Skip to main content

STRIP-OUT & PREPARATION

Free online strip-out estimates for cabinets, kitchens, bathrooms and shop reinstatement

You can ask before taking measurements. Tell us what should go and what should stay. If you have photos, show us the whole area and the route for carrying materials out.

  • We reply within four business hoursWe review your photos and description to understand the scope
  • Removal, protection and waste collection are itemised in the quoteStrip-out work carries no warranty. Agree protection and clearance in advance.
  • On-site measurement arrangementsFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

For a cabinet removal, identify adjacent wall tiles to retain. For a whole-flat strip-out, agree the floor removal depth. For lease-end reinstatement, check the landlord’s handover list. We quote removal, protection, handling and subsequent repairs separately. You can start with a WhatsApp message and send photos later.

Data verification date:2026-11-22・Numbers are accompanied by sources

Boards stacked after removing old cabinets from a flat
Hong Kong · Strip-out · March 2021 · Site photo

Scope of work, published prices and photo enquiries

Choose the areas to include in your demolition quote

Send photos for a cabinet removal, partial kitchen or bathroom strip-out, or shop reinstatement. Show what should stay so protection, carrying and clearance can be priced.

1. Choose the type of work

You can attach photos in WhatsApp and ask before you have dimensions or a final scope.

Other details about scope, timing or current conditions (optional)

Continue to the enquiry form with this scope Your selected project type and scope carry over. You can add other details on the form.

You can enquire without filling in these fields. The button opens a draft in WhatsApp. Add any photos there and send it when you're ready.

Interior demolition at Laguna City, Lam Tin

More demolition site photos
During demolition at Laguna City, Lam Tin, rubble and bags of material remain on the floor beside the grey curtains.
Demolition in progressDebris remains by the windows.
After clearance, the floor beside the windows in the same flat is visible. Vertical pipes remain at the former partition.
After debris was clearedThe floor is exposed and the pipes are still visible.

Do you need removal and debris clearance? Mark what should go and what should stay in your photos. We check protection, the route from the flat to the vehicle, and disposal charges separately.

Will the walls need repairs after removal? Ask for separate items in the written quote for rendering around openings, wall finishes and final clearance.

See two stages of repairs around a wall opening in Mong Kok

Compare demolition prices by checking what each quote covers

Cabinet removal, a full kitchen or bathroom strip-out and waste haulage have separate pricing scopes. Choose what you need. Demolition carries no warranty.

A06 · Our published indicative prices

Remove kitchen or bathroom cabinets

HK$170 / linear ft

Priced by the horizontal length of the cabinets. Confirm carrying and disposal separately.

A10 · Our published indicative prices

Strip out and clear one bathroom

HK$9,950 / room

Strip-out and carrying for one bathroom. New waterproofing, tiling and fitting sanitaryware cost extra.

A11 · Our published indicative prices

Remove construction debris (per truckload)

HK$4,200 / truckload

The per-load charge includes haulage and government disposal fees. For small jobs priced by the bag, HK$2,000 is the minimum charge for the job.

Choose the items that match your scope. The options are not all added together. Your written quotation after on-site measurement confirms the price.See the full price list and measurement rules

How much is stripping 100 sq ft of floor tiles plus one truckload of waste?

rangeBasis of charge and inclusionsIndicative cost
Remove tiles and floor bed down to the concrete (A02)100 sq ft × HK$52HK$5,200
Rubble removal (A11)Assume 1 truckload × HK$4,200HK$4,200
Indicative subtotal for the two items aboveDemolition plus the assumed waste removal chargeHK$9,400

Worked example only: 1 truckload is not a fixed allowance for every 100 sq ft job. Confirm the volume, floor and access route. Deep breaking-out, sunken slabs, later repairs and tiling cost extra. A09 and A10 already include carrying. Check the scope before adding removal. Demolition has no warranty.

Source:Our published 2026 price list and minimum charges. These are worked examples. The final price is confirmed in writing after an on-site measurement.

HK Create Design · Records from our sites
Site photos of work in progress

Reinstatement after demolition in Mong Kok: two repair stages in photos

How is the area handed over to the masonry trade? Two stills from the same project show the grey repair stage and the later white finish.

Earlier repair stage
Video still, Mong Kok: grey repair patches at the top and sides of the opening.Tap to enlarge
Later surface finish
Video still, Mong Kok: a white finish now covers the edge of the opening, with protection and materials still on site.Tap to enlarge

Mong Kok Repairs and surface finishing after demolition

Photo location
Mong Kok · Top, sides and bottom edge of the opening
Recorded stages
Grey repair stage → Later white finish
Example scope of work
Handover for repair and finishing after demolition
Agree these details before requesting a quotation
List removal, repairs, final finishes and site clearance separately.

What to look for in the photos

  1. Specify demolition, substrate repair and final finishes separately.

  2. Inspect the head, sides and lower edge of the opening and retain handover photos.

  3. Protection is still in place. Specify the remaining site cleanup and handover arrangements.

The photographs were taken on 4 and 5 May. They show two work stages, not a one-day completion time or an inspection of the completed project.

Send photos to discuss the scope Send a wide shot and close-ups so we can identify the work area and discuss the scope.

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

WORKED EXAMPLE

Estimate the cost of strip-out work for your own project

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Estimate kitchen cabinet removal by cabinet length

  • Our A06 reference rate for removing kitchen cabinets or bathroom vanities is HK$170 per linear foot.
  • Measure base, wall and corner cabinets separately, then confirm the lengths used in the quotation.
  1. A06 cabinet removal labour and the specified workTotal cabinet length × HK$170HK$1,360

Indicative cabinet removal subtotalHK$1,360

This subtotal covers cabinet removal only. Confirm debris handling, disposal and subsequent wall repairs separately in the written quotation, based on volume and access. [1]

HOW WE HELP

How can we help you

WhatsApp free consultation

Send the on-site photos, unit area and scope of what you want to do to WhatsApp 5243 7747 (https://wa.me/85252437747). Designers and masters with more than 15 years of renovation experience will share the plan with you for free. They will explain clearly what can be done and what needs to be checked first.

Limited-time free on-site measurement and professional advice

For work that needs an on-site assessment, our tradesperson can meet you to measure, inspect and explain the proposed work. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

Check the plans first and don’t dismantle them randomly

Before demolishing walls, check the plans approved by the Buildings Department. Structural walls, beams, and columns must not be demolished. If you have any questions, ask professionals for judgment.

Accept all major and minor projects

You can do everything from demolishing one or two cabinets, a piece of gypsum board wall, a toilet, to demolishing the whole house; if there is little waste, you can dismantle it in bags.

Legal clearance and completion clearance

The quote sets out which waste removal is included and which items need a separate price. Collection by the truckload (A11) includes carrying waste downstairs, transport, lawful disposal and government disposal fees. We sweep the work area when the job is complete.

AI quotation assistant with 117 public prices

Our 117 list rates are available through /calculator and /ai-quote for a preliminary budget. The final price is the written quotation after site measurement.

KEY NUMBERS

Strip-out work: figures to check before work begins

company public price

HK$30/ sq. ft.

Remove wall or floor tiles down to the cement bed

The company publishes a reference unit price; if you want to cut to the concrete, an additional HK$10/sq.

[1]

company public price

HK$9,950/ room

Dismantle and clear out a kitchen or toilet room (A09/A10)

The company's public price: removal of wall and floor tiles, cabinets or sanitary ware, including transportation; the open kitchen will be adjusted according to the actual scope.

[1]

government/official

HK$400,000

Penalties for unauthorized construction projects

Under the Buildings Ordinance, those who carry out construction works without approval are liable upon conviction to a fine of HK$400,000 and two years' imprisonment.

[8]

government/official

HK$200/metric tons

Landfill disposal fee

The government disposal fee for transporting mixed construction waste to landfills; transporting inert materials to public fill reception facilities is HK$71/metric ton.

[7]

government/official

HK$71/175/200/metric tons

Construction waste third-level disposal charges

The Environmental Protection Department charges: HK$71 per ton for fully inert waste sent to public fill reception facilities; HK$175 per ton for waste that is more than 50% inert and sent to screening and classification facilities; HK$200 per ton for waste that is less than 50% inert and sent to landfills. Minimum 1 metric ton per vehicle.

[7]

government/official

4,694Metric tons/day

Construction waste sent to landfills in 2024

EPD waste statistics for 2024: Hong Kong generated 50,505 tonnes of construction waste daily on average and reused over 90%. Approximately 4,694 tonnes per day went to landfill, up around 6% from 4,428 tonnes in 2023.

[6][5]

government/official

three quarters

Consumer Council mystery shopper: You can tear down walls just by looking at the floor plan

In 2024, the Consumer Council researched and requested quotations from 59 home renovation companies, and three-quarters recommended that they only review the floor plan of the unit and demolish the wall without further verification of the nature of the wall.

[2]

government/official

7,112images

Buildings Department issues unauthorized building removal order in 2025

The Buildings Department issued 7,112 clearance orders under Section 24 of the Buildings Ordinance in 2025 (8,074 in 2024), and removed 29,109 unauthorized structures through enforcement in the same year.

[4]

CHARTS

Strip-out work figures at a glance

Construction waste sent to landfills (average daily)(Unit:Metric tons/day)
2023
4,428
2024
4,694

The EPD attributed the 2023 increase partly to more businesses closing or opening and the resulting minor renovation and demolition waste. Total construction waste averaged 45,560 tonnes daily in 2023 and 50,505 in 2024. Over 90% was reused. [5][6]

Construction waste disposal charges (per metric ton)(Unit:HK$)
Public fill reception facility (fully inert)
71
Screening and sorting facilities (more than 50% inert)
175
Landfill (not more than 50% inert)
200

EPD Construction Waste Disposal Charging Scheme; minimum 1 tonne per vehicle. The better the classification, the lower the disposal fee. [7]

FULL GUIDE

Strip-out work: stages and points to check

How do residential strip-out and lease-end reinstatement quotations differ?

It is easy to overlook the edges of a partial strip-out. Removing kitchen cabinets exposes the old wall and worktop joints. Include the adjacent tiles, flooring and door frames you want to keep in your photos, so protection, removal and finishing can be priced separately.

Agree the strip-out room by room. Mark window sills, the entrance door, plumbing and electrical points to retain on the floor plan. State whether to remove floor finishes alone or also the substrate. Agree the handover condition with the following tiling, waterproofing or electrical trade before removal starts.

Before a shop or office lease ends, check the lease attachments, landlord’s reinstatement list and management’s permitted working hours. List ceiling or partition removal, floor repairs, night-time transport and key handover separately, with the deadlines.

What is the demolition project package? Common items have the same unit price

Our published strip-out rates are A01 removal of wall or floor tiles to the cement base at HK$30 per sq ft, plus HK$10 per sq ft to reach concrete. A02 removal of floor tiles and screed to concrete is HK$52 per sq ft. A03 stripping painted walls to concrete is HK$18 per sq ft. A04 removal of non-loadbearing brick partitions is HK$69 per sq ft (minimum HK$2,800). A05 plasterboard partition removal is HK$34 per sq ft (minimum HK$1,850).

A06 kitchen cabinet or bathroom vanity removal is HK$170 per linear foot. A07 built-in wardrobe or tall cabinet removal is HK$61 per sq ft of front face (minimum HK$740 per item). A08 timber floor removal is HK$22 per sq ft. A09 or A10 strip-out and clearance of one kitchen or bathroom is HK$9,950 including handling. A11 debris collection is HK$4,200 per truckload including carrying downstairs, transport, lawful disposal and government charges. Small jobs can be priced by the bag, with a HK$2,000 minimum.

[1]

Just dismantle one or two cabinets: small demolition point plan

You can book demolition without a whole-flat renovation. Common small jobs include one old wardrobe, kitchen cabinets, a plasterboard partition or timber flooring. Built-in wardrobes are measured by front face (height × width) at HK$61 per sq ft, minimum HK$740 each. Kitchen cabinet removal is HK$170 per linear ft of cabinet run and includes making the exposed service points safe.

Small amounts of debris can be collected in bags, subject to a HK$2,000 minimum, without booking a full truck. We tidy the wall edges after removal. Rendering, painting or new fitted cabinets can follow if required.

[1]

Preparations before dismantling

1. Check approved plans through the Building Records Access and Viewing On-line system to identify structural elements. 2. Confirm management rules on hours, noise, haulage, deposits and worker registration. 3. Protect lifts, lobby and corridors. 4. Have qualified personnel isolate affected circuits and pipes before demolition.

Fifth, take photos to record the current situation: including the unit and public areas, so there will be evidence for future disputes. Sixth, clarify with the owner what is to be removed and what is to be retained: for example, retaining the window sill, retaining some floor tiles, retaining the air-conditioning unit, etc. It is best to put stickers on the site to mark it.

[9]

Structural walls, non-structural walls: points?

Walls at the entrance of residential units can be roughly divided into three categories: structural walls (load-bearing walls, shear walls), non-structural brick partition walls, and lightweight gypsum board partition walls. Structural walls, beams, and columns are building structures and cannot be dismantled or opened by the renovation company. Any modification must appoint an authorized person and a registered structural engineer, and obtain approval from the Buildings Department. The Buildings Department pointed out that carrying out construction works without approval will result in a fine of HK$400,000 and two years' imprisonment upon conviction.

Non-structural walls cannot necessarily be demolished at will. Some walls are fire-resistant partitions or are related to the fire protection design of the building; their removal may affect escape routes. Therefore, before demolishing a wall, we will always check the unit's approved plans through the Buildings Department's Building Plans website and mark the structural components. If the plans are inconsistent with the site, or if we have any questions, we should leave it to professionals for judgment. It is unreliable to judge simply by knocking on the wall and listening to the sound or looking at the thickness of the wall.

[8][9]

Standard demolition procedures

Demolition is generally done from top to bottom and from the inside out: first remove lamps, false ceilings, cabinets and sanitary ware, then remove wall tiles and walls, and finally remove the floor. In this way, the fallen debris can be prevented from destroying the already processed parts, and it can also be easily sorted. When drilling, the depth must be controlled. The drilling on the platform should be stopped until concrete is seen. It is not easy to drill through the floor. The caisson position or deep drilling must be evaluated separately.

Separate inert debris such as brick, concrete and cement from mixed waste such as wood, plastic, metal and packaging. Sorting supports recycling and can reduce disposal charges. Clear passages every day and keep corridors and escape stairs free of debris.

Hidden Thread: The Biggest Hidden Risk in Clearance

Concealed pipes and wiring in older buildings may differ from the drawings. Before work, the relevant trades verify water and electrical services and what must be isolated. If an unidentified service is exposed, work stops in that area until a qualified person identifies it and advises how to proceed.

If stripping reveals old or corroded services or unsuitable routes, we photograph them, explain any proposed replacement and quote in writing. Work proceeds after your approval. Avoid concealing a known issue to keep to the original schedule.

Is it legal to dispose of a piece of clay?

Hong Kong’s EPD scheme requires a billing account before using construction waste disposal facilities. For contracts below HK$1 million, the owner or contractor can open an account or use a contractor with a valid account. Disposal fees depend on the waste: wholly inert material costs HK$71 per tonne at public fill facilities, waste with over 50% inert material costs HK$175 at sorting facilities, and waste with 50% or less inert material costs HK$200 at landfills. The minimum charge is one tonne per vehicle.

Ask whether rubble removal includes carrying downstairs, a truck and government disposal charges. Our A11 rate of HK$4,200 per truckload includes carrying, transport, lawful disposal and government fees. A09/A10 strip-out of a whole kitchen or bathroom already includes carrying. Illegal dumping can leave owners exposed, so check disposal arrangements when comparing prices.

[7][1]

Click here to see the price quote from the demolition master

A demolition quote should state what is removed, depth to the cement bed or concrete, area or item count, carrying downstairs, trucks, government disposal fees, protection and cleaning. The Consumer Council recommends quantities and unit prices for each task. Only 38% of the preliminary quotes it assessed listed all items.

The most important question is: Do you check the plans before demolishing the wall? If the other party says, "You'll know by looking at the floor plan" or "You'll know by knocking on the button," be careful. We will first check the approved plans and refer any questions to professionals for judgment.

[2][3]

Acceptance at the completion point of demolition?

At handover, all specified items should be removed, with retained items undamaged. Floors and walls should expose the agreed cement bed or concrete. Services should be made safe and labelled, with no penetration of the slab or damage to structural elements. Remove the debris and sweep the site.

Get disposal records and photos after strip-out, including any concealed pipes or cracks discovered. They will help the masonry, plumbing and electrical teams that follow.

  • Complete photos before and after disassembly
  • Services isolated, ends secured and labelled
  • No structural components were damaged and no holes were drilled through the floor slabs.
  • Rubble removed and disposal record provided
  • List items that have been demolished, not yet demolished and items to be processed

After demolition: connecting to follow-up projects

After strip-out, inspect for spalled concrete, rusting reinforcement, ageing pipes and slab cracks. Deal with defects before masonry and waterproofing. In stripped bathrooms and kitchens, renew the waterproofing and flood-test before tiling.

Our designers coordinate demolition, masonry, plumbing, electrical work, painting and fitted furniture, with a clear point of responsibility across trades.

Common mistakes

Common mistakes include removing a structural or fire-resisting wall without checking plans, breaking out finishes before isolating water and power, cutting into slab reinforcement, and obstructing rear stairs or dumping debris. Other problems include starting without notifying management, failing to photograph the stripped-out site and sending unsorted construction waste to landfill.

How much renovation and demolition waste is produced in Hong Kong every day?

Strip-out typically starts a renovation and produces much of its waste. In 2024, the EPD recorded an average 50,505 tonnes of construction waste generated daily. More than 90% was reused, while about 4,694 tonnes per day went to landfill, around 6% above 4,428 tonnes in 2023. The EPD linked the 2023 increase to more businesses opening or closing, leading to additional minor renovation and demolition work.

The consequences of opening the wrong things can be serious. In 2024, the Consumer Council researched and requested quotations from 59 home renovation companies. Three-quarters said they could demolish walls only after looking at the floor plan of the unit without further verification of the nature of the wall. The Buildings Department issued 7,112 unauthorized building removal orders in 2025, and in the same year, 29,109 unauthorized building structures were removed through law enforcement. It is much better to check before demolition than to repair the problem after demolition.

[6][5][2][4]

COMPARE

Compare options for strip-out work

How can I compare strip-out quotations against the same handover requirements?

EngineeringWhat to remove and what to retainCheck each item in the written quotation
Remove kitchen cabinets or a bathroom vanityBase cabinets, wall cabinets, worktops and wall tiles to retainHorizontal length in linear feet, safe termination of services, handling and edge finishing
Remove old finishes throughout the flatMark the flooring, partitions, doors and equipment to retain in each room.Removal depth, protection, truckloads and handover to the next trade
Shop or office lease-end handoverCheck each item against the original condition and the landlord’s reinstatement list.Itemised removal and reinstatement, goods-lift slots, final collection and key handover date

Circle the items to retain in a photo and attach it to the quotation as a reference before work and at handover. [1][3]

Can side walls be removed?

Wall typeCan the renovation company directly dismantle it?What to doReference unit price
Gypsum board partition walls and joistsGenerally OKFirst confirm the wires and pipes in the wallHK$34/sq. ft. (minimum HK$1,850)
Non-structural brick partition wallOK after verificationCheck the approved drawings to confirm non-structural and non-fire-resistant wallsHK$69/sq. ft. (minimum HK$2,800)
Structural wall/beam/columnNoAppoint an Authorized Person and Registered Structural Engineer, and obtain approval from the Buildings DepartmentNot applicable

Check the structural layout on the flat's approved plans through the Buildings Department's BRAVO online service. If the plans differ from the site conditions, seek a professional assessment. [8][9][1]

How is construction waste sorted, where does it go and what does disposal cost?

Waste natureExampleGo to the edgegovernment disposal fee
completely inertBrick, concrete, sand (no mixture)public fill reception facilityHK$71/metric ton
More than 50% inertMainly made of masonry, with a small amount of wood or glueFilter sorting facilitiesHK$175/metric ton
Not more than 50% inertCabinets, wooden floors, mixed materialslandfillHK$200/metric ton

Each vehicle is based on a minimum of 1 metric ton; there are additional charges for waste transfer facilities on outlying islands. The clearer the classification, the lower the disposal fee. [7]

List of public prices for company liquidation

No.ItemUnit pricePay attention to
A01Remove wall or floor tiles down to the cement bedHK$30 per sq ftAn additional HK$10/sq.ft. will be charged for digging until concrete is visible.
A02Remove the platform and dig out the floor tiles until you see the concreteHK$52 per sq ftDeep chisel and caisson position are discussed separately
A04Remove a non-loadbearing brick wallHK$69/square foot (minimum HK$2,800)Non-structural walls must be identified first
A06Remove kitchen or bathroom cabinetsHK$170 per linear ftMeasured according to the horizontal length of the cabinet body
A07Remove built-in wardrobes or tall cabinetsHK$61/square foot (minimum HK$740 per item)By front area
A09/A10Demolish and clear out a kitchen or toilet roomHK$9,950 per roomAlready moved
A11Rubble removalHK$4,200 per truckload. Bagged collection has a HK$2,000 minimum charge.Includes transportation and government disposal fees

Prices come from the company's 117 public prices; the final quotation is subject to written quotation after on-site measurement. [1]

SITE SOP

Strip-out work: work standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Our demolition construction process

  1. 1. Check the approved plansshutdown checkpoint

    Check the unit's approved plans through Bailou.com to mark structural walls, beams, and columns; if you have any questions, refer them to professionals.

  2. 2. Mark the removal range on siteshutdown checkpoint

    Confirm with the owner item by item what will be demolished and what will be retained, on-site stickers will be posted, and photos will be taken to record the current situation.

  3. 3. Management and protection

    Confirm construction time, lift protection, and transportation routes.

  4. 4. Isolate water and electricity

    Have qualified persons isolate relevant circuits and water pipes.

  5. 5. Demolition from top to bottom

    Remove lamps, ceilings, cabinets, and sanitary ware first, then walls, and finally the floor; control the depth of drilling.

  6. 6. Sort into bags

    Separate inert and mixed waste, and clean the channels daily.

  7. 7. Clearance and clearance

    Dispose of debris lawfully and keep collection records. Sweep the site and hand over photos after demolition.

Acceptance Checklist 0/4

[8][9][7]

DELIVERABLES

Quotation and handover documents

Removal range mark

Before starting work, confirm with you item by item what should be removed and what should be left, and take photos to record it.

Photos of the current condition after demolition

At the end of strip-out, provide photos of the substrate, pipe and cable routes and any cracks for the masonry, plumbing and electrical teams.

Clearance and follow-on repairs checklist

Check removals, retained items and debris clearance against the written scope. Record exposed connections, outstanding repairs and requirements for the next trade.

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Confirm the current status of the unit and demolition projects
  • Check the construction and transportation arrangements of the management office
  • Assess the protection of retained furniture, floors and public areas
  • Assessment of necessary isolation, approval and safety measures by a competent person

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Do you already have floor plans or past project records?

  2. 02

    Are there any suspected asbestos-containing materials or structural changes?

  3. 03

    Are removal, disposal and protection of public areas included?

FAQ

Frequently asked questions

How can I ask for a strip-out quotation before I have measurements?

WhatsApp us what you want to remove and retain. Send a wide shot, then close-ups of joints or access routes if available. The district and measurements can follow later. Our team confirms the scope, checks the site and issues a written quotation.

Is stripping a shop empty enough for lease-end handover?

Check the lease and the landlord’s reinstatement list first. The premises may require you to retain specified equipment, make good walls, repaint or repair floors before returning the keys. Send us the list and current photos so we can itemise strip-out, reinstatement and clearance.

Do you know anything about the border system wall?

Approved plans can be checked on the Buildings Department's Building Plans website; if in doubt, the judgment should be made by an authorized person or a registered structural engineer, and should not be based solely on knocking sounds.

How are debris removal charges calculated?

Our A11 rubble collection costs HK$4,200 per truckload, including carrying the waste downstairs, transport, lawful disposal and government disposal fees. We can quote small loads by the bag, with a minimum charge of HK$2,000. Whole-kitchen (A09) and whole-bathroom (A10) strip-outs already include removal. Check the scope so the same waste is counted only once.

Even if you dismantle a wardrobe?

Yes. Removing a built-in wardrobe costs HK$61 per sq ft of front face, subject to a HK$740 minimum per item. Small quantities of debris can be collected in bags, with a HK$2,000 minimum charge.

How much does it cost to dismantle a toilet?

A10 Demolition and removal of a toilet costs HK$9,950, including removal of wall and floor tiles, sanitary ware, bathroom cabinets, and removal. If you want to redo waterproofing after disassembly, you can consider C05 bathroom with disassembly and redo waterproofing for HK$13,000.

Do I need to notify the management office for demolition?

want. Most buildings have renovation time, noise and handling regulations, and some require workers to be registered and deposits paid. We will confirm with the management office before starting work.

Can I dispose of construction waste myself?

Before using government waste disposal facilities, you must open a payment account and use appropriate vehicles for transportation; dumping is illegal. It is generally more practical to let the contractor handle it on your behalf.

What if worn concealed pipes are discovered after demolition?

We will take photos to notify you immediately, suggest treatment methods, and issue a written quotation first. You must confirm that you do it first, and we will not wait quietly.

Will the demolition be noisy?

There will definitely be noise when digging. We will carry out construction according to the time specified by the management office and notify the neighbors in advance.

Will the trash be removed after demolition?

We sweep the work area and carry out basic cleaning at the end of the job. Your written quote sets out which waste we will carry downstairs, take away and dispose of. Our cleaning partner can arrange a separate deep clean if needed.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Strip-out work carries no warranty. The written agreement sets the scope, protection and clearance arrangements.

Send photos on WhatsApp for a free demolition estimate Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-01
  2. Official sourceConsumer Council proposes 4 measures to strengthen regulation of the home renovation industry (21 February 2024) · consumer council· Accessed 2026-11-01
  3. Official sourceThe renovation quotation should be detailed and teach you one by one in the 12 major areas. · consumer council· Accessed 2026-11-01
  4. Official sourceReply from the Expenditure Estimate Controller for 2026-27 (DEVB(PL)156, etc., age distribution of private buildings) · Buildings Department/Development Bureau· Accessed 2026-11-01
  5. Official sourceEPD release of 2023 waste statistics, 19 December 2024 · Environmental Protection Department (Hong Kong Government Press Release)· Accessed 2026-11-01
  6. Official sourceEPD release of 2024 waste statistics, 22 December 2025 · Environmental Protection Department (Hong Kong Government Press Release)· Accessed 2026-11-01
  7. Official sourceConstruction Waste Disposal Charging Scheme · Environmental Protection Department· Accessed 2026-11-01
  8. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-01
  9. Official sourceBailoutu.com — Online building records · Buildings Department· Accessed 2026-11-01

Why talk to HK Create Design?

Understand your Strip-out work before you decide.

Start with the current condition

Identify what to remove, what to retain and how to protect common access routes. Agree carrying, clearance and handover arrangements.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗