2026 pipe replacement rates by work item

Many homeowners ask, “Pipe replacementper square foot?” Plumbing costs depend on outlet count, whole-room coverage, any relocations and whether pipes are concealed in walls or floors. Our quote therefore lists the work by item.[9]

Our 2026 published rates: G01 opening up for supply or drainage inspection HK$930 per item, G02 relocating a hot or cold water point HK$1,700 per point, G03 complete kitchen pipework HK$13,300, G04 complete bathroom pipework HK$13,300, G05 kitchen and bathroom supply and drainage pipe replacement HK$22,300, G06 washing-machine cold supply and drain HK$1,550, and G07 Toilet relocationFrom HK$9,300 including waste pipe rerouting.[9]

G05 is the combined kitchen and bathroom rate at HK$22,300. Do not add G03 and G04 to it. Pricing the rooms separately under G03 and G04 totals HK$26,600, so coordinating replacement can cost less.[9]

The minimum charge for a separate small-job visit is HK$2,000. A single point normally triggers that minimum. When combined with other work, the item rates apply.

  • Set the scope: local points, one room or the whole flat
  • Use G05 for the kitchen and bathroom together to avoid double counting
  • Allow for the HK$2,000 small-job minimum
2026 company pipe replacement prices: inclusions and exclusions

You can swipe left or right on your phone to view the complete table.

ItemCompany rateIncludedExcluded or priced separately
G01 Come and go for water pipe drilling inspectionHK$930 per itemOpen the specified area, report with photographs and make good the openingPipe alterations are extra. [9]
G02 Change the hot and cold water pipe positionHK$1,700 per pointChase the wall, install new copper pipework, pressure-test and reinstate the plasterFor tiled walls, tile removal and replacement tiles are extra
G03 Install hot and cold water pipes throughout the kitchenHK$13,300 per itemSink and washing machine water supply and drainage, including pressure testingRemoval and refitting of kitchen cabinets, wall and floor tiles
G04 Toilet complete set of hot and cold water pipesHK$13,300 per itemHot and cold supply, drainage and pressure testing for the shower, WC and basinWaterproofing, tiling and sanitaryware supply
G05 Whole house water pipe replacement (kitchen and toilet)HK$22,300 per itemComplete replacement of kitchen and toilet, pressure testRebuilding concealed runs and cutting new routes are quoted separately. Do not add G03 or G04 to the same scope.
G06 — washing machine drain and cold-water supplyHK$1,550 per itemInstall a new drain point and cold tapThe washing machine itself
G07 Toilet moved and water divertedFrom HK$9,300Relocation, water removal, floor repairQuotation after on-site assessment

HK Create Design's published 2026 prices are for preliminary budgeting. The written quote after site measurement governs. A separate small-job visit has a HK$2,000 minimum. [9] [9]

Wall chased for rewiring at a flat in Ho Man Tin Estate
Site photo: wall chases in an older flat ready for new pipework. Confirm the actual routes on site. Select an image to enlarge

02

Specify what the quoted price includes and excludes

Our G-series items include cutting chases, installing new copper pipes, pressure testing and making good the render (G02), or complete kitchen and bathroom supply and drainage pipework with pressure testing (G03, G04 and G05).[9] These stages cover the pipe replacement itself.

Common exclusions include rebuilding concealed pipework and opening new routes (separately priced under G05), tile removal, new tiles and retiling in affected areas. Clients generally select sanitaryware and taps separately. Installation rates include K01 WC at HK$1,300, K02 basin and tap at HK$1,150 and K03 shower mixer at HK$970. Other exclusions includeWaterproofing, such as C02 Bathroom waterproofing HK$4,850。[9]

A lower total tells you little if one quote includes testing and wall repairs and another just says “pipe replacement”. Compare material, point count, pressure testing, reinstatement, submissions and exclusions before work starts.

  • Confirm pressure testing and render reinstatement are included
  • Clarify charges for replacing concealed pipes and cutting a new route
  • List sanitaryware, taps, waterproofing and tiling separately
Removing a bath and wall tiles
Site photo: stripped bathroom ready for pipe replacement and waterproofing before tiling. Select an image to enlarge
Pipe replacement prices: key figures illustrated | HK Create Design
Pipe replacement prices: key figures at a glance | HK Create Design Select an image to enlarge

03

Seven factors affecting pipe replacement costs

1. Outlet count: each additional relocated hot or cold point adds G02. 2. Whole-room scope: use G03, G04 or G05 where a complete kitchen, bathroom or combined installation is required. 3. Routing: new chases or rebuilding concealed runs need a separate quotation.[9]

4. Wall finish: a painted wall can be re-rendered after chasing, while a tiled wall may need tiles removed and replacement tiles priced separately. 5. Concurrent renovation: pipes exposed during kitchen and bathroom strip-out reduce chasing. 6. Submissions: soft-soldering copper generally calls for a licensed plumber's permission application outside the minor-nature category.[2] 7. Occupancy: working in an occupied home means staged shutdowns and temporary water arrangements, which can lengthen the programme.[3]

Even two flats with the same bedroom count can have different plumbing costs. Measure the site, inspect pipe positions and the walls and obtain an itemised quote.

  • Count the outlets
  • Identify the wall finish
  • Ask whether a new pipe route must be opened
  • Renovating at the same time can avoid duplicate chasing
Company prices for major pipe replacement items(Unit:HK$)
G01 Opening-up inspection
HK$930
G06 Washing-machine point
HK$1,550
G02 Relocate a plumbing point, per point
HK$1,700
G03/G04 Complete kitchen or bathroom installation
HK$13,300
G05 Whole flat (kitchen and bathroom)
HK$22,300

Our published 2026 rates. The written quotation governs. [9]

「Check whether the price covers exposed pipe replacement or chasing for concealed pipes. Ask about pressure testing, render repairs and reconnection near the water meter.」

Plumbing Supervisor, HK Create Design

04

Choosing between local and whole-flat replacement

The Water Supplies Department notes that unlined galvanised steel pipes were once widely used in Hong Kong. They may corrode after several years and discolour water left standing in the pipe. Severe cases may require replacement.[4] Replacing one or two visibly affected points in an ageing installation leaves the remaining old pipes susceptible to corrosion.

If the pipes have already been replaced and just one connection leaks, a local repair may suffice. G01 exploratory inspection at HK$930 includes photos so you can see the pipe material and condition before deciding.[9]

Our team's experience is that repiping an entire older flat works best alongside kitchen and bathroom strip-out. For one local fault and no renovation planned, investigate before deciding on replacement. We use copper for drinking-water pipework.

  • Identify the existing pipe material first
  • Consider whole-flat replacement for ageing galvanised steel pipes
  • A fault confined to a connection may be repaired locally
Worked example 1

Example 1: repiping the kitchen and bathroom of an older two-bedroom flat, adding a washing machine connection and two extra pipe points

Assumptions

  • One kitchen and one bathroom in the flat, with the old pipes replaced together.
  • Add a washing-machine point and relocate two hot or cold points, for example for a water heater and kitchen water filter.
  • Our licensed plumbing partner handles WSD applications. Rebuilding concealed runs, opening new wall routes, tile removal and tile supply are excluded.

How to calculate quantities

  1. G05 Replace kitchen and bathroom supply and drainage pipes throughout the flat: HK$22,300. [9]
  2. G06 Washing-machine drain and cold supply: HK$1,550.
  3. G02 Changing the hot and cold water pipe locations: 2 × HK$1,700 = HK$3,400.
  4. Total: HK$22,300 + HK$1,550 + HK$3,400 = HK$27,250.

On these assumptions, budget about HK$27,250 for the plumbing portion.

Excludes sanitaryware and taps, which clients usually select separately, plus tile removal, waterproofing, tiling and painting. We charge installation labour. Refer to the written quotation after site measurement. [9]

Use your square footage instead and see a reference budget
New white storage-type electric water heater mounted above the shower in a small bathroom, with neatly arranged pipes
Illustration: a new white electric storage water heater above the shower in a compact bathroom, with neatly arranged pipework. HK Create Design. Select an image to enlarge

05

What the quote should cover for WSD submissions and a licensed plumber

Section 14 of the Waterworks Ordinance generally requires written permission from the Water Authority before constructing, installing, altering or removing an inside service. A licensed plumber can apply. Breach is an offence. Section 15 reserves specified plumbing work to designated persons, including licensed plumbers and registered plumbing workers, subject to the minor-nature provisions.[1]

The Water Supplies Department describes some in-flat replacements as works of a minor nature only where all five listed conditions apply. One condition is that the work does not involve soft-soldered copper joints.[2] Some pipe replacements require an application and others may qualify as minor in nature. Ask the licensed plumber to check against the Water Authority's criteria.

Our licensed plumbing partners handle Water Supplies Department applications, inspections and follow-up on your behalf. When quoting, we will identify the work that requires an application.

  • Identify the licensed plumber responsible
  • Confirm whether permission is required
  • Keep the application and inspection documents
Project photo of plumbing work at Yat Man House, Ho Man Tin Estate | HK Create Design
Project photograph: plumbing at Yat Man House, Ho Man Tin Estate, May 2026, HK Create Design Select an image to enlarge

06

Five common omissions in pipe replacement quotes

Three common omissions are point count and material, testing and reinstatement. List the points to avoid extra charges. Pressure-test before closing the walls so leaks can be found. Specify how chases, render, paint and tiles will be made good.

4. Missing permission. Starting work that requires written permission without obtaining it is unlawful.[1][2] 5. Ignoring communal pipes. The Water Supplies Department distinguishes pipes serving a single flat from communal pipework, pumps and tanks managed by the building management or registered agent.[5] Replacing all the pipes inside your flat may leave a communal pipe fault unresolved.

Use the checklist to compare each line of the quote. Agreeing clear answers before work starts helps reduce extra charges later.

  • State point counts and materials
  • Pressure-test before enclosing pipes
  • Define the extent of reinstatement
  • A licensed plumber handles the application
  • Distinguish pipes inside the flat from communal pipes
Comparing whole-flat repiping, separate kitchen and bathroom replacement, and local pipe relocation

You can swipe left or right on your phone to view the complete table.

practiceSuitable for the situationPricing methodPay attention to
Relocate individual plumbing pointsOnly one or two points leak, produce discoloured water or need relocatingG01 + G02 × number of pointsOther old pipes remain and may require the wall to be opened again
Replace only the kitchen or bathroom pipeworkRenovating just one roomG03 or G04: HK$13,300Check the condition of old pipes retained in the other room
Kitchen and bathroom togetherWhole-flat renovation in an older building with ageing pipes throughoutG05 HK$22,300, without adding G03 or G04HK$4,300 less than separate G03 and G04 items totalling HK$26,600. [9]
Whole-flat repiping with relocated pointsAdding a washing-machine or water-heater point or changing the kitchen layoutG05 + G06 + G02 × number of pointsRebuilding concealed pipework and cutting new chases are by separate agreement

Comparison uses our published rates only. It excludes associated strip-out, waterproofing and tiling. [9] [9]

07

Handover evidence to check before final payment

Acceptance includes more than checking a running tap. Our G items include pressure testing before the walls are closed, with photographs for the record.[9] Run each outlet in turn, check for leaks and confirm that the drains discharge freely.

For work requiring permission, the licensed plumber submits WWO 46 Part IV on completion. WSD's final inspection includes non-destructive lead testing of selected soft-solder joints. At occupied buildings, water is sampled after stagnation of at least 30 minutes. Criteria include lead ≤10 µg/L, copper ≤2,000 µg/L and turbidity ≤3.0 NTU. WWO 46 Part V(b) follows after the relevant acceptance requirements have been met.[3]

Keep three kinds of evidence: pressure-test records, photos of pipe routes before enclosure, and Water Supplies Department documents handled by the licensed plumber.

  • Pressure test records
  • Photos of the pipe routes
  • Water Supplies Department inspection records
  • Run and check each outlet
Guide prices for three worked examples(Unit:HK$)
Replace two local points
HK$4,330
Whole-flat replacement, washing-machine point and two relocated points
HK$27,250
Bathroom refurbishment with pipe replacement, excluding tiling
HK$31,520

Calculated using the stated assumptions and our published rates. [9]

Site photo of a completed custom bathroom cabinet | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

08

Official guidance on pipe replacement and water quality

The Water Supplies Department identifies corroded building pipework and unclean roof tanks as major causes of cloudy or yellow water. For persistent or severe discolouration, ask a licensed plumber to inspect private pipes and replace corroded sections as needed, and ask management to inspect communal installations.[5]

2. Unlined galvanised steel pipe was prohibited for new installations from 23 December 1995.[4] 3. Pipes and fittings used in Hong Kong inside services must meet Water Authority requirements. General Acceptance (GA) letters are issued for products meeting specifications under the Waterworks Regulations.[6]

The price also covers meeting the applicable requirements: suitable approved materials, qualified workers, necessary submissions and inspection. Include these in the scope alongside labour and materials.

  • Pipes and fittings must meet Water Authority requirements
  • Persistent discolouration: check both private and communal pipework
  • Allow for required statutory submissions

09

Pipe replacement programme and payment stages

Timing depends on scope and the need for permission. Where required, the licensed plumber submits WWO 46 Parts I and II, and work starts only after the Water Authority issues Part III.[3] After completion, submit Part IV. Under the applicable inspection arrangements, WSD issues notice and makes the final-inspection appointment within seven working days of receipt.[3]

Allow time for both permission and inspection. When coordinated with kitchen and bathroom renovation, replace pipes after strip-out and before waterproofing and tiling.

We stage payments against the work as set out in the written contract. Include a successful pressure test and delivery of handover documents among the payment milestones so each instalment corresponds to verifiable work.

  • Allow time for permission and inspection
  • Schedule repiping before waterproofing and tiling
  • Link payments to evidence of completion
Worked example 2

Example 2: bathroom renovation and pipe replacement, excluding tiling

Assumptions

  • Complete strip-out and reconstruction of one bathroom of about 30–40 sq ft.
  • Replace all bathroom hot and cold pipework, renew waterproofing, then install the client's WC, basin with tap and shower mixer.
  • Wall and floor tiles and laying labour are extra.

How to calculate quantities

  1. A10 Strip out and clear one bathroom: HK$9,950. [9]
  2. G04 Complete bathroom hot and cold water installation: HK$13,300.
  3. C02 Waterproof one bathroom including a 24-hour flood test: HK$4,850.
  4. K01 WC installation HK$1,300 + K02 basin and tap installation HK$1,150 + K03 shower mixer installation HK$970 = HK$3,420.
  5. Total: HK$9,950 + HK$13,300 + HK$4,850 + HK$3,420 = HK$31,520.

Bathroom renovation with pipe replacement, excluding tiling: indicative total about HK$31,520.

Tiling, tiles, vanity, sanitaryware and extra waste removal beyond the specified scope are separate. For bathrooms over 40 sq ft, additional waterproofing is priced under C01. Refer to the written quote. [9]

Use your square footage instead and see a reference budget

10

Repiping an occupied home: water shutdowns, temporary drinking water and phasing

Pipe problems often arise while the home is occupied. The item rate may be similar, but the work needs different sequencing. Water Supplies Department guidance favours laying new pipes alongside ageing ones before removing the old where practical. In-place replacement is considered where a parallel route is unavailable.[3] The first approach can shorten the shutdown. The second requires staged interruptions.

The guidance calls for temporary drinking water where replacement affects consumers, for example a metered temporary supply, suitable filtration or bottled water. Notify those affected.[3] This is especially important on communal pipework. Even for work affecting just one home, agree the shutdown date, duration and whether water will be available overnight.

For an occupied home, our team may start with the kitchen and then move to the bathroom, or restore service at the end of each day so the household can cook and shower. The programme can take longer but daily disruption is lower. We set out the sequence and planned shutdowns when quoting.

Before a shutdown, check that the stop valve beside the meter operates. The Water Supplies Department advises isolating the supply at that valve when a leak is found and engaging a licensed plumber to repair it.[7] In an older building, a corroded stop valve may no longer close fully. Have it dealt with before starting pipe replacement.

  • Agree shutdown dates and times
  • Where practical, run new pipes beside the old before removing them
  • Check that the stop valve beside the meter closes fully
  • Arrange a temporary water supply
Pipe replacement quotation checklist: questions before signing

You can swipe left or right on your phone to view the complete table.

Questions to askWhy it mattersEvidence to request
Which pipe material will be used?Corroded unlined galvanised steel pipes are a common problem in older buildings. [4]Specify copper pipes and pipe diameters in the quote
Who handles the application?Altering an inside service generally requires written permission from the Water Authority. [1]Name of the responsible licensed plumber, verifiable in the public register
Will soft soldering be used?Soft-soldered copper joints are outside the minor-nature category described. [2]Specify jointing methods in the quote
Pressure testing and flushingConfirm there are no leaks before closing the wallPressure-test photographs and recorded readings
Water quality acceptance checksRepiping in occupied buildings must satisfy the applicable water sample acceptance criteria. [3]The licensed plumber follows up the WWO 46 Part V documentation
Wall reinstatementChases disturb paint and tilesSpecify whether render reinstatement is included and tiles are extra

This checklist draws on Water Supplies Department information and our quoting practice. A licensed plumber assesses the actual installation. [1][2][3][4]

Renovated small Hong Kong bathroom with large light grey tiles, a glass shower enclosure, wood-grain vanity and LED-lit mirror
Illustration: renovated compact Hong Kong bathroom with large light-grey tiles, a glass shower enclosure, wood-effect vanity and LED mirror. HK Create Design. Select an image to enlarge

11

Budgeting for pipe replacement in different types of flat

A small flat usually has one kitchen and one bathroom. G05 at HK$22,300 covers their main outlets. Add G06 for a new washing-machine point or G02 for a relocated water-heater point where needed.[9] In a small flat, removing bathroom and kitchen wall tiles is often the main cost variable.

In a two-bathroom flat, clarify how the second bathroom is priced. G05 specifies the kitchen and bathroom installation. We list the actual outlets in the written quote after site measurement.

Village houses or flats supplied by a roof tank may differ in pressure, pipe length and route. The Water Supplies Department distinguishes direct mains supply from indirect, tank-fed supply. Many buildings use a combination.[8] Identify how the flat is supplied before choosing which pipe section to replace.

For public rental and Home Ownership Scheme flats, check estate or Housing Authority renovation rules. Some work needs an application before starting. We can review the requirements at the measuring visit and identify what can proceed and what needs consent.

  • Small flat: G05 plus any required relocations
  • Two-bathroom flat: itemise each outlet
  • Village houses: identify the supply arrangement first
  • Public rental and Home Ownership Scheme flats: check renovation rules first
Made-to-measure kitchen cabinets and wall units | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge
Pipe replacement prices: checklist illustrated | HK Create Design
Pipe replacement prices: checklist | HK Create Design Select an image to enlarge

12

Coordinate pipe replacement with other work to avoid duplication

Pipe replacement often forms part of kitchen and bathroom refurbishment,Rewiringand waterproofing. Coordinating the work means stripping, chasing and making good once. For a complete bathroom strip-out, A10 at HK$9,950 already opens the walls and floor. G04 replacement pipework can then be installed without stripping tiles a second time for chases.[9]

Repiping and rewiring are often coordinated. Both may require chases, but water pipes and electrical conduits need separate routes. We plot both at the site visit and agree the plumbing and electrical points before schedulingMasonry and tiling.

Replacing pipes this year and stripping the kitchen and bathroom next year can mean reopening newly reinstated walls. If funds are limited, consider urgent local inspection and repairs under G01/G02 now and coordinate the remaining replacement with the later renovation.

  • Coordinate with kitchen and bathroom strip-out to save work
  • Separate plumbing and electrical routes
  • Consider urgent local repairs first if the budget is limited
Worked example 3

Example 3: local pipe replacement for two outlets with discolouration or leakage

Assumptions

  • The owner wants to treat only one faulty point in the kitchen and one in the bathroom.
  • Open up to inspect the existing pipework, then replace two points.

How to calculate quantities

  1. G01 Open up to inspect supply or drainage pipes: HK$930. [9]
  2. G02 Changing the hot and cold water pipe locations: 2 × HK$1,700 = HK$3,400.
  3. Total: HK$930 + HK$3,400 = HK$4,330, above the HK$2,000 minimum for a separate small-job visit.

Indicative cost for two local points: about HK$4,330.

If the fault is on communal pipework, arrange action through building management. If the remaining pipes in the flat have also aged, consider G05 whole-flat replacement. [9]

Use your square footage instead and see a reference budget

13

Request a quote from HK Create Design

HK Create Design opened in 2019. The team has 15 years of project experience. Our licensed plumbing partners carry out drinking-water pipe replacements and we coordinate WSD applications. Workmanship warranty: one year.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

For a small repair, send photos on WhatsApp for an initial assessment and estimate. See our pipe replacement service page andPlumbing and electrical workpage.

  • Send photos by WhatsApp to 5243 7747
  • Book a site measurement
  • View our pipe replacement service

Advice from our tradespeople

「Check whether the price covers exposed pipe replacement or chasing for concealed pipes. Ask about pressure testing, render repairs and reconnection near the water meter.」

Plumbing Supervisor, HK Create DesignHK Create Design project team

「Replacing corroding galvanised pipes that produce discoloured water with copper is a long-term option. Plan outlet positions together to allow for a future water heater or washing machine.」

Partner Licensed Plumber, HK Create DesignHK Create Design's partner plumbing contractor

「We specify pipe lengths, diameters and connection counts. We confirm additional points by WhatsApp before proceeding.」

Project Manager, HK Create DesignHK Create Design project team

FAQ

12 practical questions answered

01What does whole-flat repiping cost in 2026?

HK Create Design's G05 rate is HK$22,300 for whole-flat kitchen and bathroom supply and drainage pipe replacement, including pressure testing. Rebuilding concealed runs or opening new routes is priced separately.[9]

02Is repiping charged by the foot?

No. Plumbing is priced by work item and point. G02 is HK$1,700 per relocated hot or cold water point. G03 and G04 are HK$13,300 each for a complete kitchen or bathroom installation.[9]

03If the kitchen and bathroom are repiped together, do I add G03 and G04?

No. Use G05 at HK$22,300 when replacing both kitchen and bathroom services. Charging G03 and G04 separately would total HK$26,600 and would duplicate the combined scope.[9]

04How much does replacement at one point cost?

G02 is HK$1,700 per point. A separate small-job visit has a HK$2,000 minimum, so a single point normally costs HK$2,000.

05Does pipe replacement include taps and sanitaryware?

No. Clients generally select their own taps and sanitaryware. We charge for installation, such as HK$970 under K03 for a shower mixer.[9]

06Is there a separate Water Supplies Department application charge for repiping?

Our licensed plumbing partner handles required WSD applications on your behalf. We record this in the quote. Altering an inside service generally requires written permission from the Water Authority.[1]

07What kind of pipes do you use?

We use copper for drinking-water pipes. Brands include Wednesbury, Kembla (Kempress), LAWTON, OTTO and OPAL, with fittings from Pegler and Tectite/ENDEX.

08Why is water sometimes yellow in older buildings?

The Water Supplies Department notes that older unlined galvanised steel pipes can corrode after several years, leaving standing water yellow.[4]

09What should I inspect when accepting new pipework?

Keep pressure-test records, photos of pipe routes and WSD documents where an application is required. For repiping in occupied buildings, water samples must meet criteria including lead ≤10 µg/L.[3]

10Will replacing pipes in my flat help if water is seeping from upstairs?

Not necessarily. Ceiling seepage may originate upstairs and may have a source other than a supply pipe. The Water Supplies Department advises contacting the upstairs occupant to arrange inspection by a licensed plumber. Unresolved cases can be referred to the Joint Office.[5]

11Is pipe replacement covered by a warranty?

Yes. Our plumbing work carries a one-year warranty, excluding deliberate damage.

12How do I book a quotation?

WhatsApp 5243 7747 or visit the Wong Tai Sin showroom, Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Water Supplies Department: Employing a Licensed Plumber Accessed: 2026-11-03
  2. [2]Water Supplies Department: Minor works Accessed: 2026-11-03
  3. [3]Water Supplies Department: Guide to Application for Water Supply (October 2026 edition) Accessed: 2026-11-03
  4. [4]Water Supplies Department: Water Facts Accessed: 2026-11-03
  5. [5]Water Supplies Department: water supply problems in private estates and buildings and maintenance of inside service systems Accessed: 2026-11-03
  6. [6]Water Supplies Department: Make Smart Choices of Pipes and Fittings (General Acceptance, GA) Accessed: 2026-11-03
  7. [7]Water Supplies Department: Advice on unusually high water consumption Accessed: 2026-11-03
  8. [8]Water Supplies Department: How inside-service water supply systems work Accessed: 2026-11-03
  9. [9]HK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-03