Estate renovation concepts: drag to compare the designs
Explore whole-home design, demolition, painting, masonry and bespoke furniture by estate and type of work. The before-and-after images illustrate design options for the estates shown. Our project gallery contains photographs of our own site work. The design and quotation depend on the condition of your flat.
show 57 estate design options and cases. Project photographs and illustrations are labelled separately.
Estate design options and project examples
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for East Point City: whole-flat fitted furniture design, before and after from the same angle.(East Point City, Hang Hau)
New Territories · Hang HauWhole house custom designDesign concept
East Point City, Hang Hau | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (7 steps)
Before starting construction, register the renovation with the management office, and use protective boards to pave the floor of the elevator lobby and unit entrance corridor.
After measurement, prepare floor plans, coordinated services drawings, furniture drawings and VR views, and review each with the client
A full-height living room cabinet fills one wall, with a central TV recess, display shelves and pre-cut cable holes.
A half-height sideboard is added to the dining room, with sockets reserved for a rice cooker and a kettle.
A false ceiling is added with an indirect light trough, and an access port is left in the fire position of the light strip to facilitate future replacement.
The whole house is dusted, moisture-proof primer is applied, and then two layers of topcoat are applied. The color of the cabinets and walls are unified with light wood grain.
After installing the cabinets, adjust door hinges and drawers one by one, remove garbage and do basic cleaning before delivery.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Metro City: custom furniture, before and after from the same angle.(Metro City, Tseung Kwan O)
New Territories · Tseung Kwan OBespoke furnitureDesign concept
Metro City, Tseung Kwan O | bespoke furniture
Demonstration of custom-made furniture for a fine bedroom: wardrobe, platform bed and storage, all made according to measurements without wasting space.
Site measurement
Wardrobe
Platform bed with storage
What work does this design involve? (6 steps)
Register the project with the management office, reserve an elevator on the loading day, and protect the inner walls of the elevator and the lobby floor during transportation
After measuring the bedroom, take a look at the furniture design drawing based on the window sill, air conditioner and beams to make sure the wardrobe is deep enough not to block the door.
The built-in wardrobe reaches the top, with seasonal quilts on the upper floor and two drawers hanging on the lower floor.
The window sill is used as a platform bed with lift-up storage, and sockets and reading lamps are left beside the bed.
The cabinet body is made of 18mm board with PVC edge sealing, and the top of the cabinet is glued with the ceiling seal.
After installation, adjust door hinges and rails, remove packaging materials and perform basic cleaning.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for LOHAS Park: whole-flat fitted furniture design, before and after from the same angle.(LOHAS Park, Tseung Kwan O)
New Territories · Tseung Kwan OWhole house custom designDesign concept
LOHAS Park, Tseung Kwan O | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (7 steps)
Before starting construction, apply to the management office for renovation, carry out construction according to the building's stipulated time, and protect the elevator lobby and corridors.
The designer prepares the floor plan, building services drawings and VR views for review before the production order
Make a tall shoe cabinet in the entrance hall with a stool, leaving space at the bottom for daily shoes
The TV wall in the living room is built as a modular cabinet with open shelves, and the air-conditioning pipe and wires are hidden in the cabinet body.
Add light troughs and spotlights in the dining room, and reserve a chandelier outlet above the dining table.
The walls were dusted and polished, with moisture-proof primer and two layers of topcoat to match the wood grain color of the cabinets.
After the furniture installation is completed, each item will be inspected and accepted, and the garbage will be removed and basic cleaning will be carried out.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Park Central: repainting, before and after from the same angle.(Park Central, Tseung Kwan O)
New Territories · Tseung Kwan OPaintingDesign concept
Park Central, Tseung Kwan O | painting
This painting example shows the sequence from stripping, skimming and sanding to two topcoats. Address the base first wherever paint peels or mould forms near windows.
Strip and skim
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
Register the painting project with the management office, move or wrap up the furniture, and cover the floor and window sills with protective film
Strip peeling paint around the window back to sound plaster and treat mould before repainting
Cracks and chipping in the wall should be repaired with dust, and then polished to make it smooth.
Apply moisture-proof primer to the entire room, then apply two layers of topcoat, and strengthen the window edges.
After the painting is completed, check the light position, joints and socket panel edges, and tighten the fine positions.
Remove the protective film, remove trash and do basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Po Lam Estate: public rental or HOS flat refurbishment, before and after from the same angle.(Po Lam Estate, Po Lam)
New Territories · Po LamPublic housing/HOS housing renovationDesign concept
Po Lam Estate, Po Lam | public rental or HOS flat renovation
A staged renovation example for a compact public housing or HOS flat, covering painting, flooring, storage and basic plumbing and electrical work to suit the budget.
Painting
floor
Storage
Basic plumbing and electrical work
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect the elevator lobby and the corridor at the entrance of the unit, and place and wrap furniture together
Remove loose paint from the old wall, dust it twice, sand it, then apply moisture-proof primer and two layers of topcoat
The living room is paved with SPC wood grain flooring with moisture-proof mats, and edges are added at the door and kitchen and toilet areas.
One wall is covered with a storage cabinet and a folding table, making good use of the small unit space.
Replacement of worn-out light switches and addition of sockets will be carried out by registered electrical workers
After completion, remove rubbish, sweep clean and do basic cleaning.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Taikoo Shing: kitchen refurbishment, before and after from the same angle.(Taikoo Shing, Quarry Bay)
Hong Kong Island · Quarry BayKitchen renovationDesign concept
Taikoo Shing, Quarry Bay | kitchen renovation
Demonstration of renovation of an old kitchen: removal, waterproofing, hot and cold water pipes, and replacement of new kitchen cabinets and countertops.
Strip-out
Waterproofing
hot and cold water pipes
kitchen countertops
What work does this design involve? (7 steps)
Register the renovation with the management office and protect the floors of elevator lobbies, corridors and unit entrances
Remove the old kitchen cabinets and wall and floor tiles, make the plumbing and electrical connections safe, and clear the debris the same day.
The junction between the floor and the wall is turned up and made of SikaTop Seal-107 waterproofing with two layers, and the zinc basin is reinforced.
Redo the sink and hot and cold water pipes of the washing machine, and test the pressure after completion.
Lay new wall and floor tiles, install moisture-proof board floor cabinets, wall cabinets and quartz stone countertops
Install range hoods, cooking stoves and under-cabinet lights, and test them one by one
When clearing away garbage and doing basic cleaning, remind guests to use water before the glue is dry.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Heng Fa Chuen: bathroom masonry, before and after from the same angle.(Heng Fa Chuen, Chai Wan)
Hong Kong Island · Chai WanMasonry / bathroomDesign concept
Heng Fa Chuen, Chai Wan | masonry and bathroom works
Demonstration of detailed toilet renovation: dismantling, waterproofing two layers, closing the water to test the water, then laying tiles and installing sanitary ware.
Strip-out
Two layers of waterproof
Flood testing
Tiling and sanitary ware
What work does this design involve? (7 steps)
Register the project with the management office, protect the elevator lobby and corridors, and drop waste materials in batches.
Remove the old bathroom tiles, bathtub and sanitary ware until they are bottomed out, and take photos of the old water pipe levels to record them.
Repair the cracks in the base and redo the slope of the platform according to the water level.
The entire floor, turned-up wall and full-wall shower stall are made of SikaTop waterproof two-layer
The land is leaking and the water is closed for 24 hours. Observe the water level and take photos to record it. Lay the bricks first.
Lay light-colored wall and floor tiles, build urns and casings, and install toilets, basins and showers.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for South Horizons: custom furniture, before and after from the same angle.(South Horizons, Ap Lei Chau)
Hong Kong Island · Ap Lei ChauBespoke furnitureDesign concept
South Horizons, Ap Lei Chau | bespoke furniture
Demonstration of custom-made furniture for a fine bedroom: wardrobe, platform bed and storage, all made according to measurements without wasting space.
Site measurement
Wardrobe
Platform bed with storage
What work does this design involve? (6 steps)
Register the renovation with the management office, reserve the elevator on the day of cabinet installation and protect the inner wall of the elevator
When measuring, clearly measure the beam position, window sill and air conditioner position, and confirm the furniture design drawing with the customer.
The built-in wardrobe is used as a sliding door, and the internal hanging passages, shelves and drawers are allocated according to the number of guests.
Make a desk and wall cabinet next to the window, leaving holes for wiring and light strips on the table
Floor bed with storage cabinets and sockets at the bedside
After installation, adjust the rails and door hinges, remove the packaging and do basic cleaning.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Wah Fu Estate: public rental or HOS flat refurbishment, before and after from the same angle.(Wah Fu Estate, Pok Fu Lam)
Hong Kong Island · Pok Fu LamPublic housing/HOS housing renovationDesign concept
Wah Fu Estate, Pok Fu Lam | public rental or HOS flat renovation
A staged renovation example for a compact public housing or HOS flat, covering painting, flooring, storage and basic plumbing and electrical work to suit the budget.
Painting
floor
Storage
Basic plumbing and electrical work
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect the floors of corridors and lift lobbies, and remove old furniture first
The wall is shoveled and polished, and then applied with moisture-proof primer and two layers of topcoat.
The living room and dining room are covered with wood grain floors, and the edges of the door are closed without affecting the opening of the door.
Full-height storage with a fold-down table and a narrow wardrobe beside the bed
Replacement of old light switches and addition of sockets will be carried out by registered electrical workers
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Mei Foo Sun Chuen: strip-out, before and after from the same angle.(Mei Foo Sun Chuen, Mei Foo)
Kowloon · Mei FooStrip-out workDesign concept
Mei Foo Sun Chuen, Mei Foo | strip-out works
The strip-out example shows the handover condition: removal to the agreed substrate, common areas protected and waste removed the same day so masonry and services can start.
protect public spaces
Remove tiles back to the base
Waste removal
What work does this design involve? (6 steps)
Register the demolition project with the management office and protect the elevator lobby, corridors and unit entrances
Isolate water and electricity before removing the old kitchen cabinets, sink and hob. Have the relevant trades make the remaining connections safe.
Remove old wall and floor tiles to the cement bed, hacking back to concrete where the bed is loose
Take photos and record the rusty parts of the old water pipe, and hand it over to the customer to decide to replace it together with the microphone.
Waste materials are put into bags, dropped off the building at the specified time and transported away by dump trucks.
Sweep the floor and hand the area over ready for the masonry, plumbing and electrical trades.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Whampoa Garden: whole-flat fitted furniture design, before and after from the same angle.(Whampoa Garden, Hung Hom)
Kowloon · Hung HomWhole house custom designDesign concept
Whampoa Garden, Hung Hom | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (6 steps)
Register the renovation with the management office and protect the elevator lobby and corridor floors
The designer prepares whole-flat floor plans, building services drawings, furniture drawings and VR views
A modular tall cabinet with display shelves in the living room, and a sideboard in the dining room
False ceiling plus light troughs and spotlights, the lamp positions are designed according to the placement of furniture
The whole house was dusted and polished, and moisture-proof primer was added with two layers of topcoat.
After the furniture is installed, it will be inspected item by item, and the garbage will be removed and basic cleaning will be carried out.
Demonstration of replacing old window frames with aluminum windows; the actual window style and size must be measured and confirmed according to the approval requirements.
Site measurement
Remove old windows
Install aluminum windows
What work does this design involve? (6 steps)
Visit the customer to measure the window size and confirm the window model, glass and color with the customer
Register the project with the management office and select the window frame color according to the building’s appearance requirements.
Arrange and process the required documents in accordance with the minor works requirements of the Buildings Department
Remove the old window frames and grilles, and repair the window edges
Install new aluminium windows, seal all four sides of the frame and test the sashes and locks
Repair the water stains on the wall under the window sill, remove rubbish and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Amoy Gardens: bathroom masonry, before and after from the same angle.(Amoy Gardens, Ngau Tau Kok)
Kowloon · Ngau Tau KokMasonry / bathroomDesign concept
Amoy Gardens, Ngau Tau Kok | masonry and bathroom works
Demonstration of detailed toilet renovation: dismantling, waterproofing two layers, closing the water to test the water, then laying tiles and installing sanitary ware.
Strip-out
Two layers of waterproof
Flood testing
Tiling and sanitary ware
What work does this design involve? (7 steps)
Register the project with the management office, protect the elevator lobby and corridors, and drop waste materials in batches.
Remove the old bathroom tiles and sanitary ware until they are bottomed out, and check the water level and floor drain.
Repair the base layer and redo the dewatering slope of the floor
The inner corners and pipe positions are reinforced with two layers of SikaTop Seal-107 waterproofing.
Close the water and test it for 24 hours to confirm that there is no water seepage before laying bricks.
Lay wall and floor tiles and epoxy joints, install toilet, basin, showerhead and bathroom cabinet
Apply anti-mold glue, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Choi Hung Estate: repainting, before and after from the same angle.(Choi Hung Estate, Choi Hung)
Kowloon · Choi HungPaintingDesign concept
Choi Hung Estate, Choi Hung | painting
This painting example shows the sequence from stripping, skimming and sanding to two topcoats. Address the base first wherever paint peels or mould forms near windows.
Strip and skim
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
Before starting construction, check with the housing estate office to confirm the construction time and protect the corridors and doorways.
Move the furniture to the middle of the room and wrap it with tape, and lay a protective film on the floor
Scoop off the skin and mildew stains at the window and remove the mildew
Catch the dust twice, sand it, apply moisture-proof primer and two layers of topcoat
After completion, check the light position and socket panel edge position.
Demolition protection, garbage removal and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tin Ma Court: whole-flat fitted furniture design, before and after from the same angle.(Tin Ma Court, Wong Tai Sin)
Kowloon · Wong Tai SinWhole house custom designDesign concept
Tin Ma Court, Wong Tai Sin | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (6 steps)
Register the renovation with the management office and protect the elevator lobby and corridor floors
After measurement, prepare the full floor plans, services and furniture drawings, and VR views
There are many beams in the Home Ownership Scheme flats. The high cabinets in the living room are covered with beams to avoid wasting the top space.
The bedroom is made into a wardrobe with a platform bed, and the entrance hall is made into a tall shoe cabinet.
False ceiling plus light trough, whole house dusting, moisture-proof primer plus two layers of topcoat
After furniture installation, adjust door hinges and drawers, remove garbage and perform basic cleaning.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Lions Rise: whole-flat fitted furniture design, before and after from the same angle.(Lions Rise, Wong Tai Sin)
Kowloon · Wong Tai SinWhole house custom designDesign concept
Lions Rise, Wong Tai Sin | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (6 steps)
Register renovation with the management office, carry out construction according to specified time and protect public areas
The designer prepares whole-flat floor plans, building services drawings, furniture drawings and VR views
The living and dining room has a ceiling-mounted cabinet, with the air-conditioning pipe and wires hidden inside the cabinet.
The bedroom wardrobe is integrated with the desk, with reserved sockets and network slots
Light troughs and spotlights match the counters, and the entire house is coated with moisture-proof primer and two layers of topcoat.
Item-by-item inspection, garbage removal and basic cleaning before delivery
Lung Poon Court, Diamond Hill | kitchen renovation
Demonstration of renovation of an old kitchen: removal, waterproofing, hot and cold water pipes, and replacement of new kitchen cabinets and countertops.
Strip-out
Waterproofing
hot and cold water pipes
kitchen countertops
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
Remove old kitchen cabinets and wall and floor tiles, then secure the plumbing and electrical connections.
The junction between the floor and the wall is made of two layers of SikaTop waterproofing, and the zinc basin is reinforced.
Renew the hot and cold pipes and pressure-test them. Add a dedicated circuit for the hob if required.
Lay new bricks, install moisture-proof board kitchen cabinets and countertops, and range hood
Test machine and check water removal, garbage removal and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Lok Fu Estate: public rental or HOS flat refurbishment, before and after from the same angle.(Lok Fu Estate, Lok Fu)
Kowloon · Lok FuPublic housing/HOS housing renovationDesign concept
Lok Fu Estate, Lok Fu | public rental or HOS flat renovation
A staged renovation example for a compact public housing or HOS flat, covering painting, flooring, storage and basic plumbing and electrical work to suit the budget.
Painting
floor
Storage
Basic plumbing and electrical work
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect lift lobbies and corridors, remove old furniture first
The wall is dusted and polished, and a moisture-proof primer and two layers of topcoat are applied.
SPC wood grain flooring in the living room with moisture-proof mat and edge strips
Full-height storage with a fold-down table and a shoe cabinet by the entrance
Replacement of old light switches and addition of sockets will be carried out by registered electrical workers
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tak Long Estate: repainting, before and after from the same angle.(Tak Long Estate, Kai Tak)
Kowloon · Kai TakPaintingDesign concept
Tak Long Estate, Kai Tak | painting
This painting example shows the sequence from stripping, skimming and sanding to two topcoats. Address the base first wherever paint peels or mould forms near windows.
Strip and skim
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
The office of the same housing estate confirms the construction time and protects the corridors and doorways.
Patch fine cracks and chips locally on the new flat's walls
After sanding, apply moisture-proof primer and then two layers of topcoat.
According to the light color selected by the customer, the room can be made into different colors
After completion, check the joint and light position, and ensure the fine position.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Grand Waterfront: custom furniture, before and after from the same angle.(Grand Waterfront, To Kwa Wan)
Kowloon · To Kwa WanBespoke furnitureDesign concept
Grand Waterfront, To Kwa Wan | bespoke furniture
Demonstration of custom-made furniture for a fine bedroom: wardrobe, platform bed and storage, all made according to measurements without wasting space.
Site measurement
Wardrobe
Platform bed with storage
What work does this design involve? (6 steps)
Register the renovation with the management office, reserve the elevator on the loading day and protect the elevator
Measure clearly the window sill, air conditioner and beam positions, and confirm with the furniture design drawings
The built-in wardrobe reaches the top, and internal hangings, shelves and drawers are allocated as needed.
Floor bed with storage cabinet and bucket, small desk and light strip by the window
Apply glue to the cabinet top and wall edges, and adjust the door hinges after installation.
Remove packaging materials, clear garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for City One Shatin: repainting, before and after from the same angle.(City One Shatin, Sha Tin)
New Territories · Sha TinPaintingDesign concept
City One Shatin, Sha Tin | painting
This painting example shows the sequence from stripping, skimming and sanding to two topcoats. Address the base first wherever paint peels or mould forms near windows.
Strip and skim
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
Register the painting project with the management office, wrap the furniture, and lay protective film on the floor
Strip peeling paint at the window wall back to sound plaster and treat mould-affected areas
Cracks and chips were cleaned twice and polished smooth
Apply moisture-proof primer, then two layers of topcoat
Check the light position and the edge of the socket panel, and make sure the details are correct
Demolition protection, garbage removal and basic cleaning of the site
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Kingswood Villas: flooring, before and after from the same angle.(Kingswood Villas, Tin Shui Wai)
New Territories · Tin Shui Waiflooring projectDesign concept
Kingswood Villas, Tin Shui Wai | flooring
Demonstration of floor replacement in the living room: the old brick surface is leveled and then SPC wood grain flooring is laid, with moisture-proof mats and edges.
Levelling
SPC flooring
edge trim
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridor floors
Clean the old floor tiles in the living room, repair cracked tiles and chipped corners first
Level the upper and lower parts with self-leveling to ensure that the floor does not float.
Lay down moisture-proof mat and install SPC wood grain flooring with snap-on method
Add edge strips to doorways and walls along with new base lines
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Caribbean Coast: flooring, before and after from the same angle.(Caribbean Coast, Tung Chung)
New Territories · Tung Chungflooring projectDesign concept
Caribbean Coast, Tung Chung | flooring
Demonstration of floor replacement in the living room: the old brick surface is leveled and then SPC wood grain flooring is laid, with moisture-proof mats and edges.
Levelling
SPC flooring
edge trim
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridor floors
Remove furniture and check for hollows and cracks in old floor tiles
After leveling the floor, lay a moisture-proof mat
Snap-on installation of SPC wood grain flooring, leaving expansion joints
Add edge strips to the door and install new skirting on the wall
Furniture is returned to its original position, garbage is removed and basic cleaning is completed
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Sunshine City: strip-out, before and after from the same angle.(Sunshine City, Ma On Shan)
New Territories · Ma On ShanStrip-out workDesign concept
Sunshine City, Ma On Shan | strip-out works
The strip-out example shows the handover condition: removal to the agreed substrate, common areas protected and waste removed the same day so masonry and services can start.
protect public spaces
Remove tiles back to the base
Waste removal
What work does this design involve? (6 steps)
Register the demolition project with the management office and protect the elevator lobby and corridors
Isolate water and electricity before removing old cabinets and sanitaryware. Have the relevant trades secure the remaining connections.
Remove old wall and floor tiles to the cement bed and take unsound areas back to concrete
The waste is put into bags and transported away by dump trucks according to building time.
Take photos to record the condition of old water pipes and wires to facilitate the next quote
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tai Wo Estate: repainting, before and after from the same angle.(Tai Wo Estate, Tai Po)
New Territories · Tai PoPaintingDesign concept
Tai Wo Estate, Tai Po | painting
This painting example shows the sequence from stripping, skimming and sanding to two topcoats. Address the base first wherever paint peels or mould forms near windows.
Strip and skim
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
The office of the same housing estate confirms the construction time and protects the corridors and doorways.
Furniture is wrapped and protective film is laid on the floor
Scooping and removing mildew stains and peeling spots on windows
Catch the dust twice, sand it, apply moisture-proof primer and two layers of topcoat
Check the light position and maintain the fine position
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Chi Lok Fa Yuen: aluminium window work, before and after from the same angle.(Chi Lok Fa Yuen, Tuen Mun)
New Territories · Tuen MunAluminium windowsDesign concept
Chi Lok Fa Yuen, Tuen Mun | aluminium windows
Demonstration of replacing old window frames with aluminum windows; the actual window style and size must be measured and confirmed according to the approval requirements.
Site measurement
Remove old windows
Install aluminum windows
What work does this design involve? (6 steps)
Visit the customer to measure the window position and confirm the window model, glass and color with the customer
Register the project with the management office and select the window frame color according to the building’s appearance requirements.
Arrange and process the required documents in accordance with the minor works requirements of the Buildings Department
Remove the old rusty window frames and grilles, and repair the window edges
Install new aluminium windows, weather-seal the perimeter and test opening, closing and locks
Repair the paint on the wall under the window sill, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tsuen Wan Centre: kitchen refurbishment, before and after from the same angle.(Tsuen Wan Centre, Tsuen Wan)
New Territories · Tsuen WanKitchen renovationDesign concept
Tsuen Wan Centre, Tsuen Wan | kitchen renovation
Demonstration of renovation of an old kitchen: removal, waterproofing, hot and cold water pipes, and replacement of new kitchen cabinets and countertops.
Strip-out
Waterproofing
hot and cold water pipes
kitchen countertops
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
Remove old kitchen cabinets and wall and floor tiles, secure services and clear the debris.
Use two layers of SikaTop waterproofing at the interface between the floor and the wall.
Redo the sink and hot and cold water pipes of the washing machine, and test the pressure after completion.
Lay new tiles and install kitchen cabinets, countertops and range hoods
Test machine and check water removal, garbage removal and basic cleaning
Richland Gardens, Kowloon Bay | masonry and bathroom works
Demonstration of detailed toilet renovation: dismantling, waterproofing two layers, closing the water to test the water, then laying tiles and installing sanitary ware.
Strip-out
Two layers of waterproof
Flood testing
Tiling and sanitary ware
What work does this design involve? (7 steps)
Register the project with the management office and protect the elevator lobby and corridors
Remove old bathroom tiles and sanitary ware to the bottom
Repair the base layer and redo the dewatering slope of the floor
The entire floor and shower wall are made of SikaTop waterproof two-layer
Close the water and test the water for 24 hours, take photos and record before laying bricks
Lay wall and floor tiles, install toilet, basin, shower and bath screen
Apply anti-mold glue, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tierra Verde: whole-flat fitted furniture design, before and after from the same angle.(Tierra Verde, Tsing Yi)
New Territories · Tsing YiWhole house custom designDesign concept
Tierra Verde, Tsing Yi | bespoke whole-flat design
Take the common living and dining room in this type of housing estate unit as an example to demonstrate the customized design direction of the whole house: built-in high cabinets, hidden storage, light troughs and unified wood grain tones.
Free WhatsApp consultation
Dimensions and floor plans
Bespoke furniture
Paint and light troughs
What work does this design involve? (6 steps)
Register the renovation with the management office and protect the elevator lobby and corridor floors
After measurement, prepare the full floor plans, services and furniture drawings, and VR views
Living room tall cabinets with display shelving and a dining room sideboard
The bedroom wardrobe is connected to the platform bed, and the entrance hall is used as a tall shoe cabinet.
Light troughs and spotlights match the counters, and the entire house is coated with moisture-proof primer and two layers of topcoat.
After installation, item-by-item acceptance, garbage removal and basic cleaning will be carried out.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Kornhill: whole-flat renovation, before and after from the same angle.(Kornhill, Quarry Bay)
Hong Kong Island · Quarry BayWhole-flat renovationDesign concept
Kornhill, Quarry Bay | whole-flat renovation
This Kornhill example coordinates ageing walls, floors, kitchen, bathroom and wiring in one renovation. Start with strip-out and services, follow with masonry and waterproofing, then complete paintwork, flooring and fitted furniture.
Cleaning out kitchen and toilet
Plumbing and electrical alterations
Kitchen and toilet waterproofing and tiling
Whole house painting and flooring
Customized storage cabinet
What work does this design involve? (7 steps)
Register with the management office for renovation and protect the floors in elevator lobbies, corridors and unit entrances
The designer prepares the floor plan, services and furniture drawings and VR views. Confirm them before construction
Remove old tiles, cabinets and sanitaryware from the kitchen and bathroom, secure services, and carry debris downstairs during the building's permitted hours.
Replace the hot and cold water pipes in the kitchen and toilet and test the pressure; the electric wires will be handled by registered electrical engineers, and a WR1 completion certificate will be issued upon completion.
Use SikaTop Seal-107 for two layers of waterproofing in the kitchen and toilet. The toilet should be closed and tested for 24 hours before laying the tiles.
The whole house was dusted and polished, with moisture-proof primer and two layers of topcoat, and SPC floors were laid in the living room, dining room and bedrooms.
Install custom-made wardrobes, kitchen cabinets and TV cabinets. After item-by-item inspection, garbage removal and basic cleaning are completed.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Chi Fu Fa Yuen: kitchen refurbishment, before and after from the same angle.(Chi Fu Fa Yuen, Pok Fu Lam)
Hong Kong Island · Pok Fu LamKitchen renovationDesign concept
Chi Fu Fa Yuen, Pok Fu Lam | kitchen renovation
This Chi Fu Fa Yuen kitchen example replaces swollen cabinets and a worn worktop. Strip back, waterproof and renew the pipes, then fit moisture-resistant cabinet boards and quartz counters. Coordinate the hood and hob positions.
Kitchen demolition
Kitchen waterproofing
hot and cold water pipes
Kitchen cabinets and countertops
Range hood installation
What work does this design involve? (7 steps)
Register the project with the management office and protect the elevator lobby and corridor floors
After isolating water and electricity, remove the old kitchen cabinets, wall and floor tiles and sink, then secure the service connections.
The entire floor and wall-to-floor junction were raised 150mm using SikaTop Seal-107 two-layer waterproofing, and the zinc basin was reinforced.
Redo the water supply and drainage of the sink and washing machine, and test the pressure after completion.
Dedicated circuit for the induction hob, installed by a registered electrical worker
Lay new wall and floor tiles, install moisture-proof board floor cabinets, wall cabinets and quartz stone countertops, and add light strips under the cabinets
Install the range hood and test it, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Grand Promenade: custom furniture, before and after from the same angle.(Grand Promenade, Sai Wan Ho)
Hong Kong Island · Sai Wan HoBespoke furnitureDesign concept
Grand Promenade, Sai Wan Ho | bespoke furniture
This Grand Promenade bedroom concept works around a sill and air conditioner. A measured fitted wardrobe, storage platform bed and window-side desk use the room height and limited floor area.
On-site measurement
built-in wardrobe
Platform bed with storage
desk by window
What work does this design involve? (6 steps)
Register the renovation with the management office, reserve the elevator on the day of cabinet installation and protect the inner wall of the elevator
Measure clearly the window sill, air conditioner and beam positions, and confirm with the furniture design drawings and VR renderings
The built-in wardrobe has a top sliding door, and the internal hangings, shelves and drawers are allocated according to the number of guests.
The platform bed has lift-up storage, and there are sockets and reading lamps at the bedside.
The desk by the window is equipped with a light strip, and there are wiring holes on the table.
After installation, adjust the rails and door hinges, remove the packaging and do basic cleaning.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Aldrich Garden: bathroom waterproofing renewal, before and after from the same angle.(Aldrich Garden, Shau Kei Wan)
Hong Kong Island · Shau Kei WanWaterproofingDesign concept
Aldrich Garden, Shau Kei Wan | waterproofing
In this Aldrich Garden bathroom example, staining has appeared on the ceiling below. Locate the seepage, strip tiles to a sound base, make repairs, apply two waterproof coats and flood-test before retiling.
Water seepage level inspection
Remove tiles back to the base
SikaTop waterproof two layers
24-hour flood test
Retile
What work does this design involve? (6 steps)
Coordinate with the management office and the residents downstairs to inspect the location of water damage on the ceiling downstairs and take photos to record it
Drill to check the water level and floor drain interface to confirm the source of water seepage
Remove the bathroom wall and floor tiles until they are bottomed out, and repair cracks and loose spots in the base layer.
After the inner corners and pipe positions were strengthened, the entire floor and walls were renovated with two layers of SikaTop Seal-107 waterproofing.
The floor drain was filled with water and closed for 24 hours, and the residents downstairs confirmed that there was no new water damage on the ceiling.
Re-laying wall and floor tiles and applying anti-mold glue, garbage removal and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Yue Wan Estate: flat refurbishment, before and after from the same angle.(Yue Wan Estate, Chai Wan)
Hong Kong Island · Chai WanPublic housing/HOS housing renovationDesign concept
Yue Wan Estate, Chai Wan | public rental or HOS flat renovation
This Yue Wan Estate small-flat concept uses repainting, floors, full-height storage and basic services improvements. Phase the work to suit the budget and avoid major changes to the layout.
Wall paint
wood grain floor
Full-height storage cabinet
light switch socket
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect lift lobbies and corridors, remove old furniture first
The wall is shoveled and polished, and then applied with moisture-proof primer and two layers of topcoat.
The living and dining rooms are paved with SPC wood grain flooring with moisture-proof mats, and edges are added at the door.
One wall is covered with a storage cabinet and a folding table, making good use of the small unit space.
Replacement of old light switches and addition of sockets will be carried out by registered electrical workers
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Hing Man Estate: plumbing and electrical upgrades, before and after from the same angle.(Hing Man Estate, Chai Wan)
Hong Kong Island · Chai WanPlumbing and electrical workDesign concept
Hing Man Estate, Chai Wan | plumbing and electrical work
This Hing Man Estate concept addresses insufficient sockets, trailing power strips and corroded kitchen pipes. Check estate approval requirements, assess existing circuits, provide the planned concealed socket routes and replace affected pipes.
Electrical inspection
Added concealed outlet socket
Replace light switch
Kitchen hot and cold water pipes
pressure test
What work does this design involve? (6 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
On-site electrical inspection, testing switches, leakage and circuits, and issuing a preliminary report
The living room and bedroom are slotted and 13A concealed pipe sockets are installed, and the dust is removed and restored.
Replace old light switch connections; the electrical work is carried out by registered electrical workers and a WR1 completion certificate is issued
Replace the kitchen sink and washing machine water pipes, and test the pressure after completion
Patch and repaint the chases, remove waste and carry out a basic handover clean.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for City Garden: aluminium window replacement, before and after from the same angle.(City Garden, North Point)
Hong Kong Island · North PointAluminium windowsDesign concept
City Garden, North Point | aluminium windows
This City Garden example starts with flaking frames, loose stays and rain staining below the sill. Confirm the new style and dimensions, remove the old window, repair the opening, weather-seal the replacement frame and make good the internal finish.
On-site measurement
Remove old windows
Install new aluminum windows
Window perimeter weather sealant
wall repair paint
What work does this design involve? (6 steps)
Visit the customer to measure the window size and confirm the window model, glass and color with the customer
Register the project with the management office and select the window frame color according to the building’s appearance requirements.
Arrange and process the required documents in accordance with the minor works requirements of the Buildings Department
Remove the old window frames and grilles, and repair the window edges
Install new aluminium windows, weather-seal the perimeter and test opening, closing and locks
Repair the water stains on the wall under the window sill, remove rubbish and perform basic cleaning
This Sceneway Garden owner-occupier concept renews the kitchen, bathroom, wiring, floors and storage together. The designer prepares the whole-flat plans, then the trades coordinate strip-out, services, masonry, painting and joinery.
Whole house design drawing
Cleaning out kitchen and toilet
Plumbing and electrical alterations
Masonry, waterproofing and tiling
Painted floors and custom furniture
What work does this design involve? (7 steps)
Register renovation with the management office and protect elevator lobbies, corridors and unit entrances
Prepare floor plans, building services drawings, furniture drawings and VR views for the client to review item by item
Remove the old bricks, cabinets and sanitary ware from the kitchen and toilet, and the waste will be dropped off according to the building's time
Replace old fuse box with MCB/RCD electrical box, constructed by registered electrical engineers
Make two layers of waterproofing in the kitchen and toilet. Close the water in the toilet and test it for 24 hours before laying wall and floor tiles.
The whole house was dusted twice and sanded, moisture-proof primer and two layers of topcoat were applied, and SPC flooring was installed in the living room.
Installation of custom-made kitchen cabinets, wardrobes and shoe cabinets, garbage removal and basic cleaning after acceptance
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Metro Harbour View: plumbing and electrical upgrades, before and after from the same angle.(Metro Harbour View, Tai Kok Tsui)
Kowloon · Tai Kok TsuiPlumbing and electrical workDesign concept
Metro Harbour View, Tai Kok Tsui | plumbing and electrical work
This Metro Harbour View services concept accommodates an induction hob and oven and relocates a bathroom water heater. Assess the load, provide dedicated circuits and relocate the water points, then test the circuits and pressure-test the pipework.
Electrical inspection
Add a dedicated circuit
Relocate hot and cold water outlets
pressure test
Slot repair
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
On-site electrical inspection to confirm existing circuit and electrical box capacity
Provide separate dedicated circuits for the kitchen induction hob and oven, including connection to the distribution board.
Electric power projects are constructed by registered electrical engineering personnel, and a WR1 completion certificate is issued upon completion.
The bathroom water heater was relocated, the hot and cold water pipes were grooved, and the hot and cold water pipes were tested and the pressure was tested.
Make good chases with skim coat, remove waste and provide basic cleaning before handover
In this Parc Oasis kitchen concept, peeling cabinet fronts and a cracked worktop prompt a refit. Strip back, waterproof and renew the hot and cold pipes before fitting cabinets, a worktop and a cooker hood. Plan storage around the household's cooking habits.
Kitchen demolition
Kitchen waterproofing
hot and cold water pipes
Kitchen cabinets and countertops
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridor floors
Remove old kitchen cabinets, worktop and wall and floor tiles and secure the service connections.
Use SikaTop Seal-107 two-layer waterproofing at the junction between the floor and the wall, and strengthen the zinc basin.
Redo the sink and washing machine and test the water flow and pressure.
Lay new wall and floor tiles, install moisture-proof board kitchen cabinets, pull baskets and quartz stone countertops
Install range hoods and under-cabinet lights and test them, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Lower Ngau Tau Kok Estate: repainting, before and after from the same angle.(Lower Ngau Tau Kok Estate, Ngau Tau Kok)
Kowloon · Ngau Tau KokPaintingDesign concept
Lower Ngau Tau Kok Estate, Ngau Tau Kok | painting
In this Lower Ngau Tau Kok Estate painting example, the window wall is peeling and a ceiling corner shows mould. Address moisture, strip the unsound finish, treat mould, fill and sand, then apply a moisture-resistant primer and two finishing coats.
Remove mold and mildew
Skim and sand
Moisture-proof primer
Two coats of topcoat
What work does this design involve? (6 steps)
The office of the same housing estate confirms the construction time and protects the corridors and doorways.
Move the furniture to the middle of the room and wrap it up, and lay protective film on the floor and window sills.
Strip peeling paint at the window and ceiling corners back to sound plaster and treat mould-affected areas
Apply two skim coats and sand smooth
Apply moisture-proof primer, then two layers of topcoat
Demolition protection, garbage removal and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Oi Man Estate: flat refurbishment, before and after from the same angle.(Oi Man Estate, Ho Man Tin)
Kowloon · Ho Man TinPublic housing/HOS housing renovationDesign concept
Oi Man Estate, Ho Man Tin | public rental or HOS flat renovation
This Oi Man Estate example updates an older floor, paintwork, switches and sockets and adds full-height storage. The design keeps the original structure and follows estate rules.
Wall paint
SPC flooring
Full-height storage cabinet
Light switch socket replacement
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect the floors of corridors and lift lobbies, and remove old furniture first
Remove loose paint from the wall, sand it, apply moisture-proof primer and two layers of topcoat
Cleaning and leveling the old floor, laying SPC wood grain flooring with edge strips
Full-height storage with a fold-down table and a shoe cabinet by the entrance
Replacement of worn-out light switches and sockets will be carried out by registered electrical workers
The Pacifica, Cheung Sha Wan | masonry and bathroom works
In this small-bathroom example at The Pacifica, old tiles are cracked and grout has darkened. Remove the tiles, prepare the base, apply two waterproof coats and flood-test. Retile, fit the sanitaryware and replace the old bathing area with a shower.
Bathroom demolition
Two layers of waterproof
Flood testing
Tiles and tiles
Sanitary ware installation
What work does this design involve? (7 steps)
Register the project with the management office, protect the elevator lobby and corridors, and drop waste materials in batches.
Remove old bathroom tiles, sanitary ware and bathroom cabinets to the bottom
Repair the base layer and redo the dewatering slope of the floor
The entire floor, turned-up wall and full-wall shower stall are made of SikaTop waterproof two-layer
Close the water and test the water for 24 hours, take photos and record before laying bricks
Lay wall and floor tiles, build urns and casings, install toilets, basins and showers
Apply anti-mold glue, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tak Bo Garden: bathroom waterproofing renewal, before and after from the same angle.(Tak Bo Garden, Kowloon Bay)
Kowloon · Kowloon BayWaterproofingDesign concept
Tak Bo Garden, Kowloon Bay | waterproofing
At Tak Bo Garden, water marks around the kitchen floor and wall base accompanied a leak complaint from downstairs. The example strips the tiles, reinforces penetrations, installs two waterproofing coats and flood-tests before retiling.
Water leakage inspection
Remove tiles back to the base
SikaTop waterproof two layers
Flood testing
Retile
What work does this design involve? (6 steps)
Coordinate with the management office and the residents downstairs to clearly see the location of water damage on the ceiling and take photos
Drill and check the zinc basin water drain and washing machine water drain connections
Remove the old bricks from the kitchen floor and wall base to the bottom, and repair the base layer
The entire floor and the junction between the wall and the floor were raised 150mm using two layers of SikaTop Seal-107 waterproofing, and the pipe position was strengthened.
Close the water and test it for 24-48 hours. Check with the downstairs staff that there are no new water stains.
Re-laying of wall and floor tiles, garbage removal and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Ko Chun Court: cabinet removal and wall repairs, before and after from the same angle.(Ko Chun Court, Yau Tong)
Kowloon · Yau TongMinor projects and cabinet removalDesign concept
Ko Chun Court, Yau Tong | small works and cabinet removal
This Ko Chun Court example removes two bedroom wardrobes, repairs and repaints the wall and fits new skirting. We can take on one- or two-cabinet removals and carry away the old units and debris.
Remove old wardrobe
wall repair
Painting
New leggings
What work does this design involve? (6 steps)
Go to the door and check how the cabinet is fixed, and make sure there are no water or electrical wires behind the cabinet.
Register the project with the management office and protect the floors and corridors
Remove the cabinet body, back panel and closing
Repair and polish nail holes and chipped areas in the wall
Moisture-proof primer plus two layers of topcoat, plus new moldings
Old cabinets and waste materials are taken away, garbage is removed and basic cleaning is completed
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Discovery Bay: whole-flat fitted furniture design, before and after from the same angle.(Discovery Bay, Lantau Island)
New Territories · Lantau IslandWhole house custom designDesign concept
Discovery Bay, Lantau Island | bespoke whole-flat design
This Discovery Bay living/dining concept reorganises storage with full-height cabinets, a sideboard and cove lighting. The designer prepares measured plans and VR views, and deliveries follow management's access rules.
Whole house design drawing
Living room cabinet combination
Sideboard
Light troughs and paint
What work does this design involve? (6 steps)
Register the renovation with the management office and arrange the delivery time of materials and furniture according to regulations
After measurement, prepare floor plans, building services and furniture drawings, and VR views
The living room has a ceiling-mounted modular cabinet with display shelves, and the air-conditioning pipe and wires are hidden inside the cabinet.
A half-height sideboard is added to the dining room, with sockets reserved on the counter.
False ceiling plus light trough, whole house moisture-proof primer plus two layers of topcoat
After the furniture is installed, it will be inspected item by item, and the garbage will be removed and basic cleaning will be carried out.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Sui Wo Court: whole-flat renovation, before and after from the same angle.(Sui Wo Court, Fo Tan)
New Territories · Fo TanWhole-flat renovationDesign concept
Sui Wo Court, Fo Tan | whole-flat renovation
This Sui Wo Court HOS concept renews an older flat's kitchen, bathroom, pipes and wiring. Coordinate strip-out, services, waterproofing and tiling, then paintwork, floors and custom furniture.
Cleaning out kitchen and toilet
Water pipes throughout the house
Electrical boxes and wires
Waterproofing and tiling
Paint floor furniture
What work does this design involve? (7 steps)
Register the renovation with the management office and protect the elevator lobby and corridor floors
The designer prepares floor plans, building services and furniture drawings, and VR views
Remove old bricks, cabinets and sanitary ware from the kitchen and toilet, and take photos of the old water pipe locations to record them
Replace the water pipes in the kitchen and toilet and test the pressure; the electrical boxes and wires will be handled by registered electrical workers
Make two layers of waterproofing in the kitchen and toilet. Close the water in the toilet and test it for 24 hours before laying wall and floor tiles.
The whole house was dusted and polished, moisture-proof primer was added with two layers of topcoat, and the living room was floored.
Installation of custom-made wardrobes and kitchen cabinets, garbage removal and basic cleaning after acceptance
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Garden Rivera: bathroom waterproofing renewal, before and after from the same angle.(Garden Rivera, Sha Tin)
New Territories · Sha TinWaterproofingDesign concept
Garden Rivera, Sha Tin | waterproofing
In this Garden Rivera bathroom example, dark shower grout, peeling at the wall base and staining below suggest a leak. Remove tiles to a sound base, repair the substrate, apply two waterproof coats and flood-test before retiling.
Water seepage level inspection
Remove tiles back to the base
Two layers of waterproof
Flood testing
Re-tiles and sanitary ware
What work does this design involve? (6 steps)
Coordinate with the management office and residents downstairs to record the location of ceiling watermarks
Drill and inspect the shower and floor drain connections to confirm the source of water seepage
Remove the bathroom wall and floor tiles to the bottom and repair the cracks in the base layer
The shower stall is wall-to-wall and the floor is fully covered with SikaTop Seal-107 waterproofing with two layers and reinforced inner corners.
The land was leaking and water was closed for 24 hours, and photos were taken to record the water level.
Re-paving bricks, installing sanitary ware and applying anti-mold glue, removing rubbish and basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Kam Ying Court: plumbing and electrical upgrades, before and after from the same angle.(Kam Ying Court, Ma On Shan)
New Territories · Ma On ShanPlumbing and electrical workDesign concept
Kam Ying Court, Ma On Shan | plumbing and electrical work
This Kam Ying Court HOS example updates an old distribution board, adds sockets and renews corroded bathroom hot and cold pipes. Specify MCB/RCD protection and carry out electrical and pipe pressure testing.
Electrical inspection
Replace the distribution board
Add sockets
Toilet hot and cold water pipes
pressure test
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
On-site electrical inspection, testing switches, leakage and circuits
Modify the old fuse box into an MCB/RCD electrical box and mark the circuit
The living room is equipped with concealed pipe sockets and network points; the electrical work is carried out by registered electrical engineers and issued WR1
Replace toilet showers, toilets and basin hot and cold water pipes and test pressure
Make good chases with skim coat, remove waste and provide basic cleaning before handover
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tai Po Centre: kitchen refurbishment, before and after from the same angle.(Tai Po Centre, Tai Po)
New Territories · Tai PoKitchen renovationDesign concept
Tai Po Centre, Tai Po | kitchen renovation
This Tai Po Centre concept makes a narrow kitchen easier to use. Strip back, waterproof and renew plumbing, then fit base and wall cabinets and a worktop to provide storage along the long walls.
Kitchen demolition
Kitchen waterproofing
hot and cold water pipes
kitchen cabinet ceiling countertop
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
Remove old kitchen cabinets and wall and floor tiles, secure services and clear the debris.
The junction between the floor and the wall is made of two layers of SikaTop waterproofing, and the zinc basin is reinforced.
Redo the water supply and drainage of the sink and washing machine, and test the pressure after completion.
Lay new bricks, install moisture-proof board floor cabinets, ceiling-mounted cabinets and countertops
Install the range hood and test it, remove garbage and perform basic cleaning
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Flora Plaza: plumbing and electrical upgrades, before and after from the same angle.(Flora Plaza, Fanling)
New Territories · FanlingPlumbing and electrical workDesign concept
Flora Plaza, Fanling | plumbing and electrical work
In this Flora Plaza example, rearranged furniture needs different socket and light positions, plus washing-machine connections in the kitchen. Coordinate these changes on the building services drawings.
Coordinated building services drawings
Add new sockets and light spots
Spotlight installation
Washing machine comes and goes
pressure test
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridors
The designer prepares the layout of the new furniture and confirms the locations of sockets and lights with the customer.
The living room and bedroom are slotted to add sockets, TV and network slots, and the dust is restored.
Install spotlights and replace light switches; electrical works shall be carried out by registered electrical workers. WR1
Remove the water level and cold water faucet of the new washing machine in the kitchen, and test the pressure after completion
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Melody Garden: strip-out, before and after from the same angle.(Melody Garden, Tuen Mun)
New Territories · Tuen MunStrip-out workDesign concept
Melody Garden, Tuen Mun | strip-out works
The Melody Garden concept starts a major renovation with strip-out. Protect common areas, strip the kitchen and bathroom back, isolate services safely and arrange lawful disposal before masonry and services work begins.
protect public spaces
Demolition of kitchen and toilet
Remove tiles back to the base
Waste removal
What work does this design involve? (6 steps)
Register the demolition project with the management office and protect the elevator lobby, corridors and unit entrances
Isolate water and electricity, remove old cabinets and sanitaryware from the kitchen and bathroom and secure the pipe and cable ends.
Remove old wall and floor tiles to the cement bed and take unsound areas back to concrete
Photograph the existing pipes and wiring to support the plumbing and electrical quotation.
Waste materials are put into bags, transported by dump trucks according to the building time, and disposed of legally.
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for YOHO Town: floor replacement, before and after from the same angle.(YOHO Town, Yuen Long)
New Territories · Yuen Longflooring projectDesign concept
YOHO Town, Yuen Long | flooring
In this YOHO Town living-room example, the old tiles are cracked or chipped. Repair and level the surface, add underlay and wood-effect SPC, then fit edging and skirting. A suitable existing base can stay in place.
Old brick repair
Levelling
SPC flooring
Edge strips and base lines
What work does this design involve? (6 steps)
Register the project with the management office and protect the elevator lobby and corridor floors
Remove furniture, check for hollows and cracks in old floor tiles and repair them
Use self-leveling to level the upper and lower positions
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Tin Heng Estate: flat refurbishment, before and after from the same angle.(Tin Heng Estate, Tin Shui Wai)
New Territories · Tin Shui WaiPublic housing/HOS housing renovationDesign concept
Tin Heng Estate, Tin Shui Wai | public rental or HOS flat renovation
For a family short of storage at Tin Heng Estate, this concept combines repainting, flooring, full-height storage, a fold-down table and extra sockets. Retain the structural walls and follow the Housing Department's renovation conditions.
Wall paint
SPC flooring
Full-height storage cabinet
Add sockets
What work does this design involve? (7 steps)
Before the start of construction, the Tongwu Village Office will confirm the renovation application requirements and carry out construction according to the specified time.
Protect lift lobbies and corridors, and place furniture together and wrap it up
The wall is dusted and polished, and a moisture-proof primer and two layers of topcoat are applied.
SPC wood grain flooring in living and dining room with moisture-proof mat and edge strips
Full-height storage with a fold-down table and a narrow wardrobe beside the bed
Adding sockets and replacing light switches will be carried out by registered electrical workers
Illustration before workIllustration of the proposed result
‹ ›
Design illustration · Design concept for Riviera Gardens: aluminium window replacement, before and after from the same angle.(Riviera Gardens, Tsuen Wan)
New Territories · Tsuen WanAluminium windowsDesign concept
Riviera Gardens, Tsuen Wan | aluminium windows
At seafront Riviera Gardens, this concept addresses corroded old frames, loose stays and wind-driven rain. Survey the openings, confirm the window design, replace the frames, make good and weather-seal the perimeter, then test the sashes.
On-site measurement
Remove old windows and window grilles
Install new aluminum windows
Waterproof sealant
wall repair
What work does this design involve? (6 steps)
Visit the customer to measure the window size and confirm the window model, glass and color with the customer
Register the project with the management office and select the window frame color according to the building’s appearance requirements.
Arrange and process the required documents in accordance with the minor works requirements of the Buildings Department
Remove the old rusty window frames and grilles, and repair the window edges
Install new aluminium windows, weather-seal the perimeter and test opening, closing and locks
Repair the water stains on the wall under the window sill, remove rubbish and perform basic cleaning
Worried about unfinished work or unsure where to start? Ask us on WhatsApp for free.
From the design and customization of the entire house to the removal of one or two cabinets, we handle all projects, large or small. If you haven't decided whether to do it or not, you can always ask. It won't be a hard sell.
Worried the contractor might leave the job unfinished?
Before work starts, you receive a written quotation listing the work stages, materials and payment schedule. Ask us on WhatsApp who is responsible for each stage and when it is due.
Finding it hard to coordinate the trades?
One WhatsApp contact coordinates design, demolition, plumbing, electrics, masonry, painting and fitted furniture, so you do not need to find and schedule each trade yourself.
New to renovation?
Start with the calculator or AI estimator to understand the budget. Discuss the scope with our team free of charge before deciding.
What do the figures tell us about renovation disputes in Hong Kong?
1,205 casesHome Improvement Complaints 2017–2023
The total amount exceeded HK$270 million, averaging nearly HK$230,000 per case.
About one in five of the 505 respondents reported a dispute. The most common issues were delays (61%), poor workmanship (39%) and failure to put defects right (30%).
The Consumer Council records complaints about unfinished works. There are no official figures for the total number of unfinished renovation projects in Hong Kong, so we do not quote a figure.
Our online calculator and AI quotation tool are for reference only. Our team measures the space and checks the structure and site conditions before giving a written quote.
Find us:117 published renovation prices, with the unit, rate, inclusions and exclusions shown for each item.
Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.