2026 masonry wall rates: what HK$93 per sq ft covers

HK Create Design charges HK$93 per sq ft, minimum HK$3,700, for a new masonry partition. The rate includes lightweight blocks or red bricks, ties and cement-and-sand render on both faces in preparation for paint or tiles. Painting, doors, frames and applicable minor works professional fees are extra.

Multiply the wall length by its height in feet. A wall 10 ft long and 8.5 ft high measures 85 sq ft and costs HK$7,905 at HK$93 per sq ft. For a doorway, ask how the opening and associated work are treated in the quote.

The work extends beyond laying courses of bricks. Set out the wall, prepare its base, lay the masonry, tie it to the existing wall at intervals, form the door opening and lintel, render both faces and finish the junctions at ceiling and walls. Each step affects stability and cracking.

Beyond price, the statutory classification is an important consideration. The Buildings Department requires qualifying non-loadbearing masonry walls in domestic flats to be handled by the prescribed building professionals and/or prescribed registered contractors, with notice before or after the work as applicable.[1] Building a wall therefore involves more thanMasonry and tilingand needs to be planned before work starts.

  • Multiply length by height to get the wall area
  • Confirm both faces will be rendered
  • Painting and doors are extra
  • Check the minor works requirements first
Our 2026 rates for building and removing walls

You can swipe left or right on your phone to view the complete table.

ItemUnit priceMinimum chargeincludeExclusions and points to check
B03 Build a brick partition and render both facesHK$93 per sq ftHK$3,700Lightweight blocks or red bricks, wall ties and two rendered facesPainting, doors and minor works submission fees
A04 Remove non-main brick wallsHK$69 per sq ftHK$2,800Remove the non-structural partition and make good its junctions with walls, floor and ceilingConfirm the wall is non-structural before work starts and follow applicable minor works requirements
A05 Remove a plasterboard partitionHK$34 per sq ftHK$1,850Remove the plasterboard and framing and clear the fixing points—
L03 Replace a plywood internal doorHK$3,000—Door leaf, frame, hinges and handle, including installationSolid timber doors from HK$4,650
A11 Rubble removalHK$4,200 per truckloadSmall jobs priced by the bag, with a HK$2,000 minimumCarry waste downstairs, dispose of it lawfully and pay government disposal fees—

Wall area is length × height in square feet. The written quotation after site measurement governs. [10]

Site photo: a mason uses a laser level to set out a lightweight block partition.
Site photo: a mason uses a laser level to set out a lightweight block partition. Select an image to enlarge

02

Understanding minor works items 3.39 and 1.43

Two minor works items are relevant to additional walls in a domestic flat. Under item 3.39, the total added non-loadbearing block wall length must exceed 0.1 m and be no more than 0.3 m per m² of floor area. Maximum wall density is 650 kg/m³, height 3 m and thickness 75 mm. The supporting slab must be at least 125 mm thick and its screed no more than 25 mm above structural floor level. The work must not add load to a cantilevered slab or alter other structural elements. The contractor submits MW05 within 14 days of completion.[2]

For domestic flats, item 1.43 may apply to a non-loadbearing wall where the added length exceeds 0.1 m/m² and item 3.39 does not apply, for example because the wall is heavier or thicker or the ratio exceeds 0.3 m/m². It must not add load to a cantilevered slab or alter other structural elements. Submit MW01 at least 7 days before commencement and MW02 within 14 days of completion.[3]

Heavier, thicker or longer walls can change the statutory classification. Lightweight blocks and red bricks differ in cost and weight and may differ in their ability to meet item 3.39's density limit.

The Buildings Department notes that carrying out building work without required approval can carry a maximum HK$400,000 fine and two years' imprisonment. Carrying out work in a manner that causes danger may carry a maximum HK$1,000,000 and three years' imprisonment.[1] These thresholds come from the regulations. Check the applicable conditions before building.

The Buildings Department has a separate guide to minor works associated with subdivided units,[4] Adding walls to create subdivided units entails additional requirements and risks. Have qualified professionals assess and handle the work.

  • Calculate the wall length ratio
  • Check wall density, thickness and height
  • Check the supporting slab thickness
  • Submit the MW forms required for the applicable item
  • Take particular care with subdivided units
Our per-square-foot rates for building and removing walls(Unit:HK$ per sq ft)
A05 Remove a plasterboard partition
HK$34
A04 Remove non-main brick walls
HK$69
B03 Build masonry wall and render both faces
HK$93

HK Create Design's published 2026 rates. Each item has its own minimum charge.

Brick partition prices: key figures illustrated | HK Create Design
Brick partition prices: key figures at a glance | HK Create Design Select an image to enlarge

03

Calculating the wall length ratio

Divide the added wall length in metres by the flat's floor area in m². One sq ft is about 0.0929 m². A 500 sq ft flat is about 46.45 m². A ratio of 0.1 m/m² corresponds to a wall length of about 4.65 m, and 0.3 m/m² to about 13.94 m.[2]

Adding a 10 ft (about 3.05 m) wall in a 500 sq ft flat gives a ratio of about 0.066, below 0.1. Adding two walls totalling 6 m in a 400 sq ft flat (about 37.16 m²) gives about 0.161, within item 3.39's length range.

This calculation illustrates the rule only. The prescribed building professional or prescribed registered contractor should determine the floor area, the aggregate additional wall length and how existing walls are treated under Buildings Department requirements.

The item 3.39 and 1.43 descriptions do not cover a domestic ratio below 0.1. Other rules may still apply. Ask a qualified person to confirm the classification and procedure before work starts.

  • Convert square feet to square metres
  • Wall length divided by floor area
  • Have a qualified person confirm
  • Check the classification even below 0.1
Completion photo: new masonry wall rendered on both faces, with an opening for the door and positions for electrical points.
Completion photo: new masonry wall rendered on both faces, with an opening for the door and positions for electrical points. Select an image to enlarge

04

Lightweight blocks, red bricks or plasterboard?

Lightweight blocks are relatively quick to lay as domestic partitions and impose less load on the slab. They may meet item 3.39's density limit, subject to the actual product data. Use suitable anchors or plan reinforcement wherever heavy items will be fixed.

Red bricks are heavier and more solid, making it easier to fix heavy items, but they add more load to the floor and may exceed item 3.39's density limit. Consult a qualified person before selecting them.

Plasterboard on a stud frame uses dry construction and is usually the lightest, quickest and least dusty option. Sound insulation and support for heavy loads may require additional layers or reinforcement. Ordinary plasterboard is generally unsuitable in wet areas. Ask a qualified person whether the proposed partition falls under minor works. Removal is HK$34 per sq ft. New partitions are priced by written quotation.

Choose for the intended use. Masonry is often preferable for a TV, wall cabinets, bathroom or kitchen. Plasterboard suits a lightweight partition where speed matters.

  • Lower-weight blocks
  • Check suitability before using heavier red bricks
  • Plasterboard is quick to install but generally unsuitable for wet areas
  • Choose to suit the intended use
Worked example 1

Example 1: add a 10 ft masonry wall in a 500 sq ft flat

Assumptions

  • Assume a floor area of about 500 sq ft (46.45 m²).
  • New wall 10 ft (about 3.05 m) long and 8.5 ft high.

How to calculate quantities

  1. Wall area: 10 × 8.5 = 85 sq ft.
  2. B03:85 × HK$93 = HK$7,905。
  3. Wall length ratio: 3.05 ÷ 46.45 ≈ 0.066 m/m², below item 3.39's lower threshold of 0.1.

Wall construction HK$7,905, excluding painting, door and other work.

Below 0.1, other statutory requirements may still apply. A qualified person should confirm the wall type, location and proposed work. [1] [2][1]

Use your square footage instead and see a reference budget
Masonry and rendering in Tai Kok Tsui | HK Create Design
Site photo: Masonry and plastering in Tai Kok Tsui, May 2026. HK Create Design. Select an image to enlarge

05

What explains differences in masonry wall quotations?

1. Render to both faces. Some quotes cover only bricklaying and price render separately. Our B03 includes both faces. Compare like-for-like scope.

2. Wall ties and junctions. Connect new masonry to the existing wall with ties and detail the ceiling joint to reduce cracking where old and new meet. Look for wall ties in the quotation.

3. Masonry materials. Lightweight blocks and red bricks differ in weight and cost. Mortar may be site-mixed or ready-mixed. OPTIMIX F12, for example, is specified for masonry, floors and plastering, comes in 40 kg bags and has a compressive strength of about 35 MPa.[5]

4. Door openings and lintels. Allow for the opening and lintel and coordinate the dimensions with the door frame.

5. Statutory procedures. Where minor works apply, the prescribed parties must handle the work and submit the forms. Check their fees and ask how the process will be handled if the quote omits it.

6. Handling and rubble. Bricks are heavy and may have to be carried by hand in walk-ups. Follow Labour Department guidance on safe manual handling.[6] Cutting bricks or blocks also produces dust.[7]

  • Ask whether render to both faces is included
  • Ask whether wall ties are included
  • Ask which bricks or blocks and mortar are specified
  • Ask about the lintel above the door opening
  • Ask about minor works procedures
Buildings Department minor works items 3.39 and 1.43

You can swipe left or right on your phone to view the complete table.

compareItem 3.39Item 1.43
ApplicableErecting a non-loadbearing masonry wall in a domestic flatErecting a non-loadbearing wall in a domestic flat outside item 3.39
Wall length ratioMore than 0.1 m and no more than 0.3 m per m² of floor areaMore than 0.1 m
Main conditionsDensity ≤650 kg/m³, height ≤3 m, wall thickness ≤75 mm, supporting slab ≥125 mm and its screed ≤25 mm above structural floor level; no additional load on a cantilevered slab or alteration to other structural elements—
NoticeSubmit MW05 within 14 days of completionMW01 at least 7 days before commencement and MW02 within 14 days of completion

From the Buildings Department's minor works item descriptions. [2][3] The prescribed building professional or prescribed registered contractor must assess which item applies. [2][3]

06

Confirm the wall is non-structural before removal

Removing an existing wall brings particular risks. Our A04 rate is HK$69 per sq ft, minimum HK$2,800, to remove a non-loadbearing masonry partition and make good its junctions with adjacent walls, floor and ceiling. Confirm that the wall is non-structural before work starts.

Check the approved plans held by the Buildings Department or seek a prescribed building professional's assessment. Tapping a wall or measuring its thickness alone is unreliable. Follow the applicable minor works procedure if it covers the removal.

Removing a wall leaves marks on the floor and ceiling. Allow for patching, levelling and retiling or repainting. A11 rubble removal costs HK$4,200 per truckload, including carrying it downstairs and government disposal charges. The Environmental Protection Department charges by weight, with a one-tonne minimum.[8]

The Buildings Department also points out that structural alterations need prior approval. Unauthorised work may create danger and result in prosecution.[1]

  • Confirm the wall is non-structural first
  • Check the approved plans
  • Allow for making good
  • Budget for rubble removal
Wall length corresponding to item 3.39's lower threshold of 0.1 m per m²(Unit:m)
400 sq ft flat
About 3.72 m
500 sq ft flat
About 4.65 m
600 sq ft flat
About 5.57 m

Illustrative calculation using the Buildings Department item 3.39 ratio. [2]

07

Professional and official guidance

The following information comes from public documents issued by the Buildings Department, Labour Department, Environmental Protection Department and material manufacturers.

The Buildings Department regulates qualifying non-loadbearing masonry partitions in domestic flats under the Minor Works Control System. Internal plastering and tiling are generally exempt from prior approval but must still comply with the applicable rules.[1]

Buildings Department item 3.39 sets conditions for wall length ratio, density, height and thickness as well as the supporting slab and its floor screed. Submit MW05 within 14 days of completion.[2]

Buildings Department item 1.43: submit MW01 at least 7 days before commencement and MW02 within 14 days of completion.[3]

OPTIMIX F12 masonry mortar is intended for masonry, floors and plastering.[5]

Our team sees cracks most often where new walls meet old ones or the ceiling. We use wall ties and detail the ceiling junction to reduce future cracking.

  • Follow the applicable minor works procedure
  • Observe the MW form deadlines
  • Tie the new masonry into the existing wall
Worked example 2

Example 2: add two walls totalling 6 m in a 400 sq ft flat

Assumptions

  • Assume a floor area of about 400 sq ft (37.16 m²).
  • Two new walls with a combined length of 6 m (about 19.69 ft) and a height of 8.5 ft.

How to calculate quantities

  1. Wall area: 19.69 × 8.5 ≈ 167.3 sq ft.
  2. B03:167.3 × HK$93 ≈ HK$15,559。
  3. Wall-length ratio: 6 ÷ 37.16 ≈ 0.161 m per m², which is within the 0.1–0.3 range in 3.39.
  4. Item 3.39 applies only if all its conditions are met. If it does not apply, check the separate conditions for item 1.43. Qualifying item 1.43 work needs MW01 at least 7 days before commencement. [2][3]

About HK$15,559 for the walls, plus applicable minor works professional fees. Refer to the written quotation.

The prescribed parties should verify how wall length and floor area are measured under Buildings Department requirements. [2][3]

Use your square footage instead and see a reference budget
Self-levelling floor installation | HK Create Design
Site photo: Flooring work on site. HK Create Design. Select an image to enlarge

08

Common pitfalls when building a partition

1. Starting without checking the statutory requirements. Failing to follow the applicable minor works procedure can cause problems when selling, arranging a mortgage or responding to a complaint.

2. Excess weight. Heavy bricks or excessive wall thickness may fall outside item 3.39 and raise the load on the supporting floor.

3. Missing electrical points. New walls often need sockets and switches. Allow for conduits before rendering and use a registered electrical worker.

4. Incorrect door opening. Order the door before building or agree the standard opening dimensions, to avoid enlarging or filling it later. HK Create Design charges HK$3,000 to replace a plywood room door. Solid timber doors start at HK$4,650.

5. Cracks at the junction with an existing wall. Missing ties or poor joint detailing can show up as cracks soon after painting.

6. Missing paperwork. Minor works forms and associated records may be needed for a future sale or mortgage. Request copies from the contractor and keep them safely.

  • Address statutory requirements first
  • Choose a suitable brick or block
  • Allow for electrical points
  • Size the opening for the selected door
  • Install wall ties at the junction
  • Retain copies of minor works documents

09

Handover checklist

Plumb and flatness: use a spirit level or laser to check that the wall is vertical and the render flat on both faces.

Junctions: inspect where the new wall meets existing walls, the ceiling and the floor for cracks or gaps.

Door opening: check its dimensions, position and the lintel above.

Electrical points: check sockets and switches against the drawings.

For minor works, keep copies of MW forms and supporting documents. Our one-year workmanship warranty is subject to the written quotation.

  • Check plumb and flatness
  • Check junctions for cracking
  • Check the door opening
  • Check the electrical points
  • Keep the minor works records
Wall length ratio ready reckoner with examples

You can swipe left or right on your phone to view the complete table.

Flat's floor areaApproximate m²Wall length at 0.1 m per m²Wall length at 0.3 m per m²
400 sq ft37.16About 3.72 mAbout 11.15 m
500 sq ft46.45About 4.65 mAbout 13.94 m
600 sq ft55.74About 5.57 mAbout 16.72 m

1 sq ft ≈ 0.0929 m². Ratio thresholds are from Buildings Department item 3.39. [2] Have a qualified person confirm how to measure the floor area and additional wall length. [2]

Renovation work in progress | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

10

Scheduling masonry partitions

Typical sequence: set out the design, confirm the regulatory category and procedure, and file MW01 7 days before work starts if item 1.43 applies. Mark out the wall, lay the bricks, allow for electrical points and door openings, render both sides and allow curing. Finish with paint or tiles, and submit the relevant form within 14 days of completion.[2][3]

Allow masonry mortar to gain sufficient strength before rendering. Let the render cure before painting. For tiled areas such as a bathroom, coordinate rendering and waterproofing.

Our designers use AutoCAD, 3ds Max and SketchUp. Confirm the wall, door and furniture positions on the drawings before work starts.

On a renovation that also includes services, tiling and painting, build walls after strip-out and before or alongside first-fix plumbing and electrical work. Position sockets, switches and pipes before rendering. Coordinating trades avoids reopening finished render and unnecessary return visits. Schedule hacking and brick cutting within the building's permitted noisy-work hours.

  • Establish the statutory procedure first
  • Allow time for curing
  • Draw up plans before work starts
Worked example 3

Example 3: remove an 8 ft non-loadbearing masonry wall

Assumptions

  • Assume the wall has been confirmed as non-structural.
  • Wall 8 ft long and 8.5 ft high.

How to calculate quantities

  1. Wall area: 8 × 8.5 = 68 sq ft.
  2. A04: 68 × HK$69 = HK$4,692, above the HK$2,800 minimum.
  3. Masonry debris is heavy. Assume one A11 truckload at HK$4,200.
  4. Total: HK$8,892.

HK$8,892, excluding tiling and painting after repairs to the floor and ceiling.

Confirm the wall is non-structural before work starts and follow the Buildings Department minor works procedure where applicable. [10]

Use your square footage instead and see a reference budget

11

Adding walls in public rental flats, Home Ownership Scheme flats and older buildings

Public rental flat renovation: Public rental flat alterations must follow Housing Department rules. Consult the estate office and apply before adding or removing partitions.

Home Ownership Scheme flat renovation: Home Ownership Scheme flats are private property and subject to their deed of mutual covenant, management rules and the same minor works requirements as private flats. Check any applicable restrictions before alterations if the premium remains unpaid.

Older flat renovation: Older buildings vary in slab thickness and structural condition. Item 3.39 requires a supporting slab at least 125 mm thick,[2] Older buildings may not meet these conditions. Have a qualified person assess the slab.

  • Consult the estate office first for public rental housing
  • Follow the deed of mutual covenant and management rules in Home Ownership Scheme flats
  • Assess the slab in an older building first
Lightweight blocks, red bricks and plasterboard partitions compared

You can swipe left or right on your phone to view the complete table.

compareLightweight blocksRed bricksPlasterboard
WeightLighterHeavierLightest
Installation workMasonry construction requiring renderMasonry construction requiring renderDry construction with stud framing and boards
Hanging heavy itemsUse suitable anchorsEasierAllow for plywood backing or reinforcement
Wet areasSuitable with appropriate waterproofingSuitable with appropriate waterproofingGenerally unsuitable for wet areas
minor projectsNon-loadbearing masonry walls may fall under the Minor Works Control System. [1]As on the leftA qualified person must assess the actual conditions

Check the product density against item 3.39 before selecting the wall material. Seek a qualified assessment. [2] [1][2]

12

Masonry walls and furniture dividers compared

A masonry wall is one way to divide a space.Bespoke wardrobe, bookcases or sliding doors can also divide a space and can be removed later without carrying out masonry partition works. They generally offer less privacy and sound insulation.

A bedroom may warrant a masonry wall for sound insulation and privacy. For a work area within a living space, furniture can provide enough separation and take less time to fit.

A half-height wall with glass preserves daylight. A masonry partition with a large sliding door can open or close as needed. Check the statutory classification of either option because the masonry section remains a non-loadbearing wall.

HK Create Design can price both masonry walls andBespoke furnitureoptions so you can compare cost, programme and statutory requirements before deciding.

  • Choose a wall where sound insulation and privacy matter
  • Use furniture if flexibility is important
  • Compare budgets and programmes
Worked example 4

Example 4: build a short 4 ft wall

Assumptions

  • Suppose the entrance needs a short wall 4 ft long and 8.5 ft high.

How to calculate quantities

  1. Area: 4 × 8.5 = 34 sq ft.
  2. B03: 34 × HK$93 = HK$3,162, below the minimum charge.
  3. The HK$3,700 minimum charge applies.

HK$3,700。

A short wall is still a non-loadbearing masonry partition. Check the applicable statutory requirements. [10]

Use your square footage instead and see a reference budget
Custom storage cabinets throughout a flat | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

13

What bedroom, bathroom and kitchen walls need to support

Bathroom walls need waterproofing before tiling. The shower area generally needs full-height protection. Masonry is usually more suitable for wet areas than ordinary plasterboard.

In kitchens, a wall for hanging cabinets needs adequate fixing strength. Allow for heat near the hob. Before enclosing an open kitchen, check ventilation and gas pipe positions.

Bedroom walls need sound insulation and suitable fixings for heavy items. Render both faces before painting and allow for sockets and switches.

For a study or workspace, plan the support for shelves and monitor arms before building. Lightweight blocks may need dedicated anchors or local reinforcement where heavy loads will be mounted. Tell the mason how the wall will be used.

Store rooms and walk-in wardrobes need ventilation and moisture control. Small enclosed spaces can develop mould in Hong Kong's humid climate. Allow for ventilation, consider mould-resistant paint and check for condensation against external walls.

  • Coordinate bathroom walls with waterproofing
  • Kitchen walls supporting wall cabinets
  • Consider sound insulation for bedroom walls
What wall length in your flat could fall under the Minor Works Control System?

You can swipe left or right on your phone to view the complete table.

Flat's saleable areaApproximate square metres0.1 m threshold expressed as total wall length
300 sq ft27.9About 2.79 m
400 sq ft37.2About 3.72 m
500 sq ft46.5About 4.65 m
700 sq ft65.0About 6.50 m
1,000 sq ft92.9About 9.29 m

Estimate based on the Buildings Department threshold for items 1.43/3.39 (more than 0.1 m per square metre of floor area) [4]. The Department's floor area definition and the applicable conditions determine the actual result. [4]

14

What to include in the budget for an extra room

Adding a room entails more than the wall. In example 2, two walls covering about 167 sq ft in a 400 sq ft flat cost about HK$15,559. Also allow for a room door (HK$3,000 for plywood), painting, sockets and switches, floor junctions and applicable minor works professional fees.

Moving a partition, for example to turn two small rooms into a larger and smaller pair, means allowing HK$69 per sq ft for brick wall removal, plus rubble, floor and ceiling repairs and the new wall. Allow extra time as well as money.

List masonry, doors, painting, electrical work, flooring, statutory procedures and rubble in the budget. An itemised quote helps avoid omissions. The Consumer Council also recommends listing the work and materials separately.[9]

  • List every stage of the work
  • Ask about minor works fees
  • Itemise the quotation

15

Site measurement, quotations and appointments

Before quoting, we measure the flat's floor area, wall position and ceiling height and ask how the wall will be used. If minor works procedures apply, we explain them as part of the assessment.

Before booking, gather a floor plan if available, photos of the proposed or existing wall, the intended room use and your preferred door type.

If you are comparing a wall with a furniture divider or lightweight blocks with plasterboard, discuss the options at the site visit. We can explain the work, costs and statutory requirements. The quote separates masonry, doors, painting, electrical work and rubble so you can compare the options.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Prepare a floor plan
  • Explain the intended use
  • Confirm the statutory procedure and notice periods
Worked example 5

Example 1: partitioning off a room

Assumptions

  • Illustrative example.
  • Wall 10 ft long × 8.5 ft high.

How to calculate quantities

  1. Area: 10 × 8.5 = 85 sq ft
  2. 85 × HK$93 = HK$7,905[10]

About HK$7,905, including render to both faces

Painting, doors, electrical points and minor works submission fees are extra. [10] [10]

Use your square footage instead and see a reference budget
Project photo of bespoke kitchen cabinets with worktop | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge
Brick partition prices: checklist illustrated | HK Create Design
Brick partition prices: checklist | HK Create Design Select an image to enlarge

16

Check the load on the floor slab

Masonry is heavy. Check the structure in older buildings, at cantilevers and where no beam supports the proposed wall. We review the plans and site and may recommend lightweight blocks or plasterboard to reduce load.

Settle the wall position, door opening, switches and sockets before building. Moving them later means extra hacking and cost.

  • Check the plans first
  • Avoid cantilevered areas
  • Decide on door openings and electrical points in advance
Worked example 6

Example 3: convert a three-bedroom flat to two bedrooms by removing one wall and building another

Assumptions

  • Illustrative example.
  • Remove a 10 × 8.5 ft masonry wall and build one of the same size in a new position.

How to calculate quantities

  1. Remove a non-loadbearing masonry wall: 85 × HK$69 = HK$5,865. [10]
  2. Build new masonry wall: 85 × HK$93 = HK$7,905. [10]
  3. Rubble removal: HK$4,200 per truckload. [10]

About HK$17,970, excluding painting, electrical points and submissions

Government disposal fees range from HK$71 to HK$200 per tonne [8] and are included in our rubble removal service. [10][8]

Use your square footage instead and see a reference budget

17

Why choose HK Create Design to build a masonry wall?

Our online calculator publishes HK Create Design's masonry wall rates, with inclusions, exclusions and minimum charges available before work starts.[10] HK Create Design’s quotations list materials, work stages and acceptance checks so you can compare other quotations line by line.

HK Create Design offers a one-year warranty after completion under the terms of the written quotation. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

For a project estimate, send photos and the approximate area to HK Create Design on WhatsApp 5243 7747. You can also see samples and discuss options at our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.

  • Published, itemised prices
  • List inclusions and exclusions in the written quotation
  • One-year workmanship warranty
  • Send photos to WhatsApp 5243 7747 for a quotation

FAQ

16 practical questions answered

01How much does a masonry wall cost?

HK Create Design charges HK$93 per sq ft, minimum HK$3,700, to build a masonry wall and render both faces. Painting is extra.

02Does a masonry wall need to be reported to the Buildings Department?

Building a non-loadbearing masonry wall in a domestic flat can fall under the Minor Works Control System. The prescribed parties must handle qualifying work and notify the Buildings Department.[1]

03How do items 3.39 and 1.43 differ?

Item 3.39 requires more than 0.1 and no more than 0.3 m/m², as well as conditions on density, height, thickness and other matters. Submit MW05 within 14 days of completion.[2] For a domestic flat, item 1.43 may apply above 0.1 m/m² where item 3.39 does not apply and the other conditions are met. Submit MW01 at least 7 days before commencement.[3]

04How do you calculate the wall length ratio?

Divide added wall length in metres by the flat's floor area in m². For example, 6 m of new wall in a 400 sq ft (37.16 m²) flat gives about 0.161.

05How much does wall removal cost?

Removing a non-loadbearing masonry wall costs HK$69 per sq ft (minimum HK$2,800). Removing a plasterboard partition costs HK$34 per sq ft (minimum HK$1,850).

06How can I tell whether a wall is loadbearing?

Check the approved plans or seek an assessment from a prescribed building professional. Sound and thickness alone cannot identify the type of wall.

07Should I choose lightweight blocks or red bricks?

Lightweight blocks are more likely to meet item 3.39's density limit. Red bricks are heavier and more solid. Check the actual product data and seek a qualified assessment.

08What are the consequences of carrying out building work without the required approval?

Up to HK$400,000 and two years' imprisonment. Work that causes danger may carry up to HK$1,000,000 and three years' imprisonment.[1]

09Can a plasterboard partition be used in a bathroom?

Generally not recommended. A masonry wall with a suitable waterproofing system is a more dependable option in a wet area.

10Can I add a wall in a public rental flat?

Alterations in public rental flats must follow Housing Department requirements. Consult the estate office first.

11How much does a room door cost?

HK$3,000 to replace a room door with plywood. Solid timber doors start at HK$4,650.

12Will building a masonry wall be noisy?

Laying bricks is quieter than hacking, but cutting masonry, removing walls and chasing produce noise and dust. Work within the building's permitted hours and control dust at source.[7]

13When can a new wall be painted?

Wait until the mortar and render on both faces have gained sufficient strength and dried before painting. Follow the product data and account for the weather and site conditions.

14Will a new partition crack?

Cracks commonly appear at the junction with an old wall or the ceiling. Appropriate ties, properly detailed joints and adequate curing time reduce the risk.

15Is there a warranty?

The work carries a one-year warranty after completion, subject to the terms of the written quotation.

16How can I make an appointment?

WhatsApp 5243 7747. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-11-03
  2. [2]Buildings Department: minor works item 3.39 for non-loadbearing block walls in domestic flats Accessed: 2026-11-03
  3. [3]Buildings Department: minor works item 1.43 for non-loadbearing walls in flats Accessed: 2026-11-03
  4. [4]Buildings Department: minor works associated with subdivided units Accessed: 2026-11-03
  5. [5]OPTIMIX F12 Masonry Mortar technical data Accessed: 2026-11-03
  6. [6]Labour Department: Manual Handling Operations – A Guide for Employees Accessed: 2026-11-03
  7. [7]Labour Department guidance on preventing silicosis among quarry and construction workers Accessed: 2026-11-03
  8. [8]Environmental Protection Department: Construction Waste Disposal Charging Scheme Accessed: 2026-11-03
  9. [9]Consumer Council, CHOICE issue 529: how to read a renovation quotation across 12 categories Accessed: 2026-11-03
  10. [10]HK Create Design’s published 2026 prices: masonry, waterproofing, demolition and miscellaneous work Accessed: 2026-11-03
  11. [11]Consumer Council: legal considerations when altering internal partitions Accessed: 2026-11-03
  12. [12]1823 government helpline: Is Buildings Department approval required for changing internal partitions in a domestic flat? Accessed: 2026-11-03
  13. [13]Environmental Protection Department: FAQs on noise from renovation in residential premises Accessed: 2026-11-03