01

What does a demolition job involve beyond the strip-out?

Demolition involves more than simply taking something out.Demolition is specialist work that requires planning, judgement and risk controland is the first critical stage in the renovation.

Residential strip-out in Hong Kong commonly includes the following:

  • Wall demolition (Non-load-bearing walls only)
  • Remove floor and wall tiles
  • Remove kitchen cabinets, wardrobes and floor platforms
  • Remove existing doors, windows and aluminium frames
  • Construction waste removal (Disposal must be lawful)

Demolition requires a clearly defined scope.
A professional strip-out requires Assess, dismantle, then clear the sitebefore starting any work.

02

What to assess before demolition

Before work, a contractor normally checks:

  • Whether the wall is structural or non-structural
  • Pipe routes, including mains and branches
  • Whether the distribution board or wiring runs close to the wall
  • Floor slab thickness and condition
  • New build, older private flat, public rental flat or walk-up

If this step is missed, demolition can lead to Removing the wrong item, extra work and potential safety issues.

03

Common demolition work in Hong Kong homes and the associated risks

Demolition itemCan it be removed without restriction?Potential risksCommon consequences
Non-structural wall✔ Possible, subject to confirmationMisidentifying the type of wallOrdered to stop work
Structural wall or shear wall✖ Not permittedAffects the building structureBuildings Department follow-up
Floor and wall tiles✔ PermittedVibration cracks in adjoining walls and water seepage into the flat belowComplaints and claims
Old kitchen cabinets and wardrobes✔ PermittedPulling out an item also damages the pipeworkImmediate repair needed
Aluminium windows and door frames⚠️ Check carefullyAffects external wall safetyIntervention by the management office
Construction debris removalRequiredIllegal disposalOwner responsible

Points to remember:
Even work that may legally be demolished can cause problems if removed incorrectly.

Plan what can safely be removed

For any work involving the following areas, always Do not alter without authorisation:

  • Structural walls, beams and columns
  • Mains and shared drainage
  • Main distribution board and communal wiring
  • External walls or elements affecting the building's appearance

The most serious consequences of removing the wrong element include:

  • Stop work immediately
  • Fines or reinstatement work
  • Delays the entire renovation
  • Significant increase in the whole-flat renovation cost

04

Why demolition requires an experienced team

An error in demolitionA small extra payment cannot remedy it.and can affect all subsequent masonry, plumbing and electrical work as well as structural safety.

The appropriate approach is:
👉 Inspect, plan, strip out, then build

05

2026 demolition price list from HK Create Design

These are indicative 2026 rates for 11 demolition items. A dash means no fixed minimum is listed here. Small quantities may still have a minimum charge. Depth, carrying routes, floor, lift access and waste removal affect the total. Use the written quotation issued after site measurement.

No.Demolition itemUnit of measureReference unit priceMinimum charge
A01Remove wall or floor tilessq ftHK$30—
A02Break out floor tiles and screed to expose the concretesq ftHK$52—
A03Strip painted walls back to concretesq ftHK$18—
A04Remove a non-loadbearing brick wallsq ftHK$69HK$2,800
A05Remove a plasterboard partitionsq ftHK$34HK$1,850
A06Remove kitchen or bathroom cabinetslinear ftHK$170—
A07Remove built-in wardrobes or tall cabinetssq ftHK$61HK$740
A08Remove timber flooringsq ftHK$22—
A09Strip out and clear one kitchenroomHK$9,950—
A10Strip out and clear one bathroomroomHK$9,950—
A11Remove construction debris (per truckload)truckloadHK$4,200—

Worked example: Item A10 lists HK$9,950 to strip out one bathroom, including haulage. Waterproofing, tiling and sanitaryware installation cost extra. Removing eight linear feet of kitchen cabinets alone under item A06 comes to 8 × HK$170 = HK$1,360. Check the arrangements for protection and waste removal separately.A11 at HK$4,200 per truckload is not an automatic addition to each demolition quote. If carrying or removal is already included for the same debris, do not charge for it twice.Availablerenovation calculatorto organise the work. Confirm on site whether to remove the tiles alone or strip back to the concrete.Get a free demolition quote for the tile removal depth and waste collection you need.

06

How demolition is priced in 2026

A single lump-sum price rarely explains the full cost of demolition.
In Hong Kong, demolition quotations are normally made up of separate items added togetherand prices can vary widely with conditions in each flat.

The main factors affecting a demolition quote are:

  • Flat area in sq ftlarger areas take more time and labour to strip out
  • Scope of demolitionremoving only floor tiles requires different labour and generates a different volume of debris from also removing walls, cabinets and a thick bedding layer
  • Is there heavy construction waste?such as concrete walls or thick render
  • Access and carrying restrictionswhether a lift is available and whether materials may only be moved at specified times
  • Disposal methodcharges vary considerably between authorised landfills and transfer stations

A professional Demolition quotationshould list the items individually. A single lump-sum entry for demolition leaves the scope unclear.

07

Indicative demolition prices in Hong Kong for 2026

These common pricing approaches explain the quotation structure. Actual prices depend on site conditions.
Demolition itemCommon pricing methodImpact on priceRemarks
Remove floor or wall tilesPer square footMediumTile and adhesive-bed thickness can make a substantial difference.
Remove a non-load-bearing wallPer wallHighRemoving a concrete wall differs substantially from removing a lightweight partition
Remove old kitchen cabinetsper setLow to mediumDoes removal include the worktop and splashback?
Remove wardrobes or raised platformsper setLow to mediumComplexity of the existing construction
Remove aluminium windows or door framesPer itemMediumHigh-floor flats require special arrangements
Construction waste removalNumber of truckloads or weightHighMost likely to incur extra charges

08

Why does construction waste removal run over budget?

Many demolition overruns arise from Waste removal fee item.

Type of wasteTypical sourceWaste removal cost
Lightweight wasteTimber boards and cabinet carcassesLow
Mixed wasteBrick, timber and concreteMedium
Heavy concrete debrisWall demolition and thick floor bedsHigh
Wet wasteOld render and cement-containing debrisHigh

If the number of truckloads or the weight included is unspecified, additional charges are likely.

09

Common problems with unusually low demolition quotes

Some demolition quotes look unusually cheap. Common explanations include:

  • Excluded from the quotation Construction waste haulage
  • Only basic demolition included, with extras charged separately
  • Excluded Costs arising from building management's restrictions on moving materials
  • Site left uncleared after demolition

The usual outcome is
An apparent saving can push up the total renovation cost.

10

What makes a reasonable demolition price?

A sound demolition quotation should include:

  • State exactly what will be removed under each item
  • Specify whether haulage and disposal are included
  • The quote follows an on-site assessment
  • Identify the circumstances that could lead to extra charges

A well-managed strip-out affects the renovation schedule and directly determines Accuracy and reliability of the whole-flat renovation price.

11

Common pitfalls in demolition quotations

Many problems on demolition jobs arise because Quotation too vague.
These are among the most frequent complaints homeowners raise about demolition work.

Pitfall 1: The quote lists a single demolition item

Some demolition quotations contain just one line:

“Demolition, lump sum”

The quote may appear to cover everything, but Nothing is clearly specified.

Items often left out include

  • Which walls will be removed, and have structural and non-structural walls been distinguished?
  • How far does removal extend: finishes only, or render as well?
  • Does the price cover dismantling the cabinets only, or dismantling and taking them away?
  • Is construction waste removal included?
  • Is the site left in the agreed condition and loose rubble swept up after demolition?

What one demolition line item can actually cover

Suggested wordingActual risk
Demolition works, lump sumAlmost every item can be charged as an extra
Removing wallsWaste removal may cost extra
Lifting floor tilesRemoving the underlying layer may cost extra
Dismantling and removal from siteRelatively clear

Once work starts, it is hard to challenge a contractor who says an item was excluded if the quote left it unclear.

Pitfall 2: A deliberately low quote followed by extra charges once work starts

This is The most common and hardest to avoid demolition pitfalls.

Typical explanations include:

– “The wall is thicker than expected, so there will be an extra charge.”
– “There are actually two layers of tiles.”
– “There is more debris than expected.”
– “This turns out to be a concrete wall.”

Common extras after a low demolition estimate

Reason for an extra chargeFrequency
Wall thicknessHigh
Bedding beneath floor tilesHigh
Number of truckloads of construction wasteVery high
Access and carrying restrictionsMedium

The issue is:
Once work starts, stopping may be costly, leaving the owner little choice but to pay.

The appropriate approach is:
Set out assumptions and potential extra charges before demolition starts.

Pitfall 3: Illegal disposal can leave the owner facing the consequences

To keep the quoted price down, some unscrupulous demolition crews will Waste removal fee where details may be manipulated:

  • Illegal dumping of construction debris at night
  • Using an unauthorised waste transfer site
  • No evidence of lawful disposal provided

A small saving upfront can leave the owner carrying all the risk.

Potential consequences of illegal disposal

Site conditionsWho is responsible
Complaint madeOwner
Summons issuedOwner
Follow-up action by the management officeOwner
Fines or clearance costsOwner

If construction debris is dumped illegally,The owner may also be held responsibleand if the contractor disappears, you are left to deal with it.

Pitfall 4: Leaving the site unprepared after demolition holds up the following trades

After some demolition jobs

  • Rubble left on the floor
  • Nails and steel bars left protruding from the wall
  • Sand and rubble blocking the drain

Outcome

The masonry team has to clear the site again
The renovation programme slips
Costs rise again

Consequences of leaving issues unresolved after demolition

Items affectedConsequences
Masonry and tilingAdditional labour required
WaterproofingReduced effectiveness
DurationDelay
Total renovation costIncrease

12

How to avoid unexpected extras in demolition quotations

What matters when appointing a demolition team is Clear scope, lawful disposal and predictable costs.

At a minimum, the owner should

  • Requested demolition work List each item
  • State whether waste removal is included
  • Ask about lawful disposal
  • Does the quote include basic cleaning after demolition?

A clearly scoped demolition quotation can help you avoid A mistake at the difficult first stage of the renovation.

13

Four serious problems that can arise during demolition

Demolition is the first stage, but mistakes can have serious consequences.
In practice,A single demolition mistake can derail the whole renovation and lead to legal problems.. Four of the most serious demolition risks follow.

1. Removing a structural wall can affect the entire building

Structural walls, beams, columns and shear walls are all Do not demolish without checking scope.
Common problems include:

  • Starting work before checking the original plans
  • Mistaking a thick wall for a non-load-bearing wall
  • Assuming a small flat has no structural walls

If the wrong element is removed:

The management office may order work to stop immediately
The Buildings Department may require testing and strengthening work
In serious cases, the owner may have to Reinstatement and structural strengthening

Consequences of removing a structural wall by mistake

ConsequencesSeverity
Stop work immediatelyHigh
Structural assessment feeHigh
Strengthening workVery high
Legal liabilityVery high

If this type of problem occurs,At this point the issue is structural safety..

2. Damaging shared pipework can lead to compensation claims

Some of the greatest demolition risks are hidden in Communal pipes concealed in the wall:

  • Shared drainage pipe
  • Water supply main
  • Vent pipe

If a pipe is broken:

  • Water immediately leaks into the flat below
  • Intervention by the management office
  • The owner is responsible for compensation and repairs

Consequences of damage to shared pipework

Items affectedConsequences
Flat belowWater stains and damage to finishes
Amount of compensationMedium to high
Project delayHigh
Credit recordAffected

Problems of this typeusually falls outside a standard demolition quotationmust all be borne by the owner.

3. A demolition error can hold up every trade that follows

Poor demolition work can have lasting effects on The entire renovation programme:

  • The masonry team cannot start until demolition is complete
  • An uncleared floor delays waterproofing
  • Unresolved drainage holds up plumbing and electrical work

How demolition problems affect the renovation programme

Work stageSeverity of impact
Masonry and tilingHigh
Plumbing and electrical workHigh
PaintingMedium
Installation workMedium

The end result is
Higher labour costs, a longer programme and poor coordination.

4. A cheap strip-out can send the renovation over budget

The immediate consequence when demolition goes wrong is

  • Repeated additional charges
  • Redoing completed work
  • Repairs to the structure or pipework

Choosing the cheapest demolition quote can increase A substantial overrun on a 2026 whole-flat renovation budget.

14

Why the lowest demolition price can be a false economy

A demolition mistake can have consequences beyond cost, including

  • Structural safety
  • Legal liability
  • Renovation schedule breaks down

A professional demolition team should
Remove the correct items completely and lawfully, leaving the site ready for the next trade.

15

How to avoid common strip-out problems

A professional demolition teamA quick, cheap estimate does not establish quality.because the team anticipates and resolves risks before work starts. The following practices are widely used in the trade to protect owners.

Inspect the site before pricing demolition

An immediate demolition price without a site inspection carries risks.
Professional practice includes:

  • Inspect wall thickness and construction on site
  • Check pipe routes, especially in older buildings
  • Estimate the waste volume and check the route out
  • Check lift access and management restrictions

How the risk changes with and without a site inspection

practiceRisk of extra charges
Quoting before inspecting the siteVery high
A quick look at photosHigh
Site inspection and measurementLow

A professional demolition team bases its quote on Inspect before quoting.

Itemise each demolition task in specific terms

A professional demolition quotation breaks down the work instead of giving a single lump sum.

  • Which wall is to be removed?
  • How many sq ft of wall or floor tiles?
  • Which cabinets are to be removed?
  • Does the price cover removal of doors and windows, including aluminium windows?

Itemised and lump-sum quotations compared

Pricing methodRisk of unexpected problems
Itemise separatelyLow
Broad descriptionHigh
Quantities and locations unspecifiedVery high

A clear demolition quote reduces disputes later.

Specify lawful waste removal in writing to protect the owner

There is more to a demolition job than dismantling.Haulage and disposal is equally important.
A professional quotation should clearly state:

  • Includes construction waste removal
  • Use an authorised disposal facility
  • Disposal charges included

Comparing authorised and unauthorised waste removal

ItemAuthorised waste removalUnlawful waste removal
CostNormalApparently lower
Legal risksNoneVery high
Owner's responsibilityNoneAll
ConsequencesPeace of mindFines or enforcement action

If something goes wrong,The owner may also be held responsiblealso concerns parties beyond the demolition contractor.

Consult structural drawings to avoid removing the wrong element

Before demolition, the contractor should:

  • Refer to the original approved building plans
  • Identify structural walls
  • Avoid mains and communal pipes

Check the layout of structural walls carefully, especially in older buildings, public rental housing and Home Ownership Scheme flats. It can differ markedly from that in a private development.

Demolition decisions require site information as well as experience and judgement.

An experienced renovation company coordinates demolition and follow-on work

When one contractor handles demolition and another handles the rest of the renovation, common problems include

  • Contractors blame one another
  • No one accepts the cost of rectification
  • Disruption between trades

Single-point coordination or separate subcontractors

practicerisk
Renovation company coordinating all tradesLow
Demolition contracted out separatelyHigh
Work split between several subcontractorsVery high

Demolition is part of the overall Renovation stages first stage and must be coordinated with subsequent masonry, plumbing and electrical work.

16

How careful demolition helps later trades

The following steps help prevent demolition disputes

  • Pre-work inspection
  • A clear quotation
  • Lawful process
  • An experienced project coordinator

A good strip-out helps the subsequent More predictable costs and completion dates, with lower risk.

17

How an orderly strip-out helps the following trades

As we enter Hong Kong's renovation market in 2026, demolition directly affects Safety, renovation cost and overall programme critical step.

A well-executed strip-out helps the masonry, plumbing, electrical, fitted furniture and painting teams work smoothly afterwards.
A demolition problem can bring every following trade to a halt, force changes and add costs.

How different approaches to demolition affect the whole renovation

Demolition approachRenovation risksRisk of going over budgetImpact on the programme
Professional assessment and itemised quotationLowLowAccurate
Pricing from experience aloneMediumMediumDelayed
Unplanned demolition without an itemised listHighHighSerious delay

If something goes wrong during demolition,Putting faults right afterwards usually costs more than doing the job properly at the outset..

Why does putting a problem right later cost more than getting it right at the start?

Demolition problems generally occur when

  • Discovering a wall should have been retained after it has been removed
  • Pipe defects discovered only when masonry starts
  • Dimensions found to be wrong only during furniture installation

Cost of putting mistakes right by stage of discovery

Stage at which the problem is discoveredCost of putting the problem right
Before demolitionMinimum
During masonry workMedium
After plumbing and electrical workHigh
Furniture already orderedVery high

The later a demolition problem is discovered,the greater the risk of renovation costs spiralling.

Before work starts, establish the following

  • The owner's own flat Actual demolition cost What is the approximate cost?
  • Which walls can be removed and which are structural?
  • After demolition How does demolition fit into the full programme, and when do masonry, plumbing and wiring follow?

Clarify the scope before starting so the risk is understood.

Professional advice

A reliable way to manage the work is to have An experienced renovation company Coordination

Inspect the site first
Then itemise the demolition work
Include lawful waste removal
Coordinate with the trades that follow

Later trades run smoothly when the strip-out is done properly,This reflects difficult experience on real sites..

2026 PRICE LIST

2026 demolition rates for selected items

A01Remove wall or floor tiles

HK$30/ft from

Remove the old tiles down to the cement bed, provide basic protection and bag the debris for temporary storage. Firmly bonded tiles or removal down to the concrete cost an extra HK$10 per sq ft.

A02Break out floor tiles and screed to expose the concrete

HK$52/ft from

Remove the tiles and cement screed to expose the concrete, then clear the rubble. Deep breaking-out and work in recessed slabs are quoted separately.

A04Remove a non-loadbearing brick wall

HK$69/ft from

Minimum charge: HK$2,800

Remove the partition and make good the junctions with the walls, floor and ceiling. Confirm that the wall is non-structural before starting and follow Buildings Department minor works requirements where applicable.

A06Remove kitchen or bathroom cabinets

HK$170per linear ft from

Remove base and wall cabinets and the worktop, securing service connections. Measure by horizontal cabinet length.

A10Strip out and clear one bathroom

HK$9,950/ room from

Strip out wall and floor tiles, sanitaryware and vanity cabinets, including carrying the debris out.

A11Remove construction debris (per truckload)

HK$4,200per truckload from

Includes carrying debris downstairs, trucking, lawful disposal and government disposal charges. Small jobs can be charged by the bag, with a minimum of HK$2,000. A09 and A10 already include carrying debris out. Any additional waste removal depends on the actual scope.

Rates are from our 2026 price list. Select only the items you need. A process already included in a package is charged once. We confirm final prices in writing after site measurement.Calculate each item

FAQ

Strip-out workFrequently asked questions

01How to read the demolition price list

Check three things: the unit (square foot, linear foot, room or truckload), any minimum charge and whether rubble removal is included. Item A04 for removing a non-loadbearing brick wall is HK$69 per sq ft with a HK$2,800 minimum. Rubble removal under A11 costs an additional HK$4,200 per truckload.

02How much does it cost to strip out one bathroom?

Our price list gives HK$9,950 under item A10 to strip out one bathroom and take away its debris. Subsequent waterproofing and tiling are priced separately.

03Do I need to submit plans to remove a wall?

First identify the wall type and check the fire safety requirements. Removing a non-structural wall inside a flat may be exempt from prior approval, but the work must still meet building and fire safety requirements. For structural walls, beams or columns, an Authorised Person and a Registered Structural Engineer must assess the proposal. Obtain the necessary approval and consent before work starts. Check the approved plans and consultBuildings Department guidance.

04How is rubble removal priced?

Company item A11 is HK$4,200 per truckload including carrying and government disposal charges. Small jobs may be charged by the bag, subject to an overall minimum of HK$2,000, not HK$2,000 per bag. A09 and A10 include carrying. Confirm what they cover and price additional debris separately.

05How long does demolition take?

Allow roughly 1 to 2 days for a kitchen or bathroom strip-out, or 3 to 7 days for a whole flat. The building's permitted breaking-out hours and debris handling affect the programme.

06Could demolition damage the flat below?

Control the depth when breaking out a floor to avoid penetrating the slab or damaging the ceiling and pipework below. We protect common areas before starting. For A02 we stop when the concrete surface is exposed.

07How are asbestos roofing sheets removed?

Suspected asbestos-containing material needs separate assessment and handling by a registered asbestos contractor. Do not remove it as ordinary rubble. SeeGuide to removing asbestos roofing sheets.

08Is there a charge for measuring up?

Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order.

09Does demolition work come with a warranty?

Demolition carries no warranty. The quotation sets out what it covers for removal, protection, handling, disposal and clearance. If masonry, tiling or waterproofing is also included, refer to the written warranty terms for each trade.

REFERENCES

References