COMMERCIAL OIL PAINTING & FIT-OUT
Shop and office fit-outs: handover terms, working hours, electrical works and minor works requirements
- Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
- Browse prices for 117 work itemsSelect work items online to see an indicative budget
- 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty
The biggest difference between shop and office renovation and residential work is that "time is rent": every day's delay in opening means another day's rent. HK Create Design takes on commercial jobs big and small, from office painting, false ceilings, lighting points and sockets to shop strip-outs and reinstatement for handover; our designers and tradesmen with over 15 years' experience first check the lease handover terms, building works hours and regulatory requirements before setting the scope and sequence. This page compiles the official rules and data you need to know for commercial renovation, so you're well prepared when talking to landlords and management offices.
Data verification date:2026-11-01・Numbers are accompanied by sources

WHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
WORKED EXAMPLE
What will a shop or office fit-out cost? Adjust the figures for your premises.
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
Office building renovation estimates (paint + false ceiling + flooring)
- E02 Apply plaster and oil HK$21/sq.ft. Estimated wall expansion area based on area × 2.5
- F01 Gypsum board false ceiling HK$51/foot, based on total area
- J01 SPC floor HK$60/sq.ft., J04 skirting is approximately based on area × 0.4 linear sq ft × HK$10
- H08 20 spotlights × HK$310, H02 sockets 10 sets × HK$640
- L02 Third party insurance and labor insurance HK$6,700
- Paint (E02)Area × 2.5 × HK$21HK$52,500
- Fake ceiling (F01)Area × HK$51HK$51,000
- Floor + base line (J01 + J04)Area × (HK$60+0.4 × HK$10)HK$64,000
- Spotlights and sockets (H08+H02)20 × HK$310+10 × HK$640HK$12,600
- Insurance (L02)HK$6,700HK$6,700
Office building renovation reference project feesHK$186,800
Intervals, furniture, air-conditioning, network wiring and night construction arrangements are not included; the actual quantity must be confirmed by on-site measurements, and the final written quotation shall prevail. [10]
Calculation of lease cancellation and restoration (demolition interval + heavy oil)
- A05 Removal of gypsum board partition walls HK$34/square foot
- Repair and heavy oiling after wall demolition, estimated based on partition area × 2 × E02 HK$21
- A11 One truckload of rubble: HK$4,200
- Removal of gypsum board walls (A05)Area × HK$34HK$10,200
- Repair and heavy oil (E02)Area × 2 × HK$21HK$12,600
- Rubble removal (A11)HK$4,200 × 1 carHK$4,200
Restore reference engineering feeHK$27,000
Removal of ceilings, floors, signboards and wire restoration are not included; delivery standards are subject to the lease agreement and the owner's requirements. [10]
HOW WE HELP
How can we help you
Read the lease agreement and code of conduct first
Define the scope according to the terms of delivery and renovation regulations, and separately list the items that require the cooperation of the owner or management office.
Clearly distinguish regulations and items
Statutory projects such as WR1/WR2, minor works, and fire protection shall be handled by qualified persons and shall not be replaced by general renovation plans.
Match operating hours
Arrange the process according to the designated time period of the building or shopping mall, and plan the noise and purchase time in advance.
Item-by-item quotations facilitate review and approval
The quantity, unit price, materials, and excluded items are clearly listed, and all 117 price items are disclosed.
Large and small projects welcome
We do everything from office building renovations to demolition of one or two cabinets, renting out and restoration, and after completion, we clean out the trash and clean up the area.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.




KEY NUMBERS
Fit-out figures to check before work begins
government/official
13,545,400square metres
Total private office stock at the end of 2025
Grade A 9,034,000, Grade B 3,033,200, Grade C 1,478,200 square meters.
[1]government/official
17.6%
Private office vacancy rate at the end of 2025
The vacant space is approximately 2,385,700 square meters; tenants change hands and move frequently, and there is continued demand for closing and restoration works.
[1]government/official
12.5%
Private commercial building vacancy rate at the end of 2025
The stock of private commercial buildings (mainly retail) is 11,882,600 square meters, with approximately 1,490,700 square meters vacant.
[1]government/official
2,130 buildings
Private industrial/commercial buildings aged 40 years or above
The Buildings Department's year-end figures for 2025: 1,239 buildings in 40-49 years and 891 buildings in 50 years or above, accounting for nearly half of the 4,474 industrial and commercial buildings.
[2]government/official
5 years
Periodic inspection of fixed electrical installations with approved load exceeding 100A
Electrical and Mechanical Services Department: must be inspected, tested and issued a periodic test certificate (WR2) by registered electrical workers every 5 years; public entertainment venues, dangerous goods warehouses, etc. every 12 months.
[5]government/official
HK$71–200/metric tons
Construction waste disposal charges
Public fill HK$71, screening and classification HK$175, landfill HK$200; each vehicle is at least 1 metric ton.
[8]CHARTS
Shop and office fit-out figures at a glance
Rating and Valuation Department "Hong Kong Property Report 2026"; converted from square meters, rounded to one decimal place. [1]
Buildings Department’s 2026–27 annual expenditure estimate response; a total of 4,474 buildings. [2]
FULL GUIDE
Shop and office fit-out guide: stages, trades and points to check
What is the difference between commercial renovation and residential renovation?
The main consideration for residential renovation is to make your stay comfortable; for shops and office buildings, operations, brand image, lease terms and regulations must also be taken into consideration. First, there is great time pressure: the rent-free period is usually limited, the opening date is set early, and project delays directly affect income. Second, there are many site rules: shopping malls and commercial buildings generally have their own renovation codes, specifying construction periods, restocking times, protection and insurance requirements. Third, there are many levels of regulations: electrical installations, construction projects, fire protection installations, signboards, etc., are regulated by different departments.
Therefore, before starting a commercial project, it is most important to collect three documents: the lease (especially the delivery and restoration terms), the building or shopping mall renovation code, and the construction site plans. We will determine the scope of the project based on these three documents and list separately the projects that require the cooperation of the owner, management office or professionals.
[3]How many office buildings and shops in Hong Kong need renovation?
Figures from the Rating and Valuation Department show that the total stock of private office buildings in Hong Kong at the end of 2025 was approximately 13,545,400 square meters, including 9,034,000 square meters of Grade A, 3,033,200 Grade B, and 1,478,200 square meters of Grade C; approximately 2,385,700 square meters were vacant, with a vacancy rate of 17.6%. The stock of private commercial buildings is approximately 11,882,600 square meters, and approximately 1,490,700 square meters are vacant, with a vacancy rate of 12.5%.
A high vacancy rate means that tenants move, change hands and re-rent frequently. Every time it changes hands, the old tenant may have to restore the property, and the new tenant may have to renovate it. For tenants, there is a lot of room for negotiation, but they must carefully consider whether the renovation costs are consistent with the lease term.
The age of the building is also a factor. Figures from the Buildings Department show that among the 4,474 private industrial/commercial buildings in Hong Kong at the end of 2025, 1,239 are 40 to 49 years old, and 891 are 50 years or above. That is, nearly half are 40 years or above. The power capacity, pipes and internal conditions of the ceiling of the old building may not be suitable for the new use. Time should be set aside for inspection before starting construction.
[1][2]Terms of delivery of the lease: Be sure to read them before starting construction
Commercial leases usually specify handover condition (bare shell or existing fit-out retained), permitted changes, work requiring prior written landlord consent and reinstatement at lease end. These determine the scope and budget. For reinstatement, allow for strip-out, rubble disposal and repairs to walls and ceilings.
We recommend confirming with the owner before starting construction: whether it is possible to change the partition, add electricity, change air conditioning, and change water pipes; are there any restrictions on signboards and storefronts; and how much should be restored to when renting out. It is best to have these answers in writing to avoid disputes during the meeting.
We will not interpret the lease on behalf of the lawyer, but we can help you list the relevant projects and public unit prices according to the terms, so that you can have actual figures for reference when talking to the owner.
[10]Electrical installation: power on, periodic inspection and completion certificate
Commercial premises often need more sockets, dedicated circuits and lighting than homes. EMSD requires new or altered fixed installations to be inspected and tested by a registered electrical worker, with a WR1 completion certificate. Worker grades are A, B, C, H and R. For low-voltage installations, A covers up to 400 A, B up to 2,500 A and C has no capacity limit.
Fixed electrical installations with an approved loading above 100 A generally require inspection and testing every five years by a registered electrical worker. The WR2 Periodic Test Certificate is submitted to the Electrical and Mechanical Services Department for endorsement. Places of public entertainment, dangerous goods stores and high-voltage installations require testing every 12 months. Before leasing a shop, ask about the available electrical capacity and the date of its latest WR2.
Published rates: H06 dedicated circuit HK$3,350 each, H02 concealed single 13 A socket HK$640 per set, H03 double socket, TV or network point HK$1,200 per set, H08 spotlight HK$310 each, H07 light strip HK$150 per linear foot and H09 distribution board replacement HK$6,800 each. Increased supply capacity, including utility applications, requires separate assessment.
We commonly specify Hilly and ei8ht cables. For commercial units with higher loads or specifications, options include Prysmian and Nexans. Belden is an option for higher-spec office network and signal cabling. We select brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations.
[4][5][6][10]Buildings Department Minor Works Control System: What should I report?
The Minor Works Supervision System of the Buildings Department divides minor works into three levels based on scale, complexity and risk: Level I is the most complex and requires the appointment of prescribed construction professionals and prescribed registered contractors; Level II and Level III require the appointment of prescribed registered contractors. Class I and II projects are required to submit documents to the Buildings Department at least 7 days before the start of construction, and Class III projects are required to submit completion documents within 14 days after completion.
Common categories of commercial renovation include signboards, canopies, exterior wall installations, brackets, etc. Pure interior painting, false ceilings, floors, and furniture are generally not construction projects. However, if they involve wall demolition, floor slab excavation, or structural-related changes, they must first be assessed by professionals as to whether they require approval from the Buildings Department.
When we measure the scale, we will clearly distinguish some that are general renovations and some that may involve minor works or construction works that require approval. For parts involving legal procedures, we will arrange for qualified personnel to handle it or recommend that you consult a construction professional first, and general renovation plans will not be used instead.
[3]Fire protection and license plates are used for the same purpose: it’s better to wait until the renovation is completed and ask first.
Restaurants, beauty salons, tutorial centers, clinics and other industries may involve food industry, education, medical or other license requirements. The renovation design must comply with the requirements of the licensing department and the Fire Services Department, such as fire escapes, fire protection devices, ventilation, partition materials, etc. These requirements vary from industry to industry and site to site, and must be verified with relevant departments or professional consultants based on actual usage.
We recommend: before signing a lease, confirm that the property use is consistent with the target industry; submit the licensing requirements to the designer during the design stage; and refer changes to fire protection installations to a registered fire protection installation contractor. After the renovation is completed, if it is found that it does not conform to the requirements first, it will be the most expensive to dismantle and modify it.
[3]Working hours, noise and construction waste
Most shopping malls and commercial buildings have designated construction periods. For example, noisy work is only allowed to be carried out during non-business hours or at night, and designated freight elevators must be used to purchase goods and transport soil at the same time. These rules are set by the management office and must be confirmed before quoting, because night construction will affect the manpower arrangement and construction period.
In terms of legislation, the Environmental Protection Department explained that it is generally necessary to apply for a construction noise permit when using mechanical equipment to carry out construction work between 7 pm and 7 am the next day, or throughout the day on public holidays. If you want to perform noisy work at night or on holidays, you must reserve time for application and perform construction according to permit conditions.
Construction waste must go to an authorised facility. Government fees per tonne are HK$71 for public fill, HK$175 for sorting and HK$200 for landfill. Our A11 rubble removal rate is HK$4,200 per truckload, including carrying downstairs, transport, lawful disposal and government charges.
[7][8][10]Common projects for office building renovation
Office building projects usually include: wall painting, false ceilings and light troughs, floors, sockets and network points, separation between the conference room and the manager's room, water pipes in the pantry, lockers and the front desk. Most Grade B and C office buildings are old buildings. Before starting construction, you should pay attention to whether there are old pipes and wires inside the ceiling, and whether the electrical box capacity is sufficient.
Our published rates include E02 patching, damp treatment, sanding and painting at HK$21 per square foot (minimum HK$4,650), F01 metal-framed plasterboard ceiling HK$51 per square foot, F03 lighting cove HK$460 per linear foot, J01 SPC flooring HK$60 per square foot, J04 skirting HK$10 per linear foot and G06 washing machine drain and cold supply HK$1,550 per item as a pantry reference. FUR cabinetry is priced per linear foot, including FUR01 tall cabinets at HK$2,900 and FUR03 base cabinets at HK$1,250.
All 117 prices of the website computer (/calculator) are public. You can make a budget by yourself first; the final price must be measured on-site and the written quotation shall prevail.
SPC flooring can be made to order. The most commonly used thickness is 6 mm. An 8 mm option includes acoustic underlay, and a 10 mm option is available for offices with heavier foot traffic.
[10]Common items for shop renovation
The focus of the store project is the facade and display of customer flow lines. Common projects include: demolition of old renovation (A series), wall plastering or painting, floor leveling and tiling, display cabinets and cash register cabinets, spotlights and light strips, and signboards. If there is a water level in the shop (such as beauty, catering), the changes to the water pipe and water supply must be planned in advance.
Public price reference: A01 Removal of wall/floor tiles HK$30 per square foot, A05 Removal of gypsum board partition walls HK$34 per square foot, B02 Floor leveling HK$22 per square foot, D01 Installation of floor tiles HK$78 per square foot, J03 Self-leveling and leveling HK$22 per square foot, E06 Art paint per square foot HK$110, H08 spotlights are HK$310 each, L02 third-party insurance and labor insurance are HK$6,700 per order.
Signboards involve the minor works supervision system, and qualified contractors must be appointed according to category; the shops in the shopping mall must also comply with the specifications of the shopping mall signboards.
[10][3]Rent return and restoration: How to budget based on samples?
Reinstatement usually includes removing the tenant's partitions, cabinets and ceilings, repairing walls, ceilings and floors, clearing debris and sometimes removing signs and extra wiring. Check the lease and ask the landlord to confirm the handover standard in advance.
Our published rates include A05 plasterboard partition removal at HK$34 per sq ft, A07 built-in wardrobe or tall cabinet removal at HK$61 per sq ft (HK$740 minimum per unit), A06 kitchen cabinet removal at HK$170 per linear ft, A08 timber floor removal at HK$22 per sq ft, E02 local skim repairs and painting at HK$21 per sq ft and A11 rubble removal at HK$4,200 per truckload. We take small jobs too, including removal of just one or two cabinets.
[10]Do you need to write clearly in the commercial project quotation?
The Consumer Council researched and analyzed 40 renovation quotations, with an average score of only 58 points (out of 100); only 38% had detailed project breakdowns, 28% listed the quantity, 20% listed the unit price, 20% mentioned compliance with legal requirements, and only 8% mentioned compliance with property management requirements. Commercial projects involve more regulations and management requirements, and these two items must be included in the quotation.
Our quotation will itemize the project, quantity, unit price, material brands and models, excluded items, construction time assumptions, payment arrangements and additional project processing methods, which will be clear to you at a glance when you and the company or the owner review and approve.
[9][10]How to start?
Send your lease handover conditions, renovation rules and floor plan to WhatsApp 5243 7747 for a free discussion with a designer and a tradesperson with over 15 years of experience. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Use the website calculator (/calculator) or AI quotation assistant (/ai-quote) for a preliminary budget. The written quotation after measurement determines the final price.
After every order is completed, we will remove the garbage, sweep clean, and do basic cleaning. If deep cleaning is required before opening, we can have a professional cleaning company follow up.
[10]COMPARE
Compare shop and office fit-out options
Office vs. Shop vs. Residential: Comparison of Project Key Points
| Item | office building | Shop | residential |
|---|---|---|---|
| time pressure | Completed within the rent-free period, affecting relocation | Opening date affects revenue | more flexible |
| Construction period | Building code, noisy work may need to be done after work | Most shopping malls are closed during non-operating hours | General daytime |
| electricity | More sockets, network points and dedicated circuits. For applicable installations above 100 A, WR2 testing every 5 years. | Lighting, sign lights, equipment circuits | Kitchen, toilet and air-conditioning circuit |
| regulations | Interval changes, fire protection | Signboards (minor works), industry licenses, fire protection | Building Deed of Mutual Covenant and Code of Conduct |
| Rent out | Most need to be restored | Most need to be restored | Not applicable (owner-occupied) |
Three levels of minor works of the Buildings Department
| Grade | Requires appointment | Before starting construction | after completion |
|---|---|---|---|
| Level I (most complex) | Prescribed building professionals + prescribed registered contractors | Submit documents at least 7 days in advance | Submit completion documents within 14 days |
| Level II | Prescribed registered contractor | Submit documents at least 7 days in advance | Submit completion documents within 14 days |
| Level III | Prescribed registered contractor | No prior submission required | Submit completion documents within 14 days |
The specific works belong to the peripheral level and must be verified according to the Buildings Department's minor works list. [3]
Commonly used public unit prices for commercial projects
| No. | Item | Unit price | Remarks |
|---|---|---|---|
| E02 | Patch the surface, damp-proof, sand and paint | HK$21 per sq ft | Minimum HK$4,650 |
| F01 | Install a plasterboard ceiling on metal framing | HK$51 per sq ft | — |
| H06 | Add a dedicated circuit | HK$3,350 per circuit | Completion required WR1 |
| H08 | Supply and install a spotlight | HK$310 per light | — |
| J01 | Supply and install stone plastic composite (SPC) flooring | HK$60 per sq ft | — |
| A11 | Rubble removal | HK$4,200 per truckload | Includes government disposal fee |
SITE SOP
Shop and office fit-out standards and handover checklist
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Company Site Code
Our commercial engineering process
- 1. Collect documents
Tenancy settlement and reinstatement terms, building/shopping mall renovation codes, and floor plans.
- 2. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
Check the capacity of the electrical box, the interior of the ceiling, and the water level, and understand the construction period and freight elevator arrangements.
- 3. Distinguish the scope of regulationsshutdown checkpoint
List projects involving WR1/WR2, minor works, fire protection or licensing requirements and arrange for qualified persons.
- 4. Design and itemized quotationshutdown checkpoint
State the quantity, unit price, materials, construction period assumptions, excluded items and payment arrangements.
- 5. Application to the Management Office
Submit drawings, a worker list and insurance documents. Confirm access and rubble-removal hours.
- 6. Demolition and concealment worksshutdown checkpoint
Remove old items, lay out wiring and pipes, and take photos for acceptance before sealing the ceiling.
- 7. Surface works
False ceiling, paint, floor, cabinets, lighting fixtures.
- 8. Testing and Certificatesshutdown checkpoint
Electrical test and WR1; other statutory documents are submitted as required.
- 9. Clearance and settlement
Garbage removal, sweeping, and basic cleaning; if deep cleaning is required, a professional cleaning company will follow up.
Acceptance Checklist 0/5
MATERIALS
Related materials: We know how to use them and can also help you with construction
- OPTIMIXOPTIMIX TA328 Tile Adhesive (Flexible)
- OPTIMIXOPTIMIX SC273 Skimcoat (Putty for Paint)
- OPTIMIXOPTIMIX SF818 Self-Levelling Screed (Underlayment)
- SikaMonoset RX
- Cement and cement-based mortarsRunfeng Portland Cement 52.5N – Dongguan China Resources Cement Manufactory
- Cement and cement-based mortarsAsano Portland Cement 52.5N – Taiheiyo Cement Corporation
- Cement and cement-based mortarsOPTIMIX F12 Masonry Mortar
- Cement and cement-based mortarsOPTIMIX PC30 / PC40 / PC45 / PC60 Packaged Concrete
- Construction sandManufactured Sand (M-Sand)
- Construction sandPre-mixed Dry Mortar
- Nippon PaintNippon Paint Second Generation Super Five-in-One Interior Emulsion
- Nippon PaintNippon Paint Anti-Viral Odour-less Kids Paint
- DuluxDulux Pentalite Upgrade H8661
- Nippon PaintNippon Paint Weatherbond
SCOPE
This communication can first cover
- Understand retail, mall or office space usage needs
- Discuss wall, ceiling and display space projects
- Check construction period, protection and access procedures
- Clearly describe the delivery, acceptance and additional engineering processes
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
- 01
Does site management specify construction periods?
- 02
What are the written requirements for a lease and settlement?
- 03
Which projects require the cooperation of owners, shopping malls or professionals?
FAQ
Frequently asked questions
How long does it take to renovate an office building?
There is no official unified construction period. Please check the scope, construction time limit and the management office’s approval time. We will state scheduling assumptions in our written quotation.
Can construction be done at night?
Check the building or shopping mall rules. Legally speaking, if you use motorized equipment to carry out construction work between 7pm and 7am or on public holidays, you are generally required to apply for a construction noise permit.
What should I pay attention to when renting a shop?
Check the existing power capacity, condition of the electrical box and the date of the latest periodic test certificate (WR2); the approved load exceeding 100A must be inspected every 5 years.
Do I need to apply to install a signboard?
Signboards are covered by the Buildings Department's minor works control system. Prescribed registered contractors must be appointed according to grade, and some documents must be submitted 7 days before the start of construction. The interior of the shopping mall must follow the specifications of the shopping mall.
What is the rental return and restoration package?
The lease and landlord's requirements determine the scope. It commonly includes removing partitions, cabinets and ceilings, patching and painting, and debris removal. See published rates A05, A07, E02 and A11.
Will all the fine units accept it?
Pick up. We can do all kinds of projects, from demolishing one or two cabinets to renovating a conference room.
Can you provide a detailed quotation for the company's approval?
Can. The quotation will itemize the quantity, unit price, material model, excluded items and payment arrangements.
Is there any insurance?
Public price list L02 Third-party insurance and labor insurance is HK$6,700 per order; many commercial buildings require insurance documents to be submitted before entering.
Price point?
You can first use the 117-item public price calculator (/calculator) or the AI quotation assistant (/ai-quote) to make a preliminary estimate; the final written quotation shall be based on the above criteria.
RELATED READING
Read the relevant key points first
construction and safety10 sections · 6FAQ
Shop strip-out and reinstatement: street shops versus shopping centres, quotations and lease-end handover responsibilities
Shop strip-out is only one part of reinstatement. Turn the landlord's handover list into assigned responsibilities and check delivery hours, equipment interfaces, repairs and inspections before comparing prices.
See data, scope and practical examples
commercial engineering10 sections · 7FAQ
Painting and fitting out a shopping centre unit: working hours, quotations and handover
For shopping centre units, compare working hours, substrates, management restrictions, testing responsibilities and handover terms under the same scope. These details affect changes and delays before opening day.
See data, scope and practical examples
Quotes and budgets11 sections · 7FAQ
Renovation contracts, staged payments and variations: what to record to keep the budget under control
Unclear quantities, materials, payment triggers and variations often cause disputes. Check contract attachments, milestone inspections, differences in measured quantities and higher-risk work. Distinguish published reference prices, preliminary estimates and formal quotes.
See data, scope and practical examples
construction and safety10 sections · 7FAQ
Planning a renovation backwards from handover: building management, material orders and inspections in Hong Kong
Plan separately for building management papers, material lead times, site checks, professional inspections, waste removal and snagging. Comparable scopes, quantities and calculations show which activities or exclusions may affect the completion date.
See data, scope and practical examples
commercial engineering8 sections · 6FAQ
How much does it cost to take over an existing restaurant? Comparing quotes to retain or refit the kitchen
Compare refreshing the dining area with rebuilding the kitchen when taking over a cha chaan teng or café. Six cost headings and two examples cover equipment, installation and closure costs.
See data, scope and practical examples
commercial engineering8 sections · 6FAQ
Checking restaurant premises before signing the lease: food business licences, exhaust ventilation and power supply
Take the menu, existing drawings and equipment list to the viewing. Check restaurant use, extraction, power, drainage and handover with the landlord, management and contractors, and download the owner's handbook.
See data, scope and practical examplesSTART WITH THE REAL CONTEXT
Want to discuss this project?
First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-upFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.
Sources
- Official sourceHong Kong Property Report 2026 Chart (private residential, office and commercial building stock) · Rating and Valuation Department· Accessed 2026-11-01
- Official sourceExamination of Estimates of Expenditure 2026–27, reply DEVB(PL)156 — private buildings by age at the end of 2025 · Buildings Department· Accessed 2026-11-01
- Official sourceIntroduction to the minor works supervision system · Buildings Department· Accessed 2026-11-01
- Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-01
- Official sourcePeriodic testing of fixed electrical installations · Electrical and Mechanical Services Department· Accessed 2026-11-01
- Official sourceRegister as an electrical engineer · Electrical and Mechanical Services Department· Accessed 2026-11-01
- Official sourceFrequently asked questions about environmentally friendly property management (noise from renovation of residential premises) · Environmental Protection Department· Accessed 2026-11-01
- Official sourceConstruction Waste Disposal Charging Scheme · Environmental Protection Department· Accessed 2026-11-01
- Official sourceHome Renovation Industry — Better Governance for Creating Comfortable Homes (Home Renovation Industry Research Report Press Release) · consumer council· Accessed 2026-11-01
- CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-01