Skip to main content

PUBLIC HOUSING RENOVATION

Public rental housing renovations: Housing Department rules, prices and interior design in 2026

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Browse prices for 117 work itemsSelect work items online to see an indicative budget
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

The Housing Authority is the landlord. Its fixtures are classified as A, B or C. A items cannot be changed, B items require prior estate-office approval and C items can be altered without prior approval. HK Create Design checks the proposed scope and itemises prices for painting, flooring and storage. This guide covers the 14-day rent-free period, refurbishment allowance, air-conditioner and socket applications, budget examples and layouts for small flats.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design rendering: public rental flat renovation, Housing Department rules, budget and interior design
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Completed wood-effect living room floor tiles in Yat Man House, Ho Man Tin Estate
    Completed project photosYat Man House, Ho Man Tin Estate · Tiling · June 2026
  • Protective sheeting covering newly laid floor tiles in Yat Man House, Ho Man Tin Estate
    Site photoYat Man House, Ho Man Tin Estate · Whole-home renovation · June 2026
  • Chases at the base of the wall for rewiring in Yat Man House, Ho Man Tin Estate
    Site photoYat Man House, Ho Man Tin Estate · Plumbing and electrical work · May 2026
  • Building a brick partition in an Upper Wong Tai Sin Estate flat
    Site photoUpper Wong Tai Sin Estate · Partition work · June 2026
  • Skim coating a new partition and installing a bedroom door at Upper Wong Tai Sin Estate
    Site photoUpper Wong Tai Sin Estate · Partition painting · June 2026
  • Completed custom storage wall and ceiling lights at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Detail of an open compartment in custom cabinetry at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Wall tiles and wood-effect floor tiles after a whole-home renovation
    Completed project photosHong Kong · Whole-home renovation · July 2021
  • Completed custom media wall cabinets and pendant light in a living room
    Completed project photosHong Kong · Whole-home renovation
  • Completed wall painting and floor awaiting self-levelling at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026
  • Fresh floor screed outside a kitchen at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026

WORKED EXAMPLE

Estimate your public rental renovation cost

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Basic public rental flat budget: whole-flat painting and new living and bedroom flooring

  • E02 patch and repaint at HK$21 per sq ft, with estimated paint area equal to saleable floor area × 3
  • J01 SPC flooring, HK$60 per sq ft, assuming living areas and bedrooms cover 75% of the flat
  • J04 skirting, 120 linear ft × HK$10
  • H02 sockets, 4 sets × HK$640. Prior application required. A WR1 is issued on completion.
  • Excludes furniture and light fittings
  1. Whole House Paint (E02)Saleable area × 3 × HK$21HK$25,200
  2. SPC flooring in living, dining and sleeping areas (J01)Saleable floor area × 75% × HK$60HK$18,000
  3. Skirting (J04)120 linear ft × HK$10HK$1,200
  4. Additional sockets (H02)4 sets × HK$640HK$2,560

Indicative work costHK$46,960

The indicative total for 400 sq ft is HK$46,960 at published unit rates, subject to measurement and written quotation. Mouldy or previously damp walls may need E01 instead. Measure paintable surfaces and flooring on site. [13]

Small public rental flat storage package: wardrobe, platform bed, shoe cabinet and TV unit

  • FUR05 wardrobe, HK$2,900 per linear ft
  • FUR06 platform bed, 35 sq ft × HK$340, up to 450 mm high
  • FUR11 shoe cabinet, 3 linear ft, and FUR10 TV cabinet, 6 linear ft
  • FUR42 delivery HK$660. Standard ENF boards are included at no extra cost from 2026.
  1. Wardrobe (FUR05)Wardrobe width × HK$2,900HK$17,400
  2. Platform bed (FUR06)35 sq ft × HK$340HK$11,900
  3. Waist-height shoe cabinet (FUR11)3 linear ft × HK$1,350HK$4,050
  4. Low TV cabinet (FUR10)6 linear ft × HK$1,250HK$7,500
  5. Delivery (FUR42)OnceHK$660

Indicative furniture costHK$41,510

With a 6 ft wardrobe the indicative total is HK$41,510. Dimensions, handles and hardware upgrades such as Blum drawer runners affect the price. Subject to measurement and written quotation. [13]

Public rental kitchen cabinet budget: base units, quartz worktop and wall units

  • A06 old kitchen cabinet removal, HK$170 per linear ft
  • FUR14 base cabinets HK$1,300 and FUR20 quartz HK$1,200 per linear ft, including two worktop cut-outs
  • FUR15 wall cabinets, 6 linear ft × HK$1,250
  • K04 cooker hood installation, HK$860, appliance excluded
  • Keep the sink and cooking bench in place. Removing original Housing Department fittings is Category B and needs prior application.
  1. Old kitchen cabinet removal (A06)Base cabinet length × HK$170HK$1,360
  2. New base cabinets (FUR14)Base cabinet length × HK$1,300HK$10,400
  3. Quartz worktop (FUR20)Base cabinet length × HK$1,200HK$9,600
  4. Wall cabinets (FUR15)6 linear ft × HK$1,250HK$7,500
  5. Cooker hood installation (K04)One applianceHK$860

Indicative kitchen works costHK$29,720

With 8 ft of base cabinets the example totals about HK$29,720. Excludes pipe relocation, wall tiles, appliances and time awaiting Housing Department approval. Subject to measurement and written quotation. [13]

HOW WE HELP

How can we help you

Identify Category A, B and C items first.

Mark items that may proceed, need an application or must be retained.

Submit applications on your behalf

We can submit Category B applications and prepare plumbing and electrical drawings.

Storage design for small flats

Freestanding cabinets and timber-framed platform beds preserve landlord’s fixtures.

Published itemised prices

Item codes, quantities and unit rates are specified, subject to site measurement and written quotation.

Qualified service installation and clean handover

Registered electrical workers issue WR1, we coordinate WSD applications for fresh water pipe replacement, remove waste the same day and provide a one-year warranty.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

Design illustration: the same public rental flat with white walls, wood-effect flooring, full-height storage with a folding table, a sofa bed and a small round dining table.
Before illustration: a public rental flat with pale green walls, a grey terrazzo-pattern floor, a fluorescent light, a folding table and plastic stools.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: a public rental living room with Category C painting, floor finishes and freestanding storage, retaining structural walls and the entrance fire door
After illustration: the same bedroom with a tall woodgrain wardrobe, platform bed with storage drawers, small window-side desk and strip lighting
Before illustration: an empty small bedroom with white walls, pale grey floor tiles, one window and a wall-mounted air conditioner.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: a small public rental bedroom with a timber platform bed and full-height wardrobe, retaining the window and air conditioner positions
Design illustration: the same bedroom skim-coated and repainted in white and pale grey, with the mould stains removed and pale grey bedding on the single bed.
Before illustration: a small bedroom with peeling paint and dark mould around the window and on the ceiling.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: stripping and skimming peeling or mould-stained walls in an older estate flat or one covered by a refurbishment allowance
Design illustration: pale oak-effect SPC flooring and new white skirting in the same living room, with the sofa and TV unit in their original positions.
Before illustration: old beige living room tiles with cracks, chipped corners and dark grout.
Illustration before workIllustration of the proposed result
Design illustration · Design illustration: Category C SPC floor finish laid over the existing living and dining room floor

KEY NUMBERS

Public rental renovation figures to check before work starts

government/official

830Thousands

Number of Housing Authority public rental flats at end-March 2025

Including Housing Society stock, public rental housing has around 871,000 units. Around 270,000 Housing Authority flats are at least 36 years old, about 33% of its stock.

[9]

government/official

46.9%

Share of Housing Authority public rental flats with internal floor areas of 30.0–39.9 m²

At end-March 2025, 13.3% were under 20 m², 23.8% were 20.0–29.9 m² and 16.0% were at least 40 m².

[9]

government/official

14.1square metres

Living space per Housing Authority public rental tenant at end-March 2025

Based on internal floor area. The Housing Authority’s current allocation standard is at least 7 m² of internal floor area per person.

[9][2]

government/official

14days

Rent-free period for incoming public rental tenants

Since 24 April 1993, new public rental tenants have been offered 14 rent-free days before the tenancy starts to decorate. A tenant may choose an earlier commencement date.

[2]

government/official

3 monthsrent

Vacant-flat refurbishment allowance

From the fourth quarter of 2024, vacant flats of all ages qualify for a uniform allowance of three months’ rent. Prospective tenants who choose it arrange painting and related works themselves.

[8]

government/official

16points

Accumulating the threshold number of points within two years can lead to termination of tenancy.

The Marking Scheme covers 30 misdeeds carrying 3, 5, 7 or 15 points according to severity. Improper disposal of renovation debris or damage to drainage causing seepage downstairs can attract points without prior warning.

[3]

government/official

6 months

Defect rectification period for an estate-based decoration contractor

The Housing Authority licence’s schedule of decoration conditions requires licensed contractors to rectify defective works at the tenant’s request, without charge, within six months of completion, except defects attributable to the tenant.

[1]

government/official

100kg

Maximum total load on the air-conditioner platform

Housing Authority form HD272 limits the combined load of an air conditioner and its fittings on the platform to 100 kg. External wall brackets are minor works.

[4]

CHARTS

Public rental renovation figures at a glance

Housing Authority public rental flats by age, end-March 2025(Unit:Thousands)
0–5 years
54
6–10 years
69
11–15 years
74
16–20 years
68
21–25 years
145
26–30 years
82
31–35 years
67
36 years or more
270

Housing in Figures 2025 records around 830,000 Housing Authority public rental flats. In older flats, check for ageing wiring and pipes, hollow tiles and peeling paint. Establish which items are Housing Department repairs and which are the tenant’s responsibility before renovation. [9]

Distribution of Housing Authority public rental flats by internal floor area, end-March 2025(Unit:%)
Under 20.0 m²
13.3%
20.0–29.9 m²
23.8%
30.0–39.9 m²
46.9%
40.0 m² or more
16.0%

Figures are internal floor areas. One square metre is about 10.76 sq ft. Nearly half of public rental flats measure about 323–430 sq ft, so size furniture and storage carefully. [9]

FULL GUIDE

Public rental flat renovation guide: process, sequence and checks

How does public rental flat renovation differ from private residential work?

The Housing Authority owns the flat. Its classification of landlord’s fixtures divides walls, doors, windows, sanitary fittings and services into three categories. Category A cannot be altered, B requires prior approval and C requires no prior approval.

The 2025 Legislative Council housing policy brief requires estate-office applications before adding air conditioning, changing electrical circuits, or altering gates, non-structural walls, windows, grilles, pipes or WCs. After approval, appoint qualified contractors, comply with Housing Authority specifications and Hong Kong law, and provide completion records. The tenant maintains the installation. See our public rental housing rules article.

[1][2]

How Housing Department Categories A, B and C work

Category A changes are prohibited. Examples include beams, columns, slabs, structural or precast internal walls, kitchen and bathroom partitions, entrance and kitchen fire doors and closers, acoustic windows, grease traps, drainage stacks, floor drains, mains, feeder cables from the electrical room and unit number plates. The Housing Department may reinstate unauthorised changes at the tenant’s expense. Applications by people with disabilities receive special consideration.

Category B requires prior approval. Examples include alterations to non-structural internal walls outside kitchens and bathrooms, new brick partitions or screeds, non-fire-rated internal doors, security gates, window grilles, kitchen and bathroom wall or floor tiles, sanitary fittings, sinks, cooking benches, branch pipes, distribution boards, wiring, sockets and drying racks. The tenant is responsible for subsequent maintenance and replacement of approved alterations.

Category C needs no prior approval. Examples include living, dining and bedroom floor finishes, interior paint colours, room-door locks, window handles, glass, shower doors and mixers, and kitchen cabinets. Painting, laying a floor finish and replacing cabinets can generally proceed. Removing kitchen or bathroom tiles, moving a sink or adding a socket falls under Category B.

[1]

Schedule of decoration conditions: site rules during works

Housing Authority conditions require keeping the front door closed and working only inside the flat. Keep corridors and rear stairs clear and slurry out of drains and WCs. Do not alter MCBs or earth-leakage protection. Gas work downstream of the meter requires a registered gas contractor. Water pipe alterations require suitable WSD-compliant materials and a qualified plumber. Retain glazed aluminium or acoustic windows, avoid external frame fixings and exclude asbestos-containing materials.

Special conditions note that kitchen and bathroom tiles cover a waterproof membrane. Tenants may be liable for seepage caused by tile or partition removal. Seal penetrations in bathroom tiling with silicone. Structural walls contain dense reinforcement and must not be chased indiscriminately for services. Retain the entrance door colour. Check the estate office’s local rules.

[1]

How to use the 14-day rent-free period

New public rental tenants receive 14 rent-free days before the tenancy starts. Inspect on collecting keys, complete the damage report and return it by the estate office deadline. Delays can make later claims difficult.

For new estate intake the Housing Department stations decoration contractors at a ratio of 1:250. Tenants may choose a listed contractor, another firm or DIY. Listed contractors are independent of the Housing Authority, and disputes are between the parties. Their licence requires free defect rectification for six months after completion. You can ask any contractor to provide equivalent terms.

[2][5][1]

What do I arrange if I choose the vacant-flat refurbishment allowance?

From the fourth quarter of 2024, the allowance covers vacant flats of all ages at three months’ rent. Around 74% of prospective tenants chose the cash allowance each year from 2021/22 to 2023/24. Tenants now arrange painting and related works only. Minor repairs have returned to the Housing Department’s refurbishment scope.

Prioritise wall preparation. E02 patching, moisture treatment, sanding and painting costs HK$21 per sq ft on sound walls. For peeling, mould or past seepage, identify the moisture source first, then consider E01 stripping and skimming at HK$39 per sq ft. See our painting page.

[8][13]

Public rental flat renovation prices and packages: allocating the budget

Because Category A is protected and Category B requires approval, many budgets focus on paint, flooring in living and sleeping areas, storage and selected sockets. Published rates: E03 direct repaint HK$12 per sq ft, E02 patch and repaint HK$21, J01 SPC HK$60 per sq ft, FUR05 wardrobes HK$2,900 per linear ft, FUR06 platform beds HK$340 per sq ft and H02 sockets HK$640 per set.

When comparing packages, check whether painting includes direct repainting, patching or full stripping, whether flooring includes underlay and skirting, and the board and hardware specifications. In a 400 sq ft flat, E02 painting, SPC flooring, four socket sets and skirting total about HK$46,960. Prices are indicative, subject to measurement and written quotation.

[13]

Making the most of space in a small public rental flat

Housing in Figures 2025 shows that about 46.9% of Housing Authority public rental flats have internal floor areas of 30.0–39.9 m² (around 323–430 sq ft). Average living space is around 14.1 m² per tenant.

Choose removable furniture that preserves the landlord’s fixtures, such as freestanding custom cabinets and a timber-framed platform bed. A raised masonry floor or screed is Category B. Options include full-height entrance shoe storage, a wall of living-room cupboards and folding table, a platform with drawers or a fold-down bed. Follow the estate office’s fixing method for precast walls. See our interior design page and small-flat storage article.

[9][1]

How do I apply to add sockets or install air conditioning?

Distribution boards, wiring, switches and sockets are Category B and need prior application. We can submit services drawings and the application. Once approved, a registered electrical worker carries out the work and issues a WR1. In older estates, arrange an electrical check before adding high-power appliances. Standalone minor work carries a HK$2,000 minimum. Send photos to WhatsApp 5243 7747 for a repair estimate.

Submit three copies of HD272 to the estate office. Use the designated platform where provided, with a total load no greater than 100 kg. External wall brackets are minor works requiring a prescribed registered contractor and filing with the Independent Checking Unit. Surface wiring must connect to a spare board circuit. Remove the unit and reinstate on moving out. Dripping air conditioners are a warning item under the Marking Scheme. See the air-conditioning installation article.

Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.

[1][4][12][11][3]

Which repairs should the Housing Department handle, and which are mine?

The Housing Authority repairs normal wear to landlord’s fixtures, except door and window glass, with a pledge to start within 12 days of a report. The Total Maintenance Scheme inspects flats in estates aged 10–30 every ten years and those over 30 every five. Painting and decoration are excluded.

For abnormal damage or replacement of a functioning fixture, ask the estate office about Housing Department chargeable repair services. Report minor landlord repairs through estate channels. We focus on paint, flooring, furniture, lighting and service improvements, and identify landlord repairs at measurement.

[6][7]

Can renovation work attract penalty points?

Accumulating 16 points within two years triggers tenancy termination under the Marking Scheme. Dumping renovation waste in communal areas or refuse points, or damaging drainage pipes and causing seepage downstairs, attracts points without warning. Noise or failure to rectify unauthorised alterations attracts a warning first. We bag and remove waste the same day and locate pipes before drilling.

In Housing Society rental estates, tenants must also apply to the estate office and obtain written approval before renovating. When the tenancy ends, tenants must reinstate the original fittings at their own expense.

[3][10]

How HK Create Design renovates public rental flats

We have 15 years of experience. We discuss what can be done before pricing it. Send photos to WhatsApp 5243 7747 for an initial discussion. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. We itemise the quotation. For Category B work, we can submit the application and prepare plumbing and electrical drawings on your behalf. Work begins after approval.

We use Nippon or Dulux paint. Custom furniture includes ENF-grade boards and Blum hardware as standard. ENF boards have very low formaldehyde emissions, so ventilation before moving in is still important. Our partner licensed plumber handles Water Supplies Department applications for fresh water pipe replacements, and registered electrical workers carry out the electrical work and issue WR1. Our one-year warranty covers paint cracking, blistering and peeling, loose or detached furniture hinges, runners or screws, and swollen door panels, except where the damage was deliberate. Small site jobs have a minimum charge of HK$2,000. We also take on some repairs: WhatsApp photos to 5243 7747 for a quote. Optional post-completion RenoClean 170°C steam cleaning is available through our partner. Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Hong Kong, Monday to Saturday, 10:00–18:00.

[13][12]

COMPARE

Comparing renovation options for public rental flats

Public rental housing fixture categories: prohibited changes and works requiring approval

PartCategory A: alterations prohibitedCategory B: prior Housing Authority approval requiredCategory C: no prior approval required
Walls and floorsBeams, columns, slabs, structural walls, precast internal walls and kitchen, WC or bathroom partitionsAlterations to non-structural internal walls outside kitchens and bathrooms, new brick walls or floor screeds, and installation of sliding balcony windowsFloor finishes in living rooms, dining areas and bedrooms, and interior paint colours
doorEntrance and kitchen fire doors, frames, hardware and overhead door closersNon-fire-rated kitchen, WC, bedroom, bathroom and balcony doors, frames and hinges, and metal security gate and lockLocks, pulls and handles on WC, balcony and bedroom doors
windowAcoustic windows and panels, grease traps and acoustic balcony componentsExternal windows, corridor fanlights, window grilles and security barsWindow handles and stays, and glass in doors, windows and louvres
Kitchen and bathroomSoil, waste and rainwater stacks, floor drains and fire collarsKitchen and bathroom floor and wall tiles, baths or shower trays, WCs, washbasins, sinks, cooking benches and branch pipesShower doors, cooking bench surface finish, showerheads, taps, toilet seats, shower curtain rails, grab rails and kitchen cabinets
Plumbing and electrical workFresh and flushing water mains, feeder cables between the electrical room and consumer unit, and pipe ductsBranch pipes and fittings, consumer units, wires, switches and socketsDoorbell. Tenants apply directly to providers for gas and telephone installations.
OtherLetterbox door and hinges, and flat number plateDrying racks or rails, intercom handset and television outlet, depending on the estateLetterbox lock

Based on Annex I, Classification of Landlord’s Fixtures, of the Housing Authority’s Reference List of Decoration Contractors guidelines. The Housing Department may reinstate unauthorised Category A alterations at the tenant’s expense. Tenants maintain and replace approved Category B alterations. Confirm current requirements with your estate office. [1]

Published rates for common public rental renovation work, 2026

Type of workItemThe company’s public unit pricePublic rental housing considerations
PaintingE03 Repaint the existing finish throughoutHK$12/square foot (minimum HK$3,700)Interior paint colours are Category C. Keep the entrance door in its original colour.
PaintingE02 Moisture-proof polishing oilHK$21/square foot (minimum HK$4,650)Suitable for local cracks and peeling paint in older estates
floorJ01 Supply and install stone plastic composite (SPC) flooringHK$60 per sq ftLiving and bedroom floor finishes are Category C. Kitchen and bathroom floor tiles are Category B.
electricityH02 Added 13A unit socket (concealed pipe)HK$640 per setWiring and sockets are Category B. We can submit the application. The standalone small-work call-out minimum is HK$2,000.
furnitureFUR05 Wardrobe with hinged or sliding doorsHK$2,900 per linear ftFreestanding cabinets dismantle more easily on moving out. ENF boards are standard from 2026.
furnitureFUR06 Platform bed/TatamiHK$340 per sq ftTimber-framed platform. Heights above 450 mm are quoted separately.
cleanL01 RenoClean post-renovation cleaning and formaldehyde treatmentHK$16/square foot (minimum HK$2,800)170°C steam cleaning by our partner

Indicative price, subject to measurement and written quotation. Finish materials such as tiles, sanitaryware and lights are separate. Standalone small-work call-outs have a HK$2,000 minimum. [13]

Renovation stages in public rental housing: timing, restrictions and priorities

stageOfficial arrangementsRenovation priorities
New tenancy14-day rent-free period. Submit the damage report by the specified deadline after key collection.Inspect first. Choose a listed contractor, another company or DIY.
Reallocated older flat with a refurbishment allowanceCash allowance of three months’ rent, with tenants arranging painting.Prioritise patching, damp treatment and mould removal.
Long-standing tenantsThe Housing Authority repairs normal wear and pledges to start within 12 days of a report.Report landlord repairs before commissioning work within the tenant’s scope.
Total Maintenance SchemeIn-flat inspections every ten years for estates aged 10–30 and every five years for older estates. Painting and decoration are excluded.Coordinate with survey dates to avoid removing newly installed cabinets.
Moving out or transferringUnauthorised changes may be reinstated at the tenant’s expense. Remove air conditioning and reinstate on moving out.Retain approval letters and completion certificates.
[2][5][8][6][7][1][4]

SITE SOP

Public rental renovation rules and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Public rental flat renovation application and work sequence

  1. 1. Check the Category A, B and C classificationshutdown checkpoint

    At measurement, mark Category C work for direct action, B for application and A for retention.

  2. 2. Submit the application on your behalf

    We can submit Category B applications to the estate office with services drawings and a description of works. Air-conditioner applications require three copies of HD272.

  3. 3. Wait for written approval before startingshutdown checkpoint

    Only Category C work proceeds pending approval. A prescribed registered contractor handles minor works such as external air-conditioner brackets and drying racks.

  4. 4. Protect communal areas

    Keep the front door closed, corridors and rear stairs clear, and cement slurry out of drains.

  5. 5. Install services to specificationshutdown checkpoint

    Leave the MCBs and earth-leakage protection devices in place. For fresh water pipe replacements, our partner licensed plumber handles the work and applies to the Water Supplies Department on your behalf. A registered electrical worker carries out the electrical work and issues WR1.

  6. 6. Stop work immediately if asbestos is suspectedshutdown checkpoint

    Housing Authority conditions prohibit asbestos-containing materials. If suspected material is uncovered, we stop work and arrange assessment and handling by registered asbestos consultants and contractors.

  7. 7. Submit completion recordsshutdown checkpoint

    Remove waste the same day. Submit WR1, air-conditioner acknowledgements and other records as requested. Keep copies until you move out.

Acceptance Checklist 0/4

[1][2][4][3][11][12]

Company Site Code

Suggested 14-day schedule for moving into a public rental flat

  1. Day 1: inspect the flatshutdown checkpoint

    Inspect doors, windows, taps, drains and switches. Photograph defects and return the damage report by the deadline.

  2. Days 1–2: measure and agree the scope

    Identify Category C works and Category B applications, and submit applications the same day.

  3. Days 2–4: place ordersshutdown checkpoint

    Select paint colours and flooring, and release approved furniture drawings for early production.

  4. Days 4–12: carry out approved work

    Paint first, lay flooring, then fit furniture. Wait for approval before Category B work.

  5. Days 12–14: rectify defects and cleanshutdown checkpoint

    Rectify defects and remove waste before moving in. Optional RenoClean steam cleaning is available.

Acceptance Checklist 0/3

[2][5]

DELIVERABLES

The design drawings you will receive

Category A, B and C checklist

Category and application requirement for each work item

Plumbing and electrical drawings

Socket, wiring and pipe layout for a Category B application

Floor plan and furniture drawings

Cabinet dimensions, wall fixing points and fixing method

Itemised written quotation

Item codes, quantities, unit rates and material models.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Check each item against the Housing Authority categories and mark what can proceed, requires approval or must be retained.
  • Whole-flat painting and SPC or timber floor finishes in living and sleeping areas
  • Custom storage and platform beds for small flats
  • Prepare socket and air-conditioner applications. A WR1 is issued for completed electrical work.

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Are you moving into a new estate or a reallocated flat? Did you choose the refurbishment allowance?

  2. 02

    Do you plan to add sockets or air conditioning, or alter the kitchen or bathroom?

  3. 03

    Has your estate office supplied its renovation guidance?

FAQ

Frequently asked questions

Do I need approval to renovate a public rental flat?

It depends on the alteration. Painting, floor finishes in living, dining and bedrooms, kitchen cabinets and shower taps are Category C and do not need prior approval. Wiring and sockets, metal entrance gates, non-structural internal walls, kitchen and bathroom floor tiles, sanitaryware and window grilles are Category B: apply to the estate office first. Category A items cannot be altered. These include structural walls, fire-rated entrance and kitchen doors, acoustic windows and main pipes.

How much does a public rental flat renovation cost?

For a 400 sq ft flat, E02 painting, SPC flooring, four socket sets and skirting cost about HK$46,960. The wardrobe, platform bed, shoe cabinet and TV unit example costs about HK$41,510. Indicative, subject to site measurement and written quotation.

Can I remove walls or make an open kitchen in a public rental flat?

Structural walls, precast internal walls, kitchen and bathroom partitions and the kitchen fire door are Category A and cannot be changed, so an open kitchen is generally not feasible. Other non-structural internal walls fall under Category B and need prior application.

Can I install SPC or wood flooring in a public rental flat?

Living and bedroom floor finishes are Category C and can be installed over existing floors. Kitchen, bathroom and balcony tiles have waterproofing beneath and fall under Category B. Raising the floor with screed is also Category B and requires prior application.

Must I use a contractor appointed to the estate by the Housing Department?

No. Tenants may choose a listed contractor, another renovation company or DIY. Estate-based contractors do not act as Housing Authority agents. Contract disputes are between the parties.

How long do new public rental tenants get to decorate?

New tenants have 14 rent-free days to decorate before the tenancy begins. Inspect and submit the damage report on key collection day where possible.

How can I add sockets in public rental housing?

Additional sockets are Category B and require prior application. We can submit drawings and the application. Once approved, a registered electrical worker installs and issues a WR1. H02 sockets cost HK$640 per set, normally combined with other work. Standalone small-work call-outs have a HK$2,000 minimum.

What should I know before fitting air conditioning in public rental housing?

Apply using HD272. Maximum platform load is 100 kg. External brackets are minor works. Remove the installation and reinstate on moving out.

May I replace windows or fit grilles in public rental housing?

Do not alter glazed aluminium windows or acoustic windows or attach fittings to the outer wall around the frame. External window grilles are Category B and require approval. Acoustic windows are protected Category A fixtures.

Must I reinstate alterations when I move out?

The Housing Department can reinstate unauthorised changes and charge the tenant. Remove air conditioners and reinstate the opening on leaving. Choose removable units and retain written approvals.

Is there a warranty on public rental flat renovation?

The one-year warranty covers paint cracking, blistering and peeling, detached furniture hinges, loose runners, screws coming out and swollen door panels, excluding deliberate damage.

Can you visit the flat?

Yes. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send photos to WhatsApp 5243 7747 for an initial discussion.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. Official sourceGuidelines for the Reference List of Decoration Contractors (Annex I: Licence, Schedule of Conditions of Decoration and classification of landlord's fixtures) · Hong Kong Housing Authority· Accessed 2026-11-02
  2. Official sourceBrief on housing policies relating to public housing, Legislative Council paper CB(1)1246/2025(01), 1 April 2025 · Legislative Council Panel on Housing· Accessed 2026-11-02
  3. Official sourceMarking Scheme for Estate Management Enforcement · Hong Kong Housing Authority and Housing Department· Accessed 2026-11-02
  4. Official sourceAir-conditioner installation application HD272, revised October 2026 · Hong Kong Housing Authority· Accessed 2026-11-02
  5. Official sourceNotes for moving into public housing · Hong Kong Housing Authority and Housing Department· Accessed 2026-11-02
  6. Official sourcePolicy Focus, Part C, Chapter 2: maintenance performance pledges · Hong Kong Housing Authority· Accessed 2026-11-02
  7. Official sourceProgress of the Total Maintenance Scheme, Legislative Council Panel on Housing paper, June 2025 · Legislative Council Panel on Housing· Accessed 2026-11-02
  8. Official sourceHousing Authority revision of the vacant-flat refurbishment allowance, press release of 27 August 2024 · Hong Kong SAR Government press release· Accessed 2026-11-02
  9. Official sourceHousing in Figures 2025 · Housing Bureau· Accessed 2026-11-02
  10. Official sourceFrequently asked questions on decoration in rental estates · Hong Kong Housing Society· Accessed 2026-11-02
  11. Official sourceMinor Works Control System · Buildings Department· Accessed 2026-11-02
  12. Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
  13. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your Interior design before you decide.

Start with the current condition

Tell us what you want to keep and what needs replacing. Once the scope is clear, we can compare costs and arrangements.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗