Skip to main content

RENOVATION HANDYMAN

Choosing tilers, plumbers, electricians and joiners: qualifications, independent tradespeople and contractors

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Mason’s day rate: HK$2,700 per dayPublished prices · Estimate the cost of 117 work items online
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

For a repair, extra socket, WC or tile replacement, check both practical experience and whether the work needs registered personnel. Electrical, plumbing, gas and some minor works have specific requirements. Insurance and responsibility matter if an accident occurs. Drawing on 15 years in construction, HK Create Design explains the trades, compares independent and company arrangements, shows how to check EMSD and Buildings Department registrations and provides small-job cost examples.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design concept for small masonry, electrical, plumbing and joinery jobs
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Repairing and repainting a wall after bed removal in a Long Ping flat
    Completed project photosLong Ping · Repairs · April 2026
  • Installing a new partition and internal door
    Site photoUpper Wong Tai Sin Estate · Partitions and internal doors · May 2026
  • New internal door and frame after installation
    Completed project photosHong Kong · Internal doors · September 2021
  • Completed corridor paintwork and custom cabinets in a Kai Tak flat
    Completed project photosKai Tak · Paint repairs · April 2026

DESIGN RENDERS

Design renderings for reference

These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.

  • Design rendering: refit cabinet doors with new hinges, replace drawer runners and reseal the sink edge.
    Design renderingMinor kitchen cabinet repair (design concept)
  • Design rendering: patch and repaint the wall beside a door and replace a switch faceplate.
    Design renderingLocal wall repairs (design concept)

WORKED EXAMPLE

What would a small repair cost? Adjust the quantities for your job.

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Hire a mason by the day to patch tiles or repair render.

  • B06 Mason’s day rate: HK$2,700 per day
  • Suitable for miscellaneous repairs such as damaged tiles, render or a shower base edge.
  • Materials charged at cost and excluded from this example
  • Excludes renewing waterproofing. If required, waterproofing is charged separately under the C-series items.
  1. Mason’s day rate (B06)Number of days × HK$2,700HK$5,400

Indicative day labour charge for masonryHK$5,400

Two days at 2 × 2,700 = HK$5,400, excluding materials. Even one day exceeds the HK$2,000 standalone minimum. For a clear scope, compare itemised quotations. Final prices follow measurement and written quotation. [1]

One visit for several jobs: switch replacement, electrical inspection, mould treatment and repainting, and WC replacement

  • H04 Replace a light switch and its wiring: HK$430 per item
  • H01 — electrical inspection: HK$770 when combined with other work on the same visit
  • E05 — local mould treatment and repainting of 1 wall face: HK$1,250
  • K01 — install a customer-supplied WC: HK$1,300
  • Electrical work undertaken by a registered electrical worker
  1. Replace a light switch and its wiring (H04)Number of light switches × HK$430HK$1,720
  2. Electrical inspection (H01)1 time × HK$770HK$770
  3. Treat localised mould and repaint (E05)1 wall face × HK$1,250HK$1,250
  4. Install a WC (K01)1 × HK$1,300HK$1,300

Indicative cost of a small-works combinationHK$5,040

Four light switches: 1,720 + 770 + 1,250 + 1,300 = HK$5,040, above the HK$2,000 minimum. The WC and switch materials are extra. If seepage causes mould, find its source first. Prices are subject to measurement and written quotation. [1]

Add a dedicated circuit and kitchen sockets

  • H02 Add a 13 A single socket with concealed conduit: HK$640 per set
  • H06 — add 1 dedicated circuit: HK$3,350
  • H01 — electrical inspection before work: HK$770
  • Assumes space in the existing board for an extra circuit. H09 board replacement, if required, is an additional HK$6,800.
  1. Additional sockets (H02)Number of sockets × HK$640HK$1,920
  2. Add a dedicated circuit (H06)1 circuit × HK$3,350HK$3,350
  3. Electrical inspection (H01)1 time × HK$770HK$770

Indicative cost for an additional circuit and socketsHK$6,040

Three socket sets: 1,920 + 3,350 + 770 = HK$6,040, above the HK$2,000 minimum. A registered electrical worker tests the work and issues WR1. Prices are subject to measurement and written quotation. [1][2]

HOW WE HELP

How can we help you

Identify the cause first.

Find the cause of leaks, tripping or mould before selecting the trade, to avoid repeating work.

Coordinate several trades in one programme.

The team schedules masonry, plumbing, electrical work, joinery and painting in the correct order for you.

Work undertaken by qualified personnel

Registered electrical workers carry out electrical work and issue WR1. For gas or minor works, we appoint people with the required qualifications.

Itemised written quotation

We itemise each job at our published rates. The minimum for a standalone small call-out is HK$2,000, agreed before arrival.

Insurance and one-year warranty

The one-year warranty covers cracked, blistered or peeling paint and furniture defects such as loose hinges, runners or screws and swollen cabinet fronts. Deliberate damage is excluded.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same wall with concealed pipes and wiring, new sockets, a covered distribution board, white paint and new white tiles.
Before concept: exposed ageing wiring, yellowed sockets, untidy distribution board wiring and rusty surface-mounted pipes in an old kitchen corridor.
Illustration before workIllustration of the proposed result
Design illustration · Design concept: replacing exposed wiring and pipes with concealed services
After concept: the same bedroom after skim coating and repainting in a pale grey-white finish, with no visible mould stains.
Before illustration: a small bedroom with peeling paint and dark mould around the window and on the ceiling.
Illustration before workIllustration of the proposed result
Design illustration · Design concept: mould treatment, skim coating and repainting
After concept: the same bathroom with large light-grey tiles, a glass shower enclosure, a wall-hung vanity and a new WC.
Before illustration: a small bathroom with cracked, yellowing blue-and-white tiles, a pedestal basin, a rusty mirrored cabinet and a bath.
Illustration before workIllustration of the proposed result
Design illustration · Design concept: retiling a bathroom and replacing fixtures

KEY NUMBERS

Home repair figures to check before work begins

government/official

352 cases

Consumer Council complaints about renovation and home maintenance, January–September 2026

Consumer Council complaints: 400 in 2024, 347 in 2025 and 352 in the first nine months of 2026.

[11]

government/official

30%

Respondents with disputes who reported refusal to rectify defects

In a Consumer Council study, around 19% of respondents had experienced a dispute with a renovation firm. Common issues included delays (61%), poor workmanship (39%) and refusal to rectify defects (30%).

[12]

government/official

5grades

Electrical worker registration grades

EMSD requires registration for people carrying out electrical work on fixed installations. Registration has five grades and is normally valid for three years. A dynamic QR code on the digital E&M licence can be used to verify it.

[2]

government/official

58/68/61item

Number of Buildings Department minor works items in Classes I, II and III

The Minor Works Control System has three classes based on complexity and risk. Classes I and II require submission no later than 7 days before work. All three require completion submissions within 14 days.

[5]

government/official

142unit

Designated trade divisions under construction worker registration

The designated workers for designated skills provisions took effect on 1 April 2017. They have not been extended to construction contracts worth HK$10 million or less and do not apply to Class III minor works.

[9]

company public price

HK$2,700per day

Indicative mason’s day rate

B06 is a daily labour rate for miscellaneous or general repairs. Materials are charged at cost. Confirm the price after site measurement and in a written quotation.

[1]

company public price

HK$2,000per visit

Minimum call-out for small works

Standalone small work is subject to a HK$2,000 minimum if the chosen items total less. Indicative prices are confirmed by site measurement and written quotation.

[1]

CHARTS

Home repair figures at a glance

Consumer Council complaints about renovation and home maintenance(Unit: cases)
2024
400
2025
347
January–September 2026
352

Consumer Council complaints, 2024–2026, reclassified under revised 2026 categories. The 2026 figure covers only the first nine months. [11]

FULL GUIDE

Home repair guide: trades, work stages and points to check

Which tradespeople do what?

In Hong Kong, masons handle tile removal, rendering, screeding, tiling and shower base repairs. Plumbing and electrical trades cover sockets, lights, boards, water supplies and drains. Joiners make fitted cabinets, ceilings, door frames and timber platforms. Painters skim, treat mould and paint. General tradespeople handle miscellaneous tasks.

A small job may involve several trades. Bathroom mould could come from a pipe leak or a failed waterproof layer, followed by paint repairs. Repainting before fixing the source can allow mould to return within a month. Identify the cause before choosing the trade.

See the masonry, plumbing and electrical, and painting pages for the work undertaken by each trade.

Independent tradesperson or renovation company: who takes responsibility?

Direct booking gives flexibility for very small, clear jobs without statutory qualification requirements. You coordinate schedules, sequence, registrations, insurance and aftercare. A renovation company coordinates the trades and qualified people and provides a written quotation and warranty.

The Consumer Council's 2024 home renovation study found that about 19% of respondents had experienced disputes with contractors. Common issues were delays (61%), poor workmanship (39%) and refusal to fix defects (30%). Its complaint figures for renovation and home repair works were 400 in 2024, 347 in 2025 and 352 in the first 9 months of 2026. Whether you hire a tradesperson or a company, put the scope, price and warranty in writing to reduce disputes.

[12][11]

Plumbing and electrical trades: fixed electrical work requires a registered electrical worker.

Fixed electrical installations, including distribution boards, wiring and lighting, require EMSD-registered electrical workers. This includes replacing switches, adding sockets, rewiring, adding circuits and changing a board. The same registration does not apply to servicing portable appliances such as table lamps, televisions or refrigerators.

Electrical worker registration has five grades and normally lasts three years. Workers can show their digital E&M licence in the E&M Trade App. Scan its dynamic QR code to verify registration. The Labour Department also advises isolation, lockout and warning notices before work. Our registered electrical workers issue WR1 at handover.

Our standard rewiring and socket cables include Hilly or ei8ht with product certification such as 3C. We commonly use Schneider switches and sockets.

[2][10]

Plumbing and gas work: check statutory qualifications.

Specified work on an inside service requires a licensed plumber, a registered plumbing worker or someone under their instruction and supervision. Only alterations or repairs regarded by the Water Authority as minor can be done by a non-designated person. Our partner licensed plumber handles required WSD applications for fresh-water pipe replacement on your behalf.

A domestic gas water heater must carry the GU mark and be installed and tested by a registered gas installer employed by a registered gas contractor. Unauthorised installation or alteration is an offence. Arrange a safety inspection with a registered gas contractor every 18 months.

We use copper for fresh-water pipes with Pegler or Tectite/ENDEX fittings. Customers usually choose taps, shower mixers and sanitaryware, and we charge installation labour. Kitchen and bathroom joints use DOWSIL mould-resistant silicone.

[4][3]

Buildings Department minor works: when is a registered contractor needed?

The Buildings Department classifies minor works by nature, scale, complexity and safety risk. There are 58 Class I items, 68 Class II items and 61 Class III items. Class I requires a prescribed building professional and prescribed registered contractor. Classes II and III require a prescribed registered contractor. For Classes I and II, submit documents at least 7 days before work starts. All three require documents within 14 days of completion.

Examples of minor works include non-loadbearing brick partitions, external air-conditioner brackets and drying racks, and certain kitchen or bathroom drainage alterations. Skim coating, tiled finishes and repairs or replacement of sanitaryware can be exempt from prior approval under the Buildings Ordinance. Applicable fire, structural and drainage requirements still apply.

The Buildings Department keeps separate registers for minor works contractor companies and individuals. Companies, including sole proprietors, partnerships and bodies corporate, register by class and type. Individuals register for specific Class III items. Search by name or registration number and check the scope before appointing them.

[5][8][6][7]

Do masons, joiners and painters need licences?

Masonry, joinery and painting do not have the same individual practice licence as electrical work. Designated workers for designated skills provisions began on 1 April 2017 and cover 142 trade divisions, but have not been extended to contracts worth HK$10 million or less and do not apply to Class III minor works. Many domestic projects fall below that value, so registration as a skilled worker in the specific trade is not always required.

The Labour Department requires construction workers to complete mandatory basic safety training and hold a valid certificate, commonly called a Green Card. Working without it is an offence. Construction Industry Council skilled-worker registration can indicate experience. Check past work and written warranty terms too.

[9][10]

Employees’ compensation and third-party insurance: what owners should check

The Labour Department advises owners and tenants to obtain the contractor’s current insurance policy under the Employees’ Compensation Ordinance before work. Failure to maintain compulsory cover is an offence. Window replacement, drainage work and air-conditioner replacement may involve work at height or electrical connections. Accidents can delay the job and may expose owners or tenants to liability.

Before hiring an independent tradesperson, check the policy covers the work in your flat. Whole-flat projects have third-party and employees’ compensation cover under L02 at HK$6,700 per project. Small-job insurance is included in the labour rates.

[10][1]

How tradespeople charge: by the day or by item

There are two common charging methods. B06 mason’s day labour is HK$2,700 per day with materials at cost, useful for miscellaneous repairs of uncertain scope. Itemised rates include HK$430 per switch and wiring, HK$1,300 per WC installation and HK$1,250 per wall face for mould treatment and repainting. See the small-work price table for further items.

The minimum for a standalone small call-out is HK$2,000, so combining several small tasks can be more economical. Compare itemised quotations when the scope is clear. In a Consumer Council assessment, only 28% stated the quantity of each operation and 20% gave unit rates. Our indicative prices are subject to measurement and written quotation.

[1][12]

Working hours: noise and building management restrictions

According to the EPD, the relevant Noise Control Ordinance restrictions do not cover residential renovation noise from 7 am to 7 pm except on public holidays. From 7 pm to 7 am and at any time on public holidays, powered mechanical equipment requires a Construction Noise Permit.

Building management often imposes shorter working hours. Check the approved hours before booking a contractor.

[13]

How HK Create Design handles small jobs

We have worked on renovation projects for 15 years, mainly whole-flat and partial renovations. We also undertake repairs. WhatsApp photos to 5243 7747 for a quotation. The standalone minimum is HK$2,000. We identify the cause and provide an itemised written quotation. Registered electrical workers carry out electrical work and issue WR1. Our one-year warranty covers paint cracking, blistering and peeling and loose furniture hinges, runners or screws and swollen fronts, excluding deliberate damage.

On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. The showroom is at Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Hong Kong. It opens Monday to Saturday, 10:00–18:00.

[1]

COMPARE

Compare home repair options

Hiring an independent tradesperson or a renovation company

Compare itemsHire an independent tradesperson yourselfHire a renovation company
Pricing methodOften priced verbally or by the day, which can leave the scope unclear.Written quotation with quantities and unit rates for each item
Coordination across tradesBook each mason, plumber, electrician and joiner yourself and coordinate their order.The company schedules work in sequence, such as plumbing and electrical work before wall closure and waterproofing before tiling.
Statutory qualificationsYou must verify each electrician, plumber or minor works contractor’s registration yourself.The company arranges qualified personnel. A registered electrical worker undertakes the electrical work and issues WR1.
insuranceYou must check employees’ compensation and third-party insurance yourself.The quotation records the insurance arrangements.
Defect rectification and warrantyAftercare depends on being able to reach the individual tradesperson.Warranty period in writing. HK Create Design offers one year.
suitable forVery small, clearly defined jobs without statutory qualification requirementsSeveral trades, plumbing, electrical, gas or minor works, or several items to fix on one visit

The Labour Department advises owners to check the contractor’s compulsory employees’ compensation insurance before work. Owners can also face liability if an accident occurs. [10][1]

Qualifications required by trade and how to verify them

Type of workStatutory requirementHow to verifyResponsible authority
Electrical installations: sockets, lighting points, circuits and distribution boardsFixed electrical installations require a registered electrical worker. Work on portable appliances such as table lamps and refrigerators does not require that registration.Check the registration certificate or scan the dynamic QR code on the digital E&M licence. Request WR1 at completion.Electrical and Mechanical Services Department
Plumbing, including hot and cold pipes and inside servicesSpecified plumbing work requires a licensed plumber, a registered plumbing worker or a person under their direction and supervision. Minor alterations or repairs may be undertaken by a non-designated person.Check the WSD Directory of Licensed Plumbers.Water Supplies Department
Gas work, including gas water heaters and cooking appliancesGas installation and alterations require a registered gas installer employed by a registered gas contractor. Check the heater’s GU mark.Verify the contractor’s registration details.Electrical and Mechanical Services Department
Minor works such as non-loadbearing brick partitions, AC brackets and kitchen or bathroom drainage alterationsAppoint the prescribed registered contractor for the class. Class I also requires a prescribed building professional. Class I and II submissions are due at least 7 days before work.Check the Buildings Department register of contractors.Buildings Department
Masonry, painting and joinery, including skim coating, tiling and fixture replacementExempt from prior approval and appointment of a registered contractor, while still subject to applicable fire, structural and drainage regulations.Workers need valid Green Cards. Verify additional registrations for minor works or electrical work.Buildings Department and Labour Department

Based on public information from EMSD, WSD, the Buildings Department and the Labour Department. The actual work on site determines the applicable category. [2][4][3][5][8][10]

Common small-work rates (standalone visit minimum HK$2,000)

WorkPrice numberindicative priceinclude
Mason’s day rateB06HK$2,700 per dayGeneral or miscellaneous repairs, with materials charged at cost
Electrical inspectionH01HK$770 per visitInspect tripping, leakage current and circuits and provide a preliminary report. A full multi-circuit inspection costs HK$1,650.
Replace a light switch and its wiringH04HK$430 per unitRemove the old light switch and fit and connect the new one.
Add a 13 A single socket with concealed conduitH02HK$640 per setChasing, wiring, back box, faceplate and skim-coat reinstatement
Add a dedicated circuitH06HK$3,350 per circuitConstruction by registered electrical workers
Open up and inspect water supply and drainage pipesG01HK$930 per itemOpen the specified point, provide a photo report and make good the opening.
Install a WCK01HK$1,300 per unitInstall, connect the supply and waste and apply mould-resistant sealant.
Install a shower mixerK03HK$970 per setShower mixer connected to hot and cold supplies
Treat localised mould and repaintE05HK$1,250 per wall faceMould treatment, mould-resistant primer and topcoat. Investigation of seepage is separate.
Replace a plywood internal doorL03HK$3,000 per door leafDoor leaf, frame, hinges, handle and installation. Solid timber doors from HK$4,650.

Our unit prices are subject to site measurement and written quotation. The minimum for a standalone small call-out is HK$2,000 if the item total is lower. Customer-supplied sanitaryware and lights attract installation labour only. Small-works insurance is included in the labour rates. [1]

SITE SOP

Home repair standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Organized according to government guidelines

Checks before hiring a tradesperson, based on official guidance

  1. Clarify the scope.

    List each job, location and quantity. Send photos so the tradesperson can assess the work before arrival.

  2. Check whether the work requires statutory qualifications.shutdown checkpoint

    Does the work affect wiring, sockets, water pipes, a gas heater, a non-loadbearing brick wall, AC brackets or kitchen or bathroom drainage? Check who must be registered for the specific work.

  3. Verify electrical worker registration.

    Ask to see the electrical worker’s registration certificate or scan the digital E&M licence’s dynamic QR code.

  4. Verify plumbing and gas registrations.

    Check the WSD Directory of Licensed Plumbers. Gas installations require a registered gas installer employed by a registered gas contractor.

  5. Verify the minor works contractor.

    For minor works, check the contractor’s registered class and type in the Buildings Department register.

  6. Check Green Cards and insurance.shutdown checkpoint

    The Labour Department requires workers to hold a valid Green Card. Before work, ask to see the contractor’s current Employees’ Compensation Ordinance insurance policy.

  7. Notify building management.

    Submit the renovation application and confirm hours. Powered mechanical equipment requires a Construction Noise Permit from 7 pm to 7 am and on public holidays.

  8. Written quotation and payment

    Ask for quantities, unit prices, warranty and payment stages in writing. Avoid paying the entire price upfront.

Acceptance Checklist 0/4

[2][4][3][6][10][13]

Company Site Code

Our standard procedure for a small-job call-out

  1. Send photos on WhatsApp first

    Send photos and a description of the location so we can identify the trade and whether electrical or minor works requirements may apply.

  2. Measure and inspect on site.shutdown checkpoint

    Measure and test the existing electrical or plumbing installation to identify the cause of a leak or tripping.

  3. written quotation

    Our quotation lists each item code, quantity, unit rate and warranty. We schedule work after confirmation.

  4. Site protection and work

    Protect floors and furniture and schedule the appropriate trades. A registered electrical worker undertakes the electrical work.

  5. Testing and handovershutdown checkpoint

    Test each socket and switch, run water and check pipework for leaks, and review the items with the client.

  6. Cleaning and handover records

    Remove debris and packaging, hand over WR1 for electrical work and record the warranty start date.

Acceptance Checklist 0/4

[1]

DELIVERABLES

The design drawings you will receive

Written quotation

Specify the scope, price list codes, quantities, unit rates and warranty period.

Photographic record of the work

Photograph opening-up inspections and concealed wiring before closing the wall.

Electrical Work Completion Certificate (WR1)

Issued by a registered electrical worker following testing of completed electrical work.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Investigate leaks, electrical trips or mould on site.
  • Schedule small masonry, plumbing, electrical, joinery and painting jobs by trade sequence.
  • Arrange qualified personnel for applicable electrical, plumbing, gas or minor works.
  • Itemised written quotation, completion tests and one-year warranty

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Will the job involve wiring, sockets, water pipes or gas?

  2. 02

    Could a leak or seepage be causing the problem, and has the source been found?

  3. 03

    When does management allow work?

FAQ

Frequently asked questions

Should I hire a tradesperson or a renovation company?

For one small, clearly defined job with no electrical or plumbing work, such as repairing a tile or two, a tradesperson you know can be suitable. For several trades, rewiring or pipe changes, a company can make accountability easier, especially if you want a written quote, insurance and a warranty. In a Consumer Council study, 30% of respondents who had experienced a dispute had encountered a refusal to fix defects. Make sure the warranty spells out what it covers.

How can I check that an electrician is registered?

Ask to see the electrical worker’s registration certificate or the digital E&M licence in the E&M Trade App. Scan the dynamic QR code to verify it. Request a WR1 Work Completion Certificate when the work is finished.

Do switch replacements and new sockets require a registered electrician?

Yes. Sockets, switches, wiring and boards are fixed electrical installations and require a registered electrical worker. Portable appliances such as table lamps and refrigerators fall outside that registration requirement. H04 switch and wiring replacement is HK$430 each and H02 new 13 A sockets are HK$640 per set. The standalone small-job minimum is HK$2,000.

Does a plumber need a licence?

WSD requires a licensed plumber, registered plumbing worker or person under their instruction and supervision for specified work on an inside service. Only qualifying minor work may be undertaken by others. HK Create Design coordinates the required fresh-water pipe application through our partner licensed plumber.

Can a general tradesperson install a gas water heater?

No. EMSD requires domestic gas water heaters to be installed and tested by a registered gas installer employed by a registered gas contractor. Unauthorised installation or alteration is an offence and may lead to prosecution. Check for the GU mark and arrange a safety check every 18 months.

Which jobs need a registered minor works contractor?

Buildings Department examples include non-loadbearing brick partitions, external AC or drying rack supports and certain drainage alterations. Appoint the prescribed registered contractor and notify the department before or after work as applicable. Skim coating, tiling and sanitaryware replacement can be exempt from approval but must still meet building regulations.

Do masons and joiners need registration?

The designated workers for designated skills provisions introduced in 2017 cover 142 designated trade divisions. They have not been extended to contracts worth HK$10 million or less, which typically include domestic renovations. Domestic masons and joiners need not always hold skilled-worker registration for that trade, but workers still need valid Green Cards.

Can an owner be liable if an independent tradesperson has an accident?

The Labour Department advises owners and tenants to check Green Cards and compulsory employees’ compensation insurance. An accident may expose them to liability. Our whole-flat works include third-party and employees’ compensation cover under L02 at HK$6,700. For small works the insurance is included in the labour rates.

Should I choose a day rate or an itemised quotation?

Day rates suit miscellaneous repairs with uncertain quantities. For example, a mason charges HK$2,700 per day plus materials at cost. Fixed item rates, such as HK$1,300 for a WC or HK$970 for a shower mixer installation, are easier to compare when the scope is clear. Both are subject to the HK$2,000 standalone minimum and final written quotation after measurement.

Can a contractor identify the source of a leak on the first day?

It depends. Mould or ceiling drips may come from your own pipes or waterproofing, or from the flat above. G01 opening-up inspection is HK$930 per item, subject to the HK$2,000 standalone minimum. A source in another flat requires separate coordination. See the waterproofing guide.

Is there a warranty for small works, and how do I book a visit?

The one-year warranty covers cracked, blistered or peeling paint, loose furniture hinges, runners or screws and swollen cabinet fronts, excluding deliberate damage. Our main business is renovation, but we also undertake repairs. WhatsApp photos to 5243 7747. The minimum for a standalone small call-out is HK$2,000.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02
  2. Official sourceRegister as an electrical engineer · Electrical and Mechanical Services Department· Accessed 2026-11-02
  3. Official sourceSafety Information: Residential Gas Water Heaters · Electrical and Mechanical Services Department· Accessed 2026-11-02
  4. Official sourcelicensed plumber · Water Supplies Department· Accessed 2026-11-02
  5. Official sourceIntroduction to the minor works supervision system · Buildings Department· Accessed 2026-11-02
  6. Official sourceRegistered Minor Works Contractors (Companies) · Buildings Department· Accessed 2026-11-02
  7. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-02
  8. Official sourceDesignated workers for designated skills provisions · Construction Industry Council· Accessed 2026-11-02
  9. Official sourceOccupational safety in renovation and maintenance: guidance for owners and tenants of commercial and residential premises · Labour Department· Accessed 2026-11-02
  10. Official sourceComplaint figures: 2024–2026 · consumer council· Accessed 2026-11-02
  11. Official sourceConsumer Council recommends four measures to strengthen home renovation regulation. · consumer council· Accessed 2026-11-02
  12. Official sourceFrequently asked questions about domestic renovation noise · Environmental Protection Department· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your masonry and tiling before you decide.

Start with the current condition

Check the existing substrate, differences in level and proposed finish before agreeing on removal, repairs, installation and edge detailing.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗