How to compare a surface refresh with a complete rebuild

Two 500 sq ft flats can have very different scopes. Floor and wall work can largely be measured by area. A kitchen or bathroom rebuild, rewiring, repiping and cabinetry need pipe runs, electrical points, cabinet dimensions and materials counted separately. Mark each room on one plan as retain, remove, new or customer-supplied, then give every contractor the same plan.

The Consumer Council's 2024 study found that consumers have difficulty comparing quotes in different formats, and pointed out that incomplete quotes, insufficient protection, as well as delays, defects and non-repairs are important pain points; the study also recorded that one-fifth of the respondents had disputes.[3] Therefore, a lower total price does not necessarily mean a better deal; it may simply leave removal, maintenance, materials, electrical potential or repairs to a later date.

The most practical first step is to make a "Same Caliber Project Scope Sheet". Each line has at least the location, quantity, unit, process, material or model, who supplies it, what is included and what is not included. Do not fill in the price for items that cannot be confirmed, but mark them as "to be verified on site", and indicate the verified quotation and approval method.

  • Submit the floor plan, salable area, photos, building age, management regulations and occupancy restrictions to each bidder.
  • Separate "must-do" and "optional upgrades" to avoid covering up basic project omissions with optional options.
  • Require each verbal commitment to leave a version date on a quote attachment, drawing, bill of materials, or change order.
Design renderings: 2026 renovation quotation documents, material samples and measurement tools for reference on budget comparison topics.
Design renderings: 2026 renovation quotation documents, material samples and measurement tools for reference on budget comparison topics. Select an image to enlarge

02

First understand what the company’s computers can and cannot do

The company's 2026 quick calculator gives three examples by saleable area: basic whole-flat renovation, repainting and floor tiling. It lists 117 work items and options in 8 categories. Of these, 116 have reference rates and 1 rooftop package requires a quotation.[1] This helps break down the demand into projects, but it is not the average price of the renovation market in Hong Kong, nor is it an all-inclusive commitment for any unit.

The quick basic-renovation estimate covers selected floor and wall work. A full kitchen or bathroom rebuild, renewal of plumbing and wiring,Bespoke furniture and finish materials such as tiles. For a first estimate we use three times the saleable area for the paint surface and the full saleable area for flooring.[1] These preliminary calculations cannot be used as a substitute for measurements, especially when there is a large amount of furniture, only partial construction, special wall heights, large door and window ratios, or deteriorated walls.

The website offers free online calculations and downloadable estimates. Enquire on WhatsApp 5243 7747. Site measurements are available on the following terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[1] Before making an appointment to measure, please clearly explain the photos, dimensions, construction period to the management office, and the equipment you wish to keep, so that you can turn a measurement into a more useful formal range check.

Alongside the quick floor-area estimate, the website has a detailed calculator with 117 published items and an AI estimate assistant. The calculator lets you select work by trade and enter quantities. The assistant uses your description of the flat and the work to assemble an initial item list.[2] Both provide preliminary estimates. Neither reveals the condition of pipes, wiring or the waterproof membrane hidden behind finishes. Obtain a written quotation after a site survey.

  • After a quick estimate, circle "not included" and "pending price revision" item by item. Do not interpret the blank space as included.
  • The calculator output and date will be saved, but the official quotation, drawings and material list confirmed by both parties will be the final criterion.
  • For roofs, aluminum windows or special projects, photos and descriptions of faults or usage must be provided in advance, and calculations based on the square footage of the residence will not be made.
  • Use the detailed calculator or AI estimate assistant to prepare an initial list, then check it against the written quote
Break down “whole house renovation” into verifiable quote ranges

You can swipe left or right on your phone to view the complete table.

Project scopeWhat to measure firstCommon pricing unitsThe quotation must be written clearlyEasy to miss items or decision-making risks
Conservation, demolition, removalProtected areas, demolition area, floor level, haulage route and debris volumesquare feet, carts, bags, projectsWhere to protect, whether it is included in the building, legal disposal, arrangements designated by the management officeLift hours, protection of public areas, additional handling and removal vehicles to be determined
Masonry, tiling and waterproofingFloor and wall area, brick size, threshold and closing positionSquare feet, extension feet, projectDemolition, leveling, base material, paving method, sweeping, fabric supply and test arrangementHollow substrate, special finishing, tile wastage and responsibility for supplying finish tiles or sanitaryware
PaintingWall and ceiling expansion area, shovel bottom range, cracks and damp locationssquare feet, well, projectScope of shoveling or dusting, model, color, and number of coats of primer and topcoatUnresolved seepage or mould source, or using saleable area as the actual work quantity
Plumbing and electrical workElectrical boxes, circuits, sockets, lamp positions, sanitary ware positions and equipment loadsPoint, loop, piece, projectFloor plan, line range, equipment availability, testing and delivery documentsFor fixed electrical alterations, identify the registered contractor and acceptance checks in writing. A verbal promise that “services are included” is insufficient.
Kitchen and bathroomCabinet length, countertop, wall and floor tiles, sanitary ware, drain and electrical appliance locationSquare feet, square feet, pieces, roomsCabinet drawings, hardware, countertops, sanitary ware, fabrics, installation and disassembly responsibilitiesMistaken full rebuild as quick estimate included; dimensions and shipping lanes not verified
Customized furniture, doors and hardwareWidth, height, depth, door opening direction, internal configuration, on-site closingSquare feet, square feet, pieces, itemsBoard material, thickness or grade, door panel, hardware model, back panel and installation openingCompare only based on cabinet length, ignoring internal accessories, minimum charges or cost of modifications

The table is a comparison framework, not a unified engineering specification or price list. The Consumer Council pointed out that it is difficult to compare quotations in different formats, and homeowners are advised to use the same list of quantities and specifications when requesting a response. Projects involving structures or fixed electricity must also be checked against professional and statutory requirements. [3] [4] [5] [3][4][5]

Whole-flat renovation costs: key figures illustrated | HK Create Design
Whole-flat renovation costs: key figures at a glance | HK Create Design Select an image to enlarge

03

How to look at renovation prices in Hong Kong: area, number of pieces and minimum charges

A tiling price may include removing old tiles, breaking out screed, levelling, bedding, laying, grouting, edges, carrying materials and clearing debris. It may also be labour only. Ask for each task and whether its unit is floor area, wall area, linear feet, pieces, truckloads or a lump sum. A single “Masonry and tiling” total gives no way to check whether both contractors have allowed for the same substrate preparation.

Paint should not be priced directly by the usable area. The usable area can be preliminarily estimated, but the actual construction volume depends on the expansion area of ​​walls and ceilings, door and window openings, furniture shielding, shovel area, crack repairs and the condition of the ground floor. The company's quick version uses the useful area multiplied by 3 only as an estimate; the formal quotation should indicate the measurement basis and the reasons for on-site adjustments.[1]

Any items that have a minimum spend, minimum size, clearance by truck, or installation by piece are displayed individually. This is not to pick on details, but to avoid multiplying the unit price per square foot by the total area, only to find out that small amounts of engineering, transportation or upstairs and downstairs are extra. Do not fill in 0 for unknown unit prices; write "Not Quoted/Pending Verification" and reserve the right to decide whether to do the project.

  • Separate questions about floor tiles: whether demolition, base layer, labor, surface tiles, loss, transportation and removal are each included.
  • Paint separation: partial or full priming, dusting, primer, topcoat, color conversion and furniture protection.
  • Furniture is divided into separate questions: external dimensions, internal configuration, panels, hardware, back panels, closings, delivery and installation.
Design renderings: residential space and woodwork details under renovation.
Design renderings: residential space and woodwork details under renovation. Select an image to enlarge
Renovation work in progress on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

04

Basic renovation prices for 300, 400, 500 and 700 sq ft flats

For a whole-flat basic renovation we calculate A01 old floor tile removal at HK$30 per sq ft, B02 levelling at HK$22, D01 straight-laid tiles up to 600 × 600mm at HK$78 for labour and bedding, and E02 painting at HK$21 per sq ft of painted surface, estimated initially as three times saleable area. Add HK$4,200 for one truckload of rubble under A11.[1][2]

The basic examples total around HK$62,100 for 300 sq ft, HK$81,400 for 400 sq ft, HK$100,700 for 500 sq ft and HK$139,300 for 700 sq ft. Including a 20% homeowner contingency gives planning budgets of HK$74,520, HK$97,680, HK$120,840 and HK$167,160 respectively. The contingency stays with the owner unless an extra is agreed.[1]

The example excludes kitchen and bathroom rebuilding and waterproofing, replumbing and rewiring, custom furniture, finish materials such as tiles and sanitary fittings, works insurance, management deposits and handling fees.[1] Add kitchen and bathroom works by trade using the rates below to estimate a wider scope.

To coordinate custom cabinets and electrical points outside the basic budget, compareWhole-flat renovation photos at Melody Garden, Tuen Mun, thenRequest itemised prices for the actual scope of your flat.

  • Use the flat's saleable area for the planning calculation
  • Check the inclusions and exclusions for each flat size
  • Add kitchen, bathroom, services and furniture work by trade
  • The 20% contingency stays in your budget and is separate from company charges
Worked example 1

Example 1 — check flooring and painting quantities first

Assumptions

  • This example is not a completed case by the company, nor is it a formal quotation; it is assumed that the usable area of ​​the unit is 500 square feet, and the entire floor is paved with 600 × 600 mm floor tiles.
  • For painting, we only used the company's quick estimate of "usable area × 3" as the initial spread area. The door and window openings were not covered, and it was not judged whether the bottoming, repairs or ceilings were all done.
  • The number of tiles only demonstrates area conversion; an additional 5% is used as a hypothetical reserve for cutting and layout. Actual loss must be confirmed based on the paving method, room shape, material retention, and supply packaging.

How to calculate quantities

  1. Initial paint surface estimate: 500 × 3 = 1,500 sq ft.
  2. Area of one 600 × 600mm tile in square feet: (600 ÷ 304.8)² = 3.87500775 sq ft.
  3. Tile count before wastage: 500 ÷ 3.87500775 = 129.032 tiles.
  4. With an illustrative 5% allowance, 129.032 × 1.05 ≈ 135.5. Round up to 136 tiles.

Using the above pure assumptions, the homeowner can request a quotation that lists separately the 500-square-foot flooring process, the 1,500-square-foot initial painting range, and the purchasing assumptions for 136 tiles; none of the three can automatically equate to a "whole house package."

The company states that "usable area × 3" is just a quick paint estimate. This example does not take into account baseboards, wall tiles, actual door and window openings, tile fabric prices, transportation, loss rules or substrate conditions, and cannot be used as an order price. [1]

Use your square footage instead and see a reference budget

05

Renovation prices by trade — strip-out, wet trades, waterproofing, plumbing, electrical work, painting, flooring and furniture

The whole-flat estimate is a starting point. The order is priced by trade. Floor tile removal costs HK$30 per sq ft. A complete kitchen or bathroom strip-out and clearance costs HK$9,950 per room. Rendering is HK$43 per sq ft, floor levelling HK$22 and wall or floor tiling HK$78, subject to minimum charges.[2]

For waterproofing,Bathroom waterproofingHK$4,850 per bathroom, HK$4,300 per kitchen and HK$1,400 for a flood test. We use products such as Sika 107 for waterproofing and OPTIMIX materials for wet trades.[2] For plumbing and electrics, a full set of kitchen hot and cold pipes is HK$13,300, plumbing for kitchens and bathrooms across the home HK$22,300, a dedicated electrical circuit HK$3,350 andDistribution board replacement HK$6,800。[2] We coordinate with a licensed plumber to handle any required Water Supplies Department application for potable water pipe replacement.

Three painting specifications range from HK$12 to HK$39 per sq ft of surface. SPC flooring starts at HK$60 per sq ft.[2] Custom furniture is priced by linear foot. Wardrobes and tall cabinets are HK$2,900 per linear foot, kitchen base units HK$1,300. ENF-grade boards have been standard since 2026 without an upgrade charge.[2] ENF indicates very low formaldehyde emissions. Ventilation before occupancy is still important.

  • State the unit rate, quantity and minimum charge for each trade
  • Specify the waterproofed areas, upstand heights and flood test
  • Identify who is responsible for any Water Supplies Department application when replacing potable water pipes
  • Specify furniture board grade and hardware model

06

Renovation Quotation Comparison Checklist: Check Five Scope Differences First

The first difference is the scope of the project: one part is packed and used, and the other part has to be removed and transported by the owner. The second is quantity: one list lists 12 sockets, and the other just says "whole house potential". The third type is material: both copies have the same brand, but no model, size, thickness or hardware series. These three differences are enough to make the low price moot.

The fourth difference is boundaries of responsibility. There may not be a problem with the customer-supplied ceramic tiles, sanitary ware, electrical appliances or the deposit from the management office. The problem lies in who measures the dimensions, who checks the arrival, how to deal with damage or delay, and whether installation accessories are included. The fifth type is on-site risks, such as water seepage, loose sealing, pipeline conflicts or electrical box capacity issues after being disassembled. It's better to write them down as items to be confirmed than to argue afterwards about whether they should have been included or not.

Put both quotations in the same comparison sheet. For each item, record the location, quantity, method, materials, party responsible, handover check and possible extras. Treat unanswered questions as unresolved costs. Before choosing a contractor, you canCompare contractors using one item schedule, and check the programme, payment schedule and warranty at the same time.

  • Circle the words "all-inclusive", "high-quality", "according to actual conditions", "negotiable", "standard", etc. and fill in the definitions one by one.
  • Requires a list of customer and contractor supplies, delivery arrangements and installation responsibilities.
  • Write each risk to be confirmed in the quotation or attachment together with the confirmation period.
After receiving two quotes, compare them column by column rather than just the total.

You can swipe left or right on your phone to view the complete table.

Check forA more comparable way of writingNeed to write a questionHomeowner next step
Project scopeList rooms, locations, processes, and plan versionsWrite "whole house renovation" or "standard practice" without attachmentsMark each room on the same floor plan and ask both parties to resubmit
Quantity and unit400 square feet floor, 12 sockets, 2 sets of cabinets arranged separatelyList only the total amount of the project, or write "according to actual"Requires measurement benchmarks, minimum charges, how losses and excess are calculated
Materials and substitutionsMake, model, color, thickness or grade, and substitutions subject to prior written consentJust write "environmentally friendly paint" or "high-quality hardware"Request product data sheets, samples and supply responsibilities; do not use advertising names as specifications
Uncovered and on-site risksList management fees, customer-supplied fabrics, clearance, concealment status and items to be confirmed independently."All inclusive, we will discuss on site"Fill in the unpackaged list item by item, specifying who will make the quotation first and who can approve it after problems are discovered.
Acceptance and documentationTake photos before concealment, test items, defect list, repair date and delivery documentsOnly explain after completion, or only promise to "follow up"Link payments to visible, recordable completion points and keep a paper trail
Compliance and securityClearly identify structural, kitchen fire protection or fixed electrical work that needs to be checkedA promise that a wall can definitely be removed or that all services are included, without naming who takes responsibilityCheck the plans and management office requirements first; check arrangements with registered electrical contractors for fixed electrical work

No quote automatically represents an equivalent range. The Consumer Council has studied and recommended a standard quotation; the requirements of the Buildings Department and the Electrical and Mechanical Services Department remind that structure, kitchen fire protection structure and fixed electrical work cannot be determined based on the lowest quotation alone. [3] [4] [5] [3][4][5]

Custom storage cabinets throughout a flat | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

07

Six line-by-line checks for a renovation quotation

First, show the item, unit, quantity and rate on each line, for example D01 floor tiling, 300 sq ft at HK$78. Second, identify minimum charges and quantities. Small tiling jobs may be charged at the HK$3,250 minimum.[2] Third, list material brands, models and grades, including board grades and hardware specifications for furniture.

Fourth, distinguish labour from materials and state who supplies tiles, sanitary fittings, lights and appliances. Fifth, link instalments to progress. Sixth, put warranty conditions in writing. Our one-year warranty excludes deliberate damage and covers examples such as cracked, blistered or peeling paint, loose hinges, runners or screws and swollen cabinet doors.

The Consumer Council notes that inconsistent quotation formats and limited detail make it difficult for homeowners to compare offers.[3] Ask every contractor to price the same list of items and use the comparison checklist below to review their replies.

  • Show unit, quantity and rate on each line
  • State minimum charges and minimum billable quantities
  • Specify material brands, models and grades
  • Distinguish supply and installation from labour only
  • Link instalments to construction progress
  • Record warranty period and coverage

08

Common questions behind a low quotation

A lump sum without an item schedule makes exclusions hard to spot. Check waste, protection and carriage. The example rates are HK$4,200 per rubble truckload and HK$6,700 per whole-flat job for third-party and employees' compensation insurance. On small jobs, insurance is included in the relevant labour rates.[2] A quotation that simply says “waterproofing” should identify the wall height, number of coats and flood-test arrangements.

Our minimum site charge for a small job is HK$2,000. If another quotation is lower, check labour, materials and warranty. Send repair photos to 5243 7747 on WhatsApp for an initial estimate. Agree all variations in writing before work starts to avoid disputes at settlement.

Older buildings can contain asbestos. If suspect materials are discovered, we stop the affected work and arrange an assessment by a registered asbestos consultant and, if needed, work by a registered asbestos contractor. The quotation should specify how work stops, who is notified and how any additional scope will be priced.

  • Even a fixed-price quotation needs an item schedule
  • Include waste removal, protection and insurance in the quotation
  • Specify waterproofing height, coat count and flood testing
  • Minimum charge for small jobs — HK$2,000
  • Confirm variations in writing
  • Ask how suspected asbestos will be handled
Worked example 2

Example 2 — distinguish the calculator subtotal from your planning allowance

Assumptions

  • This example only recalculates the example of a 400-square-foot private building and 4 selected projects displayed on the company's detailed calculation page as of 2026-10-21; the page subtotal is HK$77,200.
  • Assume that the homeowner sets the 20% as the planning upper limit on his own, instead of the surcharge already charged by the contractor.
  • This example is not a case that has been completed by the company, nor does it include unselected projects, customer-supplied fabrics, management office fees, or any new areas on site.

How to calculate quantities

  1. A 20% planning allowance: HK$77,200 × 0.20 = HK$15,440.
  2. Planning budget including the allowance: HK$77,200 + HK$15,440 = HK$92,640.
  3. Separately list HK$15,440 as "Planning Reserve Pending Confirmation of Site and Changes" and do not mix it into the contractor's confirmed project subtotal.

In the example on this page, the subtotal of the selected range is HK$77,200; if the homeowner selects a 20% planning reservation, the upper limit of the capital planning is HK$92,640. When comparing another quotation, you should make sure that the other quotation also covers the same 4 items, the same quantity and the same uninclusive items, so that there is a basis for comparison.

The detailed page also shows the HK$88,780 reserved by 15%; 20% is the planning scenario used in this article to show the calculation. Neither is an average market price, a fixed markup, a payment requirement or a formal project quote. [2]

Use your square footage instead and see a reference budget
Project photo of completed bespoke kitchen cabinets | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

09

A retainer is not a markup: use it to manage the unknown, not cover it up

A retainer is the room the homeowner makes for cash flow before the concealment is fully visible; it is not an additional charge that the contractor can use on his or her own initiative. The "confirmed project subtotal" and the "owner's customized planning reservation" should be separated. Each time a reservation is to be used, there must be on-site findings, alternatives, quotations, impact on construction schedule and written approval.

The example of the company's detailed calculation page shows the reservation percentage separately from the subtotal, and explains that the upper limit includes the reservation and not the company's automatic surcharge.[2] This column approach is worth adopting, but the page example only works with the selected items and quantities. It cannot be extrapolated to whole-house costs for other units, nor does it replace face-to-face scope confirmation.

Don’t replace surveys with “Leave 20%.” Kitchens, toilets, water, electricity or furniture that are known to be redone should be directly entered into the scope list; unknown items should be listed as reserved. If the reservation is large, it usually reflects that the plans, materials, rights and responsibilities or on-site information are not yet mature. The better next step is to supplement the information or make a decision in stages, rather than packaging the total amount more beautifully.

  • Subtotals, customer-supplied materials, management fees and planning reservations are displayed separately.
  • No changes or reservations will be added to payment requirements without written approval from the owner's designated person.
  • Record the number, reason, project quantity, additions and subtractions, construction period impact and photos of each change.

10

Don’t just look at the brand for materials: Use model numbers and technical data sheets to lock in assumptions

It’s still not enough to quote “a certain brand of environmentally friendly paint” or “imported hardware”. What you need is the product model, suitable substrates, primer and topcoat systems, number of coats, color, estimated coverage, if it is supplied by who, and whether it can be substituted if it is out of stock. Samples can help with color selection, and technical data sheets allow both parties to check construction conditions and product limitations.

Take the technical data sheet for Dulux Ambiance A600 as an example of the document structure: it lists a theoretical coverage rate of 13 to 16 square meters per liter per layer, and states that actual coverage will vary significantly depending on construction methods, surface roughness and porosity.[6] This is not the only recommended product, nor does it mean that any unit must use it; the point is that the same product cannot promise dosage or effectiveness based solely on the square footage of the house.

If there is continuous water seepage, blistering, chalking or mildew on the wall, first find out and deal with the cause, and then decide on the base layer and painting process. Requesting a data sheet or safety data sheet does not guarantee an immediate safe occupancy; ventilation, drying, practical construction and personal needs will all affect arrangements. Don’t accept “formaldehyde removal” or health promises without specific product and construction conditions.

Typical specifications include Hilly or ei8ht electrical cable, with Prysmian or Nexans as higher-spec options, and Belden for higher-spec data cable. We use copper for potable water pipes with Pegler or Tectite fittings. After stripping paint we use Kangaroo water-based sealer and two or three thin coats of Nippon low-odour wall filler. We use DOWSIL mould-resistant silicone in kitchens and bathrooms. ENF-grade boards come from our Foshan factory.SPC flooringThe usual thickness is 6mm, with 8mm including a sound-reducing underlay and 10mm also available. Customers generally choose their sanitary fittings and taps, and the company charges for installation.

  • The material list should at least list the brand, model, specification, color, unit, supplier and substitution rules.
  • When there are product performance claims, request the corresponding technical data sheet and check that the product name is completely consistent with the quotation.
  • Write down the purchase deadlines for fabrics, sanitary ware and hardware to avoid temporary shortages turning into unlimited substitutions.
Basic renovation prices by flat size using company rates

You can swipe left or right on your phone to view the complete table.

Saleable areaWorks subtotalPlanning budget including a 20% allowanceInclusions and item codes
300 sq ftHK$62,100HK$74,520300 sq ft of old floor tile removal (A01), levelling (B02) and straight-laid floor tiling up to 600 × 600mm including labour and bedding (D01). Add 900 sq ft of paint surface with local filling, moisture-resistant primer, sanding and two topcoats (E02), plus one truckload of rubble (A11)
400 sq ftHK$81,400HK$97,680400 sq ft of tile removal (A01), levelling (B02) and straight-laid tiling with labour and bedding (D01), plus 1,200 sq ft of painted surface (E02) and one truckload of rubble (A11)
500 sq ftHK$100,700HK$120,840500 sq ft of tile removal (A01), levelling (B02) and straight-laid tiling with labour and bedding (D01), plus 1,500 sq ft of painted surface (E02) and one truckload of rubble (A11)
700 sq ftHK$139,300HK$167,160700 sq ft of tile removal (A01), levelling (B02) and straight-laid tiling with labour and bedding (D01), plus 2,100 sq ft of painted surface (E02) and one truckload of rubble (A11)

A01 is HK$30 per sq ft, B02 HK$22, D01 HK$78 and E02 HK$21 per sq ft of paint surface estimated at three times saleable area. A11 is HK$4,200 per truckload. All four examples exclude complete kitchen and bathroom reconstruction and waterproofing, services renewal, custom furniture, finish materials and sanitary fittings, works insurance and building management deposits and fees. The 20% is a homeowner-held allowance. [1][2] [1][2]

Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

11

Structure, kitchen and fixed electricity: check first, then discuss demolition and modification

The Buildings Department pointed out that if the modification involves the structure, such as the removal or modification of structural walls, beams or columns, the owner must appoint an authorized person and a registered structural engineer to provide advice and submit plans, and after approval and consent, the construction will be carried out by a registered contractor.[4] Simple projects such as plastering, laying bricks and replacing sanitary ware may be exempted construction projects, but they must still comply with fire protection, structural and drainage requirements; do not interpret "exemption" as meaning that they can be changed at will.

If you want to change the kitchen to an open style, especially if you don’t rely solely on the naked eye to determine that the wall is removable. The Buildings Department reminds that the walls or doors enclosing the kitchen may be structural or fire-resistant structures, and their removal and modification may also affect escape requirements.[4] Before signing a contract, check the approved plans, relevant project records, deeds of mutual covenant and management office requirements. If you have any doubts, seek evaluation from an appropriate construction professional instead of asking workers to dig in first.

EMSD advises using a registered electrical contractor to arrange for an appropriately graded registered electrical worker to add to, alter, inspect, test or repair a fixed installation. On completion, the work must be inspected and tested before energising and certified on FormWR1. [5] In the quotation, state the name of the contractor, responsible for arrangements, testing and handover documents, and check the information in the relevant official register. This article does not provide any DIY methods for demolishing walls, changing wiring, or dangerous processes.

  • For any changes to walls, beams, columns, kitchen enclosures, exterior walls or windows, first ask about the plans and professional assessment requirements.
  • Fixed power project requirements state the arrangements for registered electrical contractors and WR1 settlement responsibilities.
  • Check with management before construction to confirm application, construction period, lift protection, trash and common area rules.

12

Contracts and Change Orders: Turning “We’ll Talk About It Later” into an Enforceable Procedure

Once a quote is accepted, it should be retained along with floor plans, bill of materials, construction sequence, schedule assumptions, payment milestones, maintenance schedules and unpackaged lists. Each attachment must have a version number and date. If you use messaging software to confirm, it’s better to organize the final content into a single change order rather than leaving important commitments scattered among messages, phone calls, and voice records.

A usable change order should at least state: the location and reason for the change, the original scope, the added or deleted quantity, material or model, the addition or subtraction, the impact on the completion date, and the confirmation date between the homeowner and the contractor. If you encounter hidden problems, you can take photos and explain the options first; before confirming the price and construction period, "do it first and then calculate later" should not be regarded as a routine.

Payments should not be based solely on calendar dates or verbal progress. A more reasonable approach is to connect it to verifiable results, such as protection and disassembly completed, concealment work recorded, designated process completed, defect list processing and document delivery. There is no payment ratio or minimum construction period that is universal and suitable for all projects in Hong Kong; the ratio, construction period and final conditions shall be determined based on the scope, risks and written agreement between the parties. This paragraph is general planning information, not a legal conclusion.

  • Only changes confirmed in writing by the designated person will be included in the project and payment records.
  • Take dated photos of each inspection and note the location, problem, person responsible and repair deadline.
  • Keep all versions of quotations, receipts, delivery notes, product warranty documents, testing and completion documents.
Prices by trade — strip-out, wet trades, waterproofing, plumbing, electrical work, painting, flooring and furniture

You can swipe left or right on your phone to view the complete table.

Type of workExample items and company ratesWhat is includedPay attention to
RemoveA01 floor tile removal HK$30 per sq ft. A02 removal down to the concrete HK$52 per sq ft. A09 kitchen and A10 bathroom strip-out and clearance HK$9,950 per room. A11 rubble removal HK$4,200 per truckload, with a HK$2,000 minimum for bagged collectionA09 includes removing kitchen wall and floor tiles and cabinets and carrying them away. A10 covers bathroom tiles, sanitary fittings and vanity units with removal.Specify the number of rubble truckloads and carriage down from the flat
MasonryB01 rendering HK$43 per sq ft, minimum HK$2,350. B02 floor levelling HK$22 per sq ft, minimum HK$1,850. D01 floor or D02 wall tiling HK$78 per sq ft, minimum HK$3,250Tiling labour and bedding materialsFinish tiles are extra. Diagonal or herringbone layouts add 24% to D01–D06
WaterproofingC01 Sika 107 waterproofing HK$39 per sq ft, minimum HK$2,350. C02 bathroom waterproofing HK$4,850 per room. C03 kitchen waterproofing HK$4,300 per room. C04 flood test HK$1,400. C05 bathroom strip-out and waterproofing renewal HK$13,000C02 includes the full bathroom floor, waterproofing up walls to 6 ft and to full height in the shower, two coats of Sika 107 and a 24-hour flood test. C03 includes the whole kitchen floor, 150mm upstands, reinforcement at the sink and two coats of Sika 107State the waterproofing height and whether a flood test is included
Plumbing and electrical workG03 kitchen hot and cold water pipes HK$13,300. G05 kitchen and bathroom plumbing throughout the flat HK$22,300. H02 13A outlet HK$640 per group. H06 dedicated circuit HK$3,350. H09 board replacement HK$6,800HK Create Design coordinates any required Water Supplies Department application for potable water pipe replacement through its licensed plumbing partnerSpecify WR1 certification after electrical alterations and identify where replacement pipework starts
PaintingE03 repaint HK$12 per sq ft, minimum HK$3,700. E02 local making good and repainting HK$21 per sq ft, minimum HK$4,650. E01 stripping, preparation and painting HK$39 per sq ft, minimum HK$7,450Measured by actual surface area. E02 includes local filling, moisture-resistant primer, sanding and two topcoatsNippon children's paint adds HK$4 per sq ft. Specify the area to be stripped
floorJ01 SPC flooring HK$60 per sq ft and J02 laminate HK$82 per sq ft, both subject to a 200 sq ft minimum. J03 self-levelling HK$22 per sq ft, minimum HK$2,800Based on saleable areaSmall areas can trigger a minimum billable quantity
furnitureFUR01 tall cabinet and FUR05 wardrobe HK$2,900 per linear foot. FUR14 kitchen base unit HK$1,300, FUR15 wall unit HK$1,250 and FUR19 seamless solid-surface worktop HK$830 per linear footFrom 2026, ENF-grade board is standard without an upgrade charge. FUR14 includes a moisture-resistant carcass, doors, soft-close hinges, adjustable feet and plinth.Worktop and FUR42 delivery charged separately. Delivery is HK$660 per trip

These are examples from the company's 117 published rates. An on-site survey confirms quantities, and the written quotation confirms the final price. [2] [2]

13

Hidden works and handover: visible evidence of early arrangements

Before sealing walls, laying bricks or installing cabinets, it is the easiest time to lose the opportunity to check. Homeowners do not need to perform professional testing on their own, but they can ask the contractor to explain what inspections will be performed on the project, what criteria will be used, when you will be able to view the results, and what photos or records will be provided. Waterproofing, dewatering, water, electricity and grassroots conditions should be arranged according to the actual project and applicable requirements; this article does not pretend that Hong Kong has a unified water closure hours, slope or acceptance procedures that apply to all residential projects.

The handover inspection should go back to the original scope sheet: rooms, surfaces, door cabinets, hardware, sanitary ware, electrical potential, lighting, cleaning and documentation are checked one by one. When you find a problem, record it with the number, location, photo and deadline, instead of just writing "missing". It is necessary to distinguish whether an unfinished project is a defect, has not yet been supplied, or is a new request from the homeowner. The three have different treatment of price and time.

The company's website points out that the pictures on its page are representations of design or process effects and are not actual completion records, nor does it mean that the rapid plan includes all materials or processes in the pictures.[1] Therefore, when selecting a contractor, you should not treat renderings as project results, licenses, customer ratings, or proof of maintenance; instead, ask directly for a verifiable written scope and responsibility arrangement from your organization.

  • Before taking cover, confirm the shooting range, test records, and notify the homeowner of the points to check.
  • Check it room by room when the building is handed over, and don't replace the defect list with a general "completed".
  • Place the remaining work, repair dates, documents and final conditions in the same settlement record.
Made-to-measure furniture during installation | HK Create Design
Site photo: Custom furniture on site. HK Create Design. Select an image to enlarge

14

The actual decision-making route from free initial estimate to formal quotation

Start with online tools to identify the scope and undecided items. Gather saleable area, room photos, equipment to retain and an initial budget limit. List flooring, painting, kitchen, bathroom, services, furniture and debris removal separately.

Ask each contractor to reply to the same list a second time. Identify differing inclusions and what needs site confirmation before comparing. Before arranging measurement, ask about fees, deliverables, the timetable and when the formal quotation will arrive. The company publishes the following terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Initial online estimates and enquiries are free.[1]

The choice comes last: you can choose to reduce the scope of the project, postpone optional upgrades, switch to clearly listed materials, or wait until concealment is confirmed. Don’t leave necessary protection, clearance, documentation, acceptance or professional arrangements blank in pursuit of a lower total; truly controllable costs come from earlier and clearer decisions.

  • First obtain written quotations of the same scope and then compare them. Do not rely on chat screenshots as the sole basis.
  • Prioritize confirmation of projects that affect safety, compliance or future maintenance, and decorative upgrades can be decided later.
  • If the information is still insufficient, position the quote as a budget rather than a guaranteed price to avoid committing to an unverified total.
Whole-flat renovation costs: checklist illustrated | HK Create Design
Whole-flat renovation costs: checklist | HK Create Design Select an image to enlarge

FAQ

12 practical questions answered

01Should the 2026 renovation quotation be compared first with the total price or the item-by-item unit price?

First compare the quantities, processes, materials and uninclusive items within the same range, and then look at the total price. The item-by-item unit price is not a separate answer: if one party includes demolition, leveling, removal and materials, and the other party only lists the labor for paving and laying, the lower unit price is not comparable. Consumer Council research is pointing out that different quotation formats make it difficult for consumers to compare.[3]

02Does a quick estimate based on saleable area give an all-inclusive whole-flat price?

No. The quick calculator gives a budget for a specific example scope. The basic renovation excludes full kitchen and bathroom reconstruction, replumbing, rewiring, fitted furniture and tile finishes. Saleable area × 3 is only a painting estimate. Use the result to discuss your brief, then confirm scope and cost through site measurement and a written quotation.[1]

03Does the 20% planning reservation mean that the contractor can charge an additional 20%?

no. The company page describes 20% as a planning reservation cap, not an automatic surcharge.[1] The homeowner can keep the reservation in his own financial planning; any part to be used should be based on specific changes or confirmed on-site problems, the amount and construction period impact should be stated, and then decided according to the written procedures of both parties.

04Is it necessary to apply to the Buildings Department for ordinary residential renovation?

uncertain. The Buildings Department lists simple projects such as plastering, laying bricks and replacing sanitary ware as possible exempted construction projects, but they must still comply with relevant requirements. If structural walls, beams or columns are involved, the procedures and professional requirements are different; the kitchen enclosure may also involve structural or fire protection structures. Before starting construction, you should check the approved plans, deed of mutual covenant and management office requirements, and seek appropriate professional advice if necessary.[4]

05Is “rewire and replumb the whole flat” enough detail in a quotation?

not enough. At least there must be electrical box or circuit conditions, socket and lamp location diagrams, equipment load considerations, scope of supply, testing and delivery document arrangements. The Electrical and Mechanical Services Department pointed out that the installation, modification, inspection, testing and maintenance of fixed electrical installations related to renovation should be handled by registered electrical contractors and registered electrical workers of appropriate grades. They must have WR1 before powering on.[5]

06If you see "low VOC" or "formaldehyde-removing" paint, does it guarantee safe move-in immediately after completion?

Can't. Product claims are not a substitute for actual construction, base treatment, drying and ventilation arrangements, nor do they constitute a health or occupancy guarantee. Require specific models, technical data sheets and safety data sheets to check coatings, applicable surfaces and construction restrictions; for example, a specific A600 product data sheet indicates that the theoretical coverage will be affected by the construction method and the porosity of the base layer.[6]

07How much does it cost to renovate a 500 sq ft flat?

A 500 sq ft basic renovation is around HK$100,700, or HK$120,840 with a 20% planning allowance. It includes old floor tile removal, levelling, straight-laid tiling labour and bedding, painting and one rubble truckload. Kitchen and bathroom reconstruction, services renewal, custom furniture and finish materials are separate.[1]

08What about a 300 or 700 sq ft flat?

For the same scope, a 300 sq ft flat is around HK$62,100 or HK$74,520 with contingency, and 700 sq ft is around HK$139,300 or HK$167,160 with contingency. The survey confirms the actual scope.[1][2]

09How are waterproofing, plumbing and electrical work priced?

Bathroom waterproofing HK$4,850 per room, kitchen waterproofing HK$4,300 per room and a flood test HK$1,400. A full set of kitchen hot and cold pipes is HK$13,300. A new dedicated circuit is HK$3,350.[2] Our licensed plumbing partner handles the Water Supplies Department application where required for potable water pipe replacement.

10Does ENF-grade board cost extra for custom furniture?

From 2026, ENF-grade boards are standard across our custom furniture, at no extra upgrade charge.[2] ENF is a very low formaldehyde emission grade. Ventilate the flat before moving in.

11How accurate are AI estimates and online calculators?

Both tools help organise your requirements and provide a rough estimate. They cannot see pipes, wiring or waterproofing inside walls. The written quotation after a site measurement determines the final price. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[1][2]

12How is a small repair priced?

The minimum site charge for small jobs is HK$2,000. Send photos to 5243 7747 on WhatsApp for an initial estimate and to establish whether a site visit is needed.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design 2026 Quick Renovation Budget Calculator and Quotation Instructions Accessed: 2026-10-21
  2. [2]HK Create Design 2026 Detailed Project Budget Calculation Page Accessed: 2026-10-21
  3. [3]Consumer Council: Research on Home Renovation Industry - Create a Comfortable Home and Build Good Governance Together Accessed: 2026-10-21
  4. [4]Buildings Department: Frequently Asked Questions on Alteration and Addition Works for Domestic Units in Private Buildings Accessed: 2026-10-21
  5. [5]Electrical and Mechanical Services Department: Electrical Safety in Residential Units Accessed: 2026-10-21
  6. [6]Dulux Ambiance Emulsion Paint A600 Technical Data Sheet Accessed: 2026-10-21