NEW FLAT RENOVATION
Renovating a new flat: handover inspections, defects, fitted furniture and budgeting
- Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
- Browse prices for 117 work itemsSelect work items online to see an indicative budget
- 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty
Inspect before work starts so the developer’s defects remain identifiable. Measure before buying furniture so it fits. The Rating and Valuation Department recorded 18,450 private flat completions in 2025 and forecast 16,980 for 2026. We help plan inspection, the six-month defects period, bespoke furniture, new electrical points and WR1 certification, and cleaning before move-in. The quotation lists each item.
Data verification date:2026-11-02・Numbers are accompanied by sources

WHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
WORKED EXAMPLE
Estimate new flat costs for your own quantities.
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
Bespoke furniture budget for a new two-bedroom flat
- FUR01/FUR05/FUR12 tall cabinets and wardrobes: HK$2,900 per linear ft (e.g. 7 ft in the main bedroom, 5 ft in the second bedroom and 4 ft in the entrance).
- FUR10 low TV cabinet: 8 linear ft × HK$1,250
- FUR06 second-bedroom platform bed: about 40 sq ft × HK$340
- FUR08 desk: 4 linear ft × HK$1,850
- FUR42 one delivery: HK$660
- Standard ENF boards and standard soft-close hinges. Blum upgrades, cabinet lights and worktops are extra.
- Tall cabinets and wardrobesTotal tall cabinet length × HK$2,900HK$46,400
- Low TV cabinet (FUR10)8 linear ft × HK$1,250HK$10,000
- Platform bed (FUR06)40 sq ft × HK$340HK$13,600
- Desk (FUR08)4 linear ft × HK$1,850HK$7,400
- Delivery (FUR42)HK$660 × 1 deliveryHK$660
Indicative furniture price for a new two-bedroom flatHK$78,060
The 16-linear-foot example totals HK$78,060, with standard ENF boards included. Cabinets above 2,400 mm and split deliveries cost extra. Final prices follow site measurement and a written quotation. [9]
Basic move-in work: sockets, lights, curtain pelmets, repainting and cleaning
- E03 whole-flat repainting costs HK$12 per sq ft of paintable area, estimated at saleable floor area × 3.
- L01 RenoClean post-renovation cleaning: HK$16 per sq ft
- H02 — 6 additional 13 A single sockets × HK$640. H03 — 3 double sockets, TV or network outlets × HK$1,200.
- H05 — install 5 customer-supplied ceiling lights × HK$670.
- F04 curtain pelmet: about 20 linear ft × HK$460
- Excludes furniture, light fittings, curtains and management fees
- Whole-flat colour change (E03)Saleable area × 3 × HK$12HK$18,000
- Post-renovation cleaning (L01)Useable area × HK$16HK$8,000
- Add sockets, TV or network outlets (H02 + H03)6 × HK$640+3 × HK$1,200HK$7,440
- Install ceiling lights (H05)5 × HK$670HK$3,350
- Form a curtain pelmet (F04)20 linear ft × HK$460HK$9,200
Indicative costs for basic move-in workHK$45,990
The 500 sq ft example totals HK$45,990. Changing from a dark to a light paint colour adds HK$4 per sq ft. The E03 minimum is HK$3,700 and the L01 minimum is HK$2,800. A WR1 is provided for the electrical work. Final prices follow measurement and written quotation. [9]
HOW WE HELP
How can we help you
Start work after coordinating defect repairs.
We check your snagging progress and wait for the developer to rectify suspect areas before working nearby, so responsibility stays clear.
Measure at handover
Measure corners, sills, air-conditioning pipework and sockets on site. Confirm the furniture drawings and renderings before production.
Standard ENF boards with Blum hardware
ENF-grade boards have been standard for bespoke furniture since 2026, at no extra charge. The quotation states the board grade and hardware models.
WR1 provided for electrical additions
A registered electrical worker handles sockets, lights and strip lighting. Receive the WR1 completion certificate at handover.
Working with the new estate’s management office
Apply under the estate rules and book the goods lift and delivery slots to reduce delays.
One-year warranty and optional cleaning
The one-year warranty covers paint cracking, blistering and peeling, loose furniture hinges, runners or screws, and swollen cabinet fronts, excluding deliberate damage. RenoClean 170°C steam cleaning can be arranged. Ventilate before moving in.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.




KEY NUMBERS
New flat figures to check before work begins
government/official
18,450unit
Private domestic completions in 2025
Down 24% from 24,260 units in 2024. Kowloon accounted for 49%, the New Territories 36% and Hong Kong Island 15%. Kowloon City accounted for 28%.
[1]government/official
16,980unit
Forecast private domestic completions for 2026
The forecast for 2027 is 15,360 units. Of the 2026 forecast completions, 58% are in the New Territories, including 19% in Tai Po and 15% in Sai Kung.
[1]government/official
Approximately 7,120unit
Vacant flats with occupation permits but no certificate of compliance or consent to assign
At the end of 2025, 56,080 private flats were vacant, 4.3% of the stock. Around 7,120 were new flats with occupation permits that were not yet ready for formal handover.
[1]government/official
6 months
Deadline for buyers to report defects in writing
Under the Residential Properties (First-hand Sales) Ordinance, the sale and purchase agreement must provide for the purchaser to notify the vendor in writing within 6 months of completion of defects not caused by the purchaser. The vendor must remedy them at its own cost as soon as reasonably practicable.
[2]government/official
11locations
Consumer Council case: defects listed in a new flat inspection report
Defects included several hollow tiles and extensive black mould on flooring. The owner stayed in a hotel for 2 months while waiting for a response. After the Consumer Council intervened, the flooring throughout the flat was replaced.
[3]government/official
≤0.025mg/m³
Formaldehyde emission limit for ENF-grade wood-based boards
GB 18580-2025 took effect on 1 June 2026 and requires wood-based panel products to meet E0 (≤0.050 mg/m³). The voluntary GB/T 39600-2021 standard also defines the lower-emission ENF grade.
[4]government/official
7am–7pm
Daytime period when residential renovation noise is outside the Noise Control Ordinance restrictions described here
Public holidays are excluded. From 7 pm to 7 am the next day, and on public holidays, contractors need a Construction Noise Permit to use powered mechanical equipment. Estate management may set shorter working hours.
[7]company public price
free
Site measurement and professional advice (limited-time offer)
On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Initial consultations on WhatsApp are free.
[9]CHARTS
New flat renovation figures at a glance
The Rating and Valuation Department’s preliminary Hong Kong Property Review 2026 figures include forecast completions under Starter Homes projects from 2025. More than ten thousand new flats are handed over each year, so inspections, defect repairs and move-in works often coincide. [1]
FULL GUIDE
New flat renovation guide: stages and points to check
How does a new flat fit-out differ from renovating an older flat?
New flats usually come with floors, kitchen cabinets, a fitted bathroom, switches, fresh wiring, pipes and waterproofing. After handover and snagging, budgets therefore tend to go towards furniture, sockets, lighting, curtains and new wall colours.
The Rating and Valuation Department recorded 18,450 private flat completions in 2025 and forecast 16,980 for 2026. At the end of 2025, about 7,120 vacant units had occupation permits but no certificate of compliance or consent to assign. Where hundreds of households receive their keys together, management approvals, goods lifts and trade availability can fill up quickly.
For an older second-hand property, see our older flat renovation page. This guide covers a first-hand flat from handover to move-in.
[1]New flat fit-out sequence: from handover notice to moving in
Starting renovation immediately can blur responsibility for damage between the developer and your contractor. Inspect the flat, submit defects in writing, let the developer finish major repairs, then measure for bespoke furniture and start work.
Accurate furniture measurements require access after handover. Arrange measurement promptly. After the design is approved, furniture production and the building management application can proceed in parallel.
- 1. On receipt of the handover notice, book an inspection and bring the sales brochure.
- 2. Inspect every room, take photos and record defects on a snagging list.
- 3. Notify the vendor of defects in writing within 6 months of the completion date.
- 4. Measure and design: prepare furniture layouts, lighting and socket plans, and renderings.
- 5. Apply to management and confirm renovation rules, deposits, worker registration and working hours.
- 6. Add electrical points and ceiling coves, paint, then install the furniture.
- 7. Deep-clean and ventilate before moving in.
What to inspect at handover and how to record it
The Consumer Council notes that the Residential Properties (First-hand Sales) Ordinance requires the sales brochure to describe fittings, finishes and appliances. Bring the brochure to handover and check the layout and supplied appliances against it.
Check the parts you will use daily: hollow or chipped tiles, buckling or mould on timber floors, doors and windows that stick, staining around windows, slow kitchen or bathroom drainage, and operation of switches, sockets and appliances. You can inspect yourself or hire a professional with building or surveying experience. Describe and photograph each defect.
In a Consumer Council case, an independent inspection listed 11 defects, including hollow tiles and extensive mould on flooring. The owner stayed in a hotel for 2 months while awaiting the developer’s response. After the Council followed up, the flooring throughout the flat was replaced. Keep a clear written and photographic record.
[3]The six-month defects period: what to consider before renovating
According to the Sales of First-hand Residential Properties Authority, the sale and purchase agreement must allow the purchaser to notify the vendor in writing within 6 months of completion about defects in the property or specified fittings, finishes or appliances, except those caused by the purchaser’s act or neglect. The vendor must remedy them at its own cost as soon as reasonably practicable.
If you remove the developer’s finishes, a later problem may be hard to attribute. Ask the developer to rectify suspected original defects such as hollow flooring, seepage at windows or a slow bathroom drain. Confirm the repair before working nearby.
The Consumer Council recommends keeping written records of defects and correspondence, and asking for service contacts and warranty arrangements for built-in appliances so you can follow up after the warranty period.
[2][3]What should I keep or change in a new flat?
Flooring, kitchen cabinets and bathrooms in a new flat can usually be retained. Stripping them out adds cost and may affect the developer’s defect repairs and warranty. Typical additions include wardrobes, a shoe cabinet, TV cabinet, platform bed and desk, sockets and lighting in living areas and bedrooms, ceiling coves, curtain pelmets and a change of wall colour.
The Buildings Department advises that walls or doors enclosing a kitchen may be structural or need fire resistance. Check approved drawings before opening up a kitchen. Bathroom alterations may require renewed waterproofing and flood testing. See the comparison of items to retain or alter below.
[8]Bespoke furniture for a new flat: measurement, boards and fittings
Measure after handover because finished dimensions, corners, sills and air-conditioning pipes may differ from the plans. We prepare furniture drawings and renderings and confirm door swings, drawers, hanging rail heights and socket positions before production.
GB 18580-2025 took effect on 1 June 2026 and requires E0 boards (≤0.050 mg/m³). A voluntary standard also defines ENF (≤0.025 mg/m³). Since 2026 ENF boards have been our standard for bespoke furniture at no extra charge. Their emissions are very low but still require ventilation. Blum upgrades include FUR31 soft-close hinges at HK$380 each and FUR32 TANDEMBOX runners at HK$1,500 per set.
Our rates include FUR01 tall cabinets (1,501–2,400 mm) and FUR05 wardrobes at HK$2,900 per linear ft, FUR10 low TV cabinets at HK$1,250 per linear ft, FUR06 platform beds at HK$340 per sq ft, FUR08 desks at HK$1,850 per linear ft and FUR42 delivery at HK$660 per trip. Final prices follow site measurement and written quotation. See the platform bed and bespoke furniture pages for designs.
Our own factory in Foshan produces the ENF boards. A partner export factory supplies quartz worktops directly with quality assurance and a choice of colours.
[4][9]New sockets and lights in a new flat still require a WR1.
Even in a new flat, adding a socket or light or changing a switch is an addition or alteration. EMSD requires the altered installation to meet current safety requirements. Before energisation a registered electrical worker inspects and tests it and issues WR1. Keep the certificate.
Wall chasing marks new paint and tiles, so plan bedside, desk, TV, entrance and kitchen appliance points before painting or furniture installation. H02 single 13 A sockets cost HK$640 per set, H03 double sockets, TV or network points HK$1,200 per set, H05 pendant or ceiling light installation HK$670 each, H08 spotlights HK$310 each and H07 strip lighting HK$150 per linear ft.
Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.
[6][9]New estate management and permitted working hours
The EPD states that the relevant restrictions do not apply from 7 am to 7 pm except on public holidays. From 7 pm to 7 am and on public holidays, powered mechanical equipment requires a Construction Noise Permit. Building management may impose additional noise and working-hour restrictions.
Get the estate renovation rules before work. Check deposits, worker registration, goods-lift bookings, debris collections and furniture delivery times. When many households renovate in the same phase, reserve goods-lift and delivery slots early.
[7]Formaldehyde and ventilation before moving into a new flat
Hong Kong’s Indoor Air Quality Information Centre identifies pressed wood products, adhesives, particleboard, medium-density fibreboard and other renovation materials as indoor formaldehyde sources. It recommends solid wood or low-formaldehyde boards and good ventilation, including opening windows regularly.
With new built-ins installed alongside the flat’s own floors and kitchen cabinets, allow time to open windows and cabinet doors before moving in. Our partner RenoClean can provide 170°C steam cleaning. L01 is HK$16 per sq ft, subject to a HK$2,800 minimum.
[5][9]How are new flat renovations priced?
The budget depends mainly on the lengths and quantities of furniture, electrical additions, ceilings and painting. With less strip-out and pipe replacement, work is often simpler than in an older flat of the same size. Extensive cabinetry can still add substantially to the total.
The first worked budget covers typical furniture for a two-bedroom flat and varies the total length of tall cabinets. The second covers sockets, lighting, curtain pelmets, repainting and cleaning based on floor area. These examples use our published rates. We confirm the final scope and price after measuring on site.
[9]How HK Create Design can help with a new flat fit-out
We have 15 years of experience. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. After handover, send the floor plan and photos on WhatsApp to discuss furniture and budget. After measuring, we prepare furniture designs, lighting and socket layouts and renderings. Once you confirm the drawings, we itemise quantities, unit prices and materials in the quotation.
Standard furniture uses ENF-grade boards with Blum hardware. Paint options include Nippon and Dulux. Registered electrical workers complete the electrical installation and issue WR1. The one-year warranty covers cracked, blistered or peeling paint, loose furniture hinges, runners or screws, and swollen cabinet fronts, excluding deliberate damage. RenoClean 170°C steam cleaning is available. Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Monday–Saturday 10:00–18:00. WhatsApp 5243 7747.
[9][6]COMPARE
Compare new flat renovation options
What to keep or alter in a new flat
| Item | Condition on handover by the developer | General guidance | Pay attention to |
|---|---|---|---|
| floor | Timber floors or floor tiles are usually already fitted. | Retain the floor. Ask the developer to rectify hollow tiles or buckling first. | If you remove or replace it yourself, it becomes difficult to establish responsibility for an existing defect. |
| Kitchen cabinets and bathroom | Existing kitchen cabinets and sanitaryware | Keep existing fittings and consider adding a wall cabinet or mirror cabinet. | Renew waterproofing when altering a bathroom. Check approved drawings before removing a kitchen wall. |
| Wall paint | White or light-coloured | Change the colour with E03 direct repainting at HK$12 per sq ft. | Changing a dark paint colour to a light one adds HK$4 per sq ft. |
| Sockets and lighting points | Base quantity | Add sockets and lighting to suit the furniture layout. | Electrical additions and alterations require WR1 certification. |
| Wardrobes and storage | Usually none or very few | Bespoke wardrobes, shoe cabinet, TV cabinet and platform bed | Measure promptly after handover |
| ceiling | Plain ceiling | Add lighting coves or curtain pelmets (F03/F04, HK$460 per linear ft). | Keep air-conditioning pipes and service access panels clear. |
Indicative price, subject to site measurement and written quotation. [9][8][6]
Indicative prices for typical bespoke furniture in a new flat
| furniture | Price number | Unit of measure | indicative price | Common locations |
|---|---|---|---|---|
| Wardrobe with hinged or sliding doors | FUR05 | linear ft | HK$2,900 | Main and second bedrooms |
| Full-height shoe cabinet in the entrance hall | FUR12 | linear ft | HK$2,900 | Entrance area |
| Low TV cabinet | FUR10 | linear ft | HK$1,250 | Living room |
| Platform bed or tatami platform | FUR06 | sq ft | HK$340 | Small bedroom or study |
| Desk or dressing table | FUR08 | linear ft | HK$1,850 | Window area or second bedroom |
| Mid-height sideboard | FUR13 | linear ft | HK$1,350 | Dining area |
| ENF-grade boards | — | All bespoke furniture | Standard specification at no extra charge | whole house |
For cabinets above 2,400 mm, FUR04 adds HK$100 per linear ft for each additional 100 mm of height. Final prices follow measurement and written quotation. [9]
Who handles new flat defects, workmanship warranties and appliance warranties?
| Category | Responsible party | term | range |
|---|---|---|---|
| Defects handled by the developer | Vendor | Written notice within 6 months of completion | Defects in the flat or the fixtures, finishes and appliances listed in the agreement, other than those caused by the buyer |
| Renovation workmanship warranty | Renovation contractor (HK Create Design) | One year from completion | Cracked, blistered or peeling paint, loose furniture hinges, runners or screws, and swollen cabinet fronts, excluding deliberate damage. |
| Built-in appliances | Manufacturer or service agent | Subject to the product warranty terms | The Consumer Council recommends asking for repair contacts and warranty arrangements at handover. |
SITE SOP
New flat work standards and handover checklist
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Organized according to government guidelines
New flat handover inspection checklist
- 1. Prepare the documents and tools.
Bring the sales brochure, sale and purchase agreement, snagging forms, torch, camera, socket tester and masking tape.
- 2. Check the layout and equipment supplied.
Check the layout, finishes and appliance models against the sales brochure, item by item.
- 3. Check wall tiles, floor tiles and flooring.
Check for hollow-sounding tiles, chipped edges, cracks and grout defects. Inspect timber floors for buckling, mould and gaps.
- 4. Check the doors and windows.shutdown checkpoint
Open and close each window, check hinges, catches and seals, and look for staining around sills and surrounding walls.
- 5. Check the kitchen and bathroom.shutdown checkpoint
Run water at each fixture. Check drainage speed, leaks at taps and wastes and whether the WC flushes normally.
- 6. Check switches, sockets and appliances.
Test each socket, operate every light and built-in appliance and check distribution board labels.
- 7. Record and mark each defect.
Mark each defect with masking tape, photograph it and record its position and condition.
- 8. Submit the list in writing.shutdown checkpoint
Notify the vendor of defects in writing within 6 months of completion. Keep copies and correspondence.
- 9. Reinspect the repairs.
Reinspect each item after the developer’s repairs. Follow up outstanding defects in writing before renovation starts.
Acceptance Checklist 0/4
Company Site Code
Our process for fitting out a new flat
- 1. Free initial consultation
WhatsApp your floor plan and photos to 5243 7747 to discuss furniture and budget.
- 2. On-site measurement
On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. On site we measure wall corners and window bays and note air-conditioning pipes and socket positions.
- 3. Design and drawshutdown checkpoint
Confirm the furniture drawings, lighting and socket plan, and renderings before quotation.
- 4. Item-by-item quotation and signingshutdown checkpoint
List quantities, unit prices, ENF board grade, hardware models and exclusions.
- 5. Application to the Management Office
Submit the renovation application and worker list, and reserve the goods lift and delivery slots.
- 6. Electrical additions, ceilings and painting.
Chase walls for electrical additions and form ceiling lighting coves before painting. Test the completed electrical work.
- 7. Make and install the furniture.
Cut the furniture to the production drawings, install it and adjust hinges and drawers.
- 8. Complete the inspection, receive the WR1 certificate and arrange cleaning.shutdown checkpoint
Check each defect repair and receive WR1. RenoClean steam cleaning is available. Ventilate before moving in.
Acceptance Checklist 0/4
DELIVERABLES
The design drawings you will receive
furniture design drawings
Dimensions, door swings, internal layout and fittings for every bespoke piece.
Lighting and socket plan
Mark new sockets, lights, strip lighting and TV or network points on the furniture layout.
Design renderings
Confirm renderings for the living and dining area and individual rooms before quotation.
Itemised quotation
List quantities, unit prices, ENF board grade, hardware models and exclusions.
MATERIALS
Related materials: We know how to use them and can also help you with construction
SCOPE
This communication can first cover
- Advice on handover inspections and scheduling defect repairs
- Measure for bespoke wardrobes, shoe cabinet, TV cabinet, platform bed and desk.
- Add sockets, lighting points, strip lighting, ceiling coves and curtain pelmets.
- Wall colour changes, post-renovation cleaning and ventilation before move-in
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
- 01
When is handover, and have you submitted your snagging list?
- 02
Which furniture pieces do you need? Do you have a floor plan or sales brochure?
- 03
Does the estate restrict working hours or deliveries?
FAQ
Frequently asked questions
How much could a new flat renovation cost?
Furniture is usually the main cost. A worked two-bedroom example with 16 linear ft of tall cabinets and wardrobes, a low TV cabinet, platform bed and desk totals about HK$78,060. Another example for a 500 sq ft flat with added sockets, lighting, curtain pelmets, repainting and cleaning totals about HK$45,990. Prices are subject to measurement and written quotation.
When should I start renovating after handover?
Inspect the flat and submit a written snagging list first. Begin work after the main defects are rectified so original defects remain distinguishable from renovation damage. You can measure after handover and run furniture production alongside the building management application.
How long is the deadline for the new building to be delayed?
The Sales of First-hand Residential Properties Authority states that purchasers can notify the vendor in writing within 6 months of completion about defects they did not cause. The vendor must remedy them at its own cost as soon as reasonably practicable.
Should I inspect the flat myself or hire a professional?
Either is possible. The Consumer Council suggests considering a professional with construction or surveying experience. If inspecting yourself, describe each defect clearly, photograph it and submit your written notice by the deadline.
Should I replace the flooring and kitchen cabinets in a new flat?
Usually you can retain the new flooring and cabinets. Removing them can waste money and make it harder to establish responsibility for existing defects. Ask the developer to rectify hollow tiles, buckling or mould first.
When should we measure for bespoke furniture?
Arrange measurement promptly after handover. Finished surfaces can differ from the drawings. Measure corners, window sills and air-conditioning pipe positions on site before preparing furniture drawings.
What is the difference between E0 and ENF boards?
Both are formaldehyde emission grades for wood-based boards. E0 is ≤0.050 mg/m³ and ENF is ≤0.025 mg/m³ under GB 18580-2025 and GB/T 39600-2021. ENF has been our standard furniture board since 2026 at no extra charge. It still emits some formaldehyde, so ventilate before moving in.
Does a new socket in a new flat require a WR1?
Yes. After an electrical addition or alteration, a registered electrical worker must inspect and test it before energisation and issue WR1. We hand over the WR1 for our completed electrical work.
When can renovation work take place in a new estate?
According to the EPD, the Noise Control Ordinance does not regulate residential renovation noise between 7 am and 7 pm on days other than public holidays under the provisions described here. Estate management may impose shorter hours through its renovation rules.
How can I reduce formaldehyde exposure in a new flat?
Choose lower-emission boards and ventilate by opening windows and cabinet doors before moving in. The Indoor Air Quality Information Centre recommends solid wood or low-formaldehyde furniture and good ventilation. RenoClean post-renovation cleaning can be arranged.
Can I remove the kitchen wall to make an open kitchen in a new flat?
Check the approved plans. The Buildings Department notes that walls or doors enclosing kitchens may be structural or fire-resisting. Retain walls and doors where the approved plans require fire resistance.
Is there a charge for on-site measurement?
On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send your floor plan to WhatsApp 5243 7747 for a free initial consultation.
AFTER RENOVATION
RenoClean | Specialist cleaning and aerospace-grade air purification
After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.
- Cleaning and testing are listed separately
The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.
RELATED READING
Read the relevant key points first
Moving in and maintenance12 sections · 10FAQ
New-flat handover inspections: a room-by-room checklist, the six-month defects period and planning your move
Prepare for new-flat handover, inspect each room, write a defects list and calculate the six-month deadline. Sales of First-hand Residential Properties Authority and Consumer Council information also helps schedule fitted furniture and minor alterations.
See data, scope and practical examples
design and space10 sections · 6FAQ
Comparing custom furniture quotations: linear-foot rates, boards, hardware, drawings and acceptance checks
Match dimensions, pricing units, boards, door styles, hardware, delivery, installation and exclusions for every piece. Use agreed drawings and final site measurements to determine whether fitted furniture quotes cover the same work.
See data, scope and practical examples
design and space12 sections · 14FAQ
Custom wardrobes: choosing boards, hinged or sliding doors, internal layout and hardware, with prices and formaldehyde considerations
Plan a fitted wardrobe through measurement, door selection, internal layout, board emissions, durable hardware and installation checks. Use our published prices to calculate a wardrobe that fits your home and belongings.
See data, scope and practical examples
design and space9 sections · 6FAQ
Renovating a small Hong Kong flat: balancing storage, circulation space and the scope of work
Plan storage for the things you use, keep doors able to open fully and preserve light at windows. Agree quantities and exclusions before seeking a quote. Includes a worked example, comparison table and safety checks.
See data, scope and practical examples
Moving in and maintenance9 sections · 6FAQ
Post-renovation cleaning and formaldehyde in Hong Kong: handover, ventilation, testing and moving in
Before moving in, separate outstanding works, construction dust, ventilation, testing and cleaning service costs. This helps direct spending without treating a single clean or spray treatment as a guarantee of readiness for occupation.
See data, scope and practical examples
construction and safety10 sections · 7FAQ
Planning a renovation backwards from handover: building management, material orders and inspections in Hong Kong
Plan separately for building management papers, material lead times, site checks, professional inspections, waste removal and snagging. Comparable scopes, quantities and calculations show which activities or exclusions may affect the completion date.
See data, scope and practical examplesSTART WITH THE REAL CONTEXT
Want to discuss this project?
First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-upFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.
Sources
- Official sourceHong Kong Property Review 2026 preliminary findings: private domestic completions, take-up and vacancy · Rating and Valuation Department· Accessed 2026-11-02
- Official sourceWhat should I do if I find defects after handover? · Sales of First-hand Residential Properties Authority· Accessed 2026-11-02
- Official sourceConsumer Council on delays and disputes over rectification of defects in new flats, 15 June 2022 · consumer council· Accessed 2026-11-02
- Official sourceNew national standard tightens formaldehyde limits for artificial panel products (GB 18580-2025) · National Forestry and Grassland Administration· Accessed 2026-11-02
- Official sourceFrequently Asked Questions about Indoor Air Quality · Environmental Protection Department Indoor Air Quality Information Center· Accessed 2026-11-02
- Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
- Official sourceFrequently asked questions about environmentally friendly property management (noise from renovation of residential premises) · Environmental Protection Department· Accessed 2026-11-02
- Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-02
- CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02