Asbestos cement sheet removal and material testing reports

For a quotation or help coordinating the project, see ourasbestos cement sheet removal servicefor details of the testing included, the registered contractor and subsequent removal of unauthorised building works.

02

Who handles the asbestos, and whose registration applies?

HK Create Design coordinates the work and keeps you informed. Our EPD-registered asbestos contractor carries out the asbestos work, with a registered consultant, supervisor and laboratory as required. Each role has its own registration requirements. [2][3]

The formal quotation identifies the contractor, responsibilities and documents so you can check the EPD register. The asbestos registration belongs to the partner contractor. HK Create Design itself is the project coordinator.

  • Check the actual contractor's name and current registration.
  • Confirm who handles supervision, laboratory testing and waste collection.
  • Agree who signs off the handover from asbestos work to general demolition.

03

Which laboratory report does the service include?

We arrange a laboratory report on the material's asbestos content. The quote identifies the sampling arrangements, number and location of samples, and laboratory. If you have an existing report, we can check whether it covers the proposed works.

Material test results, an asbestos investigation report, an asbestos abatement plan and air-monitoring records during or after work serve different purposes. A professional should confirm whether any specific reporting exemption applies to low-risk material. A laboratory report is not government certification of the completed work. [2]

04

Work area segregation, decontamination and monitoring depend on the site plan

The site plan specifies how the work area will be separated or enclosed, what decontamination facilities are needed and how air will be monitored. The registered professionals responsible select the controls according to site risks and the applicable codes. Enclosure requirements can differ between jobs. [2]

Before work begins, coordinate separation from residents, other trades and transport routes. The responsible professionals confirm handover conditions and when other trades may enter.

05

Complete the asbestos work before demolishing unauthorised structures

The team first checks the suspect materials, documents and notification requirements, then arranges asbestos work and compliant waste disposal. Other construction or demolition follows once the required asbestos investigation and abatement procedures are complete. [4]

Allow at least 28 days for written notice to the EPD before asbestos cement sheet removal starts. An exemption from a particular report does not waive the contractor registration or notification requirement. The start date also depends on the site and other applicable procedures. [1]

For subsequent demolition, check Buildings Department procedures, structural requirements and contractor qualifications for the type of work. Completing asbestos removal does not cancel a removal order or approve subsequent works.

  • Check site conditions and documents → Arrange testing or the required investigation
  • Confirm the scope → Give notice and schedule work
  • Registered contractor handles the asbestos → Arrange compliant waste collection
  • Confirm completion conditions → Proceed to demolition and making good

06

Compare asbestos roof removal prices alongside documentation and later demolition

Compare the sheet area, condition, coverings, access and working position, then the isolation, scaffolding, professional services, testing and waste disposal included. List metal supports, wall repairs and removal of unauthorised works separately. [5]

We can coordinate one quotation that itemises material analysis, asbestos work and subsequent demolition. A site check is needed before offering a fixed rate per square foot so that required procedures are included.

07

Coordinating documents and handover between stages

We coordinate testing, asbestos work and general demolition for you. We organise preliminary information, contractors, timings and handovers, with clear responsibilities at each stage.

Asbestos waste is handled as chemical waste, kept separate from ordinary construction debris and collected by a licensed chemical waste collector. The quotation specifies the handover documents and collection records for the agreed arrangements. [1]

  • Identify the registered contractor before confirming the work.
  • Specify the included material analysis report in the quotation.
  • Agree a staged handover between asbestos work and general demolition.
  • Compile documents and waste collection records under the applicable requirements.

FAQ

Asbestos removalFrequently asked questions

01Is HK Create Design a government-registered asbestos contractor?

HK Create Design coordinates the project. Our partner, an EPD-registered asbestos contractor, carries out the asbestos work. The quotation names the contractor so you can verify their registration with the EPD. [3]

02Does asbestos roofing removal include a laboratory report?

We arrange a laboratory report on the asbestos content of materials. The quotation lists the samples, locations and laboratory. Investigation and abatement documents and air monitoring during and after work are listed separately according to what applies. These documents serve different purposes.

03Can asbestos roof sheets be removed on the day I enquire?

Written notice must reach the EPD at least 28 days before removal. We can discuss the situation immediately, but the site, documents and other procedures must be checked before confirming a start date. [1]

04Does every project require a fully sealed negative-pressure enclosure?

The registered professional selects isolation or enclosure measures, decontamination and monitoring based on the material, site risks and applicable codes. The same controls will not suit every asbestos cement sheet project. [2]

05Can you also demolish the unauthorised structure after the asbestos roofing is removed?

Yes. First, complete the required asbestos investigation, abatement and handover. The procedures and qualifications for subsequent demolition must be checked separately. A material test alone does not clear the site for demolition. [4]

06Can you identify asbestos in a photo? Should I take a sample?

A photograph cannot confirm a material’s composition. Take photographs only from a safe position and leave investigation, sampling and testing to the appropriate professionals. [1]