with an average of nearly NT$230,000 per case.

    Source: Consumer Council
  • 19%Had a dispute with a renovation company

    Among the 505 respondents, about one-fifth had ever had disputes; the most common causes were project delays (61%), poor quality (39%), and refusal to comply (30%).

    Source: Consumer Council
  • 58%I find it difficult to compare quotations.

    The biggest difficulty faced by respondents is "difficulty comparing quotations in different formats."

    Source: Consumer Council
  • 352 casesRenovation and home maintenance complaints January–September 2026

    400 cases in 2024 and 347 cases in 2025.

    Source: Consumer Council
Number of complaints filed by the Consumer Council on "Renovation and Home Maintenance Works"
2024
400
2025
347
2026 (January–September)
352
Source: Consumer Council Complaint Figures

The Consumer Council records complaints about unfinished works. There are no official figures for the total number of unfinished renovation projects in Hong Kong, so we do not quote a figure.

Our online calculator and AI quotation tool are for reference only. Our team measures the space and checks the structure and site conditions before giving a written quote.

Find us:117 All project prices are made public, and the unit price, unit, and package included can be viewed item by item, making it open and transparent.

  • WhatsApp free consultation
  • Whole house design customization
  • Accept all projects, big and small
  • Just dismantle one or two cabinets.

AI quotation system

Introducing AI into the quotation system,
Help you calculate a reference price 24 hours a day

Use Cantonese to tell what you want to do, for example, "renovate the whole house of a 400-square-foot public housing and replace the toilet with waterproofing." AI will calculate the price item by item based on the company's public price, and list the quantity and unit price.

The cost of AI computing is borne by the company, and you don’t have to register or pay for it. We are willing to invest resources so that you can see clearly before placing an order.

The AI quotation is for reference only. The final quotation must be confirmed by a real master after measuring on site.

  1. 1 You talk about needs (text)
  2. 2 AI support 117 item public price
  3. 3 Itemize quantity, unit price, subtotal
  4. 4 One-click WhatsApp for real-person follow-up
  5. 5 The master comes to measure and make a formal quotation
START WITH THE RIGHT WORK

What type of project do you need?

Start from the problem and find relevant engineering and practical information.

Bathroom muddy tile laying instructions
Floor tiles HK$78/ft fromPlacing, leveling, paving bricks, and beautiful joints are listed item by item.
01TILING & MASONRY

Masonry, tiling and floor renovation in Hong Kong

In addition to the appearance of the tiles, the base layer, joints and drainage positions must also be considered. First confirm the materials, platform height and openings that need to be connected, and then list the related projects item by item.

  • Check the condition of the original floor and walls
  • Confirm brick size, laying method and closing position
See detailed introduction
Instructions for completion of demolition
Demolition and removal of a toilet HK$9,950 fromOne or two cabinets will be dismantled and picked up, and the mud will be removed separately.
02STRIP-OUT & PREPARATION

Hong Kong demolition works, pre-renovation protection and removal

Before demolition, confirm the demolition scope, site protection and building arrangements. Clearly write down the isolation of water and electricity, material removal, construction period and protection of shared areas, so that subsequent construction can be easily connected.

  • Confirm the current status of the unit and demolition projects
  • Check the construction and transportation arrangements of the management office
See detailed introduction
Complete house renovation instructions
117 prices are calculated item by item, no fixed price
03WHOLE-HOME RENOVATION

Whole-home renovation in Hong Kong: stages, timing and budget

The whole house renovation includes demolition, water and electricity, waterproofing, muddy water, ceiling, painting, flooring and custom-made furniture. Each process has its own sequence. First measure the drawings, then quote item by item, and make the installment application clear to the management office early in the morning.

  • Come to your home to measure and understand the condition of the unit and building renovation regulations
  • Produce floor plans, wind, fire, water and electricity plans, furniture design drawings and VR renderings
See detailed introduction
Bedroom painting completed
Directly turn oil on the whole house HK$12/ft fromSeparate plans for shoveling the bottom, criticizing dust, moisture-proofing and polishing
04PAINTING & FINISHES

Hong Kong painting services, wall skimming and refurbishment

A good-looking wall starts with the base treatment. First distinguish the causes of old oil, pine dust, moisture and mold, and then compare the actual scope of shoveling, repairing, primer and topcoat.

  • Check walls, ceilings and furniture that need protection
  • Discuss local repairs or full base treatment
See detailed introduction
Completed custom kitchen cabinets and worktop, photographed on siteOur project photos
kitchen base cabinet HK$1,300/straight feet fromItemised prices for strip-out, plumbing and electrical work, waterproofing, cabinets and worktops
05KITCHEN RENOVATION

Hong Kong kitchen renovations, from cabinets and worktops to services and waterproofing

Check separate prices for strip-out, plumbing, wiring, gas, waterproofing, tiling, suspended ceilings, cabinets and worktops. Base units cost HK$1,300 per linear foot and wall units HK$1,250 per linear foot. ENF-grade cabinet boards are standard. We measure and draw up the design before starting work to a written quote.

  • Measure the kitchen, confirm appliance models and prepare a floor plan, building services layouts and cabinet drawings
  • Remove the old cabinets or strip out the entire kitchen, then remove waste in line with building management requirements
See detailed introduction
Bathroom waterproofing completed instructions
A waterproof toilet HK$4,850 fromClose the water and test the water for 24-48 hours. Seal the bricks first.
06WATERPROOFING

Hong Kong waterproofing services for leaking roofs and bathrooms

Understand the location and actual cause of the leak before discussing waterproofing, drainage and tiling options. Rooftops and bathrooms require different surveys and procedures, and it is not appropriate to decide on a project based solely on surface water damage.

  • Understand the time, extent and past repairs of water damage
  • On-site inspection of roof, wall base, drainage and floor conditions
See detailed introduction
New electricity meter box and main switch installed in a Tai Wai village house, photographed on siteOur project photos
Replace a distribution board HK$6,800 fromRegistered electrical workers carry out the work and issue a WR1 on completion
07ELECTRICAL REWIRING

Rewiring for whole homes and older flats, plus additional sockets

For rewiring or additional sockets, we first inspect the installation to identify what can stay and what needs replacing. We use cable brands with product certification such as 3C. Registered electrical workers carry out and test the installation and issue a WR1. We provide an itemised written quote and a one-year warranty on completion.

  • Electrical inspections and fault-finding for tripping circuits and current leakage
  • Replace an old fuse box with a distribution board fitted with MCBs and RCDs
See detailed introduction
Custom living room storage wall with glass display cabinets, photographed on siteOur project photos
Full-height shoe cabinet in the entrance hall HK$2,900/straight feet fromMade to measure with ENF-grade boards as standard
08CUSTOM FURNITURE

Custom furniture in Hong Kong, from wardrobes and kitchen cabinets to whole-home joinery

We make wardrobes, tall entrance cabinets, TV units, kitchen cabinets and vanity units to site measurements, with published prices per linear foot by cabinet height. ENF-grade board is included as standard. The quote specifies hardware brands and quantities. Production starts after you approve the drawings and quote. A one-year warranty applies.

  • Measure on site, including beams, columns, window sills, sockets and pipework
  • Prepare furniture drawings and renderings, then confirm the dimensions and internal layout of each cabinet
See detailed introduction
Explore other renovation services and budget guides
Hong Kong restaurant fit-out and renovation quotesTaking over a restaurant, opening a new one or renovating while trading? We check your menu, premises and target opening date to establish which equipment can stay, where booths fit, what the kitchen extraction needs and what work is required. Use the site-viewing checklist or send photos or a floor plan by WhatsApp for an itemised quote.Hong Kong aluminium window services: leaks and repairsWater stains on windows can be related to sealing, water removal, or the condition of the window itself. First record the location and time of occurrence indoors, then arrange appropriate inspections to distinguish the different purposes of repair, replacement and mandatory window inspection.Plumbing and electrical work in Hong Kong: replacing wiring and water pipes and adding electrical pointsWater and electricity are the least visible part of the renovation, but have the greatest impact on safety. First check the condition of the electrical box, circuit and incoming and outgoing water pipes, and then decide on partial relocation or whole house replacement. The completed electrical work will be tested by a registered electrical engineer and a completion certificate will be issued.Public rental housing renovation, Housing Department requirements, prices and interior designFor public rental flats, start by checking the Housing Authority's A, B and C categories. Painting, living room and bedroom flooring, and kitchen cabinets can proceed directly. Apply to the estate office before changing wiring, sockets, metal gates or kitchen and bathroom floor tiles. Structural walls, fire-rated entrance doors and kitchen doors must stay as they are. We confirm the scope and quote item by item.Renovating new or resale Home Ownership Scheme and Green Form Subsidised Home Ownership Scheme flatsFollow the Housing Authority's schedule of renovation conditions and your estate's guidelines. Entrance and kitchen doors must be fire-rated, windows must stay as they are, and structural walls must not be chased. For a new subsidised ownership flat, inspect it and report defects first. For a resale flat, check the drawings, plumbing and wiring before obtaining an itemised quote.Renovating older buildings and resale flatsIn older homes, concealed pipes, wiring and waterproofing in kitchens and bathrooms need particular attention. We inspect on site and price essential concealed work separately from finishes that can be phased. Pipe replacements follow Water Supplies Department requirements. Registered electrical workers test electrical work and issue a WR1.New-flat renovations, from handover to moving inStart with a handover inspection and plan around the six-month defects period. Then design your custom furniture and add the sockets and lighting points you need. We can measure after handover and prepare drawings and renderings. ENF-grade boards and Blum hardware are standard. A WR1 is issued on completion of electrical works.Custom platform beds and tatami platforms with storageWe build platform beds and tatami platforms to fit small bedrooms, with drawers, lift-up compartments or side-access storage. Prices are published per square foot. We measure window sill heights, sockets and beams and coordinate the platform with your wardrobe and desk.Floor replacement, SPC and timber flooring, and floor levellingWe check the existing floor, whether old tiles need removal, how to level uneven areas, and how doorways and wet-room thresholds will be finished. Options include SPC, laminate and wood-effect tiles. Removal, levelling, flooring, skirting and waste disposal are itemised.On-site masonry, plumbing, electrical and carpentry services for small jobsFor snagging work, extra sockets, toilet replacement, tile repairs or mould treatment and repainting, we identify the cause and match the job to the right tradesperson. Registered electrical workers carry out electrical work and issue a WR1. We give an itemised written quote and a one-year warranty on completion.Pipe replacement in older flats, copper piping and Water Supplies Department applicationsFor pipe replacements in older flats, kitchens and bathrooms, we use copper for drinking-water pipes and avoid galvanised iron. Our licensed plumber handles work that needs an application, and we coordinate the Water Supplies Department submission. We pressure-test before closing the walls, quote item by item in writing and provide a one-year warranty on completion.Hong Kong interior design and custom furnitureStarting from living habits, storage and circulation, we then disassemble the design, custom-made furniture, water, electricity and renovation projects. Make quotes as clear as proposals, rather than just comparing a total price.Hong Kong commercial renovation, shopping mall and retail painting worksCommercial projects need to take into account brand image, operations and site regulations. First understand the lease delivery requirements, construction period, management office and related professional arrangements, and then formulate a suitable scope.Wong Tai Sin physical store・Dedicated contactDiscuss your flat's needs, budget and material direction face to face. Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin; please book an appointment first.RenoClean post-renovation cleaning and formaldehyde removalThe joint venture RenoClean provides professional cleaning and formaldehyde removal related services after renovation. First confirm the cleaning scope, materials, ventilation conditions and testing needs.
WHAT A CLEAR START LOOKS LIKE

The price, scope, and arrangement can only be understood if you look at them separately.

Do not regard the reference budget as an all-inclusive quotation, and do not regard concept photos as actual project shots.

First distinguish between reference and quotation

Online figures help you prepare a budget; the actual project scope, materials and arrangements are subject to confirmation of the written quotation.

Reconfirm on-site conditions

Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free. Site conditions, dimensions and building arrangements will affect the final plan.

Engineering details remain in the contract

The scope of construction, acceptance, handover and maintenance must be specified in the confirmed plan and contract.

Consumer Council mystery shopper: Most quotations are not clear enough

  • 38%The quotation lists all project details

    The Consumer Council evaluated 40 preliminary quotations and scored an average of just 58 points out of 100.

    Source: Consumer Council
  • 28%The quantity of each process is listed

    Without the quantity, it is difficult to check how much the master has made.

    Source: Consumer Council
  • 20%The unit price of each item is listed

    There is no unit price, so it is most likely to cause disputes when adding or subtracting items.

    Source: Consumer Council

Our approach: Each quotation lists the details, quantity and unit price, and uses the same set of numbers as the public price on the website, making it easier for you to check item by item.

  1. 01WhatsApp free consultation

    Pass on the legend and discuss your needs, and the designers and masters will give you free advice.

  2. 02Online reference price

    Use a computer or AI to quote, and first estimate a range based on the public price (for reference only).

  3. 03Free on-site measurement (limited time)

    A member of our team visits to measure the site and check the existing structure, plumbing and wiring. Until 31 December 2026, site measurements are free for two or more items of work with no deposit required. After that, the fee is HK$500, credited against your order.

  4. 04Written itemized quotation

    Each item lists the quantity, unit, unit price, materials and process, and there is a basis for additions and subtractions.

  5. 05Construction + stage acceptance

    Follow up by taking photos and photos according to the process, waterproofing water test, water and electricity test one by one.

  6. 06Cleaning and maintenance

    Basic cleaning and clearing for each order; if deep cleaning is required, it will be handled by the cooperative company.

Photos from our projects

See how we work on real projects

Melody Garden, Tuen Mun · Completed storage wall and ceiling lights
Melody Garden, Tuen Mun · Completed storage wall and ceiling lights
Jordan flat · Wall painting in progress
Jordan flat · Wall painting in progress

These photos show different projects. Tap a photo to see the detail and tell us about your own flat.

Estate renovation ideas and projects

Drag left or right to compare layouts

View all 57 housing estate
Design illustration after renovation, viewed from the same angle: full-height custom cabinets, timber tones and a recessed lighting troughIllustration before workIllustration of the proposed result
Design illustration · Concept for East Point City: a whole-home custom design, before and after from the same angle(Hang Hau・Donggang City)

New Territories · Hang HauWhole house custom designConcept reference

Hang Hau Donggang City | Full House Customized Design

Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.

  • Free WhatsApp consultation
  • Dimensions and floor plans
  • Custom furniture
  • Paint and light troughs
What work does this design involve? (7 steps)
  1. Before starting construction, register the renovation with the management office, and use protective boards to pave the floor of the elevator lobby and unit entrance corridor.
  2. After a visit to the home, we will provide floor plans, wind, fire, water and electricity plans, furniture design drawings and VR renderings, and confirm each item with the customer.
  3. One wall in the living room should be built up to the top of the high cabinet, with a TV space and display shelf in the middle, and the wiring holes should be opened in advance.
  4. A half-height sideboard is added to the dining room, with sockets reserved for a rice cooker and a kettle.
  5. A false ceiling is added with an indirect light trough, and an access port is left in the fire position of the light strip to facilitate future replacement.
  6. The whole house is dusted, moisture-proof primer is applied, and then two layers of topcoat are applied. The color of the cabinets and walls are unified with light wood grain.
  7. After installing the cabinets, adjust door hinges and drawers one by one, remove garbage and do basic cleaning before delivery.
Ask about similar projects
Design illustration of the same kitchen after renovation, with new cabinets and a new worktopIllustration before workIllustration of the proposed result
Design illustration · Plan reference: Taikoo Shing・Kitchen renovation before and after (same angle)(Quarry Bay・Taikoo Shing)

Hong Kong Island · Quarry BayKitchen renovationConcept reference

Quarry Bay Taikoo Shing | Kitchen renovation

Demonstration of renovation of an old kitchen: removal, waterproofing, hot and cold water pipes, and replacement of new kitchen cabinets and countertops.

  • Clearance
  • Waterproofing
  • hot and cold water pipes
  • kitchen countertops
What work does this design involve? (7 steps)
  1. Register the renovation with the management office and protect the floors of elevator lobbies, corridors and unit entrances
  2. Remove the old kitchen cabinets and wall and floor tiles, seal the water and electricity levels, and remove the waste on the same day
  3. The junction between the floor and the wall is turned up and made of SikaTop Seal-107 waterproofing with two layers, and the zinc basin is reinforced.
  4. Redo the sink and hot and cold water pipes of the washing machine, and test the pressure after completion.
  5. Lay new wall and floor tiles, install moisture-proof board floor cabinets, wall cabinets and quartz stone countertops
  6. Install range hoods, cooking stoves and under-cabinet lights, and test them one by one
  7. When clearing away garbage and doing basic cleaning, remind guests to use water before the glue is dry.
Ask about similar projects
Illustration of the proposed result · After strip-out: The underlying surfaces are exposed and the debris has been removed.Illustration before workIllustration of the proposed result
Design illustration · Scheme reference: Mei Foo Sun Estate before and after the clearance works (same angle)(Mei Foo・Mei Foo Sun Village)

Kowloon · MobilDemolitionConcept reference

Mei Foo Mei Foo Village | Demolition Project

Demonstrate what the demolition project should be like after it is completed: demolition to the bottom, public areas protected, and waste removed on the same day to facilitate the start of muddy water, water and electricity work later.

  • protect public spaces
  • Remove the bricks and find the bottom
  • Waste removal
What work does this design involve? (6 steps)
  1. Register the demolition project with the management office and protect the elevator lobby, corridors and unit entrances
  2. Remove the old kitchen cabinets, zinc pans and cooking stoves, turn off the water and electricity first, and then seal the water pipes and electrical wires
  3. Remove the old bricks from the wall and floor until they reach the mud bottom, and then dig out the loose parts until they reach the concrete.
  4. Take photos and record the rusty parts of the old water pipe, and hand it over to the customer to decide to replace it together with the microphone.
  5. Waste materials are put into bags, dropped off the building at the specified time and transported away by dump trucks.
  6. Sweep the floor area so that the mud and plumbers and plumbers can start work later.
Ask about similar projects
Illustration of the proposed result · After removal: The old wardrobes are gone and the wall has been repaired and repainted.Illustration before workIllustration of the proposed result
Design illustration · Plan reference: Telford Garden, small projects, cabinet removal before and after (same angle)(Kowloon Bay・Telford Garden)

Kowloon · Kowloon BayMinor projects and cabinet removalConcept reference

Telford Gardens, Kowloon Bay | Small works・Removal of cabinets

We can do all the detail work: remove one or two old cabinets, repair the walls and then repaint them, or even do the whole house.

  • Unpacking cabinets
  • wall repair
  • Painting
What work does this design involve? (6 steps)
  1. Come to your home to see clearly the fixing method and wall condition of two old wardrobes
  2. Floor protection, remove cabinet body, back panel and closing opening
  3. After the cabinets are removed, nail holes and chipped areas in the wall are repaired and polished.
  4. Apply moisture-proof primer and two layers of topcoat, consistent with the color of the nearby walls.
  5. New moldings were added, and the old cabinets were taken away with the scraps.
  6. Garbage removal and basic cleaning of the site, as well as detailed work are all covered.
Ask about similar projects
Design illustration after renovation, viewed from the same angle: full-height custom cabinets, timber tones and a recessed lighting troughIllustration before workIllustration of the proposed result
Design illustration · Plan reference: Tianma Court, whole house customized design before and after (same angle)(Wong Tai Sin・Tian Ma Court)

Kowloon · Wong Tai SinWhole house custom designConcept reference

Wong Tai Sin Tin Ma Court | Whole house customized design

Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.

  • Free WhatsApp consultation
  • Dimensions and floor plans
  • Custom furniture
  • Paint and light troughs
What work does this design involve? (6 steps)
  1. Register the renovation with the management office and protect the elevator lobby and corridor floors
  2. After the measurement, the whole house floor plan, wind, fire, water and electricity diagrams, furniture design drawings and VR renderings are displayed.
  3. There are many beams in the Home Ownership Scheme flats. The high cabinets in the living room are covered with beams to avoid wasting the top space.
  4. The bedroom is made into a wardrobe with a platform bed, and the entrance hall is made into a tall shoe cabinet.
  5. False ceiling plus light trough, whole house dusting, moisture-proof primer plus two layers of topcoat
  6. After furniture installation, adjust door hinges and drawers, remove garbage and perform basic cleaning.
Ask about similar projects
Design illustration of the same bedroom after skim coating and painting, with smooth white wallsIllustration before workIllustration of the proposed result
Design illustration · Scheme reference: Shatin City One, before and after the painting project (same angle)(Shatin・Shatin City One)

New Territories · ShatinPaintingConcept reference

Shatin City One, Shatin | Painting works

Demonstration of the painting process from shoveling, dust removal, sanding to two layers of topcoat. The key point is that the base layer must be treated first for mildew spots and peeling areas around the windows.

  • Strip and skim-coat
  • Moisture-proof primer
  • Two coats of topcoat
What work does this design involve? (6 steps)
  1. Register the painting project with the management office, wrap the furniture, and lay protective film on the floor
  2. The wall by the window should be shoveled from the leather to the gray bottom, and the mold stains should be removed.
  3. Cracks and chips were cleaned twice and polished smooth
  4. Apply moisture-proof primer, then two layers of topcoat
  5. Check the light position and the edge of the socket panel, and make sure the details are correct
  6. Demolition protection, garbage removal and basic cleaning of the site
Ask about similar projects
SPACES & POSSIBILITIES

Find your direction from the concept of space

Clearly distinguish between conceptual plans and actual store shots.

Each module is marked with "design renderings" or "real shots provided by the company"

Except for the photos marked "actual photos provided by the company", the others are design renderings for reference. The scope of work is subject to on-site assessment and confirmation of written quotation.

Got the direction? Use a computer to organize your budget first
KNOW BEFORE YOU BUILD

2026 renovation quotation and project strategy, read it first and then decide

First check the quotation guide, the company's reference price list and unincluded items, and then read further according to issues such as waterproofing, paint, mud and water, etc.

Browse all renovation knowledge

Check prices first and then compare?Read the 2026 Renovation Quotation Guide: Company Price List, 500-Sq.-Ft. Calculation Example and Uninclusive Items

One wall, five layers of work

From concrete to topcoat, we take it apart layer by layer for you to see.

Many of the problems of "the oil doesn't last and comes off again" are actually caused by the topcoat. Looking down, you can see a wall being built layer by layer from cement, patching, primer, plastering to topcoat.

  1. 1st floor・base levelconcrete structure

    The wall itself. Before starting work, check for cracks, loose spots and traces of water seepage - if the base layer is unstable, the surface layer will be shaken off.

  2. Layer 2・RepairOptimix RM725 lightweight repair mortar (Hong Kong Housing Department Class 25)

    If the concrete is peeling off, chipping or the steel bars are exposed, first use repair mortar to repair it in layers. It is not recommended to cover it directly with ash.

    Single layer thickness: vertical ≤50mm; ceiling bottom ≤40mm; general ≥10mm

    Source:OPTIMIX RM725 Repair Mortar (HKHA Class 25) Data Sheet
  3. Layer 3・Back coverNippon Paint primer

    The painter selects a Nippon Paint primer to suit the wall and topcoat, and lists the product in the quote. If the wall still has water marks or active seepage, we first trace and deal with the water source.

  4. Level 4・LevelingCriticizing and leveling the dust

    Batch thinly, wait for drying, batch again, then polish and check with side light. The number of layers to be batched is determined according to the actual condition of the wall.

  5. Layer 5・Top coatNippon Paint 5-in-1 interior topcoat

    Nippon Paint 5-in-1 is our standard interior topcoat. The living and dining areas can be upgraded to the bamboo-charcoal anti-formaldehyde range, and the Little Prince low-odour children's paint is available for children's rooms. Paint, colour code and coat count are confirmed room by room in the quote.

    Source:Nippon Paint Hong Kong 5-in-1 product information
FROM QUESTION TO HANDOVER

5 steps to turn needs into clear project scope

From online sorting, on-site confirmation to acceptance and after-sales.

  1. 01
    LET'S TALK

    Online/in-store consultation

    Listen to your ideas and learn about your living habits, project needs and budget.

  2. 02
    SITE VISIT

    On-site measurement and project confirmation

    Free site measurements until 31 December 2026 for two or more items of work, with no deposit required. After that, the fee is HK$500, credited against your order. We measure on site and assess whether the work is feasible.

  3. 03
    DESIGN & QUOTE

    3D design and transparent quotation

    Use design to present imagination and explain materials, projects and costs item by item.

  4. 04
    BUILD WITH CARE

    Strict construction

    Carry out construction according to the confirmed plan and construction period, and follow up on-site quality and project progress.

  5. 05
    HANDOVER & CARE

    Building inspection and after-sales maintenance

    Check and accept every detail together, explain the maintenance scope and after-sales arrangements.

HK CREATE DESIGN original black-and-gold logo
MEET IN WONG TAI SIN

Physical store in Wong Tai Sin, face to face discussion

Bring your unit information and material preferences and make an appointment with a dedicated person.

HK Create Design has a showroom in Wong Tai Sin. We offer whole-home renovations, interior design, public rental and Home Ownership Scheme flat renovations, and custom furniture. See our 117 itemised rates, project photos and budget calculator, then send your scope on WhatsApp for a quote.

HK Create DesignShop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Hong Kong
Make an appointment at the store/on-site consultation
TALK THROUGH YOUR NEXT STEP

Leave your needs to us for follow-up

You can leave your contact information or directly open a WhatsApp draft.

Ask for a free quote on WhatsApp, even if you have yet to confirm the district, floor area or photos. You can also fill in the optional form for a member of our team to follow up.

Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.

LET'S CREATE SOMETHING GOOD

Tell us your space ideas.

Enter a few details and we will reply within four hours on a business day.

Service needs *Multiple options available

Small jobs are welcome. Describe the approximate dimensions, the area to be treated or its current condition. You can send photos later on WhatsApp.

Free site measurements until 31 December 2026 for enquiries covering at least two items of work. No deposit is required. After that, the fee is HK$500, credited against your order. Online estimates and enquiries are free.

Why discuss your project with HK Create Design?

Understand your Renovation works before you decide.

Start with the existing conditions

Tell us what you want to keep and what you want to change. Once the scope is clear, compare the budget and schedule.

Check the budget item by item

Use the online prices and calculator for an initial estimate. We confirm site conditions, exclusions and final costs in the written quote.

Open the renovation calculator ↗

Project photos and a showroom you can visit

Browse our project photos or book a meeting at our Wong Tai Sin showroom and bring your plans. Check the written agreement for acceptance and warranty details.

View project photos ↗ Showroom details ↗