PUBLIC HOUSING RENOVATION
Public rental housing renovations: Housing Department rules, prices and interior design in 2026
- Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
- Browse prices for 117 work itemsSelect work items online to see an indicative budget
- 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty
The Housing Authority is the landlord. Its fixtures are classified as A, B or C. A items cannot be changed, B items require prior estate-office approval and C items can be altered without prior approval. HK Create Design checks the proposed scope and itemises prices for painting, flooring and storage. This guide covers the 14-day rent-free period, refurbishment allowance, air-conditioner and socket applications, budget examples and layouts for small flats.
Data verification date:2026-11-02・Numbers are accompanied by sources

WHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
REAL PROJECT PHOTOS
Photographs of our completed projects
These photographs were taken on actual HK Create Design projects. Client details have been removed.

Completed project photosYat Man House, Ho Man Tin Estate · Tiling · June 2026 
Site photoYat Man House, Ho Man Tin Estate · Whole-home renovation · June 2026 
Site photoYat Man House, Ho Man Tin Estate · Plumbing and electrical work · May 2026 
Site photoUpper Wong Tai Sin Estate · Partition work · June 2026 
Site photoUpper Wong Tai Sin Estate · Partition painting · June 2026 
Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026 
Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026 
Completed project photosHong Kong · Whole-home renovation · July 2021 
Completed project photosHong Kong · Whole-home renovation 
Site photoWan Chai · Older property renovation · July 2026 
Site photoWan Chai · Older property renovation · July 2026
WORKED EXAMPLE
Estimate your public rental renovation cost
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
Basic public rental flat budget: whole-flat painting and new living and bedroom flooring
- E02 patch and repaint at HK$21 per sq ft, with estimated paint area equal to saleable floor area × 3
- J01 SPC flooring, HK$60 per sq ft, assuming living areas and bedrooms cover 75% of the flat
- J04 skirting, 120 linear ft × HK$10
- H02 sockets, 4 sets × HK$640. Prior application required. A WR1 is issued on completion.
- Excludes furniture and light fittings
- Whole House Paint (E02)Saleable area × 3 × HK$21HK$25,200
- SPC flooring in living, dining and sleeping areas (J01)Saleable floor area × 75% × HK$60HK$18,000
- Skirting (J04)120 linear ft × HK$10HK$1,200
- Additional sockets (H02)4 sets × HK$640HK$2,560
Indicative work costHK$46,960
The indicative total for 400 sq ft is HK$46,960 at published unit rates, subject to measurement and written quotation. Mouldy or previously damp walls may need E01 instead. Measure paintable surfaces and flooring on site. [13]
Small public rental flat storage package: wardrobe, platform bed, shoe cabinet and TV unit
- FUR05 wardrobe, HK$2,900 per linear ft
- FUR06 platform bed, 35 sq ft × HK$340, up to 450 mm high
- FUR11 shoe cabinet, 3 linear ft, and FUR10 TV cabinet, 6 linear ft
- FUR42 delivery HK$660. Standard ENF boards are included at no extra cost from 2026.
- Wardrobe (FUR05)Wardrobe width × HK$2,900HK$17,400
- Platform bed (FUR06)35 sq ft × HK$340HK$11,900
- Waist-height shoe cabinet (FUR11)3 linear ft × HK$1,350HK$4,050
- Low TV cabinet (FUR10)6 linear ft × HK$1,250HK$7,500
- Delivery (FUR42)OnceHK$660
Indicative furniture costHK$41,510
With a 6 ft wardrobe the indicative total is HK$41,510. Dimensions, handles and hardware upgrades such as Blum drawer runners affect the price. Subject to measurement and written quotation. [13]
Public rental kitchen cabinet budget: base units, quartz worktop and wall units
- A06 old kitchen cabinet removal, HK$170 per linear ft
- FUR14 base cabinets HK$1,300 and FUR20 quartz HK$1,200 per linear ft, including two worktop cut-outs
- FUR15 wall cabinets, 6 linear ft × HK$1,250
- K04 cooker hood installation, HK$860, appliance excluded
- Keep the sink and cooking bench in place. Removing original Housing Department fittings is Category B and needs prior application.
- Old kitchen cabinet removal (A06)Base cabinet length × HK$170HK$1,360
- New base cabinets (FUR14)Base cabinet length × HK$1,300HK$10,400
- Quartz worktop (FUR20)Base cabinet length × HK$1,200HK$9,600
- Wall cabinets (FUR15)6 linear ft × HK$1,250HK$7,500
- Cooker hood installation (K04)One applianceHK$860
Indicative kitchen works costHK$29,720
With 8 ft of base cabinets the example totals about HK$29,720. Excludes pipe relocation, wall tiles, appliances and time awaiting Housing Department approval. Subject to measurement and written quotation. [13]
HOW WE HELP
How can we help you
Identify Category A, B and C items first.
Mark items that may proceed, need an application or must be retained.
Submit applications on your behalf
We can submit Category B applications and prepare plumbing and electrical drawings.
Storage design for small flats
Freestanding cabinets and timber-framed platform beds preserve landlord’s fixtures.
Published itemised prices
Item codes, quantities and unit rates are specified, subject to site measurement and written quotation.
Qualified service installation and clean handover
Registered electrical workers issue WR1, we coordinate WSD applications for fresh water pipe replacement, remove waste the same day and provide a one-year warranty.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.








KEY NUMBERS
Public rental renovation figures to check before work starts
government/official
830Thousands
Number of Housing Authority public rental flats at end-March 2025
Including Housing Society stock, public rental housing has around 871,000 units. Around 270,000 Housing Authority flats are at least 36 years old, about 33% of its stock.
[9]government/official
46.9%
Share of Housing Authority public rental flats with internal floor areas of 30.0–39.9 m²
At end-March 2025, 13.3% were under 20 m², 23.8% were 20.0–29.9 m² and 16.0% were at least 40 m².
[9]government/official
14.1square metres
Living space per Housing Authority public rental tenant at end-March 2025
Based on internal floor area. The Housing Authority’s current allocation standard is at least 7 m² of internal floor area per person.
[9][2]government/official
14days
Rent-free period for incoming public rental tenants
Since 24 April 1993, new public rental tenants have been offered 14 rent-free days before the tenancy starts to decorate. A tenant may choose an earlier commencement date.
[2]government/official
3 monthsrent
Vacant-flat refurbishment allowance
From the fourth quarter of 2024, vacant flats of all ages qualify for a uniform allowance of three months’ rent. Prospective tenants who choose it arrange painting and related works themselves.
[8]government/official
16points
Accumulating the threshold number of points within two years can lead to termination of tenancy.
The Marking Scheme covers 30 misdeeds carrying 3, 5, 7 or 15 points according to severity. Improper disposal of renovation debris or damage to drainage causing seepage downstairs can attract points without prior warning.
[3]government/official
6 months
Defect rectification period for an estate-based decoration contractor
The Housing Authority licence’s schedule of decoration conditions requires licensed contractors to rectify defective works at the tenant’s request, without charge, within six months of completion, except defects attributable to the tenant.
[1]government/official
100kg
Maximum total load on the air-conditioner platform
Housing Authority form HD272 limits the combined load of an air conditioner and its fittings on the platform to 100 kg. External wall brackets are minor works.
[4]CHARTS
Public rental renovation figures at a glance
Housing in Figures 2025 records around 830,000 Housing Authority public rental flats. In older flats, check for ageing wiring and pipes, hollow tiles and peeling paint. Establish which items are Housing Department repairs and which are the tenant’s responsibility before renovation. [9]
Figures are internal floor areas. One square metre is about 10.76 sq ft. Nearly half of public rental flats measure about 323–430 sq ft, so size furniture and storage carefully. [9]
FULL GUIDE
Public rental flat renovation guide: process, sequence and checks
How does public rental flat renovation differ from private residential work?
The Housing Authority owns the flat. Its classification of landlord’s fixtures divides walls, doors, windows, sanitary fittings and services into three categories. Category A cannot be altered, B requires prior approval and C requires no prior approval.
The 2025 Legislative Council housing policy brief requires estate-office applications before adding air conditioning, changing electrical circuits, or altering gates, non-structural walls, windows, grilles, pipes or WCs. After approval, appoint qualified contractors, comply with Housing Authority specifications and Hong Kong law, and provide completion records. The tenant maintains the installation. See our public rental housing rules article.
[1][2]How Housing Department Categories A, B and C work
Category A changes are prohibited. Examples include beams, columns, slabs, structural or precast internal walls, kitchen and bathroom partitions, entrance and kitchen fire doors and closers, acoustic windows, grease traps, drainage stacks, floor drains, mains, feeder cables from the electrical room and unit number plates. The Housing Department may reinstate unauthorised changes at the tenant’s expense. Applications by people with disabilities receive special consideration.
Category B requires prior approval. Examples include alterations to non-structural internal walls outside kitchens and bathrooms, new brick partitions or screeds, non-fire-rated internal doors, security gates, window grilles, kitchen and bathroom wall or floor tiles, sanitary fittings, sinks, cooking benches, branch pipes, distribution boards, wiring, sockets and drying racks. The tenant is responsible for subsequent maintenance and replacement of approved alterations.
Category C needs no prior approval. Examples include living, dining and bedroom floor finishes, interior paint colours, room-door locks, window handles, glass, shower doors and mixers, and kitchen cabinets. Painting, laying a floor finish and replacing cabinets can generally proceed. Removing kitchen or bathroom tiles, moving a sink or adding a socket falls under Category B.
[1]Schedule of decoration conditions: site rules during works
Housing Authority conditions require keeping the front door closed and working only inside the flat. Keep corridors and rear stairs clear and slurry out of drains and WCs. Do not alter MCBs or earth-leakage protection. Gas work downstream of the meter requires a registered gas contractor. Water pipe alterations require suitable WSD-compliant materials and a qualified plumber. Retain glazed aluminium or acoustic windows, avoid external frame fixings and exclude asbestos-containing materials.
Special conditions note that kitchen and bathroom tiles cover a waterproof membrane. Tenants may be liable for seepage caused by tile or partition removal. Seal penetrations in bathroom tiling with silicone. Structural walls contain dense reinforcement and must not be chased indiscriminately for services. Retain the entrance door colour. Check the estate office’s local rules.
[1]How to use the 14-day rent-free period
New public rental tenants receive 14 rent-free days before the tenancy starts. Inspect on collecting keys, complete the damage report and return it by the estate office deadline. Delays can make later claims difficult.
For new estate intake the Housing Department stations decoration contractors at a ratio of 1:250. Tenants may choose a listed contractor, another firm or DIY. Listed contractors are independent of the Housing Authority, and disputes are between the parties. Their licence requires free defect rectification for six months after completion. You can ask any contractor to provide equivalent terms.
[2][5][1]What do I arrange if I choose the vacant-flat refurbishment allowance?
From the fourth quarter of 2024, the allowance covers vacant flats of all ages at three months’ rent. Around 74% of prospective tenants chose the cash allowance each year from 2021/22 to 2023/24. Tenants now arrange painting and related works only. Minor repairs have returned to the Housing Department’s refurbishment scope.
Prioritise wall preparation. E02 patching, moisture treatment, sanding and painting costs HK$21 per sq ft on sound walls. For peeling, mould or past seepage, identify the moisture source first, then consider E01 stripping and skimming at HK$39 per sq ft. See our painting page.
[8][13]Public rental flat renovation prices and packages: allocating the budget
Because Category A is protected and Category B requires approval, many budgets focus on paint, flooring in living and sleeping areas, storage and selected sockets. Published rates: E03 direct repaint HK$12 per sq ft, E02 patch and repaint HK$21, J01 SPC HK$60 per sq ft, FUR05 wardrobes HK$2,900 per linear ft, FUR06 platform beds HK$340 per sq ft and H02 sockets HK$640 per set.
When comparing packages, check whether painting includes direct repainting, patching or full stripping, whether flooring includes underlay and skirting, and the board and hardware specifications. In a 400 sq ft flat, E02 painting, SPC flooring, four socket sets and skirting total about HK$46,960. Prices are indicative, subject to measurement and written quotation.
[13]Making the most of space in a small public rental flat
Housing in Figures 2025 shows that about 46.9% of Housing Authority public rental flats have internal floor areas of 30.0–39.9 m² (around 323–430 sq ft). Average living space is around 14.1 m² per tenant.
Choose removable furniture that preserves the landlord’s fixtures, such as freestanding custom cabinets and a timber-framed platform bed. A raised masonry floor or screed is Category B. Options include full-height entrance shoe storage, a wall of living-room cupboards and folding table, a platform with drawers or a fold-down bed. Follow the estate office’s fixing method for precast walls. See our interior design page and small-flat storage article.
[9][1]How do I apply to add sockets or install air conditioning?
Distribution boards, wiring, switches and sockets are Category B and need prior application. We can submit services drawings and the application. Once approved, a registered electrical worker carries out the work and issues a WR1. In older estates, arrange an electrical check before adding high-power appliances. Standalone minor work carries a HK$2,000 minimum. Send photos to WhatsApp 5243 7747 for a repair estimate.
Submit three copies of HD272 to the estate office. Use the designated platform where provided, with a total load no greater than 100 kg. External wall brackets are minor works requiring a prescribed registered contractor and filing with the Independent Checking Unit. Surface wiring must connect to a spare board circuit. Remove the unit and reinstate on moving out. Dripping air conditioners are a warning item under the Marking Scheme. See the air-conditioning installation article.
Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.
[1][4][12][11][3]Which repairs should the Housing Department handle, and which are mine?
The Housing Authority repairs normal wear to landlord’s fixtures, except door and window glass, with a pledge to start within 12 days of a report. The Total Maintenance Scheme inspects flats in estates aged 10–30 every ten years and those over 30 every five. Painting and decoration are excluded.
For abnormal damage or replacement of a functioning fixture, ask the estate office about Housing Department chargeable repair services. Report minor landlord repairs through estate channels. We focus on paint, flooring, furniture, lighting and service improvements, and identify landlord repairs at measurement.
[6][7]Can renovation work attract penalty points?
Accumulating 16 points within two years triggers tenancy termination under the Marking Scheme. Dumping renovation waste in communal areas or refuse points, or damaging drainage pipes and causing seepage downstairs, attracts points without warning. Noise or failure to rectify unauthorised alterations attracts a warning first. We bag and remove waste the same day and locate pipes before drilling.
In Housing Society rental estates, tenants must also apply to the estate office and obtain written approval before renovating. When the tenancy ends, tenants must reinstate the original fittings at their own expense.
[3][10]How HK Create Design renovates public rental flats
We have 15 years of experience. We discuss what can be done before pricing it. Send photos to WhatsApp 5243 7747 for an initial discussion. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. We itemise the quotation. For Category B work, we can submit the application and prepare plumbing and electrical drawings on your behalf. Work begins after approval.
We use Nippon or Dulux paint. Custom furniture includes ENF-grade boards and Blum hardware as standard. ENF boards have very low formaldehyde emissions, so ventilation before moving in is still important. Our partner licensed plumber handles Water Supplies Department applications for fresh water pipe replacements, and registered electrical workers carry out the electrical work and issue WR1. Our one-year warranty covers paint cracking, blistering and peeling, loose or detached furniture hinges, runners or screws, and swollen door panels, except where the damage was deliberate. Small site jobs have a minimum charge of HK$2,000. We also take on some repairs: WhatsApp photos to 5243 7747 for a quote. Optional post-completion RenoClean 170°C steam cleaning is available through our partner. Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Hong Kong, Monday to Saturday, 10:00–18:00.
[13][12]COMPARE
Comparing renovation options for public rental flats
Public rental housing fixture categories: prohibited changes and works requiring approval
| Part | Category A: alterations prohibited | Category B: prior Housing Authority approval required | Category C: no prior approval required |
|---|---|---|---|
| Walls and floors | Beams, columns, slabs, structural walls, precast internal walls and kitchen, WC or bathroom partitions | Alterations to non-structural internal walls outside kitchens and bathrooms, new brick walls or floor screeds, and installation of sliding balcony windows | Floor finishes in living rooms, dining areas and bedrooms, and interior paint colours |
| door | Entrance and kitchen fire doors, frames, hardware and overhead door closers | Non-fire-rated kitchen, WC, bedroom, bathroom and balcony doors, frames and hinges, and metal security gate and lock | Locks, pulls and handles on WC, balcony and bedroom doors |
| window | Acoustic windows and panels, grease traps and acoustic balcony components | External windows, corridor fanlights, window grilles and security bars | Window handles and stays, and glass in doors, windows and louvres |
| Kitchen and bathroom | Soil, waste and rainwater stacks, floor drains and fire collars | Kitchen and bathroom floor and wall tiles, baths or shower trays, WCs, washbasins, sinks, cooking benches and branch pipes | Shower doors, cooking bench surface finish, showerheads, taps, toilet seats, shower curtain rails, grab rails and kitchen cabinets |
| Plumbing and electrical work | Fresh and flushing water mains, feeder cables between the electrical room and consumer unit, and pipe ducts | Branch pipes and fittings, consumer units, wires, switches and sockets | Doorbell. Tenants apply directly to providers for gas and telephone installations. |
| Other | Letterbox door and hinges, and flat number plate | Drying racks or rails, intercom handset and television outlet, depending on the estate | Letterbox lock |
Based on Annex I, Classification of Landlord’s Fixtures, of the Housing Authority’s Reference List of Decoration Contractors guidelines. The Housing Department may reinstate unauthorised Category A alterations at the tenant’s expense. Tenants maintain and replace approved Category B alterations. Confirm current requirements with your estate office. [1]
Published rates for common public rental renovation work, 2026
| Type of work | Item | The company’s public unit price | Public rental housing considerations |
|---|---|---|---|
| Painting | E03 Repaint the existing finish throughout | HK$12/square foot (minimum HK$3,700) | Interior paint colours are Category C. Keep the entrance door in its original colour. |
| Painting | E02 Moisture-proof polishing oil | HK$21/square foot (minimum HK$4,650) | Suitable for local cracks and peeling paint in older estates |
| floor | J01 Supply and install stone plastic composite (SPC) flooring | HK$60 per sq ft | Living and bedroom floor finishes are Category C. Kitchen and bathroom floor tiles are Category B. |
| electricity | H02 Added 13A unit socket (concealed pipe) | HK$640 per set | Wiring and sockets are Category B. We can submit the application. The standalone small-work call-out minimum is HK$2,000. |
| furniture | FUR05 Wardrobe with hinged or sliding doors | HK$2,900 per linear ft | Freestanding cabinets dismantle more easily on moving out. ENF boards are standard from 2026. |
| furniture | FUR06 Platform bed/Tatami | HK$340 per sq ft | Timber-framed platform. Heights above 450 mm are quoted separately. |
| clean | L01 RenoClean post-renovation cleaning and formaldehyde treatment | HK$16/square foot (minimum HK$2,800) | 170°C steam cleaning by our partner |
Indicative price, subject to measurement and written quotation. Finish materials such as tiles, sanitaryware and lights are separate. Standalone small-work call-outs have a HK$2,000 minimum. [13]
Renovation stages in public rental housing: timing, restrictions and priorities
| stage | Official arrangements | Renovation priorities |
|---|---|---|
| New tenancy | 14-day rent-free period. Submit the damage report by the specified deadline after key collection. | Inspect first. Choose a listed contractor, another company or DIY. |
| Reallocated older flat with a refurbishment allowance | Cash allowance of three months’ rent, with tenants arranging painting. | Prioritise patching, damp treatment and mould removal. |
| Long-standing tenants | The Housing Authority repairs normal wear and pledges to start within 12 days of a report. | Report landlord repairs before commissioning work within the tenant’s scope. |
| Total Maintenance Scheme | In-flat inspections every ten years for estates aged 10–30 and every five years for older estates. Painting and decoration are excluded. | Coordinate with survey dates to avoid removing newly installed cabinets. |
| Moving out or transferring | Unauthorised changes may be reinstated at the tenant’s expense. Remove air conditioning and reinstate on moving out. | Retain approval letters and completion certificates. |
SITE SOP
Public rental renovation rules and handover checklist
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Company Site Code
Public rental flat renovation application and work sequence
- 1. Check the Category A, B and C classificationshutdown checkpoint
At measurement, mark Category C work for direct action, B for application and A for retention.
- 2. Submit the application on your behalf
We can submit Category B applications to the estate office with services drawings and a description of works. Air-conditioner applications require three copies of HD272.
- 3. Wait for written approval before startingshutdown checkpoint
Only Category C work proceeds pending approval. A prescribed registered contractor handles minor works such as external air-conditioner brackets and drying racks.
- 4. Protect communal areas
Keep the front door closed, corridors and rear stairs clear, and cement slurry out of drains.
- 5. Install services to specificationshutdown checkpoint
Leave the MCBs and earth-leakage protection devices in place. For fresh water pipe replacements, our partner licensed plumber handles the work and applies to the Water Supplies Department on your behalf. A registered electrical worker carries out the electrical work and issues WR1.
- 6. Stop work immediately if asbestos is suspectedshutdown checkpoint
Housing Authority conditions prohibit asbestos-containing materials. If suspected material is uncovered, we stop work and arrange assessment and handling by registered asbestos consultants and contractors.
- 7. Submit completion recordsshutdown checkpoint
Remove waste the same day. Submit WR1, air-conditioner acknowledgements and other records as requested. Keep copies until you move out.
Acceptance Checklist 0/4
Company Site Code
Suggested 14-day schedule for moving into a public rental flat
- Day 1: inspect the flatshutdown checkpoint
Inspect doors, windows, taps, drains and switches. Photograph defects and return the damage report by the deadline.
- Days 1–2: measure and agree the scope
Identify Category C works and Category B applications, and submit applications the same day.
- Days 2–4: place ordersshutdown checkpoint
Select paint colours and flooring, and release approved furniture drawings for early production.
- Days 4–12: carry out approved work
Paint first, lay flooring, then fit furniture. Wait for approval before Category B work.
- Days 12–14: rectify defects and cleanshutdown checkpoint
Rectify defects and remove waste before moving in. Optional RenoClean steam cleaning is available.
Acceptance Checklist 0/3
DELIVERABLES
The design drawings you will receive
Category A, B and C checklist
Category and application requirement for each work item
Plumbing and electrical drawings
Socket, wiring and pipe layout for a Category B application
Floor plan and furniture drawings
Cabinet dimensions, wall fixing points and fixing method
Itemised written quotation
Item codes, quantities, unit rates and material models.
MATERIALS
Related materials: We know how to use them and can also help you with construction
SCOPE
This communication can first cover
- Check each item against the Housing Authority categories and mark what can proceed, requires approval or must be retained.
- Whole-flat painting and SPC or timber floor finishes in living and sleeping areas
- Custom storage and platform beds for small flats
- Prepare socket and air-conditioner applications. A WR1 is issued for completed electrical work.
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
- 01
Are you moving into a new estate or a reallocated flat? Did you choose the refurbishment allowance?
- 02
Do you plan to add sockets or air conditioning, or alter the kitchen or bathroom?
- 03
Has your estate office supplied its renovation guidance?
FAQ
Frequently asked questions
Do I need approval to renovate a public rental flat?
It depends on the alteration. Painting, floor finishes in living, dining and bedrooms, kitchen cabinets and shower taps are Category C and do not need prior approval. Wiring and sockets, metal entrance gates, non-structural internal walls, kitchen and bathroom floor tiles, sanitaryware and window grilles are Category B: apply to the estate office first. Category A items cannot be altered. These include structural walls, fire-rated entrance and kitchen doors, acoustic windows and main pipes.
How much does a public rental flat renovation cost?
For a 400 sq ft flat, E02 painting, SPC flooring, four socket sets and skirting cost about HK$46,960. The wardrobe, platform bed, shoe cabinet and TV unit example costs about HK$41,510. Indicative, subject to site measurement and written quotation.
Can I remove walls or make an open kitchen in a public rental flat?
Structural walls, precast internal walls, kitchen and bathroom partitions and the kitchen fire door are Category A and cannot be changed, so an open kitchen is generally not feasible. Other non-structural internal walls fall under Category B and need prior application.
Can I install SPC or wood flooring in a public rental flat?
Living and bedroom floor finishes are Category C and can be installed over existing floors. Kitchen, bathroom and balcony tiles have waterproofing beneath and fall under Category B. Raising the floor with screed is also Category B and requires prior application.
Must I use a contractor appointed to the estate by the Housing Department?
No. Tenants may choose a listed contractor, another renovation company or DIY. Estate-based contractors do not act as Housing Authority agents. Contract disputes are between the parties.
How long do new public rental tenants get to decorate?
New tenants have 14 rent-free days to decorate before the tenancy begins. Inspect and submit the damage report on key collection day where possible.
How can I add sockets in public rental housing?
Additional sockets are Category B and require prior application. We can submit drawings and the application. Once approved, a registered electrical worker installs and issues a WR1. H02 sockets cost HK$640 per set, normally combined with other work. Standalone small-work call-outs have a HK$2,000 minimum.
What should I know before fitting air conditioning in public rental housing?
Apply using HD272. Maximum platform load is 100 kg. External brackets are minor works. Remove the installation and reinstate on moving out.
May I replace windows or fit grilles in public rental housing?
Do not alter glazed aluminium windows or acoustic windows or attach fittings to the outer wall around the frame. External window grilles are Category B and require approval. Acoustic windows are protected Category A fixtures.
Must I reinstate alterations when I move out?
The Housing Department can reinstate unauthorised changes and charge the tenant. Remove air conditioners and reinstate the opening on leaving. Choose removable units and retain written approvals.
Is there a warranty on public rental flat renovation?
The one-year warranty covers paint cracking, blistering and peeling, detached furniture hinges, loose runners, screws coming out and swollen door panels, excluding deliberate damage.
Can you visit the flat?
Yes. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send photos to WhatsApp 5243 7747 for an initial discussion.
AFTER RENOVATION
RenoClean | Specialist cleaning and aerospace-grade air purification
After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.
- Cleaning and testing are listed separately
The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.
RELATED READING
Read the relevant key points first
design and space12 sections · 7FAQ
Public rental housing renovation rules and applications: what can tenants change and what needs approval?
Public rental flats belong to the Housing Authority. Tenants cannot alter beams, columns, kitchen or bathroom partitions or fire doors. Changes to kitchen or bathroom floor tiles, sanitaryware, boards or sockets need prior approval. Living and bedroom floor finishes, paint colours and kitchen cabinets fall into a different category.
See data, scope and practical examples
Aluminium windows, plumbing and electrical work11 sections · 7FAQ
Installing air conditioning during renovation: condensate drainage, power, brackets and acceptance checks
Agree the air conditioner's drainage, power, external bracket classification and routes through new cabinets or ceilings before ordering. Buildings Department, Food and Environmental Hygiene Department and EMSD references help specify and inspect the work.
See data, scope and practical examples
design and space9 sections · 6FAQ
Renovating a small Hong Kong flat: balancing storage, circulation space and the scope of work
Plan storage for the things you use, keep doors able to open fully and preserve light at windows. Agree quantities and exclusions before seeking a quote. Includes a worked example, comparison table and safety checks.
See data, scope and practical examples
construction and safety12 sections · 7FAQ
Renovation noise and permitted working hours in Hong Kong: legislation, building rules and quieter works
Can drilling take place freely between 7 am and 7 pm on weekdays? Check the law, building management rules and neighbours' needs separately. Environmental Protection Department guidance covers hours, permits and penalties, with tips on scheduling and quieter tools.
See data, scope and practical examples
Public rental flat renovation12 sections · 8FAQ
Furniture layouts for public rental flats for 1–2, 2–3 and 3–4 occupants, with illustrations and custom furniture options
Plan public housing furniture by flat size. Compare clear passage widths, bed and wardrobe positions, multipurpose pieces and published price examples.
See data, scope and practical examples
Public rental flat renovation11 sections · 7FAQ
Upgrading a public rental kitchen and bathroom without removing tiles: approvals, works you can start and 2026 prices
Use Housing Authority Categories A, B and C to check kitchen and bathroom approvals, ways to renovate without removing tiles, application steps and published price examples.
See data, scope and practical examplesSTART WITH THE REAL CONTEXT
Want to discuss this project?
First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-upFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.
Sources
- Official sourceGuidelines for the Reference List of Decoration Contractors (Annex I: Licence, Schedule of Conditions of Decoration and classification of landlord's fixtures) · Hong Kong Housing Authority· Accessed 2026-11-02
- Official sourceBrief on housing policies relating to public housing, Legislative Council paper CB(1)1246/2025(01), 1 April 2025 · Legislative Council Panel on Housing· Accessed 2026-11-02
- Official sourceMarking Scheme for Estate Management Enforcement · Hong Kong Housing Authority and Housing Department· Accessed 2026-11-02
- Official sourceAir-conditioner installation application HD272, revised October 2026 · Hong Kong Housing Authority· Accessed 2026-11-02
- Official sourceNotes for moving into public housing · Hong Kong Housing Authority and Housing Department· Accessed 2026-11-02
- Official sourcePolicy Focus, Part C, Chapter 2: maintenance performance pledges · Hong Kong Housing Authority· Accessed 2026-11-02
- Official sourceProgress of the Total Maintenance Scheme, Legislative Council Panel on Housing paper, June 2025 · Legislative Council Panel on Housing· Accessed 2026-11-02
- Official sourceHousing Authority revision of the vacant-flat refurbishment allowance, press release of 27 August 2024 · Hong Kong SAR Government press release· Accessed 2026-11-02
- Official sourceHousing in Figures 2025 · Housing Bureau· Accessed 2026-11-02
- Official sourceFrequently asked questions on decoration in rental estates · Hong Kong Housing Society· Accessed 2026-11-02
- Official sourceMinor Works Control System · Buildings Department· Accessed 2026-11-02
- Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
- CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02
