01
First define "what to accept": use the confirmed scope instead of feeling
The basis for acceptance should be the final confirmed document combination: signed quotation, floor and potential diagrams, material and equipment models, furniture plans, change orders and confirmed information records. First arrange them into a "version list": which one replaces which one on what date, who confirmed it, and whether the project has been completed. This step may seem like a paperwork step, but it can prevent the original concept from being compared with the final project when the building is handed over, or the verbal discussion being mistaken for included projects.
The Consumer Council notes that incomplete descriptions, quantities, unit rates and subtotals make it difficult to calculate and compare prices. Specify pipe starting points and whether pipes are concealed, actual masonry areas, primer and topcoat counts, and furniture dimensions and hardware.[1] Therefore, do not ask "whether it is included or not" only on the handover day for items that have not been clearly written down; you should mark them as pending for confirmation first, and then ask for the calculation method or exclusion conditions to be supplemented in writing.
Homeowners can make non-destructive checks such as appearance, switches, water discharge, measurements and records, but they should not dismantle distribution boxes, cut walls, remove window frames or destroy waterproofing layers for the purpose of acceptance. If a problem is found, take a panoramic photo first and then a close-up photo, and record the room, direction, photo number, and time of discovery. The evidence can help both parties clarify the next step, but it does not mean that the homeowner can determine the cause or legal responsibility on his own.
- Arrange quotations, drawings, bill of materials, change orders, and equipment lists according to version date
- Each item is marked: included, additional, not included or to be confirmed on site
- Put verbal changes into writing and ask both parties to confirm the scope, price or calculation method
- Agree in advance on the acceptance person, entry time, re-inspection method and document delivery method

02
Five nodes are more effective than one major acceptance: don’t miss the covered projects
Check the retention and clearance list, public area protection, management office arrangements and temporary power supply before starting work. Only after demolition but before sealing trenches, sealing boards, and laying bricks can the pipes, line directions, and base layer be seen. The homeowner does not need to judge the construction technology, but can take photos of the visible conditions and ask: is it original or new, which plan will this section be located in the future, and how will it be recorded if changes are made.
After the water, electricity, waterproofing or covering processes are completed, arrange to check the agreed tests and documents before covering the surface layer. The Consumer Council recommends that the waterproofing quotation list the location, materials used, waterproofing layer height and leakage test; this is what homeowners can ask at the beginning of the project, rather than judging based on the so-called unified water closure hours on the Internet.[1] Different systems, site conditions and management arrangements will affect the test plan. This article does not state that 24 or 48 hours is the general legal rule in Hong Kong.
After most of the surface layers and furniture are completed, check the appearance, size, openings and closings. After cleaning, the final round of functional testing, confirmation of missing forms and document handover will begin. These nodes are not legally fixed deadlines; their purpose is simply to allow you to document the photos, testing, and resolution requirements while the problem is still visible and responsibility can still be traced.
- In front of the sealing board or pavement: take pictures of the visible locations of pipes, lines, drains and waterproofing, and mark the room and date
- Before coverage: Check whether the agreed test arrangements, materials and changes have been written into the document
- After the surface layer: Check the bricks, walls, cabinets, doors, windows and equipment operations one by one according to the room
- Re-inspection after handover: only items that have been completed and passed the re-test will be marked as completed
You can swipe left or right on your phone to view the complete table.
| Project scope | Quantity/specification to be locked before acceptance | Common pricing methods | It is easy to omit or include additional items | Risks and questions when handing over a building |
|---|---|---|---|---|
| Paint and base | Separately record the locations of walls, ceilings, and local shovels; list the brands/models of primer and topcoat, and the number of each layer | It can be calculated based on the development area, process or partial repair; don’t just write “whole house oily” | Comprehensive or partial shoveling, moisture-proof treatment, furniture protection, crack cause treatment | If there is color difference, bubbling or cracks, take a photo of the location and lighting first; if water seepage continues, it cannot be treated as repaired by painting. Ask about each process and re-inspection method. [1] |
| Floor, wall tiles and closing | List the construction area, brick size and laying method, closing form, location of wet area and which layer needs to be removed | Mostly calculated by square feet or sub-item; special arrangement and grassroots treatment can be listed separately | Finish tiles, carrying materials upstairs, demolition, levelling, haulage, mitred tile edges and other special finishing | Observation of hollows, chipping, seam positions and drainage must be recorded one by one; unselected fabrics cannot be written as "wrapped". The waterproofing location, material, height and testing should be stated in the quotation. [1] |
| Plumbing, sanitary ware and waterproofing | List the starting point after entering the house, exposed/concealed pipes, drain level, sanitary ware model, and each kitchen and toilet area. | It can be divided according to length, space or equipment installation; the measurement must be clearly stated | Basin faucet, bath screen, sanitary ware supply, drilling, repair, leakage source treatment | After draining the water, check the water, interfaces, cabinet bottom and adjacent locations; if there is leakage, record the conditions and ask for it to be handled by corresponding professionals. Do not remove the waterproof layer yourself. [1] |
| Electricity and fixed electrical appliances | Row-by-row sockets, light switches, air-conditioning stations, exhaust fans, changes to distribution boxes and electrical load information | It can be divided according to switches, lines, circuits or equipment; "one" with the same name may not necessarily refer to the same process | Switch style, temporary power supply, fixed electrical connection, load assessment and repair | All electrical work involved in renovation must be arranged by a registered electrical contractor; after completion, relevant new installations, additions, modifications or repairs must be inspected, tested and issued a WR1 before being powered on. [2] |
| Customized furniture, doors and hardware | Each piece includes width, height, internal partitions, boards, edges, door panels, hardware brands/models and drawing versions. | Cabinets are often priced by horizontal length or configuration of each piece; upgraded hardware should be priced separately | Transportation, going upstairs, dismantling, back panels, handles, buffer door hinges, light strips and power connections | Go door by door and drawer by drawer to check collisions, gaps, levels and drawings; don't just sign "OK". Drawings, samples and color confirmations should be retained. [1] |
| Demolition, protection and rubble | List retained objects, demolition scope, protection of public areas, temporary storage locations, handling restrictions and management office requirements. | It can be based on area, number of trains, number of bags or actual project quantity; the calculation unit must be written out | Government disposal fees, management office fees, elevator protection, deep drilling, stairs going up and down and extra trains | Demand to see protection and legal clearance arrangements, and not replace the scope with unproven "one-price all-inclusive" policies. Demolition must also first confirm whether it will affect structures, gas or public facilities. [1] [4] |
This table is used to convert different quotes into the same comparable range and does not represent any company's standard project or unit price. "To be confirmed on site" for each item should be changed to written quantity, unit price, upper limit or change process before starting work. [1][2][4]



03
Transcendental Safety and Functionality: Electricity, Fixed Equipment and Abnormal Signals
Electrical installations in residential units include unit distribution boxes, wiring, switches, sockets and electrical appliances that are not powered by sockets. The electrical work involved in renovation is no exception. The Electrical and Mechanical Services Department stated that registered electrical contractors should be arranged to carry out addition, modification, inspection, testing and maintenance.[2] When handing over the building, the owner can try out the safe operation of light switches, socket power supplies and air extraction equipment according to the room list, and is required to clearly mark the purpose of the wiring; do not open the distribution box or remove the switch while it is powered on.
Following installation, additions, alterations or repairs, a registered electrical worker must inspect and test before energising and issue aWR1work completion certificate. Users need not submit WR1 to EMSD but should retain it.[2] Therefore, WR1 does not generally refer to a "maintenance card" that all ordinary renovations must have; whether it is applicable depends on the actual project and should be asked in the quotation and settlement list.
Stop using the relevant device if you smell burning smell, see sparks, trip the switch repeatedly, the socket becomes hot, or is exposed to water. Do not turn the switch on and off repeatedly or change the wires yourself for testing. The Electrical and Mechanical Services Department also reminds that if there is any suspicion of leakage or frequent switching, you should immediately arrange for a registered electrical contractor to inspect and repair the problem.[2] Bathroom, kitchen and fixture details should not be judged by their appearance.
- List every light, every switch, every socket and fixture by room and record them item by item
- Check whether the wiring purpose of the distribution box is marked, and collect the applicable WR1 and equipment instructions.
- The location of bathroom sockets, fixture connections and any load issues should be checked by a registered electrical contractor
- If there is a burning smell, sparks, overheating or repeated tripping: stop using it and arrange for professional inspection.
04
Kitchen, toilet and wet area: look at water, waterproofing, sanitary ware and leakage sources separately
Kitchens and toilets are most likely to have several problems mixed together: slow water drainage may be caused by water level, slope, blockage or installation problems; moisture at the bottom of the cabinet may come from faucets, pipe joints, sanitary ware or external water seepage; blistering on the wall may not be caused by the indoor waterproof layer. During acceptance, first conduct non-destructive functional observations: turn on the faucet, flush the toilet, check whether drainage is smooth, and pay attention to whether there are new wet marks on the visible interfaces, under the wash basin, at the bottom of the kitchen cabinets, in the corners and in adjacent dry areas.
When it comes to waterproofing, you can’t just ask “has it been done?” The location, turning range, materials used, interface with floor drains or sanitary ware, testing arrangements and who is responsible for recording should be included in the quotation and execution list.[1] This way, if problems arise in the future, you will at least know which section of the project and documents to look back on, instead of just relying on a distant photo of the completion. This article does not provide universal slopes, universal water closure hours or waterproofing thicknesses as the sources do not list them as uniform standards applicable to all Hong Kong dwellings.
If continuous leakage, complaints downstairs, obvious water accumulation or loose sanitary equipment are observed, first keep photos, videos and conditions of occurrence, and notify the contractor to arrange for inspection by appropriate professionals. Do not remove the toilet seat, floor tiles or waterproof layer to find the source; damaging the scene may not only increase the loss, but also make it more difficult to clarify the responsibility.
- Each water removal point discharges water independently and records the location, flow direction, visible interfaces and abnormal time.
- Check the bottom of the wash basin and kitchen cabinets, the roots of sanitary ware, corners and adjacent locations for moisture marks
- The waterproofing project shall specify the location, materials, scope and testing arrangements in the quotation and execution form.
- Persistent leakage or flooding: Stop dismantling or modifying on your own, retain evidence and arrange for professional inspection
Example one: paintable area and planning allowance for a 420 sq ft flat
Assumptions
- This is a calculation example and not a completed case by the company, a formal quote, or the market average price.
- Assume a 420 sq ft flat by saleable area and use the quick calculator's saleable area × 3 rule only for an initial estimate of painted surface area.
- Assume the detailed calculator's rate of HK$21 per square foot for patching, damp treatment, sanding and painting. Substrate, wall and ceiling proportions, openings, stripping and material specifications still require a site check.
- 20% is reserved for the homeowner’s own planning; the company explains that this is not an automatic additional charge.
How to calculate quantities
- Estimated surface area: 420 × 3 = 1,260 sq ft.
- Indicative subtotal: 1,260 × HK$21 = HK$26,460.
- A 20% planning allowance: HK$26,460 × 0.20 = HK$5,292.0.
- Upper budget with allowance: HK$26,460 + HK$5,292.0 = HK$31,752.0.
The initial calculated project volume is 1,260 square feet; the subtotal based on the reference unit price of the above single company is HK$26,460, and the upper limit of the 20% planning reservation set by the owner is HK$31,752.0. This is only used to decide whether to make arrangements first and clarify the scope. It should not be regarded as a certain transaction price.
Multiplying by 3 in the quick estimate is a rough assumption. It excludes full stripping, treating the source of leaks, furniture protection, specialist paint, irregular areas and management restrictions. It is not an all-inclusive whole-flat quotation. The company publishes the following terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Online estimates and enquiries are free. [5][6]

05
Appearance is not a trivial matter, but turning “beautiful” into a repeatable description
Describe the defect before debating its severity. A record such as “main bedroom, wall left of entrance, 30 cm hairline crack beside window, visible in afternoon light and with lights on, photo P-014” can be checked later. For tiles, record chipped corners, uneven levels, joint alignment and hollow-sounding areas without damaging the finish by striking it with a heavy object.
Furniture should be compared with the signed drawings and samples, and the width, height, depth, laminates, door panels, edges, handles, rails and door hinges should be examined piece by piece. Usage testing is very important: all doors, drawers, sliding doors, locks and cabinet lights must be actually switched on and off once. Pay attention to collisions, jamming, friction, inability to fully open, or mutual obstruction with sockets, curtains and equipment. The Consumer Council also recommends that furniture projects list the dimensions, materials, transportation and accessories, and provide drawings, material samples and colors for signature and confirmation after implementation.[1]
Owners can check visible scratches, lock operation and gaps in gaskets or frame corners during normal use. For replacement, alterations or removal of windows, frames, façades or guards, use qualified professionals and site assessment. The Buildings Department classifies work by height, span, main or subsidiary frame and other conditions. Window and glazed façade alterations must meet daylight, ventilation and fire requirements.[3]
- At the same time, check the wall, brick surface, color difference and closing under natural light and with the light turned on.
- For each cosmetic defect, record the exact location, size or observable phenomenon, photo number and repair request
- Operate all cabinet doors, drawers, sliding doors, locks, and safe window latches one at a time
- Alteration/removal of aluminum windows, exterior walls or protective fences: Stop DIY and ask for applicable professional and legal procedures first
You can swipe left or right on your phone to view the complete table.
| Node/project scope | Non-destructive checks that homeowners can do | Information to be delivered or retained | Risks that cannot be skipped before completion |
|---|---|---|---|
| Before construction starts: drawings, quotations, samples | Circle items one by one including included, additional, not included and to be confirmed; check the final drawing and quotation version date | Sign quotations, change orders, material samples/models, management requirements and insurance arrangements | Verbal promises are made in lieu of quantities, unit prices, or responsibilities that are difficult to compare or track later. [1] |
| After demolition and before covering: pipes, lines, base layer | Take panoramic and close-up photos, and mark the room, wall, date and relative position on the photos; no wall cutting or stitching required. | Photos of concealed works, confirmed alteration records, professional arrangements required | Location or base problems are discovered only after sealing boards, paving bricks or sealing grooves, and the cost and impact of corrections will be greater. |
| After services are complete and before finishes | Test the lights, switches and equipment that can be operated safely according to the room list; drain the water in the kitchen and toilet and look at the visible connections, drains and cabinet bottoms | Applicable WR1, equipment instructions, models and test delivery arrangements | Homeowners are not allowed to dismantle distribution boxes for inspection when doing work involving electricity; if there is a burning smell, sparks, or repeated switching, they should stop using it and call a registered electrical contractor. [2] |
| After the surface layer and furniture are completed | Look at the walls, bricks, and door cabinet openings under natural light and with lights on; open and close doors, drawers, window locks, and sanitary ware one by one. | Signed version of furniture plans, hardware and electrical appliance maintenance information, missing photo number | If only "beautiful" is written on the appearance, there is no position, size and completion standards, and it is easy to have disagreements during re-inspection. |
| Handover and re-inspection after cleaning | Redo the affected functional tests according to the leakage table; check whether each item is repaired, redone or replaced. | Final inspection, re-inspection results, payment and maintenance terms, receipt and contact information | Signing for the goods first but not recording the items that are still pending, or mistaking safety issues for general beauty treatments will increase subsequent risks. [1] |
The node is not a legally unified construction period or number of inspections, but allows the homeowner to leave visible evidence and documents at a point in time that can still be verified. Work involving structures, exterior walls, aluminum windows, gas, electricity, demolition or work at height should be handled by appropriately qualified persons. [1][2][3][4]

06
Quotation comparison: Before totaling, compare the project quantity, pricing unit and unpackaged items.
Compare totals only where the scope matches. Put location, quantity, unit, rate, labour, base materials, finishes, protection, demolition, removal, management fees, tests, insurance and warranty in the same worksheet. The Consumer Council notes that masonry area, strip-out depth, how electrical points are counted and which materials are included all affect the comparison.[1]
The most common misunderstandings are "to be determined": the number of sockets, furniture hardware, demolition depth, number of dump trucks, restrictions on going upstairs, or the condition of the grassroots on site. If it is not determined, you cannot pretend that it has been included. The method is not to fill in the unknown unit price with zero, nor is it to call all projects all-inclusive; it should be required to list the unit in which it will be calculated in the future, who will confirm it, when the price will be revised, and whether construction will be carried out before confirmation.
HK Create Design's online tools help organise an initial budget. The quick version gives sample estimates for defined work. It excludes complete kitchen and bathroom rebuilds, waterproofing, rewiring and replumbing,Bespoke furniture, tile finishes, sanitaryware, works insurance, management deposits and renovation administration fees. Saleable area × 3 is only an initial paintable area. The 20% allowance is for planning and is not an additional charge.[5] Therefore, after using the tools, it is still necessary to confirm with on-site measurements and written quotations.
- Compare totals only using the same area, the same operation, the same material level, and the same exclusions
- For each "to be determined" item, state the unit, reference unit price/calculation method, confirmer and price revision time
- Clarify demolition, protection, rubble, stair carry, management fees, equipment supply and installation separately
- Do not mistake the company's 2026 reference price for the Hong Kong market average or official contract quotation


07
Turn the initial calculation into a decision-making tool: area, unit price and reservation should be looked at separately
The initial calculation is most suitable for answering two questions: where is the approximate project quantity, and which unknown factors are worthy of confirmation first. It should not compress complex projects into a nice sum. If the quotation is in square feet, first ask whether the measurement is the usable area, floor area, wall and ceiling area, or furniture front area; the calculated area of the same "500-foot unit" can be completely different in different processes.
The detailed version of the company tool allows for adjusting quantities by project, and the public page also clearly indicates the minimum spend, unaccounted items and budget reservations. This helps the homeowner create a list of questions, but the actual project is still affected by measured dimensions, base, handling, building regulations and final materials.[5] On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Online estimates and enquiries are free. Confirm eligibility for free measurement on WhatsApp 52437747.[5]
The two calculation examples below deliberately separate the project quantity, selected unit price and planning reservation. They are not completed cases by the company, nor do they represent the average market price, certain construction period, or the all-inclusive price of the whole house. If your project has not yet obtained a verifiable unit price, it is enough to calculate the area and quantity first. Do not make assumptions about the unit price just to make up the total.
- Write the basis of measurement next to each quote: floor, wall and ceiling area, horizontal feet, number of pieces or number of trains
- Separate the "selected project subtotal" and "homeowner planning reservation" and do not describe the reservation as an automatic price increase
- After the initial calculation, please submit photos of the unit, size, location, material preferences and management office restrictions in exchange for a formal written scope.
- When there is no verifiable unit price, only the project quantity and unconfirmed projects will be counted, and the market price will not be guessed.
Example two: pricing three selected floor refurbishment stages in a 400 sq ft flat
Assumptions
- This is a calculation example, not a completed case by the company, a formal quotation, or the average price in the Hong Kong market.
- Assume only 400 sq ft of floor is included. The detailed calculator uses three items: removal down to the cement bed at HK$30 per sq ft, levelling at HK$22 per sq ft and standard straight laying of floor tiles up to 600 × 600 mm at HK$78 per sq ft.
- Assume that the homeowner reserves 15% for his own planning; the website explains that the reservation is not an automatic surcharge by the company.
- Ceramic tile fabrics, deep chiseling, special layouts, loading, additional removals, management office fees and unselected items are not included in this calculation.
How to calculate quantities
- Existing tile removal: 400 × HK$30 = HK$12,000.
- Floor levelling: 400 × HK$22 = HK$8,800.
- Labour for laying tiles in a straight pattern: 400 × HK$78 = HK$31,200.
- Three-item subtotal: HK$12,000 + HK$8,800 + HK$31,200 = HK$52,000.
- A 15% allowance and upper budget: HK$52,000 × 0.15 = HK$7,800.0. HK$52,000 + HK$7,800.0 = HK$59,800.0.
The subtotal of the three selected processes is HK$52,000; plus the 15% planning reservation set by the homeowner, the upper limit is HK$59,800.0. Break down each area, unit and exclusion before you can compare whether another quote also includes demolition, leveling and paving.
This example excludes tiles and unselected work. The same substrate conditions cannot be assumed throughout all 400 sq ft. For wet areas, specify waterproofing locations, materials, extent and testing separately. The Consumer Council recommends stating the actual masonry area and the materials covered by a labour-and-materials rate. [1][6]

08
The leaked form must be traceable: each item is numbered, and the test must be retested after repair.
A spreadsheet, PDF or message record can be used for the leakage report form, but do not omit the following fields: number, room/location, discovery date, problem description, photo or video number, requested action (repair, redo or replacement), organizer's reply, promised completion date, re-inspection results and re-inspection date. The problem description should write down the observed facts, and avoid writing down the reasons first. For example, writing "water droplets appeared after running water under the wash basin for 5 minutes" is easier for the appropriate person to follow up than directly writing "waterproof failure".
Fixing is not the same as being done. Any item that affects the function should be retested under the same or sufficient conditions: the door hinges must be opened and closed again, the water must be drained and then drained, and the sockets or equipment must be handled by appropriate personnel under safety conditions. If the repair involves electrical power, exterior walls, windows, structures or waterproofing, ask the contractor to explain who will arrange professional follow-up and what information will be handed over, rather than asking the homeowner to verify the hidden parts on his own.
Payment, balance, maintenance and dispute arrangements are subject to the signed contract. The Consumer Council reminds that the process, charges, payment and completion period of post-processing projects, as well as the completion period and maintenance period, should all be stated in the document.[1] This is consumer information and is not a legal conclusion on any individual case. When major disputes arise, independent consumer or legal advice may be obtained depending on the circumstances.
- Write only one thing per question to avoid mixing one number into multiple positions and responsibilities
- Attached are panoramic photos, close-up photos and photo numbers, and reproducible operation situations if necessary.
- Clearly write down the date of repair/rework/replacement and re-inspection, not just “follow up”
- After receiving the repair notice, update the re-inspection results; if it fails, the original number and new evidence will be retained.
09
What situations should not be treated as a general omission: stop, isolate and find qualified persons
structural elements, slabs, beams, columns, external walls, guardrails, gas pipes, shared building pipes,Aluminium windowsmain frames and positions at height fall outside a homeowner's DIY inspection. The Labour Department notes that domestic work can involve high-risk window replacement, drain work and electrical connections. Use qualified registered electrical workers for electrical work and a suitable working platform for work at height on external walls.[4] In these cases, non-essential operations must be stopped first and the contractor can arrange appropriate personnel and safety measures.
For windows, modifications to the facade, existing windows, glass facades or guardrails may involve different minor works and conditions. The Buildings Department also pointed out that external wall openings above the ground floor must have protective barriers of no less than 1.1 meters high. Some projects also involve conditions such as construction, span, opening and height according to the original design.[3] Therefore, when you see water leakage, lock failure or glass problems, you can record the phenomenon and stop dangerous operations, but you should not dismantle the frame or judge "just repair".
If there is smell or dust after renovation, cleaning and ventilation arrangements can be included in the settlement, but we cannot promise that a certain formaldehyde removal service will equal immediate safe move-in or guarantee healthy results. If you want to use a specific product or testing service, you should ask for its product model, applicable scenarios, construction conditions, data sources and restrictions; do not regard a single product promotion or overseas standard as a legal conclusion for Hong Kong housing.
- If burnt smell, sparks, concerns about electric leakage, continuous flooding, structural abnormalities or high-level risks are detected: stop using/operating and seek professional assistance.
- Exterior walls, window frames, protective fences, gas, public pipelines and structures: Do not dismantle, modify or test by yourself
- Before arranging demolition or work at height, check the contractor’s safety arrangements, worker training, insurance and building regulations
- Require specific products and testing data for deodorization, formaldehyde removal or health claims and do not treat them as a guarantee of stay.
FAQ
8 practical questions answered
01Should the renovation acceptance be done on the day the building is handed over, or should it be done already during construction?
This should be done in stages. Lock down the scope and template before starting work; keep the hidden project location and agreed tests before sealing, paving or covering; check the appearance, size and operation after the surface layer is completed; do handover and re-inspection after cleaning. This is not a legal fixed number of times, but to avoid delaying the discovery of invisible problems until the end.
02I found cracks in the wall, problems with the tiles, or irregular cabinet doors. How should I write a leak report?
Number one item per item, write the location, observable phenomena, dimensions or operation results, photo number, required disposal method and re-inspection date. For example, write "About 30cm crack on the wall next to the living room window, P-014". Don't just write "beautiful". Avoid judging the cause as waterproofing or structural problems without inspection; record the facts first, and then let the appropriate person judge.
03Can I open the distribution board or remove sockets myself to check completed work?
Can't. Homeowners can conduct non-destructive inspections of switches and appearance, but the electrical work involved in the renovation should be arranged by a registered electrical contractor. After the relevant new installation, addition, modification or repair is completed, a registered electrical engineer must inspect, test and issue a WR1 before turning on the electricity.[2] If there is a burning smell, sparks, overheating or frequent tripping of the switch, stop using it and arrange for inspection by a registered electrical contractor.
04Must kitchen and bathroom waterproofing always have a 24- or 48-hour flood test?
This article does not regard 24 or 48 hours as the statutory uniform rules for Hong Kong residences. What is more important is that the contract or quotation should list the waterproofing location, materials, scope, testing arrangements, recording methods and treatment after leakage is discovered before starting work. The Consumer Council also recommends that this information be stated in the quotation.[1] The actual method should be confirmed by system, site and professional arrangements.
05When you enter the usable area online and see the budget, is it an all-inclusive price for the whole house?
No. The quick version of HK Create Design is a sample estimate for a specified range. The public page states that it does not include complete kitchen and toilet reconstruction, waterproofing and plumbing resurfacing, custom-made furniture and ceramic tile fabrics, etc.; multiplying the usable area by 3 for painting is only a preliminary calculation. The 20% is a planning reservation and is not an automatic surcharge.[5] The formal scope and amount must still be confirmed with measurements and written quotation.
06For electrical switch, cement or demolition projects whose quotations appear "pending", what is a fair comparison?
Keep provisional items visible and leave unknown rates unresolved. For each, record the unit, pricing method, person confirming it, when the price will be set and whether work may proceed before confirmation. Compare quotes on the same quantities, materials and exclusions. The Consumer Council identifies electrical points, strip-out, masonry areas and material inclusions as cost drivers.[1]
07The aluminum window is leaking or the latch is not working properly. Can I remove the window frame to find the problem?
You should not remove window frames yourself or operate at high places. You can record the weather, location, window lock operation, and visible condition of the glass and glue edges at the time of the leak, and then have it evaluated by an appropriate professional. The Buildings Department classifies the construction, alteration, repair, replacement and demolition of windows or glass exterior walls according to engineering conditions and may involve lighting, ventilation, fire protection and protective barrier requirements.[3]
08How much does it cost for on-site measurement, online estimation and inquiry?
Online estimates and enquiries are free under the company's published terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. WhatsApp 52437747.[5] This is the company's current public arrangement and is not a unified practice in Hong Kong's renovation industry.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Consumer Council: Don’t want to overspend again? Read the renovation quotation! Accessed: 2026-10-21
- [2]Electrical and Mechanical Services Department: Household Electrical Safety Manual Accessed: 2026-10-21
- [3]Buildings Department: Minor works related to windows Accessed: 2026-10-21
- [4]Labor Department: Occupational Safety in Renovation and Maintenance Works - Notes to Owners and Tenants of Commercial and Residential Units Accessed: 2026-10-21
- [5]HK Create Design: 2026 Rapid Renovation Budget and Pricing Instructions Accessed: 2026-10-21
- [6]HK Create Design: 2026 detailed project budget and public price list Accessed: 2026-10-21