Skip to main content

TILING & MASONRY

Tiling and rendering: how to calculate HK$78/sq ft for tiles and HK$43/sq ft for render

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Straight-laid floor or wall tiles at HK$78 per sq ftPublished prices · Estimate the cost of 117 work items online
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

Send a wide view and close-ups of the problem, and tell us whether you need tiling, rendering or levelling. You can enquire before measuring.

Published reference rates are HK$78 per sq ft for straight-laid floor tiles up to 600 × 600 mm (minimum HK$3,250) and HK$43 per sq ft for rendering (minimum HK$2,350). Finish tiles, removal and waterproofing are extra. See a 150 sq ft example and real project photos. Send site photos if you need replacement floor tiles, wood-effect tiles, wall rendering or a brick partition. We itemise removal, substrate repairs, levelling, waterproofing, tiling and exclusions. You can enquire before measuring. If concealed conditions emerge after strip-out, we confirm the revised scope in writing before proceeding.

Data verification date:2026-11-13・Numbers are accompanied by sources

Completed wood-effect floor tiling at Kingswood Villas, Tin Shui Wai
Kingswood Villas, Tin Shui Wai · Tiling · July 2026 · Completed project photos

Scope of work, published prices and photo enquiries

Masonry and tiling quotations: separate prices for tiling, rendering and brickwork

Planning new floor tiles, wood-effect tiles, wall rendering or a brick partition? Check the actual work area, old materials and substrate condition. Measure walls and floors separately because the flat’s saleable area does not give the area to be tiled.

1. Choose the type of work

You can attach photos in WhatsApp and ask before you have dimensions or a final scope.

Other details about scope, timing or current conditions (optional)

Continue to the enquiry form with this scope Your selected project type and scope carry over. You can add other details on the form.

You can enquire without filling in these fields. The button opens a draft in WhatsApp. Add any photos there and send it when you're ready.

Photos from our sites

Floor tiles, wall tiles and brickwork: see the construction details.

View more project photos
Wood-effect floor tiles laid at Kingswood Villas, Tin Shui Wai. Work on the walls is still in progress.
Wood-effect floor tiles laid at Kingswood Villas, Tin Shui Wai. Work on the walls is still in progress.
Kitchen after tiling: marble-effect wall tiles, wood-effect floor tiles and finishing at the step.
Kitchen after tiling: marble-effect wall tiles, wood-effect floor tiles and finishing at the step.
Brickwork in progress, with a spirit level and laser alignment lines visible.
Brickwork in progress, with a spirit level and laser alignment lines visible.

These photos document different sites. We check the scope, inclusions and prices for your own project item by item against actual conditions.

Send photos of a similar job to our team

See separate prices for tiling, rendering and brickwork.

Check how quantities are measured, the minimum charge and exclusions before comparing quotations for your scope.

D01 · Our published indicative prices

Lay floor tiles up to 600 × 600 mm in a straight pattern

HK$78 / sq ft

Minimum charge: HK$3,250

Straight-laid tiles up to 600 × 600 mm, including labour and bedding materials. Finish tiles, removal, levelling and waterproofing are extra.

B01 · Our published indicative prices

Apply cement–sand render to walls

HK$43 / sq ft

Minimum charge: HK$2,350

Cement–sand wall rendering. Removal of the existing finish, painting and tiling are itemised separately as required.

B03 · Our published indicative prices

Build a brick partition and render both faces

HK$93 / sq ft

Minimum charge: HK$3,700

New brick partition with rendering on both sides. Doors, painting and relocation of switches are separate. Check site feasibility first.

Choose the items that match your scope. The options are not all added together. Your written quotation after on-site measurement confirms the price.See the full price list and measurement rules

Why does the price for 20 sq ft of tiling work differently from 150 sq ft?

rangeBasis of charge and inclusionsIndicative cost
150 sq ft of straight-laid floor tiles150 × HK$78 = HK$11,700HK$11,700
20 sq ft of straight-laid tiles in a small area20 × HK$78 = HK$1,560, below the HK$3,250 minimum chargeHK$3,250

Example for D01 straight-laid floor tiles up to 600 × 600 mm. The rate covers labour and bedding materials. Finish tiles, removal, levelling, waterproofing and debris removal are extra. Measure the actual area to be tiled rather than the flat’s saleable area.

Source:Our published 2026 price list and minimum charges. These are worked examples. The final price is confirmed in writing after an on-site measurement.

Which details should I look at in masonry work?

Bathroom tiling on site. Check the shower floor, drain and wall tiles as separate items.
Bathroom tiling on site. Check the shower floor, drain and wall tiles as separate items.
Floor levelling diagram: check the finished height and threshold before laying tiles.
Floor levelling diagram: check the finished height and threshold before laying tiles.
Real site photo of a brick partition at Upper Wong Tai Sin Estate. The quotation should state the wall length, height and area of rendering on both sides.
Real site photo of a brick partition at Upper Wong Tai Sin Estate. The quotation should state the wall length, height and area of rendering on both sides.
HK Create Design · Records from our sites
Site photos of work in progress

Masonry repairs in Mong Kok: 2 stages and 3 edge details

Compare the top, side and lower edge of the same opening, from the grey repair stage to the later white finish. These are stills from the original site videos, taken at different angles.

Earlier repair stage
Video still, Mong Kok: grey repair patches at the top and sides of the opening.Tap to enlarge
Later surface finish
Video still, Mong Kok: a white finish now covers the edge of the opening, with protection and materials still on site.Tap to enlarge

Mong Kok Opening edges and surface finishing

What to look for in the photos

  1. Top edge: check the repaired area and how it meets the original surface.

  2. Side: compare the earlier substrate repair with the later surface finish.

  3. Lower edge: check the finishing and subsequent clearance. Final acceptance requires a site inspection.

4 and 5 May are the dates of the photographs. They show work in progress, with protective coverings still in place, and do not establish the duration of the job.

Send photos to discuss the scope Send a wide shot and close-ups so we can identify the work area and discuss the scope.

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Site photos of work in progress and completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Completed wood-effect floor tiling at Kingswood Villas, Tin Shui Wai
    Completed project photosKingswood Villas, Tin Shui Wai · Tiling · July 2026
  • New floor screed and wall render after bathroom tiles were removed
    Site photoHong Kong · Plastering, screeding and tiling · April 2022
  • Large-format marble-effect tiles being laid in a bathroom
    Site photoHong Kong · Tiling · May 2021
  • Building a brick partition using a laser level
    Site photoHong Kong · Plastering, screeding and tiling · October 2025
  • Completed marble-effect wall tiling and wood-effect floor tiling in a kitchen
    Completed project photosHong Kong · Tiling · July 2021
  • Rendering and plastering on site | HK Create Design
    Site photoHK Create Design masonry project photos
  • Site photo of a masonry partition under construction | HK Create Design
    Site photoHK Create Design masonry project photos
  • Masonry work in progress | HK Create Design
    Site photoHK Create Design masonry project photos
  • Masonry and rendering in Tai Kok Tsui | HK Create Design
    Site photoTai Kok Tsui · Plastering, screeding and tiling · May 2026
  • Masonry and rendering at Upper Wong Tai Sin Estate | HK Create Design
    Site photoUpper Wong Tai Sin Estate · Plastering, screeding and tiling · June 2026
  • Building a brick partition at Upper Wong Tai Sin Estate | HK Create Design
    Site photoUpper Wong Tai Sin Estate · Plastering, screeding and tiling · June 2026

Compare the scope shown in the photos

Illustrated comparison of options

  • Room floor and wall tiling during construction and after finishing
    From substrate preparation to finished tile edgesCheck separate prices for removal, levelling, laying labour, finish tiles and debris clearance.

WORKED EXAMPLE

Estimate the cost of masonry for your own project

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Self-leveling consumption estimation (Mapei Ultraplan)

  • Average leveling thickness 3mm
  • Factory dosage 1.6 kg/m²/mm
  • 23kg per pack
  1. Amount per square meter (3mm)1.6 kg × 3mm = 4.8 kg/m²144 kg
  2. Number of packages requiredTotal dosage ÷ 23kg6.3 Package

Approximate number of packages required (excluding losses)6.3 Package

If the height difference is large or exceeds 10mm in some areas, other products or layers must be used; the actual thickness must be measured on site with a level. [14]

Removing floor tiles and laying large tiles in the living room: budget tips

  • A02 Remove the floor and dig the floor tiles until the concrete is visible HK$52/sq.ft.
  • B02 Floor leveling HK$22/sq.ft.
  • D04 large brick 600×1200mm paving HK$120/sq.
  • Clearance of ceramic tile materials and soil head not included (A11)
  1. A02 Remove floor tiles until you see concreteArea × HK$52HK$10,400
  2. B02 Leveling the floorArea × HK$22HK$4,400
  3. D04 Large brick pavingArea × HK$120HK$24,000

Indicative masonry cost, excluding tiles and waste removalHK$38,800

Minimum charges apply: B02 HK$1,850 and D04 HK$3,700. Level differences over 30 mm need a separate quote. A11 rubble removal is HK$4,200 per truckload or priced by the bag. Refer to the written quote after site measurement. [1]

Tiling and floor refurbishment before and after

Tap a photo to see the details. Send us a photo of your own space to ask about similar work.

  • Before workRepair to an electrical conduit chase at a doorway – before workAfter completionRepair to an electrical conduit chase at a doorway – after completion
    Repair to an electrical conduit chase at a doorwayLook at the joint between the door frame and the wall after the conduit chase was filled. When sending photos, mark any electrical points you want to keep.
  • Before workBathroom floor before tilingAfter completionBathroom floor after tiling
    Bathroom floor tilingCompare the floor-to-wall joint before and after tiling. Check removal, substrate materials and laying costs separately in the quote.

View all project comparisons and customer reviews →

Send photos on WhatsApp for a quote on similar work

HOW WE HELP

How can we help you

WhatsApp free consultation

Send the on-site photos, unit area and scope of what you want to do to WhatsApp 5243 7747 (https://wa.me/85252437747). Designers and masters with more than 15 years of renovation experience will share the plan with you for free. They will explain clearly what can be done and what needs to be checked first.

Limited-time free on-site measurement and professional advice

For work that needs an on-site assessment, our tradesperson can meet you to measure, inspect and explain the proposed work. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

Every time we shut down for inspection, the ones that are not closed will be counted first.

Every step of demolition, base layer, waterproofing, water testing, and brick laying will be photographed, and we will ask you to check the key points together. If you have any additional questions after dismantling, please make a written quotation and confirm your decision first.

Designer + follow-up by master with more than 15 years of experience

The designer is responsible for the scope and details, and the masters with more than 15 years of experience are responsible for judging the process and on-site quality. They take on all large and small projects, including demolishing one or two cabinets and building a wall.

Garbage removal and basic cleaning after completion

After every order is completed, the garbage will be removed, swept, and basic cleaning will be done. If deep cleaning or formaldehyde removal is required, the professional cleaning company will follow up. You do not have to hire another person.

AI quotation assistant with 117 public prices

Our 117 list rates are available through /calculator and /ai-quote for a preliminary budget. The final price is the written quotation after site measurement.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same bathroom with large light-grey tiles, a glass shower enclosure, a wall-hung vanity and a new WC.
Before illustration: a small bathroom with cracked, yellowing blue-and-white tiles, a pedestal basin, a rusty mirrored cabinet and a bath.
Illustration before workIllustration of the proposed result
Design illustration · Design reference: bathroom masonry renovation
After concept: the same living room with light oak-effect flooring and new white skirting boards.
Before illustration: old beige living room tiles with cracks, chipped corners and dark grout.
Illustration before workIllustration of the proposed result
Design illustration · Plan reference: Level the old floor tiles and then replace the floor

Estate Before / After

Design illustration of the same kitchen after renovation, with new cabinets and a new worktopIllustration before workIllustration of the proposed result
Design illustration · Design concept for Taikoo Shing: kitchen refurbishment, before and after from the same angle.(Taikoo Shing, Quarry Bay)

Hong Kong Island · Quarry BayKitchen renovationDesign concept

Taikoo Shing, Quarry Bay | kitchen renovation

Demonstration of renovation of an old kitchen: removal, waterproofing, hot and cold water pipes, and replacement of new kitchen cabinets and countertops.

  • Strip-out
  • Waterproofing
  • hot and cold water pipes
  • kitchen countertops
What work does this design involve? (7 steps)
  1. Register the renovation with the management office and protect the floors of elevator lobbies, corridors and unit entrances
  2. Remove the old kitchen cabinets and wall and floor tiles, make the plumbing and electrical connections safe, and clear the debris the same day.
  3. The junction between the floor and the wall is turned up and made of SikaTop Seal-107 waterproofing with two layers, and the zinc basin is reinforced.
  4. Redo the sink and hot and cold water pipes of the washing machine, and test the pressure after completion.
  5. Lay new wall and floor tiles, install moisture-proof board floor cabinets, wall cabinets and quartz stone countertops
  6. Install range hoods, cooking stoves and under-cabinet lights, and test them one by one
  7. When clearing away garbage and doing basic cleaning, remind guests to use water before the glue is dry.
Ask about similar projects
Design illustration: the same bathroom with new tiles and sanitaryware.Illustration before workIllustration of the proposed result
Design illustration · Design concept for Heng Fa Chuen: bathroom masonry, before and after from the same angle.(Heng Fa Chuen, Chai Wan)

Hong Kong Island · Chai WanMasonry / bathroomDesign concept

Heng Fa Chuen, Chai Wan | masonry and bathroom works

Demonstration of detailed toilet renovation: dismantling, waterproofing two layers, closing the water to test the water, then laying tiles and installing sanitary ware.

  • Strip-out
  • Two layers of waterproof
  • Flood testing
  • Tiling and sanitary ware
What work does this design involve? (7 steps)
  1. Register the project with the management office, protect the elevator lobby and corridors, and drop waste materials in batches.
  2. Remove the old bathroom tiles, bathtub and sanitary ware until they are bottomed out, and take photos of the old water pipe levels to record them.
  3. Repair the cracks in the base and redo the slope of the platform according to the water level.
  4. The entire floor, turned-up wall and full-wall shower stall are made of SikaTop waterproof two-layer
  5. The land is leaking and the water is closed for 24 hours. Observe the water level and take photos to record it. Lay the bricks first.
  6. Lay light-colored wall and floor tiles, build urns and casings, and install toilets, basins and showers.
  7. Apply anti-mold glue, clean brick surfaces, remove garbage and basic cleaning
Ask about similar projects
Design illustration: the same bathroom with new tiles and sanitaryware.Illustration before workIllustration of the proposed result
Design illustration · Design concept for Amoy Gardens: bathroom masonry, before and after from the same angle.(Amoy Gardens, Ngau Tau Kok)

Kowloon · Ngau Tau KokMasonry / bathroomDesign concept

Amoy Gardens, Ngau Tau Kok | masonry and bathroom works

Demonstration of detailed toilet renovation: dismantling, waterproofing two layers, closing the water to test the water, then laying tiles and installing sanitary ware.

  • Strip-out
  • Two layers of waterproof
  • Flood testing
  • Tiling and sanitary ware
What work does this design involve? (7 steps)
  1. Register the project with the management office, protect the elevator lobby and corridors, and drop waste materials in batches.
  2. Remove the old bathroom tiles and sanitary ware until they are bottomed out, and check the water level and floor drain.
  3. Repair the base layer and redo the dewatering slope of the floor
  4. The inner corners and pipe positions are reinforced with two layers of SikaTop Seal-107 waterproofing.
  5. Close the water and test it for 24 hours to confirm that there is no water seepage before laying bricks.
  6. Lay wall and floor tiles and epoxy joints, install toilet, basin, showerhead and bathroom cabinet
  7. Apply anti-mold glue, remove garbage and perform basic cleaning
Ask about similar projects
See more housing estate cases

KEY NUMBERS

Masonry: figures to check before work begins

company public price

HK$78/ sq. ft.

Floor/wall tile front paving (D01/D02)

Published rate: straight-lay tiles up to 600 × 600 mm, including setting out, layout, adhesive or mortar bedding, grouting and edge finishing. Minimum HK$3,250.

[1]

Factory technical information

10–50mm

RM725 single layer vertical repair thickness

The repair range is generally 10mm or more (locally at least 5mm); the maximum single layer on the vertical surface is 50mm, and the maximum single layer on the ceiling is 40mm.

[12]

Factory technical information

1–10mm

Ultraplan self-leveling thickness per layer

The dosage is about 1.6 kg/m²/mm; light walking can be done in about 3 hours, and brick, stone or wooden floors can be laid after 12 hours.

[14]

Factory technical information

5–7day

SikaTop-555 Seal Initial Care

Initial curing takes about 5-7 days before tile adhesive or protective layer can be laid; full curing takes about 28 days (depending on ventilation, temperature and humidity).

[11]

Factory technical information

≥3day

SikaTop-300 Seal Care before water testing

The manufacturer specifies at least three days of curing before pond testing. Tile or render afterwards.

[10]

government/official

9,402 buildings

Private residential and mixed-use buildings aged 50 years or above

At the end of 2025, Hong Kong had 36,546 private domestic and composite buildings. Of these, 9,402 were at least 50 years old, 6,751 were aged 40–49 and 8,721 were aged 30–39. Around 70% were at least 30 years old.

[7]

government/official

476images

Building Repair Order issued by Buildings Department in 2025

The Buildings Department issued 476 repair orders in 2025 (525 in 2024) under Section 26 of the Buildings Ordinance, covering individual units and common parts, targeting defective buildings such as peeling concrete.

[7]

government/official

More than 60%

Cases of water seepage in public housing come from housing estates that are over 30 years old

The Housing Bureau reported 9,203 seepage or leakage cases in occupied public rental flats in 2025. More than 60% came from estates over 30 years old. Sources were often bathroom floors or walls. Some cases involved waterproofing or pipes damaged during tenants’ renovations.

[2]

CHARTS

Masonry figures at a glance

Age distribution of private residential and mixed-use buildings (end 2025)(Unit: buildings)
19 years or less
6,475
20–29 years
5,197
30–39 years
8,721
40–49 years
6,751
50 years or more
9,402

The figures provided by the Buildings Department in response to a question raised by the Legislative Council Finance Committee (DEVB(PL)156) only include private residences and mixed-use buildings, and do not include subsidized sale houses. The older the building, the more common it is that there will be hollows, peeling concrete and aging waterproofing. [7]

Buildings Department Building Repair Order Section 26(Unit:images)
2024
525
2025
476

Including individual units and common parts; in 2025, there will be 165 tickets for individual units and 311 tickets for common parts. The figures reflect official enforcement efforts and do not represent the total number of defective buildings in Hong Kong. [7]

FULL GUIDE

Masonry: stages and points to check

How many older buildings in Hong Kong need masonry repairs?

Hong Kong has a large stock of older buildings. At the end of 2025, the Buildings Department recorded 36,546 private domestic and composite buildings. Of these, 9,402 were at least 50 years old, 6,751 were aged 40–49 and 8,721 were aged 30–39. Around 70% were at least 30 years old. Common masonry problems include debonded render, cracked tiles, uneven floors, spalled concrete soffits and ageing bathroom waterproofing.

The Buildings Department issued 476 repair orders under section 26 of the Buildings Ordinance in 2025 and 525 in 2024. The Housing Department recorded 9,203 seepage or leakage cases in occupied public rental flats in 2025. More than 60% involved estates over 30 years old, and many originated at bathroom floors or walls. The quality of masonry and waterproofing can affect your flat and the home below.

[7][2]

What masonry includes, from strip-out to tiling

Masonry provides the base for later trades. It can include removing old tiles and cement beds, repairing concrete, rendering walls, screeding or self-levelling floors, building partitions, waterproofing bathrooms and kitchens, flood testing, wall and floor tiling, shower bases, standard grout and epoxy grout. Defects found after carpentry, painting or sanitaryware installation can mean removing completed work.

Our masonry rates are itemised per square foot: B01 cement-sand wall rendering HK$43, B02 floor levelling HK$22, B03 new brick partition rendered on both sides HK$93, B04 converting a painted wall to a rendered finish HK$26, and B05 preparing a tiled wall for painting HK$31. Waterproofing items are C01–C05 and tiling D01–D09. Compare each item individually.

[1]

Principle: Cement mortar becomes hard after spotting and requires maintenance.

Cement gains strength through hydration, which needs water and time. Direct sun or a dry substrate can pull moisture from render or mortar too quickly, leaving a weak or powdery surface, cracks or loss of bond. A hollow sound on tapping can indicate detachment.

Therefore, the base layer should be wetted until it is saturated and dry before construction, and it should be prevented from drying out too quickly after construction. Taking Optimix RM725 repair mortar as an example, the factory requires that the base surface be soaked and thinned first, and then cured immediately after completion. Mapei Ultraplan self-leveling has a specified water addition ratio. It can be used for light walking in about 3 hours, and tiles or wooden floors can be laid after 12 hours. Keeping up with the manufacturer's information is the key to a stable cement and water project.

[12][14]

Common faults: hollow tiles, cracking and concrete spalling

Hollowing and bursting of ceramic tiles are mostly caused by insufficient tile glue or glue when laying, the base layer is not clean, and there are no expansion joints reserved, or the old tiles themselves are hollowed out, and the new tiles are only laid on top of the loose layer. Large bricks (600×1200mm or above) especially need to be double-sided glued, otherwise the four corners will be easily hollowed out.

Moisture can corrode reinforcing steel and cause it to expand, breaking away the concrete cover. This is common on kitchen and bathroom ceilings affected by seepage from above. A surface patch can soon fail if the corrosion and source of seepage remain. Old floors often have an uneven cement bed that can cause noise under timber flooring or lipping in large tiles.

  • "Empty sound" when knocking bricks: The tile adhesive is not full or the old ones are hollow.
  • The brick joints burst into straight lines: there are no expansion joints or the base layer is disturbed
  • Spalling ceiling concrete and rusty reinforcement: investigate seepage from above first
  • The floor makes noise after just one line: Insufficient leveling, which needs to be dealt with before laying the floor.

Repair of peeling concrete: same process and restrictions

Standard repair practices include: removing loose concrete, cutting edges at right angles to avoid feathery thin edges, exposing and removing loose rust on steel bars, applying steel bar protection, moistening the base surface before sweeping primer, filling with repair mortar in layers, and curing. Optimix RM725 is a lightweight repair mortar that complies with Hong Kong Housing Department Class 25. The single layer on the vertical surface can be up to 50mm, and the single layer on the ceiling can be up to 40mm. The general repair thickness is 10mm or above.

Pay attention to regulations: if it involves structural components such as beams, columns, shear walls, etc., or if the scope is large, it may be a minor project of the Buildings Department and may even require an authorized person to handle it. The Buildings Department will also issue repair orders for defective buildings. We deal with small-scale spalling in the unit, but if you see large areas of rusty steel bars and directional cracks on site, we will recommend that you hire a professional for evaluation, and we will not make up for it yourself.

[12][13][8][7]

Leveling is the same as leveling: the wall must be straight and the ground must be level.

Set out the wall using lines or a level, apply cement-and-sand render in coats and strike it off with a long straightedge. An overly thick single coat can crack or debond. Before tiling a painted wall, strip it and prepare the render base under B04. Tiling onto loose paint risks failure.

There are two types of floor leveling: if the height difference is large, use British sand to make the floor (B02, if the height difference is greater than 30mm, please consult); if it is only slightly uneven and requires wooden flooring or SPC, you can use self-leveling (J03, HK$22/foot). Each layer of Mapei Ultraplan is 1-10mm, and the dosage is about 1.6kg per square meter per millimeter; deep pits exceeding 10mm must be filled with other materials first. The wet area floor must also have a slope for draining water. Water cannot accumulate in the corners for the sake of being "flat".

[14][1]

Bathroom and kitchen waterproofing within the masonry works

For bathroom waterproofing, we will remove it to the bottom, repair the base layer, strengthen the inner corner pipes, and then apply two layers of waterproof slurry. If the water is turned off and tested, the tiles will be laid first. The Buildings Department's new building guidelines recommend that the bathroom floor be fully waterproofed, the wall should be extended by 300 mm, and the shower cubicle should be at least 1,800 mm around. Our approach to C02 is to make the entire floor, extend the wall by 6 feet, and fill the entire shower wall.

Waterproof materials need to be cured according to the manufacturer’s instructions: SikaTop-555 Seal requires about 5-7 days for initial curing and about 28 days for complete curing; SikaTop-300 Seal requires at least 3 days for curing. Do a water storage test first. Please see our waterproofing project page for details.

[4][11][10][1]

Tile paving: size and paving method are the same as the price

The price of laying tiles mainly depends on the size and laying method of the tiles. 600×600mm or below (D01/D02) HK$78/sq. ft.; wood grain long bricks laid with staggered seams (D03) HK$98/sq.; large bricks 600×1200 or 800×800mm (D04) HK$120/sq. 750×1500mm and above (D05) HK$150/sq. ft., need to evaluate the transportation route and lift size; fine bricks, mosaics, hexagonal bricks (D06) HK$130/sq. ft.

Before laying bricks, lay out the bricks first. Decide to start from the edge and cut the bricks on the edge to avoid narrow strips at the door or in prominent locations. The tile adhesive used for paving is thinner and more uniform than traditional glue, and is suitable for large bricks on the same wall; the floor must have a full brick base. You can use ordinary caulking or epoxy caulking (D08, HK$21/sq. ft.) to clean the openings. It is recommended to use anti-mildew caulking in wet areas.

Before tiling, we treat the substrate with a bonding primer and lay tiles with tile adhesive. We use DOWSIL mould-resistant silicone at kitchen and bathroom tile edges, sanitaryware joints and finishing details.

[1]

Click here to see the quote from the plasterer

Of preliminary quotes assessed by the Consumer Council, only 38% listed every work item, 28% gave quantities for each operation and 20% provided unit rates. For masonry, check removal depth, render area, levelling method, waterproofing extent and number of coats, flood testing, tile area and size, tile supplier, grout and waste removal.

The Consumer Council recommends that the actual construction area of ​​plastering projects should be listed instead of just "one type". Also make an agreement: if hidden problems are found after disassembly (such as leaks in underground pipes, cracks in floor slabs), photos of the samples will be taken, and written quotations will be made with your confirmation first. All changes we make will be preceded by a written quotation.

[5][6]

Spotting and acceptance: knock, measure, pour water

At handover, gently tap tiles with a rubber mallet or coin and listen for hollow areas. Use a long straightedge or level to check wall alignment and floor flatness. Adjoining tiles should have minimal lipping and no sharp edges. Check straight, consistent joints and fully filled grout.

Pour a bucket of water into the wet area. Make sure the water flows along the slope to the floor drain. There should be no water accumulation in the corners. The cement repair site must be tapped to check that there are no hollows and thin edges around it; there must be water test records for waterproofing. Any problems will be flagged on site and followed up before completion.

  • Follow up on extensive hollow-sounding areas
  • Level: the floor is flat and the wall is vertical
  • Pour water: There is no accumulation of water in the wet area
  • Brick joints: straight, even and full
  • Photo: Waterproofing and Water Testing Records

Common mistakes

Common mistakes include laying tiles directly on paint without stripping and rendering, applying adhesive to only one surface of a large tile and leaving voids at its corners, or omitting movement joints so tiles crack as they expand and contract. Other problems include tiling before flood testing, using self-levelling compound outside its specified thickness, patching spalled concrete without addressing rusting reinforcement or seepage, and removing walls without first establishing their structural role.

The Housing Department pointed out that water seepage in some public housing estates is caused by tenants damaging the waterproofing layer or pipes during self-renovation; therefore, any masonry projects involving wall and floor digging in wet areas should be repaired and waterproofed and tested for water in advance.

[2]

Maintenance: Brick joints, silicone and ceilings should be inspected regularly

The ceramic tiles themselves are very durable, but the weak points are the seams and openings. If the joints between the bricks in the wet area turn black or become loose, they need to be cleaned and refilled; the silicone at the junction of the tank, wash basin and wall becomes moldy and cracked and needs to be repainted. If you see cracks, water stains or slight bulges in the ceiling, check as soon as possible to see if there is water seepage or corrosion of the steel bars. The sooner the ceiling is repaired, the smoother it will be.

After we finish the work, we will hand over photos of waterproofing and water testing, ceramic tile models, and grout information. We will be eligible for refunds if you install the tiles or repair the joints in the future.

COMPARE

Compare options for masonry

Comparison of bathroom/terrace waterproofing materials (factory data)

ProductsTypekey dataMaintenance/next process
SikaTop®-555 SealTwo-component flexible polymer cement waterproof slurryCrack bridging >1mm; elongation at break ≥200%; tensile strength ≥1 MPaInitial curing takes 5-7 days; full curing takes about 28 days
SikaTop®-300 SealTwo-component highly elastic polymer cement waterproof slurryPenetration 0mm under 50m water head pressure; tensile bond strength >1 MPaAt least 3 days of curing. Test the water first and then lay the tiles.

The data are typical values ​​from the factory laboratory; actual construction must be based on the product technical data sheet and site conditions. [11][10]

Concrete repair vs floor leveling: What’s wrong with using the wrong materials?

ItemOptimix RM725Mapei Ultraplan
PurposeStructural/appearance repair after peeling concrete and corroded steel bars, suitable for vertical and ceiling bottomsLevel internal floors before laying tile, stone, vinyl or timber flooring
Thickness per coatVertical maximum 50mm; ceiling bottom maximum 40mm1–10mm per layer
Certification/StandardsComplies with Hong Kong Housing Department Class 25; HKCI PCCS-RM certificationEN 13813 CT-C30-F7;EMICODE EC1 R Plus
Mixing waterAdd 3.6–4.0 liters per 20kg packageAdd approximately 22-26 parts of water per 100 parts of powder (depending on regional version)
28-day compressive strength20–40 MPa (Class 25 requirements, compliant)30 N/mm²

The two are not interchangeable; repairs involving structural components (beams, columns, shear walls) are minor works or require professionals. Please refer to the Buildings Department's guidelines for details. [12][13][14][8]

Choosing tile sizes, laying patterns and published rates

ItemApplicablePublic unit pricePay attention to
D01/D02 600×600mm or below main pavingGeneral floors and wallsHK$78/square foot (minimum HK$3,250)Ceramic tile materials are extra
D03 Wood Grain Strip BrickWood grain effect in living room, dining room and bedroomHK$98 per sq ftThere is a surcharge for diagonal bunks for herringbone/herringbone bunks.
D04 large brick 600×1200/800×800mmHall, want to reduce brick jointsHK$120/square foot (minimum HK$3,700)Double-sided glue, leveling device, two-person handling
D05 Extra Large Brick/Stone Slab 750×1500mm or aboveHigh end effectHK$150/square foot (minimum HK$4,650)To assess handling routes and lift dimensions
D06 fine brick/mosaic/hexagonal brickBathroom and kitchen feature wallsHK$130 per sq ftAlign each piece piece by piece and scan the edges with fine seams.
D08 epoxy seamWet areas, light colored bricksHK$21/square foot (minimum HK$1,400)To be constructed after clearing the seams

Prices come from the company's 117 public prices; the final quotation is subject to written quotation after on-site measurement. [1]

MATERIAL LIBRARY

Material analysis library

All specifications come from the manufacturer's public technical data; the numbers of different models in the same series may be different. Before placing an order, refer to the technical documents of the actual materials used.

Optimix · concrete repair mortarRM725 lightweight repair mortar (Hong Kong Housing Department Class 25)Ready-mixed, shrinkage-compensated polymer-modified lightweight repair mortar, suitable for repairing vertical and ceiling-mounted concrete spalling.
Thickness per coat
Vertical ≤50mm; ceiling bottom ≤40mm; general ≥10mm
28-day compressive strength
20–40 MPa (conforming to HKHA Class 25)
7-day bond strength
>1.5 MPa
Working time
About 45 minutes at 25°C; about 30 minutes at 35°C
Mixing water
Add 3.6–4.0 liters per 20kg package
VOC
≤10 g/L

Suitable for:Corrosion of steel bars leads to spalling of concrete, honeycombing and cavity repair

Not suitable for:Large area leveling of the floor

[12][13]
MAPEI Mapei · Floor levellingULTRAPLAN ultra-fast drying self-levelingSelf-leveling screed for indoor use, dries quickly, can withstand higher loads, and prepares a smooth base for various floor finishes.
Thickness of each layer
1–10mm
Operational time
20–30 minutes
light walking
about 3 hours
Can be laid on the floor
About 12 hours later
Consumption
1.6 kg/m²/mm
Packaging
23kg

Suitable for:Leveling before laying wooden/plywood floors, renovating old floor tiles

Not suitable for:Outdoors, local deep pits exceeding 10mm

[14]
Sika Sika · Flexible waterproof slurrySikaTop®-555 SealTwo-component polymer modified cement flexible waterproof coating with weather resistance and crack bridging capabilities.
Crack bridging
>1mm(ASTM C836)
Elongation at break
≥200%(ASTM D412)
Surface stem
30°C approx. 45 minutes
Initial maintenance
5–7 days
fully maintained
About 28th

Suitable for:Bathroom, terrace floor and wall base, base with slight cracks

Not suitable for:Untreated active structural cracks

[11]

SITE SOP

Masonry: work standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Adapted according to the factory construction instructions

Concrete peeling repair process (adapted according to Optimix construction instructions)

  1. 1. Chiseling and trimming

    Remove loose concrete and cut edges at right angles around the repair area to a depth of at least 10mm to avoid feathery thin edges.

  2. 2. Removing rust from steel barsshutdown checkpoint

    Expose and remove loose rust on the surface of the corroded steel bars, and apply PE polymer emulsion cement slurry (PE:cement = 1:1.5) for protection.

  3. 3. Moisturizing the base surface and slurry

    Soak it with clean water until the surface is saturated and dry, then apply a thin layer of primer; when the primer becomes sticky, apply mortar.

  4. 4. Mixing materials and construction

    Add 3.6–4.0 liters of water to each package and mix mechanically for about 5 minutes until there are no lumps; compact with a gray spoon or gloves.

  5. 5. Maintenanceshutdown checkpoint

    Immediately after completion, use a curing agent or appropriate method to prevent excessive drying.

Acceptance Checklist 0/4

[12][8]

Adapted according to the factory construction instructions

Bathroom waterproofing water test acceptance

  1. 1. Base repair and corner treatment

    First repair the cracks, level them, and strengthen the corners and water removal levels.

  2. 2. Apply waterproof layer

    Apply in layers according to the product information, and follow the manufacturer's recoating time between layers.

  3. 3. Maintenanceshutdown checkpoint

    SikaTop-300 Seal requires a minimum of 3 days of maintenance. Test the water first (other products and their technical data sheets).

  4. 4. Water storage testshutdown checkpoint

    Seal the water and drain it. After releasing the water, record the water level and the ceiling condition downstairs. The owner can be present to witness.

  5. 5. Start tiling after the test passes

    After passing the water test and taking photos for archiving, start laying bricks or plastering.

Acceptance Checklist 0/4

[10][3]

Company Site Code

Our construction process for removing old paving bricks

  1. 1. On-site inspectionshutdown checkpoint

    Knock the old bricks, measure the flatness, check the approved drawings to confirm that they are not structural walls, and take photos to record the current condition.

  2. 2. Preservation and demolition

    Protect common areas, remove old tiles down to the cement bed or concrete as specified, and bag the waste.

  3. 3. Grassroots repair and levelingshutdown checkpoint

    Repair hollows, cracks and peeling concrete parts, hang wires and sweep the floor, and create a dewatering slope in the wet area.

  4. 4. Wet area waterproofing and water testingshutdown checkpoint

    The bathroom and kitchen should be made of two layers of waterproofing. If the water test is successful, the tiles should be laid first.

  5. 5. Lay out cables and bricks

    Confirm with the owner the starting position of the paving, the position of cutting the bricks, and the width of the brick joints.

  6. 6. Paving

    The tiles are laid with full glue or glue, large tiles are glued on both sides and a leveler is used.

  7. 7. Sweep, close, and clean

    Caulking, sealing of sun corners, cleaning of brick surfaces, garbage removal and basic cleaning after completion.

Acceptance Checklist 0/5

[1][9]

DELIVERABLES

Quotation and handover documents

Brick arrangement and range indication

Before laying bricks, we will discuss with you the starting position, brick cutting position, brick joint width, and closing method.

Concealed engineering photo record

Photos of demolition, base repair, waterproofing and water testing will be submitted upon completion.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Check the condition of the original floor and walls
  • Confirm brick size, laying method and closing position
  • Discuss the division of labor in wet area drainage and waterproofing processes
  • Confirm material loss, handling, removal and acceptance

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Who supplies the ceramic tiles, and how are replenishment and losses handled?

  2. 02

    Does the original floor need to be removed or repaired?

  3. 03

    How to close doorways, corners and water levels?

FAQ

Frequently asked questions

What should I send to get a quotation?

Send a wide photo of the work area, a close-up of the issue, approximate dimensions, the property district and your preferred start date. You can enquire before you have measurements. We check what is included and what costs extra against the site conditions. Concealed issues that are still uncertain require separate written confirmation.

Can you repair peeling ceilings yourself?

Slight peeling on the surface can be treated by the renovation master according to the repair mortar process; if it involves structural components such as beams and columns or the area is large, the Buildings Department's minor works system may be applicable, and the required professionals must be confirmed first.

How thick should self-leveling be?

Taking Mapei Ultraplan as an example, each layer is 1-10mm; when laying wooden flooring on a concrete base, the manufacturer recommends a leveling layer of at least 3mm.

How long does it take to lay waterproofing before laying bricks?

Depends on the product: SikaTop-555 Seal requires about 5-7 days of initial curing; SikaTop-300 Seal requires at least 3 days of curing before testing the water.

Can new tiles be laid directly on top of the old tiles?

If the old tiles are completely stable and have no hollows, in some cases they can be covered with a suitable tile adhesive or plastered; however, this will increase the thickness and affect the door bottom and drainage slope. We generally recommend dismantling and redoing waterproofing in wet areas. Judge first after seeing the scene.

Do I have to remove the tiles if they make a hollow sound?

A small number of slight hollowings at the corners may not necessarily cause an immediate problem; if a large area is hollowed, bursting or swollen, it will need to be removed and resurfaced.

How much does tiling cost per square foot?

Published tiling rates per square foot: straight-lay up to 600 × 600 mm HK$78, wood-effect planks HK$98, large-format HK$120, sintered slabs HK$150 and mosaic HK$130. Tiles themselves are separate and minimum charges apply by item.

Before demolishing a wall, should you know whether it is a structural wall?

Approved plans can be checked on the Buildings Department's Building Plans website; any doubts should be judged by an authorized person or a registered structural engineer. We only demolish identified non-structural walls.

How long does masonry work take?

Depends on scope and maintenance time. For waterproofing, you need to wait enough time for the product to test the water first; after self-leveling for about 12 hours, you can lay the floor first. We will arrange the construction schedule with you according to the process.

Will there be a lot of dust when finished?

Masonry creates dust. We provide protection during work and remove rubbish, sweep and carry out basic cleaning at completion. Our specialist cleaning partner handles deep cleaning.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

Send photos on WhatsApp to discuss tiling or masonry Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-01
  2. Official sourceLegislative Council question 8: seepage in public housing, 28 January 2026 · Housing Bureau (Hong Kong Government Press Release)· Accessed 2026-11-01
  3. Official sourceFrequently Asked Questions about Water Seepage · Buildings Department· Accessed 2026-11-01
  4. Official sourceGuidelines for preventing water seepage in new buildings · Buildings Department· Accessed 2026-11-01
  5. Official sourceConsumer Council proposes 4 measures to strengthen regulation of the home renovation industry (21 February 2024) · consumer council· Accessed 2026-11-01
  6. Official sourceThe renovation quotation should be detailed and teach you one by one in the 12 major areas. · consumer council· Accessed 2026-11-01
  7. Official sourceReply from the Expenditure Estimate Controller for 2026-27 (DEVB(PL)156, etc., age distribution of private buildings) · Buildings Department/Development Bureau· Accessed 2026-11-01
  8. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-01
  9. Official sourceBailoutu.com — Online building records · Buildings Department· Accessed 2026-11-01
  10. ManufacturerSikaTop®-300 Seal · Sika Hong Kong· Accessed 2026-11-01
  11. ManufacturerSikaTop®-555 Seal · Sika Hong Kong· Accessed 2026-11-01
  12. ManufacturerOPTIMIX RM725 Repair Mortar (HKHA Class 25) Data Sheet · Optimix· Accessed 2026-11-01
  13. ManufacturerOPTIMIX RM725 lightweight repair mortar (Hong Kong Housing Department Class 25) · Optimix· Accessed 2026-11-01
  14. ManufacturerULTRAPLAN self-leveling compound · MAPEI Hong Kong· Accessed 2026-11-01

Why talk to HK Create Design?

Understand your masonry and tiling before you decide.

Start with the current condition

Check the existing substrate, differences in level and proposed finish before agreeing on removal, repairs, installation and edge detailing.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗