The first step: first admit that the "total price" cannot be compared, and then take it apart
Research by the Consumer Council shows that the primary considerations of respondents when choosing a renovation company include price and discounts, but 58% think that different quotation formats make it difficult, and 49% are concerned about rough quotations.[1] This is the most common contradiction faced by homeowners: One list seems cheap, but another list is very long. Length per se is not good or bad; the key is whether each one has the same commitment to the same job.
The most practical way is to create a "comparison draft" yourself first. Write down the projects that are retained, demolished, rebuilt, provided by customers, and not done at all by room, and then paste the words of the two companies into the same column. If A writes "renovating a toilet" and B writes "removal of bricks, waterproofing, paving, and installation of sanitary ware", don't worry about which one is the first; first ask whether A's package includes the processes listed by B one by one.
Each item must have at least five answers: where it is done, to what extent it is done, in what units it is measured, what materials or standards are used, who can approve changes and how it is priced. This is not about turning the quote into a legal document, but about allowing both parties to see the same thing before work begins.
- Save the floor plan, site photos and room list with the quote to avoid recalling the scope based on information alone.
- Each item is required to clearly indicate the square feet, square feet, number of pieces, points, number of cars or package boundaries; when there is no unit price, there must also be a verifiable definition of the package.
- Align the scope first, then compare the total amount, payment and schedule; do not use the lowest total price as a substitute for comparison.

02
Mistake one: “whole-flat strip-out” without identifying the layers to remove or how debris will be disposed of
“Whole-flat strip-out” can mean removing tiles, screed, cabinets, sanitaryware, non-structural partitions or flooring, or simply stripping visible finishes. Mark retained items room by room, then ask which removals are charged by area, linear foot, item or vehicle load. Record firmly bonded tiles, deeper hacking, sunken slabs and unknown wall conditions as items to confirm on site.
Garbage disposal also needs to be dismantled and asked: who puts it in the bag, who moves it downstairs, who arranges the transportation, whether it can be temporarily stored, and whether it needs to be coordinated with the building elevator and time period. The "soil removal per truck" in the public price does not mean that any project includes removal; the same company will also determine the actual scope of the kitchen and toilet demolition package and other projects based on the actual scope.[6] This example just illustrates that a single unit price expansion cannot be interpreted as an all-inclusive package.
If it involves possible structures, windows, exterior walls, gas or other high-risk locations, do not require workers to make decisions based on visual inspection on the spot. The Consumer Council pointed out that layout changes, window replacements and exterior wall improvements may affect the structure, environment or fire safety, and may not be considered ordinary interior renovation.[1] The quotation should first state "pending professional evaluation/pending verification by the management office or related procedures" instead of including unknown risks into a vague total price.
- Attached is a "removal/retention" photo list, especially of windows, built-in cabinets, door frames and sanitary ware.
- Separately list the disassembly, maintenance, transportation, removal and repair interfaces, and clarify the triggering conditions for price overrides in hidden situations.
- Do not demolish walls, windows or handle high-risk components by yourself; obtain appropriate professional advice and building arrangements first.
You can swipe left or right on your phone to view the complete table.
| Project scope | Quantity or specification required for quotation | The pricing boundary needs to be clarified | Common unpackaged or variables | What the homeowner does before signing the contract |
|---|---|---|---|---|
| Demolition and removal | List the removed and retained bricks, cabinets, sanitary ware, and floors room by room; list the quantities in square feet, linear feet, number of pieces, or number of cars. | Check separate charges for removal to the mortar bed or concrete, bagging, temporary storage, carrying downstairs and lawful disposal. | The old bricks are solidified, deep cut, lift arrangements, protection of common areas, and management restrictions. | Use on-site photos to mark reserved items; list unknown grassroots as tentative items, and agree on written price review procedures after discovery. |
| Plastering, waterproofing, tiling and painting | List the construction location, expansion area, brick size and laying method, base treatment, and who supplies the base material and fabric. | Clarify whether labour, levelling, special finishes, wastage, finish tiles and waterproofing are all included. “Labour and materials” alone gives too little detail. | Condition of wall and foundation, odd-shaped or large-sized bricks, repair scope, material substitution, testing and repair after failure. | Require pre-construction samples or models; write down the acceptance location, test methods and who will be responsible for the scope of disassembly and modification after failure. |
| Water supply, water removal and sanitary ware | Draw the start point, routes, exposed and concealed pipes, fixture locations, opening-up and reinstatement. Separate the supply of fixtures from installation. | Don’t just write “whole house pipe replacement”; you should explain the application, designated person, inspection, testing and record keeping responsibilities. | Concealed pipes, leakage sources, shared locations, sanitary ware accessories, and repairs after excavation. | Obtain the licensed/designated person information from the contractor and verify with the Water Supplies Department whether the works are minor in nature if in doubt. |
| Fixed electrical installation | The flat diagram shows the location of sockets, light switches, lamp positions, circuits, electrical boxes, panels and major electrical appliances; write the quantity for each item. | Separate new points, relocations, concealed chasing, upgraded faceplates, testing and certificates in place of a single “electrical point” allowance. | Existing wiring and loads, wall obstructions, air conditioning and hot water equipment requirements, post-completion documentation. | First, lock down the equipment list and location; check the registered electrical contractor’s information, and do not treat the fixture work as ordinary miscellaneous items. |
| Bespoke furniture | Each cabinet comes with width, height, depth, inner grid, plate, door style, edge sealing, hardware, light strip and drawing version. | It can be measured in square feet, area, or per piece, but minimum dimensions, wall cabinet heights, and hardware upgrades must be traceable. | Covering scales to change drawings, transporting upstairs, installation, countertops, handles, electrical openings, and on-site closing. | The dimensions will be locked after confirming the construction drawings; if there are differences in on-site dimensions, obtain new drawings and written confirmation of the difference first. |
| Building arrangement, professional engineering and finishing | List management office application, protection, working hours, insurance, cleaning, garbage, leakage, maintenance scope and exceptions. | Exterior walls, windows, pattern changes or safety risk projects cannot be presumed to be done as general interior renovation packages. | Management office fees and deposits, professional assessments, additional security arrangements, and delays in the arrival of customer-supplied materials. | Ask the management office about the rules first; if it involves high-risk or regulated projects, arrange for corresponding professional planning and verification before deciding whether to include it in the quotation. |
The table is a method used to align two quotations, not a legally unified quotation format. The Consumer Council's research pointed out that only 28% of the quotations of the research sample listed the quantity of each project and 20% listed the unit price; therefore, the quantity, boundary and change procedures should be completed first. [1] The qualifications and procedures for fixed electrical installations and water supply projects should be verified with the corresponding departments or professionals based on the actual scope. [2] [3] [1][2][3][4]



03
Common problem 2: masonry, waterproofing, tiling and painting all say “labour and materials” without identifying the materials
A “labour and materials” quote can leave finishes, substrate materials, accessories, wastage and edges unclear. Tiling may involve strip-out, levelling, waterproofing, laying, grouting and mitred or other special edges. Painting may involve local stripping, skimming, priming, topcoats and addressing the source of mould or seepage. Match each stage across quotes to see what is included.
When it comes to waterproofing, you shouldn’t just ask “has it been done?” You should ask which position to do, how to handle the handover with the wall and floor, which confirmed material or system to use, when to arrange the test, what observable results to accept, and if it fails, who is responsible for disassembly, modification and restoration. This article does not consider a certain water closure hour or slope as a general legal figure in Hong Kong, because engineering conditions, material requirements and management office rules vary; testing and acceptance agreed by both parties should be included in the quotation.
The actual painted surface differs from a flat's saleable area. The company's quick estimate uses saleable area × 3 only as a preliminary allowance.[5] If another quotation is directly calculated based on the usable area only, or only covers the walls but not the ceiling, the total price will not be comparable. First ask about the measurement standard, the scope of the shovel bottom and whether there is continuous water seepage, and then discuss the unit price.
- For each material, write down the brand, model, color number, thickness or acceptable alternative procedures; if not specified, at least write down performance and supply responsibilities.
- The waterproofing project will be separately listed in terms of location, testing, acceptance and failure handling, and will not be guaranteed by the unified hours circulated on the Internet.
- The paint quotation indicates whether walls, ceilings, door frames or other locations are included, and the difference between partial shoveling and comprehensive treatment.
04
Common problem three: The water pipe only says "whole house pipe replacement", but there are no routes, responsibilities and records.
Before "changing the pipe", the starting point and the end point must be clearly stated: which gate or connection position starts, which section of water supply and drainage is to be changed, whether the open pipe or the concealed pipe is included, whether excavation, sealing, plastering and ceramic tile restoration are included. It is also necessary to distinguish whether sanitary ware, faucets, air insulation, and dewatering accessories are supplied by the customer, provided by the contractor, or only included in the installation package. If the quote does not include a route map or location markings, it will also be difficult to trace future repairs after completion.
The Water Supplies Department explains that in principle, the construction, installation, alteration or dismantling of fire water supply or internal water supply systems must first obtain written permission from the Water Authority; minor alterations or repairs may be exempted. Designated projects are also requested by designated parties. If there is any doubt, the Water Supplies Department recommends notifying the Water Supervisory Authority to obtain opinions.[3] Therefore, it is not advisable to arbitrarily write "no application is required" or "a summary application" in the quotation. Instead, it should be clearly stated who will judge, submit, and keep records.
Homeowners can ask the contractor to provide information about the responsible person, and write down the test or inspection arrangements, visible inspection locations and delivery records in the quotation. There is no need to connect the pipes yourself or the properties of the changes are minor; site conditions, connection locations and building regulations will all affect the treatment method.
- Separate water supply, drainage, sanitary ware and excavation restoration into independent items to avoid covering up the scope of "water pipes in one type".
- Request an explanation of who checks the permission or exemption, who arranges for the licensed/designated person, and who delivers the records.
- Confirm the arrangement of route photos and deliverable information before sealing trenches or bricks.
Example one: how work quantities produce a HK$77,200 basic renovation subtotal for a 400 sq ft flat
Assumptions
- This is a teaching calculation based on the fixed example unit price on the company's public details page. It is not a completed case of the company, nor a formal quotation, nor the average price in the Hong Kong market.
- Assume that 400 square feet is fully included in the labor for removing wall/floor tiles, leveling the floor, and laying floor tiles of 600×600 mm or below.
- The painting example uses 400 × 3 = 1,200 sq ft of surface area at HK$21 per square foot for patching, damp treatment, sanding and painting. It excludes finish tiles, full kitchens and bathrooms, plumbing and electrical work, furniture, sanitaryware, management fees and unselected items.
How to calculate quantities
- 400 sq ft × HK$30 = HK$12,000 for removing wall or floor tiles.
- 400 sq ft × HK$22 = HK$8,800 for floor levelling.
- 400 sq ft × HK$78 = HK$31,200 for labour to lay floor tiles of 600×600 mm or smaller in a straight pattern.
- 1,200 sq ft × HK$21 = HK$25,200 for patching, moisture treatment, sanding and painting.
- Total: HK$12,000 + HK$8,800 + HK$31,200 + HK$25,200 = HK$77,200. An optional 15% planning allowance is HK$77,200 × 15% = HK$11,580, giving an upper budget of HK$88,780.
Under this assumption, the subtotal cost of the four selected projects is HK$77,200; after adding in the 15% planning reservation, it is HK$88,780. Reservations are used to manage unconfirmed scope and are not an automatic additional charge or committed all-inclusive cap.
The result changes with actual area, substrate, tile specification, special finishing, waste and management arrangements. The example leaves unverified items unpriced. Agree the scope against site measurements and a formal quotation before signing. [5][6]

05
Mistake four: leaving electrical positions “to be confirmed” and paying later for each point, cable and chase
Electricity quotations are most afraid of calling everything "one potential". Modifications to sockets, lamp positions, two-way switches, network positions, exhaust fans, air conditioners, cooking equipment, hot water equipment and distribution boxes may not necessarily involve the same wiring, the same construction difficulty or the same document requirements. The most effective way is to first place the furniture and electrical appliances on the floor plan, mark each point, control relationship, reserved equipment and electrical box locations, and then ask one by one how to plan for new additions, relocations, replacement of panels only, grooving of concealed pipes, and repairs.
The Electrical and Mechanical Services Department points out that contractors engaged in electrical works for fixed electrical installations must be registered; the scope includes the installation, testing, alteration, maintenance, supervision and certification of distribution boxes, fixed wiring and fixed lighting fixtures.[2] For fixed installations, identify the contractor, the testing and the handover documents in the quotation. Verify the relevant registration and credentials.
Security arrangements should also be written next to the corresponding items. The Labor Department stated that work on live conductors should generally not be carried out; if it is necessary due to the nature of the task, it should be handled by registered electrical workers of the corresponding level and prescribed safety measures should be taken.[4] The homeowner's decision is to confirm professional arrangements and documents, not to learn live work on his own or to exchange risks for a lower quote.
- List the locations of home appliances and furniture first, then freeze the location map; if there are any changes, confirm them with the new map and the written difference.
- Distinguish between new installation, relocation, retention, removal and panel replacement, and do not count them all as the same "position".
- Responsibility for verifying registered electrical contractor information, testing and delivery documents, but do not accept general claims of qualifications without verification.
You can swipe left or right on your phone to view the complete table.
| Public projects and units | 2026 company reference unit price | stated range | Not included/variable | Issues that cannot be omitted when comparing |
|---|---|---|---|---|
| Remove wall/floor tiles (square sq ft) | HK$30 per sq ft | Remove to the cement bed, provide basic protection, and bag the waste for temporary storage. | The old bricks may need to be chiseled until concrete is visible. An additional HK$10/sq.ft. may be added as listed on the page. | Are your quantities for wall tiles, floor tiles, or both? Are removal, removal and final legal disposal included? |
| Remove the floor with floor tiles (square sq ft) | HK$52 per sq ft | Lift the tiles, hack the cement bed back to the concrete and clear loose debris. | The position of deep chisels and caissons is discussed separately. | Does strip-out stop at the tile face, or does it include the cement bed? How will extra depth or a recessed slab be measured and repriced? |
| Non-main brick wall demolition (square sq ft) | HK$69/square foot; minimum HK$2,800 | Remove non-structural partition walls and repair wall, floor and ceiling joints. | Non-structural walls need to be confirmed before starting construction; if applicable, they will be handled in accordance with the minor works regulations of the Buildings Department. | Who confirms the wall type and applicable procedures? How does the minimum charge apply to the measured area? |
| Remove construction debris (per truckload) | HK$4,200 per truckload. Small jobs may be charged by the bag, with a minimum charge of HK$2,000. | Moving downstairs, trucking away and legal disposal, the page states that government disposal fees are included. | A09/A10 kitchen and toilet demolition has been moved; whether other items need to be cleared and transported depends on the scope. | How many cars or bags are expected? How to confirm the building's working hours, elevators, temporary storage locations, and when the budget is exceeded? |
This table shows only HK Create Design's published October 2026 rates. They are neither Hong Kong market averages nor a formal quotation. Customer-supplied items such as tiles and sanitaryware, management fees and unselected work are excluded. Payment is based on actual scope, site conditions and the formal written quotation. [6] [6]

06
Mistake five: comparing only the per-foot cabinet price while leaving doors, hardware and edge finishes out of the quotation
The comparable unit for furniture is not just “feet”. For a wardrobe of the same width, the depth, height, cabinet and door panel materials, panel thickness, back panel, edge sealing, drawers, rails, door hinges, handles, light strips, countertops, electrical openings and inner compartments will all change the method and cost. If the quote only states "per square foot of wardrobe," first ask whether it is based on cabinet width or front area, whether the minimum size applies, and what hardware is included.
More important is version management. First use the floor plan to discuss living needs, then use the elevation to confirm the width, height, depth and configuration of each cabinet; finally, write the construction drawing number and date on the confirmation document. If you want to change the drawing after taking measurements on site, you should first see the changed dimensions, materials and difference before making a decision. This is much more reliable than arguing "I thought there were three drawers" after you're done.
There are also responsible boundaries for transportation, going upstairs, assembly, maintenance, closing to walls or ceilings, and when guest power supplies arrive. Don't shoehorn unmeasured customer products or unconfirmed closings into a seemingly complete total price for furniture.
- Each cabinet has at least size, configuration, plate material, door style, hardware, color and drawing version.
- Mark "Customer supplied/Contractor supplied/Responsible for installation only" next to electrical appliances, countertops, handles and light strips.
- Drawing changes and differences after overlaying must be confirmed in writing before production.

07
Mistake six: leaving building procedures, cleaning, warranty, insurance and safety until the end
Many late orders were added not because the process suddenly appeared, but because the building requirements were not asked in the early stage. Before starting work, you should check with the management office about renovation applications, working hours, elevator and corridor protection, temporary waste storage, deposits, transportation arrangements and the availability of specific work. If the quotation says "Administration fee is additional," ask clearly what the fee is, who pays it, and whether a receipt can be obtained; do not write the unknown amount as zero or assume it is included.
The use of paints, solvents and other flammable materials cannot be masked by cleanliness alone. The Labor Department reminds that appropriate fire protection equipment and ventilation should be used when using flammable materials. Open flames and flammable processes should not be carried out at the same work place at the same time.[4] Homeowners should confirm how the construction party arranges the work, rather than directing dangerous processes on their own.
For statements such as "Formaldehyde removal" and "Safe move-in today", you should especially ask about the product, construction scope, ventilation conditions, test standards and non-guaranteed matters. Without actual testing and on-site conditions provided by the company, service promotion cannot be regarded as a guarantee of health or occupancy. Cleaning, leakage control, workmanship maintenance, insurance coverage and exceptions should also be listed separately and checked before acceptance.
- Obtain applicable written requirements from the management office before starting work, and include fees, deposits, maintenance and waste responsibilities in the bid.
- It is required to list the location of completed cleaning, the method for submitting leaks, and the maintenance coverage and exclusions; do not just accept a verbal "follow-up".
- Chemical treatment or formaldehyde removal services can only be evaluated based on specific product information and site conditions and should not be considered a health or occupancy guarantee.
Example two: why repainting quotations for 1,500 and 1,000 sq ft cannot be compared by total alone
Assumptions
- This is a hypothetical example comparing quote quantities, not a customer case. Assuming that the unit's salable area is 500 square feet, first use the company's preliminary calculation formula for quick estimation to calculate the salable area x 3 to get the expanded area of 1,500 square feet.
- Quote A lists 1,500 sq ft and Quote B lists 1,000 sq ft. To isolate the quantity difference, the example applies the same HK$21 per square foot rate for patching, damp treatment, sanding and painting to both.
- It has not yet been assumed whether the two quotations actually include the same amount of shoveling, dusting, primer, furniture covering or ceiling.
How to calculate quantities
- Quote A covers 500 sq ft × 3 = 1,500 sq ft. At HK$21 per sq ft, its subtotal is HK$31,500.
- Quote B covers 1,000 sq ft. The difference between A and B is 1,500 − 1,000 = 500 sq ft.
- At the same illustrative rate, the quantity difference costs 500 sq ft × HK$21 = HK$10,500.
- If the owner adds a 20% planning allowance only to quote A's HK$31,500, the allowance is HK$6,300 and the upper budget is HK$37,800. This 20% is not an automatic contractor charge.
Under the premise of deliberately fixing the unit price, the quantity difference of 500 square feet alone is already HK$10,500. The correct question is not which one is "flatter", but which walls, ceilings or processes are missing from B's quotation, and whether their measurement standards can be added to the same drawing.
"Usable area × 3" is only the company's initial calculation assumption and cannot replace on-site measurements; HK$21 is also a public example of the company's specified process and does not represent other paint specifications or Hong Kong prices. For any dampness, loose dust or continuous water seepage, the source and scope of repair must be determined first. [5][6]


08
Changes are not impossible: you must first set up a price review process that will not get out of control
The old building base, internal wall conduits, leakage sources and site dimensions may all cause the original plan to need to be adjusted. A good quotation does not pretend that there are no changes, but defines in advance how the changes will occur: who discovers them, how they are described in photos or drawings, what quantities and unit prices are provided, who has the authority to approve in writing, whether construction can occur before approval, and what impact it will have on the schedule.
The simplest change order can include the original project number, location, reason, before and after quantities, unit price or new package items, increase or decrease amount, picture attachments, construction impact and confirmation date. This can turn "Master's words to add" into reviewable, rejectable or replaceable options. For work that has not been confirmed, the owner's consent should not be automatically deemed to be due to verbal eagerness.
Payment nodes should also respond to verifiable results, such as specific processes that have been completed and can be inspected, materials have been confirmed on site, or documents have been delivered, rather than replacing work content with empty percentages. This article does not provide a general payment ratio, because the project scope, risks and contract arrangements are different; only by writing down the acceptable results of each period clearly can we judge whether the arrangement is reasonable.
- Use the same written change record for all additions, deletions, material changes, and on-site discovery items.
- Each price review is accompanied by location photos, measurement methods and affected drawing versions.
- The payment node corresponds to specific checkable results, documents or materials, rather than just writing a list of proportions.
09
What are online estimates suitable for? When to Stop at "Reference" and Arrange Measurements
The online calculator helps organise priorities and explore different budgets before choosing whole-flat refurbishment, repainting only or flooring first. HK Create Design's quick version gives three examples and states that basic whole-flat refurbishment excludes full kitchen and bathroom rebuilds, rewiring and replumbing,Bespoke furnitureand tile finishes. It is therefore not an all-inclusive price for the whole flat.[5] When using it, the result should be regarded as the "preliminary calculation of the selected range", not the total amount that can be directly contracted.
The company's calculator has 117 projects and supporting options, divided into 8 categories, 116 items are listed with reference unit prices, and 1 rooftop package is yet to be revised.[5] Having many options does not mean that all processes are included. In particular, windows, leaks, structures, high-risk demolition and furniture with unknown on-site dimensions must still be formally confirmed based on photos, measurements, management office conditions and professional planning.
Online estimates and enquiries are free. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Enquire on WhatsApp 52437747.[5] A site survey records positions, quantities, substrates and working conditions. Use the written quotation to confirm each inclusion afterwards, including anything discussed verbally.
- First use the online estimate to determine what is to be done and what is not included, and then bring photos, floor plans, dimensions and building regulations for on-site communication.
- If the project involves structure, windows or exterior walls, fixed electricity, water supply, leakage or hazardous demolition, check the corresponding professional arrangements first and do not rely on area estimates.
- After receiving the formal quotation, bid all examples, assumptions, customer-supplied materials, and items to be revised back to the comparison draft one by one.
FAQ
6 practical questions answered
01The two quotes are very different. What should be the first question?
Ask first, "Do the two copies do the same thing?" Don't ask if the price can be reduced first. Put units, rooms, locations, quantities, materials, protection, removal, repairs, testing, documents and unpackaged items on the same draft. Pay special attention to the fact that one package item says "toilet renovation", while the other item separates demolition, waterproofing, tiling, sanitary ware, and cleaning. Unless they are aligned, the total amount is meaningless. Only 28% of the samples in the Consumer Council's study listed the number, which just shows that this step is often ignored.[1]
02Is it necessarily unacceptable to quote "according to actual quantity"?
uncertain. The condition of the walls, the adhesion of old bricks, hidden pipes and on-site coverings may indeed prevent the quantity from being fully determined initially. The key point is to rewrite "according to actual quantity" into a verifiable procedure: what is measured, in what unit, who measures it and when, which unit price or package is used, how to confirm it with photos or drawings, and whether written approval is required before the original estimate is exceeded. Without the actual measurement of this information, it is a risk that is difficult for the homeowner to control.
03What documents and qualifications should I request for plumbing and electrical work?
Regarding fixed electrical installations, you can obtain information on registered electrical contractors and ask who is responsible for fixed wiring, electrical boxes, testing and delivery documents; the Electrical and Mechanical Services Department lists distribution boxes, fixed wiring and fixed lighting fixtures as examples of fixed electrical installations.[2] For water supply, ask who checks routes, permits or minor exemptions, who arranges designated persons, and what records are kept. The Water Supplies Department pointed out that internal water supply system projects are subject to written permission and designated person requirements, but whether there are actual exemptions must be judged on a project-by-project basis.[3]
04Can waterproofing projects only be written as "waterproofing"?
You should not just write these four words. The quotation should confirm the location, wall-to-floor handover, materials or systems, pre-construction base conditions, testing methods, acceptance standards and arrangements for demolition and modification after failure. This article does not regard a certain number of water closure hours commonly seen online as a legal requirement that applies uniformly in Hong Kong, because the site, material information, design and management requirements are different. What you need is not a beautiful number, but an agreement that is enforceable and acceptable to both parties.
05Can the budget shown on the online estimate be regarded as an all-inclusive price for the whole house?
No. Our quick estimate for a basic renovation excludes full kitchen and bathroom reconstruction, replumbing, rewiring, fitted furniture and tile finishes. Multiplying saleable area by 3 gives only a preliminary painting area.[5] The 20% of the upper limit is a planning reservation and is not an additional charge by the company. Use the estimate as the starting point for the scope discussion, followed by measurements, quantities, materials, and a formal written quote.
06If you find that you need to pay more after construction starts, how can the homeowner avoid being passive?
First request the suspension of the irreversible process within the scope of the change, and ask the other party to explain in writing the location, reasons, photos, original and new quantities, unit price or new package items, increase or decrease amounts, and the impact on the schedule. You can compare fixes, alternatives, or no options and confirm in writing. This is general project management practice and not legal advice; if a dispute has affected rights, obligations or payments, documents should be retained and appropriate independent advice should be sought.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Consumer Council: Home Renovation Industry — Better Governance for Creating Comfortable Homes Accessed: 2026-10-21
- [2]Electrical and Mechanical Services Department: Registering as an Electrical Contractor for Electrical Work Accessed: 2026-10-21
- [3]Water Supplies Department: Licensed Plumbers Accessed: 2026-10-21
- [4]Labor Department: Occupational Safety and Health Management in Renovation and Maintenance Works for the Property Management Industry Accessed: 2026-10-21