Skip to main content

HOS FLAT RENOVATION

Renovating an HOS or Green Form Subsidised Home Ownership Scheme flat in 2026

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Browse prices for 117 work itemsSelect work items online to see an indicative budget
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

HOS owners have greater flexibility than public rental tenants, but Housing Authority rules still apply. Entrance and kitchen doors need fire ratings. Retain the windows, avoid chasing structural walls, follow the approved partition layout and file minor works with the Independent Checking Unit. HK Create Design checks the rules and drawings before issuing an itemised quote. This guide covers handover, warranty periods, GSH, second-hand HOS renovation, budgets and design.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design rendering: new HOS, GSH and second-hand HOS flat renovation
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

WORKED EXAMPLE

Estimate your HOS renovation cost

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

New HOS move-in budget: painting, flooring and storage

  • E03 whole-flat repaint at HK$12 per sq ft. Estimated paint area equals saleable floor area × 3.
  • J01 SPC flooring, HK$60 per sq ft, assuming living areas and bedrooms cover 75% of the flat
  • J04 skirting, 120 linear ft × HK$10
  • H02 new sockets, 6 sets × HK$640, with WR1 on completion
  • FUR12 tall entrance shoe cabinet, 3 linear ft, and FUR05 wardrobe, 6 linear ft, at HK$2,900 per linear ft each
  1. Whole-flat repaint (E03)Saleable area × 3 × HK$12HK$16,200
  2. SPC flooring (J01)Saleable floor area × 75% × HK$60HK$20,250
  3. Skirting (J04)120 linear ft × HK$10HK$1,200
  4. Additional sockets (H02)6 sets × HK$640HK$3,840
  5. Tall entrance shoe cabinet (FUR12)3 linear ft × HK$2,900HK$8,700
  6. Wardrobe (FUR05)6 linear ft × HK$2,900HK$17,400

Indicative work costHK$67,590

Indicative total for 450 sq ft: about HK$67,590. Check the sales brochure for handover fittings and finishes. Subject to measurement and written quotation. [11]

Second-hand HOS renovation budget: whole-flat floor tiling, full paint preparation and bathroom refurbishment

  • A01 removal, B02 levelling and D01 tiling total HK$130 per sq ft, assuming 90% of saleable area after excluding the bathroom.
  • E01 strip, skim and paint at HK$39 per sq ft. Estimated paint area is saleable floor area × 3 × 90%.
  • A10 bathroom removal HK$9,950 and C02 bathroom waterproofing HK$4,850, including a 24-hour flood test.
  • Bathroom wall and floor tiling, 215 sq ft × HK$78
  • G04 bathroom hot and cold pipes HK$13,300. K01, K02 and K03 sanitary fitting installation total HK$3,420.
  • H09 board replacement HK$6,800, A11 one load of waste HK$4,200 and L02 insurance HK$6,700
  1. Whole-flat flooring (A01 + B02 + D01)Saleable floor area × 90% × HK$130HK$58,500
  2. Strip and repaint (E01)Saleable area × 3 × 90% × HK$39 ≈ saleable area × HK$105.30HK$52,650
  3. Bathroom strip-out and waterproofing (A10 + C02)HK$9,950+HK$4,850HK$14,800
  4. Bathroom wall and floor tiles (D01/D02)215 sq ft × HK$78HK$16,770
  5. Bathroom plumbing and sanitary fittings (G04 + K01 + K02 + K03)HK$13,300+HK$3,420HK$16,720
  6. Distribution board, waste disposal and insurance (H09 + A11 + L02)HK$6,800+HK$4,200+HK$6,700HK$17,700

Indicative works cost, excluding furnitureHK$177,140

Indicative total for 500 sq ft: about HK$177,140. Excludes tiles, sanitaryware, kitchen and furniture. Inspect older walls and pipes on site. Subject to measurement and written quotation. [11]

One wall of storage for a small HOS flat, with tall units and fold-down bed

  • FUR01 Tall cabinet (1,501–2,400 mm) at HK$2,900 per linear ft
  • FUR38 fold-down bed hardware HK$3,650
  • FUR40 cabinet light strips, HK$150 per linear ft based on wall width
  • FUR42 delivery HK$660
  1. Tall cabinet (FUR01)Wall width × HK$2,900HK$23,200
  2. Fold-down bed hardware (FUR38)One setHK$3,650
  3. Integrated cabinet strip lighting (FUR40)Wall width × HK$150HK$1,200
  4. Delivery (FUR42)OnceHK$660

Indicative furniture costHK$28,710

At 8 ft wide, the indicative total is HK$28,710. The mattress and extra-height cabinets are separate. Above 2,400 mm the surcharge starts at HK$100 per linear ft. Subject to measurement and written quotation. [11]

HOW WE HELP

How can we help you

Check the estate decoration guide.

At site measurement, check Housing Authority conditions and the approved partition layout.

Identify approval requirements

Identify exempt works, minor works and proposals requiring plan submission.

Inspect a new flat before decorating.

Report defects before covering them with renovation work.

Published itemised prices

Item codes, quantities and unit rates are specified, subject to site measurement and written quotation.

Qualified plumbing and electrical work and waterproofing

We obtain electrical WR1, coordinate WSD approval for fresh water pipe replacement, flood-test bathroom waterproofing and provide a one-year warranty.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After illustration: living and dining room with pale wood-effect flooring, repainted white walls, a plasterboard ceiling with concealed cove lights and downlights, and a custom woodgrain TV wall unit
Before concept: an older two-bedroom flat’s living and dining room with yellowed, cracked walls, beige floor tiles, fluorescent lighting, an old TV cabinet and a floral sofa.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: second-hand HOS whole-flat renovation retaining the entrance door, windows and structural walls
Design illustration: the same L-shaped kitchen with white and light wood-effect handleless cabinets, a white quartz worktop, a built-in hob and under-cabinet lighting.
Before illustration: an older L-shaped kitchen with worn beige cabinets, a scratched worktop and dated wall tiles.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: replacing cabinets in an HOS kitchen while retaining its fire door
Design illustration: the same bathroom with large pale grey tiles, a glass shower enclosure, a wall-hung wood-effect vanity, an LED mirror cabinet and a new toilet.
Before illustration: a small bathroom with cracked, yellowing blue-and-white tiles, a pedestal basin, a rusty mirrored cabinet and a bath.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: second-hand HOS bathroom stripped, waterproofed and flood-tested before retiling

KEY NUMBERS

HOS renovation figures to check before work starts

government/official

457Thousands

Number of subsidised sale flats at end-March 2025

Includes HOS, GSH and other subsidised sale flats. Premium-paid or freely tradable flats are counted under private housing and excluded from this figure.

[9]

government/official

Nearly 7,000unit

New HOS 2025 flats

Five new developments offered saleable areas of around 281–560 sq ft at about HK$1.5–4.8 million. Flat selection began on 21 October 2026. Around 400 resale flats were also offered.

[7]

government/official

857unit

New GSH 2025 flats at Shing Chi Court

Saleable areas of 280–469 sq ft. Flat selection ran from 25 August to 18 September 2026.

[8]

government/official

36.0%

Share of Housing Authority HOS flats with saleable areas of 50.0–59.9 m²

At end-March 2025, 25.1% were under 40 m², 30.9% were 40.0–49.9 m² and 8.0% were at least 60 m².

[9]

government/official

1years

Defects liability period for new HOS flats

One year from assignment of the individual new HOS flat. GSH flats have a one-year defects liability period from the deed of assignment.

[2]

government/official

10years

Building structural safety assurance

The Housing Authority offers a ten-year structural safety guarantee for HOS estates, or 20 years in Tin Shui Wai. Structural alterations and damage caused by improper use are excluded.

[3]

government/official

1 hours

Fire resistance rating of an HOS entrance door

Housing Authority estate decoration conditions require one-hour fire resistance for entrance doors and half an hour for kitchen doors. Replacements must meet Buildings Ordinance fire requirements.

[1]

government/official

6 months

Defect rectification period for an estate-based decoration contractor

HOS and GSH works-order terms require contractors to rectify defects without charge within six months of completion, except where the owner caused the defect.

[1]

CHARTS

HOS renovation figures at a glance

Distribution of Housing Authority HOS flats by saleable area, end-March 2025(Unit:%)
Under 40.0 m²
25.1%
40.0–49.9 m²
30.9%
50.0–59.9 m²
36.0%
60.0 m² or more
8.0%

Housing Bureau, Housing in Figures 2025, including flats tradable in the open market. Around 56% of HOS flats have saleable areas under 50 m² (about 538 sq ft). [9]

Hong Kong housing stock by type, end-March 2025(Unit:Thousands)
Private housing
1,719
Public rental housing
871
Subsidised sale flats
457

Housing Bureau, Housing in Figures 2025. Hong Kong total: approximately 3.047 million units. [9]

FULL GUIDE

HOS renovation guide: process, sequence and practical checks

How does HOS renovation differ from private flat renovation?

HOS and Green Form Subsidised Home Ownership Scheme (GSH) flats are owned by their purchasers, but the Housing Authority designed and built them. Estate decoration conditions and guidelines apply. The Housing Bureau’s Independent Checking Unit oversees minor works and structural proposals for sold Housing Authority properties. New flats have a defects liability period and structural safety guarantee, and alterations can affect claims.

At end-March 2025, Hong Kong had around 457,000 subsidised sale flats. Selection of nearly 7,000 new HOS 2025 flats began on 21 October 2026, and GSH 2025 offered 857 new flats at Shing Chi Court. See our HOS renovation guide for practical information for incoming owners.

[1][4][9][7][8]

Housing Authority HOS rules: which fixtures must be retained?

Housing Authority decoration conditions require one-hour fire resistance for entrance doors and half an hour for kitchen doors. Replacements must satisfy the Buildings Ordinance. Retain glazed aluminium and acoustic windows, avoid fixings to frames or external walls, keep chases out of heavily reinforced structural walls and retain MCBs and earth-leakage protection.

New or altered partitions must comply with the Building (Minor Works) Regulation. Unless plans were approved in advance, use the estate guide’s approved partition layout. Kitchen and bathroom tiles cover a waterproof membrane. An owner may need to compensate affected neighbours for seepage caused by tile removal or wall relocation. New flats generally lack a security gate. Added gates must satisfy fire and building rules and be properly earthed.

Fused connection units are provided for extractor fans in the kitchen and bathroom and a cooker hood in the kitchen. Incorporate these positions in the kitchen design.

  • Retain the kitchen door and fire enclosure.
  • Retain windows and avoid fixings to window frames or external walls.
  • Keep wiring chases out of structural walls.
  • Follow the approved partition layout.
  • Renew waterproofing after removing kitchen or bathroom tiles.
[1]

Do I need to submit building plans for HOS renovation?

The Housing Bureau’s Independent Checking Unit handles building control for sold Housing Authority properties. Simple interior works such as plastering, tiling and repairing or replacing sanitary fittings are exempt from prior plan submission under the Buildings Ordinance. Fire, structural and drainage requirements still apply.

Non-loadbearing brick walls and external air-conditioner brackets or drying racks are examples of minor works. File the required records with the Independent Checking Unit. If the work affects structure, ventilation, daylight, fire resistance or means of escape, appoint a prescribed building professional to assess and submit plans before starting. Enquiries: 3162 0597.

[4][6]

New HOS renovation: handover, defects liability and estate-based contractors

A new HOS flat has a one-year defects liability period from assignment, as does a new GSH flat. The Housing Authority also provides a structural guarantee from building completion, generally ten years, covering columns, beams, loadbearing walls and slabs. Ceiling seepage, plaster cracks, damaged tiles, structural alterations and damage from improper use are excluded. Inspect and report defects before floors or cabinets conceal them.

The Housing Department stations decoration contractors at new estates. Owners may use a listed contractor, another firm or DIY. Under the standard works order, an owner can terminate on seven days’ written notice if the contractor breaches the terms. Defective work must be rectified free within six months of completion. Ask other contractors for equivalent terms.

[2][3][1]

Are renovation rules the same for GSH and HOS flats?

The Housing Authority builds and sells both HOS and GSH. Their works-order terms and decoration conditions are broadly the same. GSH 2025 flats at Shing Chi Court measure 280–469 sq ft, compared with 281–560 sq ft for HOS 2025. Smaller layouts need especially careful storage planning.

Options for small flats include full-height living-room cabinets with a fold-down bed, a tall entrance shoe cabinet and a bedroom platform with drawers. The third example prices an 8 ft wall of tall units and a fold-down bed at around HK$28,710.

[1][8][7][11]

Estimating HOS renovation prices and packages

New HOS flats with sound walls may need only E03 direct repainting at HK$12 per sq ft. A 450 sq ft example with whole-flat repainting, SPC flooring, six socket sets, entrance shoe cabinet and wardrobe totals about HK$67,590. Older flats can have a substantially different budget.

Older HOS renovations often address worn floor tiles, paint and bathrooms. For a 500 sq ft flat, tile removal, levelling and retiling, E01 strip and repaint, bathroom strip-out, waterproofing and pipework, and a replacement board cost about HK$177,140, excluding furniture and kitchen work.

When comparing HOS renovation packages, check paint preparation, whether flooring includes moisture underlay and skirting, whether waterproofing includes flood testing and the grades and models of furniture boards and hardware. Prices are indicative, subject to measurement and written quotation.

[11]

Check plans and services before renovating a second-hand HOS flat.

Many second-hand HOS flats are 20–30 years old. Structural guarantees for estates sold before 2007 have expired. Before planning a new layout, check architectural and structural plans for subsidised sale flats on Public Housing e-BROS to distinguish structural and partition walls.

Bathrooms are a common focus in second-hand HOS flats. After tile removal we renew Sika waterproofing and flood-test before laying tiles with Optimix materials. Our licensed plumbing partner applies to WSD for fresh water works. A registered electrical worker issues the WR1 on completion.

If suspected asbestos-containing material is found during older-flat strip-out, we stop work and arrange registered asbestos consultants and contractors before proceeding. See our older-flat renovation and waterproofing pages.

[3][5][1][10]

Planning common HOS flat layouts

Housing in Figures 2025 shows that 25.1% of HOS flats have saleable areas under 40 m², 30.9% are 40.0–49.9 m² and 36.0% are 50.0–59.9 m². Subsidised sale flat households average 2.6 people.

With kitchen fire doors and windows retained, use furniture to provide storage and zones. Kitchen base, wall and tall appliance units can work together. TV units and sideboards can define living and dining areas, and full-height wardrobes maximise bedroom storage. We supply floor plans, furniture drawings and VR visuals for approval before work. See our design and custom furniture pages.

[9][1]

How HK Create Design renovates HOS flats

We have 15 years of experience. Send your floor plan to WhatsApp 5243 7747 for an initial discussion. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. At the measurement visit, we check the estate renovation rules and Housing Authority requirements with you and explain which items can proceed and which must be submitted to the Independent Checking Unit.

Our quotations are itemised. We use Sika or Fosroc Nitocote for waterproofing, Optimix for tiling, and Nippon or Dulux for painting. Custom furniture includes ENF-grade boards and Blum hardware as standard. ENF boards have very low formaldehyde emissions, so air the flat before moving in. We handle Water Supplies Department applications for fresh water pipe replacements and provide WR1 for electrical work. Our one-year warranty covers paint cracking, blistering and peeling, loose or detached furniture hinges, runners or screws, and swollen door panels, except where the damage was deliberate. Small site jobs have a HK$2,000 minimum charge. We also take on some repairs: WhatsApp photos to 5243 7747 for a quote. RenoClean 170°C steam cleaning is available through our partner. Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Hong Kong, Monday to Saturday, 10:00–18:00.

We use Hilly or ei8ht wiring with certifications such as 3C, commonly Schneider switches and sockets, and copper fresh water pipes. Kitchen and bathroom junctions are sealed with DOWSIL mould-resistant silicone. Kangaroo water-based sealer and Nippon low-odour filler are used in wall preparation. Our ENF boards come from our Foshan factory. Our partner export factory supplies quartz worktops directly with quality assurance and a choice of colours. Customers generally choose their own sanitaryware and taps and pay our installation labour charge.

[11][10]

COMPARE

Comparing HOS renovation options

HOS and GSH renovation rules under the Housing Authority estate decoration conditions

ItemHousing Authority requirementHow to approach the work
Partition wallsNew or altered partitions must comply with the Building (Minor Works) Regulation. Where plans have not been approved in advance, follow the approved partition layout in the estate decoration guide.Check the estate decoration guide before adding a room. Departures from the approved layout must follow the applicable minor works procedure.
Entrance and kitchen doorsOne-hour fire resistance for the entrance door and half an hour for the kitchen doorRetain the kitchen fire door. Any replacement must meet the required fire rating.
Metal entrance gateFlats are supplied without metal entrance gates. A new gate must comply with the Fire Services Ordinance and Buildings Ordinance and be earthed under the Code of Practice for the Electricity (Wiring) Regulations.Arrange installation and earthing by qualified tradespeople.
windowDo not alter glazed aluminium or acoustic windows or attach fittings to frames or external walls.Keep pelmets and window-bay cabinets clear of the window frame.
Kitchen and bathroom floor tilesA waterproof membrane lies beneath the tiles. Owners must compensate affected residents for seepage caused by tile removal or moving walls.Renew kitchen and bathroom waterproofing and carry out flood tests.
structural wallDense reinforcement. Keep chases for wiring and pipes out of structural walls.Use surface trunking or route wiring through non-structural areas.
Drying rackReplacement must follow the applicable minor works procedures.Handled by a prescribed registered contractor
Water, electricity and gasA licensed plumber uses compliant materials. Gas work downstream of the meter requires a registered gas contractor. Retain MCB and earth-leakage protection equipment.A registered electrical worker carries out electrical work and issues a WR1.

These terms originated in the licences for Housing Authority estate-based contractors. Also observe the estate decoration guide, deed of mutual covenant and management rules. [1]

Which HOS flat renovation works need to go to the Independent Checking Unit?

CategoryExampleWhat to do
Exempt building worksPlastering, tiling and repair or replacement of sanitary fittingsPrior plan submission is unnecessary. Fire, structural and drainage requirements still apply.
minor projectsConstruction of non-loadbearing brick walls and erection or alteration of external air-conditioner brackets and drying racksFile records with the Independent Checking Unit under the Minor Works Control System.
Prior submission and approval requiredStructural work or proposals affecting ventilation, daylight, fire resistance or means of escapeAppoint a prescribed building professional to assess and submit plans before work starts.

For renovation enquiries concerning sold Housing Authority properties, call the Independent Checking Unit on 3162 0597. [4][6]

Renovation priorities for new and second-hand HOS flats

compareNew HOS or GSH flatSecond-hand HOS flats
WarrantyOne-year defects liability period from assignment. Report defects before renovation.Defects liability period expired. Owners arrange old plumbing and electrical repairs.
Structural guaranteeTen years from building completion, or 20 years in Tin Shui WaiThe structural guarantee has expired for estates sold before 2007.
Common worksRepaint, install flooring and custom furniture and add sockets.Remove and relay tiles, waterproof the bathroom, replace pipework and board, strip and repaint.
Checks before work startsFittings and finishes in the sales brochure, and the estate decoration guideArchitectural and structural drawings on Public Housing e-BROS and estate management rules
[2][3][5]

Published unit rates for common HOS renovation items, 2026

Type of workItemThe company’s public unit price
PaintingE03 direct repaint / E01 strip, skim and repaintHK$12 / HK$39 per sq ft
floorJ01 Supply and install stone plastic composite (SPC) flooringHK$60 per sq ft
MasonryA01 tile removal, B02 levelling and D01 floor tilingHK$30 + HK$22 + HK$78 per sq ft
bathroomA10 bathroom strip-out and disposal / C02 bathroom waterproofingHK$9,950 / HK$4,850 per room
Plumbing and electrical workG04 complete bathroom hot and cold pipework / H09 distribution board replacementHK$13,300/HK$6,800
furnitureFUR01 tall cabinet / FUR05 wardrobeHK$2,900 per linear ft with standard ENF boards
furnitureFUR38 Fold-down bed hardwareHK$3,650 per set

Prices are indicative, subject to measurement and written quotation. Materials such as tiles and sanitaryware are separate. Standalone small-work visits have a HK$2,000 minimum. [11]

SITE SOP

HOS renovation rules and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

From handover to moving into a new HOS flat

  1. 1. Inspect on taking possessionshutdown checkpoint

    Check each fitting and finish against the sales brochure. Photograph defects.

  2. 2. Report defects within the liability periodshutdown checkpoint

    Report defects during the one-year liability period to management and have them rectified before work that would conceal them.

  3. 3. Measure and check estate decoration guidelines

    Use the estate guide and approved partition layout to agree the scope and quotation.

  4. 4. Application to the Management Office

    Submit the renovation application, worker list and programme. The same estate rules apply to listed and other contractors.

  5. 5. Carry out works and obtain completion recordsshutdown checkpoint

    Paint, lay flooring and install furniture in sequence. Obtain a WR1 for electrical work and file minor works records with the Independent Checking Unit.

Acceptance Checklist 0/3

[2][1][4][10]

Company Site Code

Checks before renovating a second-hand HOS flat

  1. 1. Check the plansshutdown checkpoint

    Check architectural and structural plans on Public Housing e-BROS to distinguish loadbearing and partition walls.

  2. 2. Inspect plumbing and electrical systems

    Check distribution board, circuits, supply and waste pipes and bathroom seepage before deciding what to replace.

  3. 3. Identify the required approvalsshutdown checkpoint

    Distinguish exempt works, minor works and submissions. Consult a prescribed building professional first for structural work.

  4. 4. Waterproof before tilingshutdown checkpoint

    After bathroom tile removal, renew waterproofing and flood-test. Lay tiles once the test shows no leakage.

Acceptance Checklist 0/3

[5][4][1]

DELIVERABLES

The design drawings you will receive

Floor plans and building services drawings

Mark sockets, lighting points and plumbing points.

Furniture drawings and VR visualisations

Confirm dimensions and the proposed finish before work starts.

Itemised written quotation

Item codes, quantities, unit rates and material models.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Check the estate decoration guide and approved partition layout.
  • Painting, flooring and custom furniture for a new HOS flat
  • Retile a second-hand HOS flat, waterproof the bathroom and replace pipes and the distribution board.
  • Arrange minor works records, electrical WR1 and other certificates.

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Is this a new HOS or GSH flat, or a second-hand HOS flat? Is it within the one-year defects liability period?

  2. 02

    Do you want to change the layout, add a room or alter the kitchen?

  3. 03

    Does the bathroom have seepage? Does the board have residual current protection?

FAQ

Frequently asked questions

How much does it cost to renovate an HOS flat?

For a new 450 sq ft HOS flat, painting, SPC flooring, sockets, shoe cabinet and wardrobe cost about HK$67,590. For a 500 sq ft second-hand flat, retiling, full paint preparation and bathroom work cost about HK$177,140, excluding furniture. Subject to measurement and written quotation.

Do I need to apply to the Housing Authority for HOS renovation?

HOS flats are owner-occupied properties. Generally apply to management and follow the estate decoration guide and deed of mutual covenant. File minor works records with the Independent Checking Unit. Structural proposals need prior submission by a prescribed building professional.

Can I convert an HOS kitchen to open plan?

Housing Authority conditions require half-hour fire resistance at the kitchen door. Removing it affects fire compartmentation. Ask a prescribed building professional to assess and submit plans before considering any change.

Can I remove a wall or add a room in an HOS flat?

Retain structural walls. New or altered partitions must follow the Building (Minor Works) Regulation. Unless plans have prior approval, follow the approved partition layout in the estate decoration guide.

Can I replace HOS flat windows?

Housing Authority conditions prohibit alterations to glazed aluminium or acoustic windows and fixings to window frames or external walls.

When should renovation start in a new HOS flat?

Inspect on taking possession, report defects during the one-year liability period and agree a start date with management.

Must I use a contractor stationed at the estate?

No. Choose a listed contractor, another company or DIY. Housing Authority works-order terms require free rectification of defects within six months of completion. You can request the same standard from another contractor.

Could renovations affect the structural safety guarantee?

The guarantee excludes structural alterations, damage caused by improper use and non-structural defects such as cracked plaster or broken tiles. Retain structural walls without chasing.

How do GSH and HOS flat renovations differ?

The HOS and GSH works-order terms and decoration conditions apply to both schemes. GSH 2025 flats measure 280–469 sq ft, making careful storage planning particularly important.

How do I identify structural walls in a second-hand HOS flat?

Consult architectural and structural plans for subsidised sale flats on Public Housing e-BROS. We compare these with the property when measuring.

Must I apply personally for water pipe replacement in a second-hand HOS flat?

No personal application is necessary. Our licensed plumbing partner applies to WSD for fresh water pipe replacement and HK Create Design coordinates the process.

Is there a warranty on HOS renovation?

The one-year warranty covers paint cracking, blistering and peeling, detached furniture hinges, loose runners, screws coming out and swollen door panels, excluding deliberate damage.

Can you visit an HOS flat?

Yes. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. WhatsApp 5243 7747.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. Official sourceReference List of Decoration Contractors guidelines, Annex II on HOS and GSH decoration conditions and works-order terms · Hong Kong Housing Authority· Accessed 2026-11-02
  2. Official sourceBrief on housing policies, Legislative Council paper CB(1)1246/2025(01), 1 April 2025 · Legislative Council Panel on Housing· Accessed 2026-11-02
  3. Official sourceStructural safety guarantee for HOS estates · Hong Kong Housing Authority and Housing Department· Accessed 2026-11-02
  4. Official sourceGeneral information on domestic flat decoration · Housing Bureau Independent Checking Unit· Accessed 2026-11-02
  5. Official sourcePublic Housing e-BROS · Hong Kong Housing Authority· Accessed 2026-11-02
  6. Official sourceMinor Works Control System · Buildings Department· Accessed 2026-11-02
  7. Official sourceFlat selection for Sale of Home Ownership Scheme Flats 2025 starts on 21 October, press release of 13 October 2026 · Hong Kong SAR Government press release· Accessed 2026-11-02
  8. Official sourceGSH 2025 timetable and flats for sale · 1823· Accessed 2026-11-02
  9. Official sourceHousing in Figures 2025 · Housing Bureau· Accessed 2026-11-02
  10. Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
  11. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your Whole-home renovation before you decide.

Start with the current condition

Tell us what you want to keep and what needs replacing. Once the scope is clear, we can compare costs and arrangements.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗