Skip to main content

PLUMBING & ELECTRICAL

Plumbing and electrical renovations in 2026: pipes, wiring, sockets, distribution boards and water heaters

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Replace the distribution board: HK$6,800 per itemPublished prices · Estimate the cost of 117 work items online
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

Plumbing and electrical work is the most "invisible" yet most safety-critical part of renovation: once wires and pipes are sealed into walls or tiled over, any later problem means opening up again. HK Create Design first sends a tradesman to inspect the existing consumer unit, circuits, pipe routes and drainage falls, then quotes item by item based on your power needs and kitchen and bathroom layout; electrical works are carried out, tested and certified with WR1 by registered electrical workers arranged by a registered electrical contractor, plumbing works are handled by qualified persons per Water Supplies Department rules, and gas water heaters are handled by a registered gas contractor. This page explains the regulations, processes, how prices are calculated, and what you should check at handover.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design rendering of Hong Kong plumbing and electrical work, including replacement wiring and pipework and additional power points
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Wall chases for electrical conduits at a flat in Tai Kok Tsui
    Site photoTai Kok Tsui · Plumbing and electrical work · June 2026
  • New electricity meter box and main switch in a Tai Wai village house
    Completed project photosTung Lo Wan Village, Tai Wai · Plumbing and electrical work · July 2026
  • Wall chased for rewiring at a flat in Ho Man Tin Estate
    Site photoHo Man Tin Estate · Plumbing and electrical work · May 2026
  • Electrical conduits being relaid in the floor at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Plumbing and electrical work · July 2026
  • New sockets and floor conduits at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Plumbing and electrical work · July 2026
  • Rewiring and new conduits at Royal Peninsula, Hung Hom | HK Create Design
    Site photoRoyal Peninsula, Hung Hom · Electrical work · July 2026
  • Project photo of rewiring and conduit replacement at Dandenong Mansion, Wan Chai | HK Create Design
    Site photoDandenong Mansion, Wan Chai · Electrical work · July 2026
  • Distribution board replacement and electrical distribution work at Dandenong Mansion, Wan Chai | HK Create Design
    Site photoDandenong Mansion, Wan Chai · Electrical work · July 2026
  • Rewiring and new conduits in Tung Lo Wan Village, Tai Wai | HK Create Design
    Site photoTung Lo Wan Village, Tai Wai · Electrical work · July 2026
  • Site photo of floor channels for pipework at Yat Man House, Ho Man Tin Estate | HK Create Design
    Site photoYat Man House, Ho Man Tin Estate · Plumbing · May 2026
  • Project photo of plumbing work at Yat Man House, Ho Man Tin Estate | HK Create Design
    Site photoYat Man House, Ho Man Tin Estate · Plumbing · May 2026

Compare the scope shown in the photos

Illustrated comparison of options

  • Compare the exposed pipe chase with the finished wall.
    Wall chasing and making goodCheck the number of electrical points, cable routes and wall reinstatement included after chasing.

WORKED EXAMPLE

Estimate the cost of plumbing and electrical work for your own project

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Estimated electrical upgrade budget for an older flat: distribution board, dedicated circuits and sockets

  • H09 Replace an electrical box (HK$6,800)
  • H06 two new dedicated circuits, for a water heater and induction hob, at HK$3,350 each
  • H02 Added 13A unit socket (concealed outlet), based on the number of input groups (HK$640/group)
  • Excludes increased entry capacity, lighting fixtures, false ceilings and wall tile slots
  1. H09 Replace the electrical box1 × HK$6,800HK$6,800
  2. H06 Add independent loop × 22 circuits × HK$3,350HK$6,700
  3. H02 Added 13A unit socketNumber of sockets × HK$640HK$3,840

Reference project fee for power upgradeHK$17,340

This is a calculation from list rates. Have the electrical contractor inspect the circuits, board location, cable lengths and possible need for a supply upgrade, then confirm a written price. [16]

Estimated budget for renovation of toilet water pipes

  • G04 Toilet complete set of hot and cold water pipes (shower, toilet, wash basin water flow, pressure test) HK$13,300
  • K01 toilet installation HK$1,300, K02 wash basin with faucet HK$1,150, K03 shower faucet HK$970
  • In addition, based on the number of input digits G02 Changing the hot and cold water pipe locations HK$1,700/person
  • Brick removal, waterproofing, tile paving, sanitary ware itself and toilet displacement are not included.
  1. G04 Toilet complete set of hot and cold water pipes1 item × HK$13,300HK$13,300
  2. K01+K02+K03 Install sanitary wareHK$1,300+HK$1,150+HK$970HK$3,420
  3. G02 Change the hot and cold water pipe positionNumber of digits × HK$1,700HK$3,400

Toilet water pipe reference engineering feeHK$20,120

If you need to move the toilet (G07, starting from HK$9,300), dismantle the toilet (A10) or waterproof (C02), additional charges will be required; the final quotation will be based on the written quotation after on-site measurements. [16]

Whole-flat rewiring budget: mid-range example

  • H09 — replace one distribution board, HK$6,800
  • H06 — 2 new dedicated circuits for the water heater and induction hob, HK$3,350 each
  • H04 — 8 replacement light switches with wiring at HK$430 each
  • H03 — 3 sets of double sockets, TV or network outlets at HK$1,200 per set
  • H02 single 13 A sockets at HK$640 per set, based on the quantity entered
  • Excludes increased incoming capacity, light fittings and suspended ceiling lighting points
  1. H09 Replace the electrical box1 × HK$6,800HK$6,800
  2. H06 — dedicated circuit × 22 circuits × HK$3,350HK$6,700
  3. H04 — replace light switches and wiring × 88 × HK$430HK$3,440
  4. H03 — double sockets or TV outlets × 33 sets × HK$1,200HK$3,600
  5. H02 — 13 A single socketNumber of sockets × HK$640HK$5,120

Indicative cost of whole-flat rewiringHK$25,660

The example with 8 socket sets totals HK$25,660. Count actual circuits, sockets and switches on site. The registered electrical contractor provides form WR1 on completion. The final price is confirmed in the written quotation. [16]

HOW WE HELP

How can we help you

Inspect first, then quote

We inspect the distribution board, circuits, water pressure and drainage on site and investigate locally where needed. Photographs help explain the issue before any recommendation for complete replacement.

Electricity is the responsibility of registered persons

The electrical project arranges for registered electrical contractors and registered electrical engineering personnel to construct, test and issue WR1. You can check the registration number when receiving the goods.

Water pipe pressure test, photo archive

Pressure-test pipes and photograph concealed work before closing walls. Keep a record of pipe and cable routes for future repairs.

Public unit price, item-by-item quotation

Sockets are by group, lamps are by lamps, circuits are by strips, and water pipes are by location. All prices are quoted from the public. All 117 price items are public. You can add or subtract by yourself.

Coordinate with whole house project schedule

Coordinate services with demolition, waterproofing, masonry and carpentry to avoid reopening finished floors. Assign gas water heater work to a registered gas contractor and record the division of responsibility.

Completion and clearance

Garbage removal, sweeping, and basic cleaning; deep cleaning or formaldehyde removal can be followed up by a professional cleaning company.

Coordinated fresh-water pipe replacement

HK Create Design coordinates the replacement of fresh-water pipes. Our partner licensed plumber submits required applications to the Water Supplies Department on your behalf.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same wall with concealed pipes and wiring, new sockets, a covered distribution board, white paint and new white tiles.
Before concept: exposed ageing wiring, yellowed sockets, untidy distribution board wiring and rusty surface-mounted pipes in an old kitchen corridor.
Illustration before workIllustration of the proposed result
Design illustration · Design example: plumbing and electrical renovation

KEY NUMBERS

Plumbing and electrical work: figures to check before work begins

government/official

590 cases

Electrical and Mechanical Services Department’s investigation into reported electrical incidents in 2025

The expenditure budget targets of the Electrical and Mechanical Services Department are: 595 cases in 2024, 590 cases in 2025, and 590 cases in the 2026 budget. The figures cover all reported cases, not just residences.

[1]

government/official

47,299 cases

Water seepage cases received by the Joint Water Seepage Complaint Investigation Office in 2024

The 2020 figure was 39,166, a rise of around 20% over five years. In the same year, investigators identified the source of seepage in 5,080 cases. The source can be a pipe, waterproofing or a drain.

[12]

government/official

9,402 buildings

Private mixed-use and domestic buildings aged 50 years or above

As of the end of 2025, there were a total of 36,546 private mixed-use and residential buildings in Hong Kong, of which 24,874 were 30 years or older; many of the original electrical wiring and galvanized iron pipes in old buildings were due for replacement.

[15]

government/official

100A/5 years

Periodic testing (WR2) threshold

Fixed electrical installations in residential or commercial premises with a permitted load exceeding 100 amps must be inspected, tested and certified at least once every 5 years, and the WR2 must be submitted to the Electrical and Mechanical Department for endorsement.

[7]

government/official

0.6m

Minimum distance between bathroom socket and bathtub/shower basin

The Electrical and Mechanical Department's Household Electrical Safety Manual states that socket circuits must also be protected by current leakage circuit breakers (water and gas switches).

[6]

company public price

HK$6,800/piece

Replace the electrical box (H09)

The old fuse box should be converted into MCB/RCD and the circuit should be marked; it is necessary to apply to the power company to increase the capacity of the house. This will be negotiated separately.

[16]

company public price

HK$22,300/item

Whole house water pipe replacement (kitchen and toilet, G05)

Complete replacement of kitchen and toilet including pressure test; reconstruction of underground pipes and cutting of walls to open roads are separately discussed.

[16]

CHARTS

Plumbing and electrical work figures at a glance

Electrical and Mechanical Services Department investigates reported electrical accidents (cases)(Unit: cases)
2019
485
2020
457
2021
516
2022
478
2023
524
2024
595
2025
590

The figures for 2019 come from the 2020-21 budget reply of the Electrical and Mechanical Department; the actual figures for 2020-2025 come from Head 42 "Investigation of Notified Electrical Incidents" in the previous years' expenditure estimates. Covers all reported cases in Hong Kong, not just residential buildings. [4][3][2][1]

Water seepage cases (cases) received by the Joint Water Seepage Complaint Investigation Office(Unit: cases)
2020
39,166
2021
43,233
2022
39,555
2023
45,033
2024
47,299

Food and Environmental Hygiene Department Legislative Council Budget Reply EEB(F)130. Causes of water seepage include water pipes, drains, waterproof layers, etc.; the number of "identifying the source of water seepage" cases will be 5,080 in 2024. [12]

FULL GUIDE

Plumbing and electrical work: stages and points to check

How common are plumbing and electrical problems in Hong Kong?

Reported electrical incidents investigated by the Electrical and Mechanical Services Department rose from 485 in 2019 to 595 in 2024, with 590 in 2025. These include homes, shops and other premises and many causes beyond renovation. Ageing installations, overloading and unsuitable alterations remain relevant risks.

The Joint Office received 47,299 seepage cases in 2024, around 20% more than the 39,166 recorded in 2020. Possible sources include pipes, bathroom waterproofing, drains or window surrounds. Finding the source can require access behind floors or ceilings.

At the end of 2025, Hong Kong had 36,546 private composite and domestic buildings, including 24,874 at least 30 years old and 9,402 at least 50 years old. Age alone does not determine whether services need replacing. Original wiring, old fuse boxes and galvanised iron pipes are worth inspecting during a whole-flat renovation, when access can save time and cost.

[1][4][12][15]

Regulations for electrical engineering: WR1, WR2 and registered electrical workers

Fixed electrical installations in Hong Kong are regulated by the Electricity Ordinance and the Electricity (Wiring) Regulations. The Mechanical and Electrical and Mechanical Department's Household Electrical Safety Manual is very clear: newly installed electrical installations, as well as newly added or modified parts of original installations, must comply with current statutory safety standards. Before addition or modification, users should arrange for a registered electrical contractor to conduct a feasibility assessment and consider future electricity consumption to decide whether it is necessary to apply to the power company to increase the allowable load.

After the completion of the project (including new installation, addition, modification or repair), the electrical installation must be inspected and tested by a registered electrical worker before powering on, and a "Completion Certificate" (Form WR1) will be issued by the registered electrical contractor and the engineer. WR1 does not need to be handed over to the Electrical and Mechanical Department, but the owner should keep it properly as it may be needed in the future when selling the property, applying for power increase, or making insurance claims.

WR2 is another matter: for residential or commercial premises with a permitted load exceeding 100 amps, fixed electrical installations must be inspected, tested and certified at least once every 5 years. WR2 must be signed by the Electrical and Mechanical Department. Most general residential units do not exceed 100A, but the EMSD also reminds that even if it does not exceed, regular inspections by registered electrical contractors should be arranged.

Registered electrical workers are classified according to the type of work: Class A can handle low-voltage fixed electrical installations with a maximum power demand not exceeding 400 amperes, Class B can handle low-voltage fixed electrical installations with a maximum power demand not exceeding 2,500 amperes, Class C can handle low-voltage installations of any power, and there are Class H (high voltage) and Class R (certain categories). It is generally sufficient for residential units to be handled by Grade A or above personnel, but the actual load of public facilities in shops or buildings must be checked.

  • WR1: After each new installation, addition, modification or repair, check, test and issue before powering on; the owner shall keep it by himself
  • WR2: Premises with a permitted load exceeding 100A must submit it to the Electrical and Mechanical Department for endorsement once every 5 years.
  • Electrical works (including inspection, maintenance and repairs) must be carried out by registered electrical contractors
  • You can check the registration information of contractors and engineering staff on the EMSD’s online list
[5][7][8]

Regulations on Plumbing Works: Licensed Plumbers and "Minor Works"

Drinking water pipes (internal water supply systems) are regulated by the Waterworks Ordinance (Cap. 102). According to Section 14 of the Ordinance, the construction, installation, alteration or removal of an internal water supply system generally requires the written permission of the Water Authority. Permission can be granted by the Water Authority on its own initiative or upon application by a licensed plumber. Section 15 stipulates that such "specified plumbing works" must be carried out by designated persons, including licensed plumbers, registered plumbers, or persons working under the instructions and supervision of licensed plumbers/registered plumbers.

The Water Supplies Department lists minor alterations and repairs, including replacing pipes or fittings inside a flat, replacing a WC and cistern or a water heater with the same type, repairing a leaking pipe, adding a valve or extending an existing pipe to one new draw-off point for a washing machine, dishwasher or filter. Five conditions must all be met: no change in the purpose of supply, no conversion from indirect to direct supply, no removal or refitting of a water meter, no soft-soldered copper pipe joints, and no appliance requiring a backflow prevention device.

The removal of water pipes (drainage) falls within the scope of the Building Ordinance. The Buildings Department pointed out that the repair or replacement of sanitary equipment is an exempted project, but it must still comply with drainage engineering standards; and modifications to toilets, bathrooms, and kitchens involving changes in related drainage pipes must be reported to the Buildings Department before the start of the project and/or after completion according to the minor works supervision system, and a prescribed registered contractor must be appointed to carry out the work. At the same time, a waterproof layer must be properly laid to prevent water from seeping downstairs.

[10][11][14]

Fresh-water pipe replacement with WSD application support

HK Create Design coordinates the quotation, application, installation and pressure test for fresh-water pipe replacement. Our partner licensed plumber applies to the Water Supplies Department. You do not have to submit the paperwork or appoint another plumber yourself.

Our team checks the pipes, meter and stop valve to identify the section and replacement material. Our partner licensed plumber submits required applications under the Waterworks Ordinance. After approval, we arrange installation, pressure testing and reinstatement. For work described as minor by the WSD, the plumber checks the specific conditions and explains whether permission is needed.

Building risers, common pipes and pipes before the meter are common parts. Changes must be arranged through building management or the owners’ corporation. We check management requirements before starting.

[10][11]

What does electrical engineering do: electrical boxes, circuits, sockets and lamp positions

The distribution board controls the home's circuits. An old fuse board may lack residual-current protection and clear labels. A board with MCBs (miniature circuit breakers) and RCDs (residual current devices) improves protection. EMSD requires circuit-purpose labels. H09 board replacement costs HK$6,800 each, including conversion from an old fuse box to MCB/RCD protection and circuit labelling. Assess any request to the electricity supplier for increased capacity separately.

Plan circuits as well as outlet numbers. EMSD advises supplying high-consumption appliances from separate sockets. For water heaters, induction hobs, ovens and dryers, we recommend assessing dedicated circuits (H06 HK$3,350 per circuit, including board connection). Sharing an overloaded circuit can cause tripping or overheating even with numerous sockets.

In terms of sockets, the H02 new 13A unit socket (concealed outlet) is priced at HK$640/set, and the H03 double/TV/network slot is priced at HK$1,200/set. Both include slotting, threading, bottom box, and panel restoration in the same batch. Newly installed in-wall circuits must be protected by appropriate enclosures (for example, installed in wire ducts). Power lines must also be separated from telephone and telecommunications lines. They cannot be placed in the same pipe or wire duct unless they meet specific safety requirements.

H04 replace light switch and wiring HK$430 per switch, H05 install a client-supplied pendant or ceiling light HK$670 each, H08 recessed spotlight HK$310 each, and H07 LED strip or T5 HK$150 per linear ft. For a suspended ceiling, agree the lights, troughs and driver positions before boarding to avoid reopening it for wiring.

Our standard Hilly and ei8ht ranges include insulated cables, network and control wiring. Upgrades include Prysmian, Nexans and Belden for higher-spec network or signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects, tests and issues form WR1 on completion. We commonly use Schneider switches and sockets and specify their models and quantities in the quotation.

  • Socket circuits must be protected by current leakage circuit breakers (water and gas switches)
  • The sockets in the bathroom should be at least 0.6 meters away from the bathtub and shower tank
  • Sockets should not be installed near faucets, gas switches or cooking stoves
  • Switches for lights, exhaust fans and electric water heaters in the bathroom should be installed outside the bathroom
[6][16][17]

What to do with water pipes: from drilling inspection to whole house replacement

For a concealed pipe of uncertain condition, G01 opens up one agreed location, records the findings in photos and makes good the opening for HK$930 per item. Rerouting is quoted separately. The minimum for a standalone small call-out is HK$2,000. Concealed corrosion can restrict older pipes even where surfaces look sound, reducing pressure or delaying hot water.

G02 relocation of a hot/cold water point, such as moving a basin, is HK$1,700 per point including chasing, new pipes, pressure testing and local render repairs. G03 kitchen pipework for a sink and washing machine and G04 bathroom pipework for a shower, WC and basin are HK$13,300 per room including testing. G05 kitchen and bathroom supply and waste renewal together is HK$22,300.

The most common problems with drains are insufficient slope and unsealed connections. Toilet relocation (G07, starting from HK$9,300) is not just about moving a toilet. It requires changing the drainage route, ensuring a sufficient slope, and then repairing the floor and making it waterproof. Sometimes, due to restrictions on the thickness of the floor slab and the location of the public water pipe, it cannot be moved at all or can only be moved a short distance, so an on-site assessment must be made before quoting.

In terms of installing sanitary ware, K01 toilet installation costs HK$1,300/piece, K02 washbasin with faucet HK$1,150/set, K03 shower faucet HK$970/set, and G06 washing machine drain and cold water HK$1,550/item. Before sealing the pipes and connections, we will do a pressure test and take photos to record them, so that you can know what the pipes are like in the future.

We use copper for fresh-water pipes. Brands include Wednesbury (CYH distributor, BS EN 1057), Kembla (Kempress), LAWTON, OTTO and OPAL. Fittings include Pegler Yorkshire, Tectite/ENDEX, push-fit and silver-brazed types. Products are certified to applicable WSD requirements. Our partner licensed plumber handles fresh-water pipe replacement and we coordinate the WSD application. You generally choose WCs, basins, showers and taps, with installation labour charged separately. We use DOWSIL mould-resistant silicone at bathroom and kitchen joints.

[16][14][10]

Pressure testing before closing the wall

Leaks are harder to locate after walls are closed. Our G02 pipe relocation, G03 kitchen, G04 bathroom and G05 whole-flat pipe replacement all include pressure testing. Testing is completed while the chases are open and before rendering, when every joint is visible.

The plumber caps the outlets on the completed installation, connects the pump and gauge, then raises pressure gradually to the test pressure specified under WSD requirements while removing trapped air. The plumber holds the pressure, watches the gauge and checks every joint for leakage, then records the readings, start time and finish time. Pressure is released and the wall closed and rendered only after the test passes.

If the pressure drops or a leak appears, repair the leaking joint and test again. The wall is closed only after a pass. Before closure we photograph the full route so you can locate the pipes for future drilling or repairs.

Drainage is tested by running water instead of pressurising the pipe. Once fixtures are fitted, each outlet is checked for drainage speed, backup and leaks. If bathroom waterproofing is also renewed, the waterproof layer undergoes a separate 24–48-hour flood test. Both tests must pass before tiling.

  • 1. Complete the pipe joints and cap all outlets.
  • 2. Connect the pressure test pump and gauge.
  • 3. The licensed plumber raises the pressure to the specified test pressure and removes trapped air.
  • 4. Hold the pressure and check for a drop at the gauge or leakage from the joints.
  • 5. Photograph the gauge reading and record the time.
  • 6. After a pass, release the pressure, close the wall and reinstate the finish. If it fails, repair the joint and retest.
[16][10]

Water heater: electric water heater or gas water heater? Regulations are very different

For electric water heaters, check the circuit and switch position. High-load storage and instantaneous units should have a dedicated supply. EMSD places the switch for a bathroom water heater outside the bathroom. H06 new dedicated circuit costs HK$3,350 per circuit where needed. The Water Supplies Department lists like-for-like heater replacement as work of a minor nature. A change of heater type requires separate consideration under its rules.

Gas water heaters (town gas or liquefied petroleum gas) are regulated by the Gas Safety Ordinance and have stricter requirements. The Electrical and Mechanical Department pointed out that all residential gas water heaters supplied or sold in Hong Kong must obtain approval from the Gas Safety Authority and bear the "GU" mark. When installing a new gas water heater, the sealed (counterbalanced) type is the only option. Ordinary flue-type water heaters cannot be newly installed for bathroom or shower purposes.

The installation and modification of gas water heaters must be carried out by registered gas installation technicians employed by registered gas engineering contractors, and they can be used after installation and testing. It is illegal to install it by yourself or to hire non-registered persons to install it. The EMSD also recommends contacting a registered gas works contractor to conduct a safety inspection of water heaters and installations every 18 months. When we do a bathroom project, we will reserve the location of the water heater, hot and cold water connections, and the flue. The gas part will be handed over to a registered gas engineering contractor, and the division of labor will be clearly stated in the quotation.

  • Select residential gas water heaters with the "GU" logo
  • Newly installed gas water heaters are only available in sealed (counterbalanced) type
  • The connection between gas pipes and water heaters can only be handled by registered gas installation technicians
  • Electric water heater on a dedicated circuit with the switch outside the bathroom
[9][6][11][16]

Services in older flats: when to replace everything and when targeted work is enough

An older flat may only need targeted work. Check the age of the fuse box and residual-current protection, repeated tripping, hot sockets or flickering lights, and signs such as old galvanised pipes, rusty water or weak pressure. H01 costs HK$770 for a visit covering tripping, leakage current and circuits with a preliminary report. A full multi-circuit or open-kitchen check is HK$1,650. Inspections are often combined with other work. The standalone small-job minimum is HK$2,000.

Whole-flat renovations that already involve stripping floors or wet areas give good access to renew services with less extra hacking. If only painting or replacing finishes, consider targeted work such as a new distribution board, dedicated circuit or repair to faulty pipework, based on assessment.

It should be noted that public parts of old buildings, such as main pipes, public water pipes and the building's electric meter room, are not within the scope of modifications by the unit owner, and must be arranged by the management office or the owners' corporation. Before we do it, we will ask the management office about the renovation regulations to avoid stopping the project halfway through.

[16][15]

How can plumbing and electrical work relate to seepage?

When there is water damage on the ceiling downstairs, the first thought of the owner is usually "burst pipe upstairs", but figures from the Joint Office show that it is not easy to find the source: 46,907 cases were handled in 2024, of which 5,080 were able to find the source of water seepage, and there were another 4,874 cases where the source could not be found and the water seepage continued. The reasons are often due to the aging of the waterproof layer in the bathroom, leakage at the drain connection, or minor cracks in the underground pipe, which must be eliminated one by one.

We separate pipe pressure tests from waterproofing flood tests. Before enclosure, test pipe connections for leaks. After waterproofing, flood-test for 24–48 hours (C04 HK$1,400 per test, included with C02 bathroom waterproofing). Tile only after both checks pass.

If you have received a water seepage notice from the joint office or the neighbor downstairs, we can first conduct a drilling inspection and photo report, and then tell you the scope of the repair. Official investigations have their own procedures and timelines. Our inspection is to assist you with repairs within your unit and does not represent official conclusions.

[12][13][16]

How are plumbing and electrical works priced?

A 400 sq ft flat and a 600 sq ft flat can have the same numbers of sockets and fixtures. Our rate card prices sockets by set, lights by fitting, circuits individually and plumbing by point or kitchen and bathroom package. Add or remove items to see the effect on price.

There are three factors that have the biggest impact on the price: first, whether to dig a concealed pipe (exposed pipes are cheap but not beautiful, and concealed pipes need to be grooved and dusted to restore); second, whether the old electrical box and the capacity of the house are enough, or whether to apply for an increase; third, whether the kitchen and toilet will be moved, which involves water diversion, floor repair and waterproofing, and the cost will increase significantly.

Use /calculator for the 117 published items or /ai-quote for an initial services budget. Plumbing and electrical work need site inspection before pricing can be confirmed in writing.

[16]

Whole-flat rewiring price range (company H-series rates)

Circuits, sockets and switches vary by flat, so rewiring is priced item by item. H09 replaces a fuse box with a labelled MCB/RCD distribution board at HK$6,800. H06 dedicated circuits for a heater, hob or oven cost HK$3,350 each. H04 replaces a light switch and wiring at HK$430. H02 adds a concealed 13 A single socket, including chasing, wiring, back box, faceplate and plaster making good, at HK$640 per set. H03 double sockets, TV or network outlets cost HK$1,200 per set.

Three examples using our rates: a board, 1 dedicated circuit, 6 switches and 6 single sockets cost around HK$16,570. A board, 2 circuits, 8 switches, 8 single sockets and 3 double sockets or TV outlets cost around HK$25,660. A board, 3 circuits, 10 switches, 12 single sockets and 5 double sockets or TV outlets cost around HK$34,830. The illustrative range is HK$16,570–34,830. The actual figure depends on the points in your flat.

Excludes increased incoming electrical capacity (separate utility application and quotation), light fittings, suspended ceiling lighting points (H05, H07 and H08) and chasing in tiled walls. A registered electrical contractor arranges the work and testing by registered electrical workers, with a WR1 on completion. The written quotation follows a site inspection.

[16][5]

How do I check plumbing and electrical work at handover?

In terms of electricity, remember to ask for the WR1 completion certificate and check the contractor and engineer registration numbers on it; open the electrical box and each switch should be clearly marked for purpose; use a socket tester to test the wiring and leakage protection of each socket, and then turn on and off each light switch one by one. The position of the bathroom socket should be at least 0.6 meters away from the bathtub and shower head.

Run the taps to check water pressure and hot-water delay. Check basins, kitchen sink and washing machine drains for backflow or odour. Flush the toilet and check the base for leaks. Keep the photos of concealed routes taken before walls were closed for future drilling and maintenance.

If there is a gas water heater, make sure it is installed by a registered gas installation technician and keep test records and water heater model information.

[5][6][9]

How we coordinate plumbing and electrical work

HK Create Design takes on jobs big and small, from adding a socket or two or replacing a consumer unit to rewiring and re-plumbing the whole home. Our designers and tradesmen with over 15 years of renovation experience can first discuss plans with you for free on WhatsApp (5243 7747); send photos of your flat, your consumer unit and a list of appliances you want to add, and we will outline feasible options.

Book a site meeting for measurement and professional advice if needed. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. On completion we remove rubbish, sweep and carry out basic cleaning. Our specialist cleaning partner can handle deep cleaning and formaldehyde removal if requested.

[16]

COMPARE

Compare options for plumbing and electrical work

Is it necessary to recruit qualified personnel for border projects?

EngineeringRegulations/Departmentswho can do itsupporting documents
New installation, addition, modification or repair of wires, sockets and electrical boxesElectricity (Wiring) Regulations/Electrical and Mechanical DepartmentRegistered Electrical Contractor and Registered Electrical WorkerWR1 Completion Certificate (kept by the owner)
Periodic testing of premises with permitted load exceeding 100AElectricity (Wiring) Regulations, regulation 20 / EMSDRegistered electrical contractorWR2 Once every 5 years, submit to the Electrical and Mechanical Department for signature
Modification of internal water supply system (general situation)Articles 14 and 15 of the Waterworks Facilities Ordinance/Water Supplies DepartmentLicensed plumber, registered plumber or person under his supervisionWritten permission from the Water Authority
Replace the water heater with the same type, replace the pipe, and add a water pointWater Supplies Department "Minor Works"License is exempted if 5 conditions are met and can be carried out by non-designated personsIt is recommended to keep construction photos and receipts
Modify kitchen and toilet related drainage pipesMinor Works Control System/Buildings DepartmentPrescribed registered contractorNotify the Buildings Department before commencement and/or after completion as required
Install or retrofit a gas water heaterGas Safety Ordinance/Electrical and Mechanical DepartmentRegistered gas installation technician employed by registered gas works contractorInstallation test record; water heater with "GU" mark

It is compiled from the websites of the Electrical and Mechanical Department, Water Supplies Department and Buildings Department and is for general information only. Whether individual projects are minor or minor in nature will be determined by the relevant departments and qualified persons. [5][7][10][11][14][9]

Published plumbing and electrical rates for 2026

ItemThe company’s public unit priceincludeAsk another question
H01 Electricity inspection (single door-to-door visit)HK$770 per visitTrip switch, leakage and circuit inspection, preliminary reportFull multi-circuit or open-kitchen inspection HK$1,650. The standalone small-job minimum is HK$2,000.
H02 Added 13A unit socket (concealed pipe)HK$640 per setWall chasing, cabling, back boxes and faceplates, including making good with skim coatWall tile slotting
H03 added 13A dual bit/TV/network bitHK$1,200 per setWall chasing, cabling, back boxes and faceplates, including making good with skim coatNetwork equipment
H06 Add independent loopHK$3,350 per circuitSpecial circuit for water heater, induction cooker or oven, connected to the main switchIncrease entry capacity
H09 Replace the electrical boxHK$6,800 per unitOld fuse box modified to MCB/RCD, circuit markedElectric power company application
G01 Come and go for water pipe drilling inspectionHK$930 per itemDrilling at designated locations, photo reports, and repairsPipe changes are extra. A standalone small call-out has a HK$2,000 minimum.
G02 Change the hot and cold water pipe positionHK$1,700 per pointChasing, new pipework, pressure testing and reinstatement of renderTile paving repair
G05 Whole house water pipe replacement (kitchen and toilet)HK$22,300 per itemComplete replacement of kitchen and toilet, pressure testRebuilding concealed pipework and cutting new chases are by separate agreement
G07 Toilet moved and water divertedStarting from HK$9,300/itemRelocation, water removal, floor repairQuotation after on-site assessment

Indicative only. Confirm the final price in a written quotation after site measurement. [16]

Electric water heater vs gas water heater: installation essentials

Itemelectric water heatergas water heater
Main regulationElectricity (Wiring) RegulationsGas Safety Ordinance
Who installs the connectionRegistered electrical workers handle electrical partsRegistered gas installation technician employed by registered gas works contractor
Model requirementsSelect according to product description and loop capacityThe residential type must be approved and bear the "GU" mark; only the sealed (counterbalanced) type can be used for new installations
switch/flueThe electric water heater switch in the bathroom should be installed outside the bathroomThe air and exhaust flue openings should lead to the exterior wall
Regular inspectionIt is recommended to have regular inspections by a registered electrical contractorThe EMSD recommends safety inspections every 18 months
[6][9]

Worked whole-flat rewiring examples using the company’s H-series rates

Example combinationItems and quantitiesIndicative work cost
Basic example: replace the board and add 1 dedicated circuit, 6 light switches and 6 single socketsH09 × 1+H06 × 1+H04 × 6+H02 × 6HK$16,570
Mid-range example: replace the board, add 2 dedicated circuits, 8 light switches, 8 single sockets and 3 double sockets or TV outletsH09 × 1+H06 × 2+H04 × 8+H02 × 8+H03 × 3HK$25,660
More extensive example: replace the board and add 3 dedicated circuits, 10 light switches, 12 single sockets and 5 double sockets or TV outletsH09 × 1+H06 × 3+H04 × 10+H02 × 12+H03 × 5HK$34,830

Unit rates are H09 HK$6,800 per board, H06 HK$3,350 per circuit, H04 HK$430 per switch, H02 HK$640 per set and H03 HK$1,200 per set. Example combinations illustrate quantities only. Increased incoming capacity, light fittings and suspended ceiling lighting points are extra. The final written quotation follows a site inspection. [16]

Pipe replacement price range (company G-series rates)

rangeItemCompany rateinclude
Relocate one or two plumbing pointsG02 Change the hot and cold water pipe positionHK$1,700 per pointChasing, new copper pipework, pressure testing and reinstatement of render. A standalone small call-out has a HK$2,000 minimum.
One complete kitchenG03 Install hot and cold water pipes throughout the kitchenHK$13,300 per itemSink and washing machine water supply and drainage, including pressure testing
One complete bathroomG04 Toilet complete set of hot and cold water pipesHK$13,300 per itemHot and cold supply, drainage and pressure testing for the shower, WC and basin
Kitchen and bathroom togetherG05 Whole house water pipe replacement (kitchen and toilet)HK$22,300 per itemComplete kitchen and bathroom pipe replacement with pressure testing. Do not add G03 or G04 again. Concealed pipe reconstruction and wall chasing are quoted separately.
Toilet relocationG07 Toilet moved and water divertedStarting from HK$9,300/itemRelocation, drain diversion and floor repairs: price after a site assessment

Our partner licensed plumber handles required WSD applications. Prices are indicative until we issue a written quotation after a site inspection. [16][10]

SITE SOP

Plumbing and electrical work: work standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Our plumbing project process (from inspection to handover WR1)

  1. 1. WhatsApp free initial introduction

    Send photos of electrical boxes, sockets, kitchen and toilets, and a list of electrical appliances you want to add. The designer and master will first discuss possible directions.

  2. 2. Site inspection. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

    Check the electrical box, circuit, leakage protection, water pressure, pipe materials and drain water; perform local drilling inspection if necessary.

  3. 3. Confirm the requirements of the management office

    Understand the building renovation regulations, construction time, main switches and main pipe locations. Public parts must be arranged by the management office.

  4. 4. Plumbing and electrical layouts and an itemised quotationshutdown checkpoint

    The quantity and unit price of sockets, lamp positions, circuits, and pipe positions are listed one by one, and it is indicated that the registered person is responsible for some of the work.

  5. 5. Form chases, lay conduits and draw cables

    The electric wires are put into the electric wire pipes, and the power lines are separated from the telecommunication lines; the water pipes are located according to the diagram.

  6. 6. Inspect concealed work before closing wallsshutdown checkpoint

    Water pipe pressure test, wire insulation and connection inspection, all are taken and archived for the customer.

  7. 7. Repair and install panels and sanitary ware

    Install socket faceplates, lights, WCs and taps. You generally choose the sanitaryware. We use DOWSIL mould-resistant silicone at kitchen and bathroom joints.

  8. 8. Inspect and test before powering on, and issue WR1shutdown checkpoint

    It will be tested by a registered electrical worker, and a completion certificate will be issued by the registered electrical contractor and the engineer.

  9. 9. Waste removal, basic cleaning and handover

    Remove waste, sweep and perform basic cleaning; deep cleaning can be followed up by a professional cleaning company.

Acceptance Checklist 0/6

[5][6][16]

Company Site Code

Pipe replacement pressure test (G02–G05)

  1. 1. Inspect the existing pipes and main stop valve.shutdown checkpoint

    Check the pipe material, meter and main stop valve to identify the sections for replacement. Coordinate common parts with building management.

  2. 2. Apply to the Water Supplies Department where required.shutdown checkpoint

    We coordinate the work. Our partner licensed plumber handles the required WSD application for you.

  3. 3. Isolate the water and remove the old pipes.

    Isolate the supply, drain the pipe and open the chase along the agreed route to remove the old pipe.

  4. 4. Lay and connect the new pipes.

    Install copper pipes to the layout with Pegler or Tectite/ENDEX fittings. Keep hot and cold runs identifiable and secure them with clips. We do not use galvanised iron pipe for this work.

  5. 5. Cap pipe outlets and connect the test pump.

    Cap the outlets and connect the pressure test pump and gauge.

  6. 6. Pressurise the system and observe it under sustained pressure.shutdown checkpoint

    The licensed plumber sets the required test pressure and removes trapped air. During the hold period, the plumber checks the gauge for pressure loss and the joints for leaks.

  7. 7. Photograph the installation for the record.

    Photograph the gauge, record the start and finish times and document the full pipe route.

  8. 8. Close and reinstate the wall only after a successful test.

    If the test fails, locate and repair the leaking joint, then repeat the test. Release pressure and reinstate the render only after a pass.

  9. 9. Test the water supply and drainage.

    After fitting taps and sanitaryware, test the water pressure and drainage at each fixture and check for backup.

Acceptance Checklist 0/5

[16][10][11]

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Check the current condition of electrical boxes, circuits, sockets and incoming and outgoing water pipes
  • Plan sockets, lighting points, dedicated circuits and hot and cold water positions
  • Run concealed pipes and wiring, pressure-test the pipework and photograph the work before closing the walls.
  • Electrical testing and completion certificate (WR1) arrangement

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    Does the electrical box have a leakage circuit breaker? How many years have the old lines been used?

  2. 02

    Do heavy-load kitchen or bathroom appliances need dedicated circuits?

  3. 03

    Are the water pipes rusty, have low water pressure or are leaking?

FAQ

Frequently asked questions

Is it necessary to have WR1 when replacing wires?

Tie. The Electrical and Mechanical Department stipulates that after new installation, addition, modification or repair of electrical equipment, it must be inspected and tested by registered electrical workers before powering on, and a WR1 completion certificate must be issued by the registered electrical contractor and engineering staff. WR1 shall not be handed over to the Electrical and Mechanical Services Department, but the owner must keep it properly.

Do residential units need to undergo regular WR2 testing?

Check the allowable load capacity. Residential or commercial premises exceeding 100 amps must be inspected and tested at least once every 5 years and the WR2 must be submitted to the Electrical and Mechanical Department for endorsement. Most general units do not exceed 100A, but the EMSD still recommends regular inspections by registered electrical contractors.

Should I hire a licensed plumber to replace faucets or water heaters?

The WSD allows certain minor alterations and repairs without permission if all 5 conditions are met. Examples include replacing pipes or fittings and replacing a water heater with the same type. Changing the heater type, converting to direct supply or soft-soldering copper pipes falls outside that exemption. HK Create Design coordinates the work, and our partner licensed plumber handles the necessary WSD application.

Can I install a gas water heater myself?

No. The Electrical and Mechanical Department points out that gas water heaters must be installed and tested by registered gas installation technicians employed by registered gas works contractors. It is illegal to install them by yourself or to hire non-registered persons. Newly installed residential gas water heaters are only available in sealed (counterbalanced) types and bear the "GU" mark.

Is it necessary to replace the battery box if the microphone is switched off all the time?

Not necessarily. Tripping may indicate an overloaded circuit, a faulty appliance or ageing wiring. An H01 electrical inspection is HK$770 per visit, subject to the HK$2,000 minimum for a standalone small job. For an old fuse box without residual-current protection, we recommend a replacement board (H09, HK$6,800).

Can the toilet be moved at will?

On-site assessment is required. The relocation involves water diversion, slope, floor thickness and the location of public water pipes. Changes to kitchen and toilet related drainage pipes must also be handled according to the minor works supervision system. Our public price for G07 starts from HK$9,300. You need to see it on site.

How long do plumbing and electrical works take?

Adding a few sockets or changing a distribution board can usually be completed within a day. Full kitchen and bathroom pipework or whole-home services must coordinate with demolition, waterproofing and tiling, so they take longer. We include the likely sequence and timing in the quotation.

There is water leakage in my unit downstairs, can you help?

We can open up and inspect a supply or drainage pipe at a specified point (G01, HK$930 per item), provide photos and discuss repairs afterwards. The HK$2,000 minimum applies to a standalone small call-out. The Joint Office conducts official seepage investigations under its own procedures. Our service covers repairs inside the flat.

Will the plumbing work be cleaned after completion?

meeting. After every order is completed, we will remove the trash, sweep up and do basic cleaning. If deep cleaning or formaldehyde removal is required, follow up with a professional cleaning company.

How to start?

WhatsApp 5243 7747 for a free initial consultation. An on-site measurement and professional advice can be arranged. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. You can also use the calculator (/calculator) or AI quotation assistant (/ai-quote) for an initial budget.

How much does whole-flat rewiring cost?

Our H-series rates give three examples. The basic combination of a distribution board, 1 circuit, 6 switches and 6 single sockets is about HK$16,570. A board, 2 circuits, 8 switches, 8 single sockets and 3 double sockets or TV outlets is about HK$25,660. A board, 3 circuits, 10 switches, 12 single sockets and 5 double sockets or TV outlets is about HK$34,830. Increased incoming capacity and light fittings are extra. We confirm the written quotation after inspection.

Do I have to apply to the Water Supplies Department myself?

No. Our partner licensed plumber handles required applications to the Water Supplies Department. G02 pipe relocation is HK$1,700 per point. A full kitchen or bathroom under G03 or G04 costs HK$13,300 per item. G05 for both rooms costs HK$22,300. All include pressure testing.

Which electrical cables do you use?

Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.

What pipes do you use for fresh water?

We use copper for drinking-water pipework and exclude galvanised iron. Common choices include Wednesbury (supplied by CYH, BS EN 1057), Kembla (Kempress), LAWTON, OTTO and OPAL. We use Pegler (Pegler Yorkshire), Tectite and ENDEX fittings, including push-fit and silver-brazed connections. The pipes and fittings carry product certification and meet Water Supplies Department requirements. Our partner licensed plumber handles the replacement and we coordinate the application.

Do you supply the sanitaryware and taps?

You usually choose the fixtures, and we charge for installation. Examples are K01 WC installation at HK$1,300 each, K02 basin and tap at HK$1,150 per set and K03 shower mixer at HK$970 per set. Send the model before buying so we can check supply and drainage positions and dimensions.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. Official source2026-27 Annual Expenditure Estimate Head 42 Electrical and Mechanical Services Department · Hong Kong Special Administrative Region Government Budget· Accessed 2026-11-01
  2. Official source2024-25 Annual Expenditure Estimate Head 42 Electrical and Mechanical Services Department · Hong Kong Special Administrative Region Government Budget· Accessed 2026-11-01
  3. Official source2022-23 Annual Expenditure Estimate Head 42 Electrical and Mechanical Services Department · Hong Kong Special Administrative Region Government Budget· Accessed 2026-11-01
  4. Official sourceReview of 2020-21 Expenditure Budget Reply No. ENB206 (Reported Electrical Incidents) · Electrical and Mechanical Services Department· Accessed 2026-11-01
  5. Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-01
  6. Official sourceHome Electrical Safety Handbook: General Installation Instructions · Electrical and Mechanical Services Department· Accessed 2026-11-01
  7. Official sourcePeriodic testing of fixed electrical installations · Electrical and Mechanical Services Department· Accessed 2026-11-01
  8. Official sourceRegister as an electrical engineer · Electrical and Mechanical Services Department· Accessed 2026-11-01
  9. Official sourceSafety Information: Residential Gas Water Heaters · Electrical and Mechanical Services Department· Accessed 2026-11-01
  10. Official sourcelicensed plumber · Water Supplies Department· Accessed 2026-11-01
  11. Official sourceWorks of a minor nature · Water Supplies Department· Accessed 2026-11-01
  12. Official sourceReview of Expenditure Estimates for 2025-26 Response No. EEB(F)130 (Number of Cases of the Joint Office for Investigation of Water Seepage Complaints) · Food and Environmental Hygiene Department· Accessed 2026-11-01
  13. Official sourceActual performance of investigating reported cases of water seepage in buildings · Joint Office for Investigation of Water Seepage Complaints· Accessed 2026-11-01
  14. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-01
  15. Official sourceExamination of Estimates of Expenditure 2026–27, reply DEVB(PL)156 — private buildings by age at the end of 2025 · Buildings Department· Accessed 2026-11-01
  16. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-01
  17. Official sourceSafety information: inspection, testing and completion certification of fixed electrical installations · Electrical and Mechanical Services Department· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your Rewiring and electrical work before you decide.

Start with the current condition

Note the switch and socket positions, existing wiring and power requirements, then check rewiring, wall chasing and reinstatement as separate items.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗