Skip to main content

WATER PIPE REPLACEMENT

Replacing water pipes in older flats: copper pipework, applications and prices

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Whole-flat supply and drainage replacement: HK$22,300 per itemPublished prices · Estimate the cost of 117 work items online
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

Discoloured water, falling pressure and stains on walls or ceilings are common reasons to investigate older pipes. HK Create Design uses copper for fresh-water replacement. Our partner licensed plumber handles necessary WSD applications. This guide covers work stages, brands, the application, lead testing, water quality checks and worked price examples. If rewiring is also planned, see our rewiring and plumbing and electrical pages.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design concept for copper pipe replacement in an older flat and WSD application support
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Wall chases for electrical conduits at a flat in Tai Kok Tsui
    Site photoTai Kok Tsui · Plumbing and electrical work · June 2026
  • New electricity meter box and main switch in a Tai Wai village house
    Completed project photosTung Lo Wan Village, Tai Wai · Plumbing and electrical work · July 2026
  • Wall chased for rewiring at a flat in Ho Man Tin Estate
    Site photoHo Man Tin Estate · Plumbing and electrical work · May 2026
  • Electrical conduits being relaid in the floor at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Plumbing and electrical work · July 2026
  • New sockets and floor conduits at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Plumbing and electrical work · July 2026
  • Rewiring and new conduits at Royal Peninsula, Hung Hom | HK Create Design
    Site photoRoyal Peninsula, Hung Hom · Electrical work · July 2026

WORKED EXAMPLE

Estimate the cost of pipe replacement for your own project

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Whole-flat kitchen and bathroom pipe replacement in an older building, plus a washing machine point

  • G05 — replace supply and drainage pipes throughout the kitchen and bathroom: HK$22,300
  • G06 — washing machine drain and cold-water supply: HK$1,550
  • G02 — each additional hot and cold water relocation: HK$1,700 per point
  • Our partner licensed plumber handles the WSD application.
  • Rebuilding concealed pipework and cutting new chases are by separate agreement
  1. Whole-flat supply and drainage replacement (G05)HK$22,300HK$22,300
  2. Washing machine drain and cold-water supply (G06)HK$1,550HK$1,550
  3. Additional relocated pipe point (G02)Number of relocated pipe points × HK$1,700HK$3,400

Whole-flat pipe replacement reference priceHK$27,250

With 2 extra points, 22,300 + 1,550 + 3,400 = HK$27,250. Excludes customer-selected sanitaryware and taps with separate installation, concealed pipe reconstruction, additional chasing and finish tiles. Prices are indicative pending inspection and a written quotation. [1]

Kitchen pipe replacement: inspect first, then replace the full set

  • G01 — open up and inspect supply and drainage pipes: HK$930
  • G03 — complete kitchen hot and cold pipework: HK$13,300, including sink and washing-machine supply and drainage and a pressure test
  • G02 — relocate hot and cold water outlets: HK$1,700 per point, for example at a water filter or heater
  1. Open up and inspect water supply and drainage pipes (G01)HK$930HK$930
  2. Complete kitchen hot and cold water pipework (G03)HK$13,300HK$13,300
  3. Relocate hot and cold water outlets (G02)Number of relocated pipe points × HK$1,700HK$1,700

Indicative kitchen pipe replacement priceHK$15,930

With 1 extra point, 930 + 13,300 + 1,700 = HK$15,930. If replacing the bathroom pipes too, compare the complete G05 price of HK$22,300. The written quotation confirms the final amount. [1]

Local pipe replacement for discoloured water or a leak at one or two points

  • G01 — open up and inspect supply and drainage pipes: HK$930, including a photo report and making good
  • G02 Relocate hot and cold water outlets: HK$1,700 per point
  • Minimum charge for a standalone visit: HK$2,000
  1. Open up and inspect water supply and drainage pipes (G01)HK$930HK$930
  2. Replacement pipe points (G02)Number of pipe points × HK$1,700HK$3,400

Indicative price for local pipe replacementHK$4,330

For 2 points, 930 + 3,400 = HK$4,330, above the HK$2,000 standalone minimum. If the problem is in a common pipe, coordinate through building management. The written quotation confirms the final amount. [1]

HOW WE HELP

How can we help you

Coordinated WSD application service

Our partner licensed plumber handles the application on your behalf.

All fresh-water pipes are copper

We use certified fittings and avoid galvanised iron pipes for fresh-water supply.

Pressure testing before wall closure

All G-series pipe work includes a pressure test before the walls are closed.

Agree the water shut-off arrangements

Give advance notice of shut-offs and arrange temporary drinking water.

One-year warranty

One-year workmanship warranty, excluding deliberate damage.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same wall with concealed pipes, white paint and new white tiles.
Before concept: rusty exposed water pipes, old wiring and worn sockets on the wall of an older kitchen corridor.
Illustration before workIllustration of the proposed result
Design illustration · Illustration: old exposed, rusty water pipes replaced with new concealed pipes in an older flat.

KEY NUMBERS

Pipe replacement: figures to check before work begins

company public price

HK$22,300/item

Whole house water pipe replacement (kitchen and toilet, G05)

Complete kitchen and bathroom pipe replacement with pressure testing. Do not add G03 or G04 again. Concealed pipe reconstruction and additional wall chasing are quoted separately.

[1]

company public price

HK$13,300/item

Complete bathroom or kitchen hot and cold pipework (G04/G03)

Bathroom work covers the shower, WC and basin supply and drainage. Kitchen work covers the sink and washing machine supply and drainage. Pressure testing is included.

[1]

company public price

HK$1,700per point

Relocate hot and cold water outlets (G02)

Includes chasing, new pipework, pressure testing and reinstatement of the render. The minimum for a standalone small call-out is HK$2,000.

[1]

government/official

WWO 46

Plumbing work application form

The licensed plumber submits WWO 46 Parts I and II. Work begins after WSD issues Part III. After completion, Part IV is submitted for the WSD’s final inspection.

[4][5]

government/official

≤10µg/L

Lead acceptance criterion for water samples

The WSD Guide to Application for Water Supply sets acceptance criteria for samples after repiping an occupied building, including lead at or below 10 µg/L.

[4]

company public price

1 year

Workmanship warranty

HK Create Design offers a one-year workmanship warranty excluding deliberate damage.

[1]

CHARTS

Pipe replacement figures at a glance

Worked pipe replacement cost example(Unit:HK$)
Replace two local points
HK$4,330
Kitchen only
HK$15,930
Whole-flat pipe replacement
HK$27,250

Calculated from HK Create Design’s rates and the assumptions on this page. The written quotation confirms the final amount. [1]

FULL GUIDE

Pipe replacement: stages and points to check

When to replace pipes: discoloured water, weak pressure and seepage

Three common concerns are discoloured water, particularly the first draw in the morning, weak or fluctuating shower and heater flow, and seepage marks on walls or the ceiling below. These can indicate ageing pipes and warrant investigation before choosing the replacement scope.

WSD guidance covers replacement of ageing pipes. We first check whether the issue originates inside the flat, in a building riser or in the tank. For a pipe inside the flat, G01 costs HK$930 for opening up, a photo report and making good. Its findings help decide between local and whole-flat replacement.

[1][4]

Why use copper for all fresh-water pipes?

HK Create Design uses copper for fresh-water pipe replacement. Galvanised iron pipes can corrode internally over time, contributing to discoloured water and weaker pressure in older buildings. We do not replace those pipes with the same material.

WSD requires pipes and fittings used in an inside service to meet Part I of Schedule 2 to the Waterworks Regulations. Copper pipes must meet specified standards such as BS EN 1057 and carry markings for the manufacturer or brand, standard, nominal size and direction of flow. These markings can be checked at handover.

Common copper pipe brands are Wednesbury, Kembla (Kempress), LAWTON, OTTO and OPAL. We use Pegler Yorkshire connections and Tectite or ENDEX push-fit or silver-brazed fittings as appropriate. Certified products are selected to WSD requirements. Customers usually select taps and sanitaryware, which we install.

[8][7]

WSD applications: when are they needed and who applies?

Under section 14 of the Waterworks Ordinance, written permission from the Water Authority is generally required to construct, install, alter or remove an inside service. A licensed plumber can apply. Unauthorised work is an offence. The WSD identifies certain minor alterations or repairs, such as replacing a pipe or fitting in a flat or repairing a leak. All five conditions must be met, including no soft-soldered joints in copper pipes.

Our partner licensed plumber determines whether an application is needed. Where required, the plumber submits WWO 46 Parts I and II, waits for WSD to issue Part III, then submits Part IV after work. WSD conducts the final inspection and records the outcome in Part V. We coordinate this on your behalf.

Since August 2015, WSD has strengthened control over inside services, including non-destructive tests on soft-soldered joints and water sampling for lead and other parameters. Pipes and fittings also require General Acceptance. The licensed plumber follows these requirements and explains each stage.

[2][3][4][6]

New routes or replacement along existing pipe runs?

The WSD Guide to Application for Water Supply recommends installing new pipes alongside the old route where possible, connecting the new pipes before removing the old ones to minimise shutdowns. Where space is limited, the pipework may be replaced in sections along the original route.

When walls and floors are already open for a full renovation or kitchen and bathroom strip-out, we can plan straighter hot and cold pipe runs for future access. For local replacement, we follow existing routes where possible to minimise chasing and reinstatement.

We draw and photograph the new pipe routes before the walls are closed, marking hot and cold pipes and joints. Keep these records when fitting cabinets, hanging pictures or planning repairs. Major rerouting, concealed pipe reconstruction and extra chasing are priced separately in the quotation.

[4][1]

Pipe replacement in an occupied flat: water shut-offs and temporary drinking water

WSD guidance calls for advance notice and a clean temporary drinking water supply, such as bottled water, during repiping in an occupied building. As work proceeds in phases, water may be temporarily restored for non-drinking purposes.

We agree the shut-off times in advance and try to phase the kitchen and bathroom work separately. Households with older residents or young children may wish to prepare enough bottled water or arrange a temporary stay during full replacement.

[4]

Handover checks: pressure testing, lead testing and water samples

Our G-series work includes pressure testing before walls are closed. See the plumbing and electrical page for the full procedure. For soft-soldered copper pipe joints, WSD calls for non-destructive lead testing of newly completed joints and a photographic record. Fittings with pre-soldered rings are exempt from that particular test.

The guidance specifies disinfection of new pipework with at least 30 ppm free residual chlorine for at least 30 minutes, followed by flushing. For repiping occupied buildings, WSD may spot-check installations. An accredited laboratory takes samples after water has stood for at least 30 minutes. Criteria include lead ≤10 µg/L, copper ≤2,000 µg/L and E. coli at 0 cfu/100 mL. Failed results require remedial work and resampling.

[4][6]

How is pipe replacement priced?

Our pipe rates: G01 open-up inspection of supply and drainage HK$930 per item. G02 move hot and cold pipe points HK$1,700 each. G03 full kitchen hot and cold pipework HK$13,300. G04 full bathroom hot and cold pipework HK$13,300. G05 whole-flat kitchen and bathroom supply and drainage HK$22,300, instead of adding G03 and G04. G06 washing machine drain and cold supply HK$1,550. G07 WC relocation from HK$9,300.

Examples using our rates: about HK$4,330 for two local points, HK$15,930 for a kitchen only and HK$27,250 for the whole flat plus a washing machine and two extra points. Excludes sanitaryware and taps chosen by the customer, concealed pipe reconstruction, additional chasing and finish tiles. The minimum for a standalone small call-out is HK$2,000. Confirm the final price in writing.

[1]

How is pipe replacement coordinated with other work?

Coordinate pipe replacement with a kitchen or bathroom renovation where possible. Removing tiles already exposes pipes and reduces chasing. Replace the pipes, pressure test, install waterproofing, flood test, then tile and fit the sanitaryware.

If you are also rewiring, the plumbing and electrical trades can coordinate the chasing. See the rewiring guide, the plumbing and electrical page for heater replacement, or the older flat guide for a complete renovation.

COMPARE

Compare options for pipe replacement

Choose the scope: from a single point to a whole flat

Site conditionsRecommended practicesCompany ratePay attention to
Unsure where the leak is? Start by checking the pipes.G01 Come and go for water pipe drilling inspectionHK$930 per itemIncludes a photo report and making good. Choose the replacement scope after inspection.
Discoloured water, leakage or relocation at one or two pointsG02 Change the hot and cold water pipe positionHK$1,700 per pointMinimum charge for a standalone visit: HK$2,000
Add a washing machine pointG06 — washing machine drain and cold-water supplyHK$1,550 per itemCombining the work with other trades may reduce costs
Kitchen or bathroom renovationG03 complete kitchen / G04 complete bathroomHK$13,300 per item for either roomReplacing pipes when stripping out the kitchen or bathroom reduces chasing costs.
Whole-flat pipe replacement in an older buildingG05 Whole house water pipe replacement (kitchen and toilet)HK$22,300 per itemDo not add G03 and G04 again. Concealed pipe reconstruction and additional chasing are quoted separately.

We coordinate work requiring a WSD application through our partner licensed plumber. The final written quotation follows a site inspection. [1][2]

Fresh-water pipe materials and brands we use

CategoryBrands we commonly useDescription
Copper fresh-water pipeWednesbury、Kembla(Kempress)、LAWTON、OTTO、OPALWe use copper instead of galvanised iron for fresh-water supply.
Pipe fittingsPegler(Pegler Yorkshire)Certified pipes and fittings meeting WSD requirements
Push-fit and silver-brazed fittingsTectite/ENDEXSelect push-fit or silver-brazed fittings to suit the location and pipe diameter.
Taps and sanitarywareUsually selected by the customerWe install the fixtures and charge installation labour.

WSD technical requirements include specified copper pipe standards such as BS EN 1057. Pipe markings must show the manufacturer or brand, standard, nominal size and direction of flow. The model depends on availability and pipe diameter on site. [1][7]

WSD form WWO 46: application stages and responsibilities

stagecontentResponsible person
Parts I and IISubmit the plumbing work applicationPartner licensed plumber coordinated by HK Create Design
Part IIIIssued after WSD approval, before work beginsWater Supplies Department
During the workWater shut-off, temporary drinking water, new installation and pressure testingLicensed plumber and our site team
Part IVSubmitted after completion to arrange WSD inspectionOur partner licensed plumber
Part VWSD final inspection, including spot checks of fittings and water samplingWater Supplies Department

The process follows the WSD Guide to Application for Water Supply. Our licensed plumber checks whether work falls within minor alterations and repairs and meets the exemption conditions. [4][5][3]

SITE SOP

Pipe replacement: work standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Our standard pipe replacement procedure

  1. Inspect pipe condition on site

    Check the meter, stop valve, existing pipe materials and route. If needed, use G01 to open up and photograph the relevant point.

  2. Confirm the scope and identify common partsshutdown checkpoint

    Distinguish the flat’s own pipes from building risers, communal pipes and pipes before the meter. Common parts are handled through building management or the owners’ corporation.

  3. Licensed plumber submits the application

    Where an application is needed, our partner licensed plumber submits WWO 46 on your behalf.

  4. Wait for approval before startingshutdown checkpoint

    Work starts after WSD issues WWO 46 Part III.

  5. Water shut-offs and temporary drinking water

    Give advance notice of water shut-offs. Arrange temporary drinking water such as bottled water and restore parts of the supply between phases where possible.

  6. Remove old pipes and install new copper pipes

    Install new copper pipes and certified fittings along the planned route.

  7. pressure testshutdown checkpoint

    Before closing the wall, pressure test, check each joint for leakage and photograph the gauge reading.

  8. Cleaning and disinfection

    Clean, disinfect and flush the new pipes under WSD guidance.

  9. Completion notice and inspectionshutdown checkpoint

    The licensed plumber submits WWO 46 Part IV and coordinates the final inspection and water sampling with WSD.

  10. Reinstate the render and hand over

    After inspection, reinstate the render and supply photographs of the pipe routes taken before wall closure.

Acceptance Checklist 0/5

[1][2][4]

Organized according to government guidelines

WSD water quality acceptance criteria for repiping occupied buildings

  1. Lead testing for soft-soldered joints

    New soft-soldered copper joints require non-destructive lead testing and a photo record. Fittings with pre-soldered rings are exempt from that test.

  2. Cleaning and disinfection

    The guidance specifies disinfection with a solution containing at least 30 ppm free residual chlorine for at least 30 minutes, followed by flushing.

  3. Water samples collected after stagnationshutdown checkpoint

    After the water has stood for at least 30 minutes, an accredited laboratory takes samples, collecting the metals sample first.

  4. Laboratory testing and follow-up

    If any result fails, corrective work and repeat sampling are required. WWO 46 Part V(b) is issued after all results meet the requirements.

Acceptance Checklist 0/5

[4][6]

DELIVERABLES

The design drawings you will receive

written quotation

List each G-series item and unit rate.

WSD application documents

Our partner licensed plumber follows up on WWO 46.

Pressure test records

Photographs of pressure gauge readings.

Photos of the pipe routes

Photographs taken before closure help with future repairs.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Inspect pipe condition and investigate discolouration or seepage
  • Replace fresh-water copper pipes in a kitchen, bathroom or throughout the flat
  • Our partner licensed plumber handles the WSD application.
  • Pressure testing before wall closure and coordination with WSD inspection

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Is the problem discoloured water, weak pressure or seepage?

  2. 02

    Replace one or two points, one room or all pipes in the flat?

  3. 03

    Will anyone stay in the flat during the work?

FAQ

Frequently asked questions

Do I need WSD permission for pipe replacement?

The Waterworks Ordinance generally requires written permission from the Water Authority to construct, install, alter or remove an inside service. A licensed plumber applies. Certain minor alterations or repairs are exempt only if the WSD’s conditions are met, including no soft-soldered copper joints. Our partner plumber assesses the work and handles the application.

Do I have to deal with the WSD application myself?

No. If an application is needed, our partner licensed plumber submits form WWO 46. We coordinate the quotation, application, installation and inspection on your behalf.

How much does whole-flat pipe replacement cost?

G05 whole-flat kitchen and bathroom pipe replacement is HK$22,300 including pressure testing. Add G06 for a washing machine point at HK$1,550 and 2 extra G02 points at HK$1,700 each for about HK$27,250. Concealed pipe reconstruction and additional wall chasing are quoted separately.

Can I replace just one or two points?

Yes. G02 is HK$1,700 per hot and cold water point. If the problem is unclear, start with a G01 opening-up inspection at HK$930. A standalone small call-out has a minimum charge of HK$2,000.

What pipes do you use? Do you use iron pipes?

We use copper for fresh water. Common brands are Wednesbury, Kembla (Kempress), LAWTON, OTTO and OPAL, with Pegler Yorkshire and Tectite/ENDEX fittings.

Why is water sometimes yellow in older buildings?

Corrosion inside an older pipe can discolour water that has stood in it, particularly the first water drawn in the morning. Building risers or the tank may also be responsible. We investigate first because our replacement work covers the pipework inside the flat.

How long does pipe replacement take?

One or two local points can usually be completed within a day, and complete kitchen or bathroom pipework takes around two to three days. Whole-flat replacement is normally scheduled alongside tile removal, pressure testing and reinstatement. Where a WSD application is needed, allow time for WWO 46 Part III before work and for final inspection afterwards.

How long will the water be off?

A local replacement involving one or two points generally interrupts water for a few hours. Whole-flat replacement is phased. We provide advance notice, arrange temporary drinking water such as bottled water, and aim to restore non-drinking water between phases.

Can the pipes be replaced while I live in the flat?

Yes, if you can accommodate phased shut-offs, dust and noise from chasing. WSD guidance calls for advance notice and a clean temporary drinking water supply. When a whole-flat renovation is planned, coordinating pipe work with strip-out reduces chasing costs.

How is new pipework checked at handover?

We pressure test before closing walls and run each outlet. For work requiring an application, the licensed plumber submits WWO 46 Part IV. WSD’s final inspection may include spot checks of fittings and sampling for water quality, including lead.

What does lead testing cover?

WSD requires non-destructive lead testing and a photo record of new soft-soldered copper joints. Fittings with pre-soldered rings are exempt from that test. We also commonly use push-fit or silver-brazed fittings.

Will replacing pipes damage the wall tiles?

Concealed pipes require chasing. G02 and related items cover reinstatement of rendered walls. Tiled walls require local tile removal and new finish tiles are extra. Coordinate replacement with kitchen or bathroom renovations where possible.

Can you replace a leaking building riser?

Building risers, common pipes and pipework before the meter are outside an individual owner’s scope. We check management requirements before work and coordinate common parts with management or the owners’ corporation.

Are taps and sanitaryware included?

You normally choose taps and sanitaryware. We charge for installation, for example HK$970 for a K03 shower mixer or HK$1,300 for a K01 WC.

Is pipe replacement covered by a warranty?

Yes. The work carries a one-year warranty, excluding deliberate damage. If a joint leaks during the warranty period, WhatsApp photos to 5243 7747 for follow-up.

How do I start a quotation?

On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. For minor repairs, send photos to WhatsApp 5243 7747 for an initial quotation.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. CompanyHK Create Design itemised renovation rates · HK Create Design· Accessed 2026-11-02
  2. Official sourcelicensed plumber · Water Supplies Department· Accessed 2026-11-02
  3. Official sourceWorks of a minor nature · Water Supplies Department· Accessed 2026-11-02
  4. Official sourceGuide to Application for Water Supply (October 2026 edition) · Water Supplies Department· Accessed 2026-11-02
  5. Official sourceForm WWO 46 · Water Supplies Department· Accessed 2026-11-02
  6. Official sourceEnhanced control of inside services · Water Supplies Department· Accessed 2026-11-02
  7. Official sourceTechnical Requirements for Plumbing Works in Buildings (2025) · Water Supplies Department· Accessed 2026-11-02
  8. Official sourceHandbook on Plumbing Installation for Buildings · Water Supplies Department· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your Water supply and drainage pipework before you decide.

Start with the current condition

Tell us what you want to keep and what needs replacing. Once the scope is clear, we can compare costs and arrangements.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗