01

First turn "fine" into measurable means of living

Storage needs in the same 350 sq ft flat will differ for someone working from home alone, a couple who cook, a family with young children, or someone caring forOlder residents. Before the appointment, list daily-use shoes, coats, appliances, ingredients and work supplies. Add monthly-use items such as the vacuum cleaner, stepladder and suitcases, then seasonal bedding and clothes. Record the width, height, depth and weight of each, especially items that will not fold, such as suitcases, pushchairs, instruments and larger kitchen appliances.

Draw another picture of the current situation that doesn’t have to be pretty. Mark the door and door opening directions, window sills, column positions, air conditioners, water drains, electrical boxes, sockets and suspected maintenance openings. Use arrows to connect people's routes from entering the house, putting away bags, washing hands, cooking, eating, working, washing clothes, and sleeping. If any cabinet door, chair or drawer presses this line after it is opened, it is not a small problem of "adapting to it in the future", but a matter of returning to the flat surface and making a new choice.

When measuring, don't just measure the width of the wall. The available space in front of the cabinet, the future replacement path of the mattress, curtain operation, air-conditioning cleaning and pipe inspection are also the same size. Each location can be divided into "immovable equipment", "area to be cleared every day" and "storage area". This allows the designer or contractor to quickly clarify which requirements conflict with each other, and also lets you know what should be retained.

  • Measure the range of doors, cabinet doors and drawers when they are fully open, not just the walls.
  • Take photos of the largest, heaviest and everyday items and record three-dimensional dimensions.
  • Mark the windows, air conditioners, electrical boxes, drains and unobstructed maintenance locations on the diagram.
Design renderings: Slim units with window seats and vertical storage. Size and feasibility must be confirmed on site.
Design renderings: Slim units with window seats and vertical storage. Size and feasibility must be confirmed on site. Select an image to enlarge

02

Arrange storage according to frequency of use to prevent tall cabinets from turning into a black hole of debris

It is more useful to first divide the storage into three layers according to frequency than to decide on the style of cabinet doors first. Items that are used every day should be placed in a position where you do not need to squat or move other items; heavier cleaning supplies, pots or tools should be placed in a low position; thick quilts, suitcases and holiday items should be placed in a high position. This is not a fixed height norm, but will be adjusted based on the height, strength and who will use it of the family members.

Before ordering a cabinet, please write "what to store" in the drawings instead of just a paragraph of cabinet length. For example, the juice machine needs to be taken out together with the cup set, the broom must be placed straight, and the thickness of the suitcase must be known; in the wardrobe, the space required for long hanging, short hanging, folding clothes, drawers and bedding must be distinguished. If the supplier only quotes a "six-foot cabinet" but does not include the width, height, depth, internal partitions, boards, door panels, hardware and closings, it will be difficult to make a fair comparison in the future, and it will also be difficult to check at the time of delivery.

Entrance halls are especially easy to fill up. Thin shoe cabinets, hooks and bag drop platforms can handle the return home process, but doors, hallways and equipment locations must first be preserved. Keeping the most commonly used items within a step or two of the door is often more practical than adding a deep, hard-to-reach cabinet. If you have a stroller, wheelchair, or items that you frequently carry around at home, first walk around the map in its widest position.

  • Each cabinet is labeled with actual items, frequency of use and maximum size.
  • The required drawings show the width, height and depth of the cabinet, internal partitions, door panels and hardware.
  • Determine who will access the high-level storage and whether access requires dangerous climbing.
Break down “renovation” into comparable ranges: What to ask before quoting

You can swipe left or right on your phone to view the complete table.

Project scopeQuantity/basis of pricingThe formal quotation should stateCommon ones not included or yet to be verifiedThe risk of not asking first
Quick version of whole house basic renovationTotal saleable area gives only an initial flooring estimate. Painting uses saleable area × 3 as a first approximation.Demolition, leveling, standard tiling, partial plastering, number of dump trucks and the quantity of each itemComplete kitchen and bathroom reconstruction, waterproofing, replumbing, rewiring, fitted furniture, finish tiles, sanitaryware, management fees and unselected itemsI mistook the sample budget as an all-inclusive price for the whole house, and only discovered that major functions were not included after construction started.
Paint walls and ceilingsAccording to the actual expansion area; the quick version is only ×3 for preliminary calculationThe position of shoveling or partial treatment, the level of dusting, brand and model of primer/topcoat, number of layers, masking and repair scopeWater seepage source treatment, comprehensive shoveling, furniture relocation and special protection must be verified on siteDirect comparison based on unit feet, ignoring the base layer, floor height and openings, resulting in distortion of engineering quantities
Remove old floor tiles/floorsSquare feet. Removing tiles to the cement bed and hacking the floor back to concrete are different scopes.Which level to dismantle to, conditions of deep excavation or caisson, protection, transportation, legal disposal and actual number of vehiclesThe bonding of old bricks, the thickness of the ground floor, the layout of the stairs and the management office may all change the scope.The unit price for simpler processes can be applied to deeper demolition or removal of missing items.
Customized storage cabinetUsually estimated by horizontal width and fittings, subject to minimum sizes or chargesWidth, height, depth, internal partitions, boards, door panels, hardware, closings, back panels, installation locations and drawingsElectrical switch/air conditioning/curtain box avoidance, finishing upgrade, transportation and on-site wall and floor inconsistency must be confirmedOnly quote "a set of cabinets" without dimensions and hardware. The delivery effect and total amount are incomparable.
Water, electricity and kitchen and toilet renovationItems should be listed according to location, line/pipeline direction, equipment and actual workRelocation, material specifications, testing/certification arrangements, protection, repairs, sanitary ware and equipment installation scopeThe basic quick estimate excludes complete kitchen and bathroom reconstruction, replumbing and rewiring. Check structure, drainage and building restrictions separately.After the storage diagram is completed, it is discovered that the socket, water drain or maintenance position is covered by the cabinet, which increases the cost and risk of making up for the damage.

This table is for comparative range purposes and does not regard the company's unit price as the market average. The Consumer Council recommends that the quotation cover the engineering and price, construction operations, maintenance and rights remedies, etc.; all unlisted items should be confirmed in writing. [1][2][4]

Design renderings: narrow entrance hall, shoe cabinet and seats.
Design renderings: narrow entrance hall, shoe cabinet and seats. Select an image to enlarge
Completed custom floor-to-ceiling wardrobe | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge
Small-flat renovation: illustrated facts and figures | HK Create Design
Small-flat renovation: key figures at a glance | HK Create Design Select an image to enlarge

03

Keep opening the door, walking and repairing first, and then talk about the full wall cabinets

A common mistake in small business units is to think that "opening the door will save space." The sliding door does not occupy the front opening arc, but will cause part of the cabinet space to be blocked by the door panel at any time; the cover door can be fully opened, but the front space needs to be reserved. The two are not necessarily better. The bed, door, drawer and user's position should be drawn together to actually simulate the process of changing clothes, making the bed and picking up luggage.

Full-height cabinets give extra seasonal storage but can block daylight, curtain pelmets, air conditioner lines or inspection openings. Near windows, consider a low cabinet or placing the taller unit on a darker wall. For transparent partitions, check cleaning, glare, privacy, impact risks and fixings as well as how open they look.

Storage and electricity should be drawn at the same time. If the workbench, vacuum cleaner charger, router, small kitchen appliances and bedside charger are processed after the cabinet is put in, the board will often need to be changed, the extension board will be exposed or the wall will be reopened. Submit the equipment power, socket location, and daily plugging and unplugging methods to a registered electrical contractor for verification; do not change the wiring yourself or hide high-load usage methods in a sealed cabinet.[5]

  • Test doors, cabinet doors, drawers and chair pull-outs simultaneously on the floor plan.
  • Maintain accessible service locations for air conditioners, curtains, pipes, electrical boxes, and equipment.
  • Map out outlet, charging, router and lighting control needs before furniture plans are finalized.

04

Lighting and Painting: Separate Preliminary Calculations, Product Specifications and Site Conditions

Lighting doesn’t just rely on light paint. First avoid placing the tallest and most solid cabinets on the main light-incoming surface, and then control the work lights, channel lights and rest area lighting separately. If the window doubles as a workbench, consider screen reflection, curtain operation and daily cleaning; if the partition is used in exchange for sleeping privacy, first check whether natural light can still reach the main activity location. These are trade-offs, not inevitable answers for any one material or fixture.

A 350 sq ft flat does not have only 350 sq ft of surfaces to paint. The quick calculator uses saleable area × 3 as an initial wall and ceiling budgeting assumption. The formal quantity depends on actual walls, ceilings, openings, ceiling height, surfaces behind cabinets and substrates requiring treatment.[1] If there are blisters, mildew spots or water seepage marks, first find the cause and confirm the scope. Do not confuse partial shoveling, full shoveling or simple painting.

Product data helps you ask the right questions. Actual performance depends on site conditions. Nippon Paint Hong Kong's Second Generation Super Five-in-One Interior Emulsion technical sheet gives theoretical coverage of 13 to 15 m² per litre per coat at a 30-micron dry film thickness. At 25 to 30°C, allow at least 1 hour for surface drying and at least 2 hours before recoating.[8] This is not an exclusive recommendation for this specific product, nor does it mean your wall will necessarily have the same coverage, duration, or results. Please include the brand model, primer, number of layers, base treatment and construction conditions in the quotation item by item.

  • First check that the tall cabinet will keep the main window light and curtain operation clear.
  • The paint quotation separately lists the development area, base treatment, primer, topcoat, number of layers and masking.
  • If a product is specified, obtain the technical information of the product and ask the contractor to state the actual construction assumptions.
Worked example 1

Example one: estimating painting for a 350 sq ft flat while keeping the ×3 area assumption separate from a 20% allowance

Assumptions

  • This is a hypothetical exercise illustrating the company's quick estimation method and is not a completed case, a formal quotation or the Hong Kong market average price of the company.
  • Assume that the usable area of ​​the unit is 350 square feet. First use the quick version rules to estimate the expanded area of ​​the wall and ceiling: 350×3.
  • Assume that the example unit price of "dust-proof and moisture-proof polishing oil" shown in the detailed price list is HK$21/square foot; the actual base layer, shovel bottom, brand, color, furniture masking and engineering volume have not been verified.

How to calculate quantities

  1. Estimated surface area: 350 sq ft × 3 = 1,050 sq ft.
  2. Subtotal for the assumed work: 1,050 sq ft × HK$21 = HK$22,050.
  3. A 20% planning allowance is HK$22,050 × 20% = HK$4,410, giving the owner an upper budget of HK$26,460.

Under the above pure assumptions, the subtotal of the process is HK$22,050; the upper limit of the budget including the 20% planning reservation is HK$26,460. The 20% is not an automatic price increase by the company, and this example does not include shoveling, water seepage sources, furniture moving, other processes or any unselected items.

Saleable area × 3 is a quick approximation of paint area. Confirm actual walls and ceilings, substrate condition and written scope for a formal quotation. The estimate does not guarantee a whole-home package, move-in readiness or a contractual commitment. [1][2]

Use your square footage instead and see a reference budget
Boards and hardware in custom furniture | HK Create Design
Site photo: Custom furniture on site. HK Create Design. Select an image to enlarge

05

Think of online estimates as a list of questions, not a full house commitment

The 2026 quick calculator uses saleable area for three example schemes: basic whole-flat renovation, repainting and floor tiling. Of 117 work items and options across 8 categories, 116 have published reference rates and 1 rooftop package is priced on enquiry.[1] This allows homeowners to first break down the amount of work they want to compare, but it is not 117 independent craftsmanships, nor is it possible to get an all-inclusive price for the whole house based on the square foot.

Read the exclusions alongside the total. The quick basic renovation scheme explicitly excludes complete kitchen and bathroom rebuilds, waterproofing, rewiring and replumbing,Bespoke furniture, tiles, sanitaryware and other finishes. Works insurance, management deposits and renovation administration fees are also not included automatically.[1] Therefore, you can use an estimator to organize the scope of what you want to do, and then confirm the materials, demolition, protection, loading and unloading, removal, testing and closing one by one, instead of using a total number to determine whether it is "worthy".

Online estimates and enquiries are free and do not require your name or phone number in advance. A site visit can be arranged if needed. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Book or enquire on WhatsApp 52437747.[1] The value of an on-site measure is to verify that walls and floors are straight, concealed equipment, moving routes, and building requirements; these are often the very differences that a quick estimate cannot reveal.

  • Divide each example solution into its processes and mark the three categories: "need", "no need", and "unknown".
  • Determine who will supply, who will install and how to accept the items not included one by one.
  • Provide photos of the current situation, floor plan, management office requirements and a list of items you have made before measuring.
How to choose a small unit storage solution: first look at the use, and then decide whether engineering is needed

You can swipe left or right on your phone to view the complete table.

Location/PlanWhat is suitable forMeasure the size firstCommon pricing methodsNot included or to be verifiedMain decision risks
Entrance slim cabinet with hook positionDaily shoes, keys, umbrellas and minor cleaning suppliesDoor opening arc, corridor width, electrical box/firefighting equipment location, shoe length and umbrella heightCustom-made cabinets should be broken down by dimensions and hardware; ready-made furniture should be compared by piece.Door hinge opening direction, wall not straight, baseboard closing, electric switch avoidance and protection of public areasThe depth of the cabinet or the direction of the door makes the entrance blocked; the capacity increases but the return home, moving and emergency access become worse.
Bedside to ceiling wardrobeClothing, bedding, luggage and low-frequency seasonal itemsBedside passage, whether the mattress can be replaced, room doors and cupboard doors opening at the same time, air conditioning and curtain inspection positionsList items by square feet, panels and door/drawer/basket hardwareThe accessibility of high-level floors, light troughs, air-conditioning pipes and maintenance openings must be checked according to the plans.Full-wall cabinets hinder lighting or maintenance; daily necessities are placed high up, and chairs are moved repeatedly to retrieve items after moving in.
Half-height cabinet doubles as work/dining table partitionDocuments, toys, tableware and removable small appliancesTable height and chair pull-out range, window light, socket location, and passages on both sidesCabinets are listed according to size and hardware; countertops, socket repositioning and lighting fixtures are listed separately.Electrical load, wall fixing, glass or lighting specifications and cleaning requirements need to be confirmedUse fixed large cabinets instead of variable desktops so that only one activity can be used in one space
Replace non-structural partitions with continuous storage wallsHouseholds that need to reconfigure rooms instead of just adding a cabinet or twoApproved plans, wall properties, kitchen/escape/window relationships, beams, columns, floor and ceiling connectionsDismantling, repairing, clearing, and rebuilding partitions and cabinets should be listed separately, and it is not appropriate to deal with them vaguely at a fixed price.Non-structural walls, fire protection requirements, management office procedures and applicable minor works requirements all need to be verifiedDemolish the structure or fire-resistant structure as if it were an ordinary wall; demolition and modification by the homeowner should not be used as a substitute for professional assessment

There is no "fixed price per square foot" for storage cabinets: size, internal components, panels, hardware, on-site closing and installation conditions will all affect the scope. When the last column involves changing the partition, first check according to the Buildings Department's guidelines and building documents. [1][3][4]

Platform bed with lift-up storage mechanism | HK Create Design
Site photo: Custom platform beds on site. HK Create Design. Select an image to enlarge

06

Demolition and open-plan design: check the plans and building restrictions first

When you want to demolish a wall in exchange for a storage wall or a sense of openness, you cannot judge by the thickness of the wall or the sound of knocking. The Buildings Department pointed out that if structural walls, beams or columns are modified, the owner must appoint an authorized person and a registered structural engineer to provide advice and submit drawings, and the construction will be carried out by a registered contractor after approval and consent.[3] The demolition of non-structural walls may be exempted under certain circumstances, but must still comply with the Buildings Ordinance and fire safety standards; the construction or alteration of non-structural partition walls may also involve the minor works system and designated person arrangements.[3]

An open kitchen is not just about removing the door. The Buildings Department reminds that the kitchen enclosure wall may be a structural wall, and the wall or door may also be a fire-resistant structure; removal may affect structural safety, fire spread and escape. Check the approved plans of the unit first and obtain professional architectural advice on location, dimensions, fire resistance and escape requirements.[3] This article is not legal or professional engineering advice, nor does it conclude whether a particular project requires procedures.

Aluminium windows, external walls and work at height should not be altered yourself to accommodate a cabinet or improve daylight. Aluminium windows are outside the calculator's 117 fixed-price items because frames, glass, seals, outside conditions and safe access need assessment from photos and on site.[1] Such work, together with structural, drainage, asbestos, dust or demolition work, should be planned and carried out by suitable professionals, registered contractors or other competent persons.

  • Check with the management office and owners' corporation about construction schedules, lifts, protection, deposits and waste arrangements.
  • It is required to see the approved plans and wall/kitchen/window related information before discussing the demolition and modification quotation.
  • Separately list any structural, fire protection, facade, window and drainage concerns as items to be verified.
Made-to-measure TV and display cabinets | HK Create Design
Site photo: Custom TV cabinets on site. HK Create Design. Select an image to enlarge
Project photo of kitchen cabinet installation | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

07

Electricity, pipes and concealed works: the critical time is before cabinet sealing

Small units are most afraid of discovering after the storage is completed that the sockets are covered by the headboard, the refrigerator is not properly powered, the washing machine is difficult to drain, or the air-conditioning pipe has no access. To avoid these problems, furniture plans, electrical appliance sizes, socket locations, pipe routing and future maintenance methods should be checked together before boarding, laying tiles or installing cabinets. Take photos to record the hidden location, and keep the photos and drawings in the delivery documents, which is more reliable than guessing the location inside the wall in the future.

The Electrical and Mechanical Services Department explains that electrical works including inspection, maintenance and repairs must be carried out by registered electrical contractors. For residential or commercial fixed electrical installations with an approved load exceeding 100 amps, statutory periodic inspection, testing and certification are required at least every five years; general residential units usually do not exceed 100 amps, but this should be determined by the registered contractor rather than the homeowner.[5] Therefore, do not regard "five years" as a uniform rule that all units must do when renovating. Instead, ask clearly about your installation, scope of changes, and required documents.

The water drainage, waterproofing and equipment location of the kitchen and toilet must also be confirmed one by one before closing. This article does not set any universal closure hours, gradients, or acceptance thresholds, as actual practices will depend on the project, plans, materials, and applicable requirements. A more useful question for homeowners is: Which section will be covered? Inspected by whom and when? How to record and correct problems found? The answer should be written in the project scope or process schedule, rather than just left verbally.

  • Before sealing boards, laying bricks and installing cabinets, take pictures of the locations of wires, pipes, water drains and maintenance openings.
  • Registered electrical contractors are required to describe inspection and documentation arrangements based on the actual installation and scope of work.
  • Mark the locations of valve switches, sockets, air conditioners and drains that need to be repaired in the future on the delivery drawing or photo.
Worked example 2

Example two: why removing tiles and breaking out the screed carry different rates even over the same 80 sq ft

Assumptions

  • These are two different demolition projects using the company's detailed price list for 2026 as a demonstration of project quantities. They are not completed cases, nor are they any average prices in the Hong Kong market.
  • Assume that the measured area is the same as 80 square feet; Project A is to remove the wall/floor tiles to the cement bottom, the reference is HK$30/square foot; Project B is to remove the floor and floor tiles to the concrete surface, the reference is HK$52/square foot.
  • It is not assumed that the two are interchangeable; the actual need for deep excavation, caissons, protection, handling and the number of dump trucks must be confirmed on site.

How to calculate quantities

  1. Item A: 80 sq ft × HK$30 = HK$2,400.
  2. Item B: 80 sq ft × HK$52 = HK$4,160.
  3. Difference: HK$4,160 − HK$2,400 = HK$1,760.

For the same 80 square feet, the difference between the two reference subtotals is HK$1,760. The difference comes from the different base floors to be demolished. You should not compare the total prices just by looking at the four words "bricks demolished per square foot."

This is not an instruction for homeowners to choose a cheaper process. Which floor should be removed depends on the current situation and subsequent platform requirements; when it comes to structural, drainage or unknown hidden conditions, it must be judged on-site by suitable professionals and contractors. [2][3]

Use your square footage instead and see a reference budget
Small-flat renovation: illustrated checklist | HK Create Design
Small-flat renovation: checklist | HK Create Design Select an image to enlarge

08

Signing and settlement: replace "guaranteed" with verifiable statements

Just because the total price is similar does not mean the projects are the same. Respondents to the Consumer Council's 2024 Renovation Study were most worried about unfinished work, defective work and loss of contact with the company after payment, with the proportions of 73%, 61% and 59% respectively; among those with actual renovation experience, 19% said they had had disputes with the company they hired.[4] These results are not a prediction that your project will go wrong, but rather a reminder that homeowners should put uncertainty into something in writing that can be checked before making a choice.

The standard quotation framework recommended by the Consumer Council includes works and prices, such as company information, scope, material specifications, construction period and payment arrangements; it also includes construction operations, such as re-projects, sub-contracting, completion standards, protection and cleaning; and rights arrangements such as maintenance, termination, remediation and insurance.[4] This is the Consumer Council’s consumer protection advice and is not a judgment on the adequacy or legal validity of any contract. If a term is important or unclear, appropriate professional advice should be sought.

When handing over, accept the room by room rather than by impression: try the doors, doors, drawers, cabinet doors, hardware, sockets, lamps, equipment and visible closings one by one; record the unfinished items, photos, who is responsible and the date of reply. Don’t replace the checklist with unresolved verbal promises. When concealed projects are involved, construction photos, product information and agreed documents will be delivered at the same time.

  • The quotation itemizes quantities, material specifications, maintenance, removal, alterations, maintenance and items not included.
  • Payment and project arrangements are subject to written documents from both parties; this article does not recommend fixed payment ratios or minimum construction periods.
  • The settlement is recorded with the room list, photos and revision deadlines, not just the overall look and feel.

09

Air, cleaning and final storage tests before move-in

The selection of new furniture, paint, adhesives and sealants should be planned together with ventilation and occupancy arrangements. The Consumer Council's investigation pointed out that even after the formaldehyde removal service is completed, furniture or paint may continue to release formaldehyde; some photocatalyst treatments are also affected by light, concentration and other environmental conditions.[7] Therefore, reduced odor, one-time service completion, or any promotional claims do not guarantee a healthy stay or that the air has reached a certain standard.

If you are considering formaldehyde removal orPost-renovation cleaning, ask which pollutants and areas the service measures, under what conditions, and whether warranty and retesting are included. The Consumer Council advises considering more than formaldehyde alone. Maintain ventilation afterwards and consider the needs of infants, older people, pets and anyone with respiratory sensitivities.[7] This is not medical advice and does not substitute for appropriate testing or professional advice.

Before moving in, do a "real use" test: put commonly used shoes, pots, suitcases, laundry baskets and work supplies back in their predetermined locations, and let the main users pick them up once each. If you need to move three items to get to daily necessities, or if a maintenance slot is completely blocked, it is often easier to adjust the shelves, compartments, or item positions now than to change the cabinets later. The success of a fine unit is not how neat it looks in photos, but how it can be maintained smoothly every day.

  • Don’t take formaldehyde removal services or the disappearance of odors as a guarantee of a healthy stay.
  • Check the scope of measurement, exclusions, maintenance and review arrangements for cleaning or treatment services.
  • Test storage, door openings, passageways, and maintenance locations with real items before moving in.

FAQ

6 practical questions answered

01Small units must have top cabinets, is storage sufficient?

Not necessarily. A full-height cabinet adds space for occasional items but can obstruct light, curtains, air conditioning or access for servicing. Separate daily, monthly and seasonal items, keep daily items within reach and size the upper compartment for luggage or bedding. Check that the bed, doors and drawers can all be used.

02Are sliding door wardrobes more suitable for narrow rooms than sliding door wardrobes?

uncertain. The sliding door can reduce the space required for the door panel to open outwards, but at the same time it will cover part of the cabinet; the sliding door can be fully opened, but the door panel and the standing position must be reserved. Draw the bed, door, drawer and user position on the floor plan, and simulate changing clothes and sheets to know which one has the least conflict. The quotation should also separately list the door panels, rails or door hinges, internal partitions and closings.

03Is an online budget based on saleable area a whole-flat renovation quotation?

No. The company's express version is an example estimate of the specified scope: basic renovation does not include complete kitchen and toilet reconstruction, waterproofing and plumbing resurfacing, furniture, tiles, sanitary ware and other finishing materials, etc.[1] Saleable area × 3 is an initial paint-area estimate. Use the site visit and written quotation to confirm selected work, quantities, materials, haulage, protection, management fees and exclusions.

04Is on-site measurement free? What should I prepare so that I don’t do it in vain?

Online estimates and enquiries are free. The company publishes the following terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[1] You can inquire via WhatsApp 52437747. Before measuring, prepare a floor plan, photos of each wall and window, furniture and appliance dimensions, items you want to keep, management's construction requirements, and features you can't compromise on, such as clothes drying, strollers, or workbenches.

05Can I remove a wall in my room or kitchen to add another wall for storage?

It should not be dismantled or modified by yourself. The Buildings Department pointed out that changes involving structural walls, beams or columns must be assessed by an authorized person and a registered structural engineer, and must be constructed by a registered contractor after obtaining approval and consent in accordance with the procedures; kitchen enclosure walls or doors may also involve structural or fire-resistant construction.[3] Even if it is considered a non-structural wall, it still needs to comply with relevant regulations, fire safety and building requirements. Check the approved plans first and obtain appropriate professional advice.

06There is no smell after renovation. Can children move in immediately?

There is no guarantee that there is no smell or that a formaldehyde removal service has been performed. The Consumer Council points out that furniture or paint may continue to release formaldehyde after service, and air assessment should not only measure formaldehyde.[7] Arrangements should be made carefully based on material information, actual ventilation, cleaning or testing needs, and the conditions of infants, young children, the elderly, pets or sensitive people at home; seek help from appropriate professionals when necessary.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design Quick Estimate 2026 Company Price List and Estimator Accessed: 2026-10-21
  2. [2]HK Create Design detailed project budget and 2026 price base Accessed: 2026-10-21
  3. [3]Buildings Department: Alteration and addition works to domestic premises Accessed: 2026-10-21
  4. [4]Consumer Council: Home Renovation Industry Better Governance for Better Protection Research Report Accessed: 2026-10-21
  5. [5]Electrical and Mechanical Services Department: Periodic inspection, testing and certification of fixed electrical installations Accessed: 2026-10-21
  6. [6]Census and Statistics Department: 2021 Census Accessed: 2026-10-21
  7. [7]Consumer Council: Post-renovation Cleaning and Formaldehyde Removal Services Accessed: 2026-10-21
  8. [8]Nippon Paint Hong Kong: technical data for Second Generation Super Five-in-One Interior Emulsion Accessed: 2026-10-21