Skip to main content

Whole-home renovation from strip-out and services to handover

Will you keep the kitchen and bathroom in your new home, or renew pipes and wiring in an older flat? The answer affects the strip-out, order of trades and move-in date. From measurement and itemised quotations to handover, we go through each room to identify what to remove, retain or build. Start with our completed project at Melody Garden in Tuen Mun.

Send photos or a floor plan if available. You can enquire before you have measurements or a budget.

Completed custom storage wall and ceiling lights at Melody Garden, Tuen Mun
Completed whole-flat renovation at Melody Garden, Tuen Mun. The full-height storage includes an open worktop section with sockets above.

Whole-flat renovation: from household needs to itemised work

A clear scope of work helps you judge what the quoted total buys.

Tell us about the flat, your household, the parts you wish to keep and your budget priorities. We can then coordinate design, strip-out, plumbing, electrical work, masonry, painting and furniture as required. We confirm the scope, schedule and deliverables in writing.

  1. 01 Set your prioritiesFloor plan, site photos, items to retain and budget priorities.
  2. 02 Agree the scopeList the stages, materials, drawings, exclusions and management arrangements separately.
  3. 03 Check the detailsConcealed work, materials approval, variations and completion inspection.

SCOPE BEFORE PRICE

Compare quotes for the same scope of work.

Write down the following items to compare like for like. Detailed work stages, photos and sources appear below.

Whole-flat renovation: pre-quote checklist
CheckDetails to confirmCommon misunderstanding
Basic whole-flat renovationSelected work such as strip-out, floors and wallsCheck whether kitchen, bathroom, plumbing, electrical work, furniture and materials are included.
Whole-flat design and constructionList the design deliverables, then the work and materials to be suppliedUse construction drawings and a formal quotation to confirm the work shown in a design rendering.
Occupied flatsWork zones, protection, temporary access and arrangements for water or power interruptionsWe confirm phasing and the programme after a site assessment.
Handover and variationsWork stages, written variations and completion recordsA project is only shown as a completed example when its costs and duration are known.

Example calculated from our rates. This is an illustrative budget, not a completed project or all-inclusive quotation.

Basic renovation of a 500 sq ft flat: where does the budget go?

Based on the calculator’s “Basic whole-home renovation” plan, assuming 500 sq ft. This only covers the selected trades. A separate quotation is needed for whole-flat design and construction.

Subtotal for selected workHK$100,700

Add20% owner’s contingency includedHK$120,840

  • Remove wall or floor tilesHK$15,000
    500 sq ft; Calculated from the selected quantities and our published rates.
  • Screed and level the floorHK$11,000
    500 sq ft; Calculated from the selected quantities and our published rates.
  • Lay floor tiles up to 600 × 600 mm in a straight patternHK$39,000
    500 sq ft; Calculated from the selected quantities and our published rates.
  • Patch the surface, damp-proof, sand and paintHK$31,500
    1500 sq ft; Calculated from the selected quantities and our published rates.
  • Remove construction debris (per truckload)HK$4,200
    1 truckload; Calculated from the selected quantities and our published rates.

Included in this example

  • Remove the existing floor tiles throughout the flat
  • Floor levelling and labour and bedding materials for straight-laid floor tiles up to 600 × 600 mm
  • Local filler repairs, moisture-resistant primer, sanding and two finish coats
  • One example truckload of construction waste

Excluded from this example

  • Kitchen or bathroom reconstruction, waterproofing and repiping or rewiring
  • Furniture, surface tiles, sanitaryware and other finish materials
  • Works insurance, management-office deposits and renovation administration fees

The contingency is an owner’s planning allowance. We confirm actual quantities, substrate conditions, materials and additional items during a site assessment and in the written quotation.

Recalculate for your flat size and scope

Our price list provides reference rates. The budget is a worked example. Design renderings and project photos are labelled separately, and original sources are credited. The proposed method still requires confirmation on site.

Sources checked: Our price list and charging basis · Consumer Council study on home renovation and recommendations for clearer quotes (2024). External sources do not certify or endorse our company. Summary compiled on . Individual source dates appear below.

Whole-home renovations before and after, including layouts, walls and flooring

When comparing photos, go room by room and note the walls you want to keep, any changes to the layout, and which floors need attention. Use the notes to check the strip-out, masonry and painting in each room against your quote.

  • Living and dining room wall and floor renovation – comparison photos
    Living and dining room wall and floor renovation
  • Room before and after building a partition wall – comparison photos
    Room before and after building a partition wall
  • Living and dining room wall and ceiling renovation – comparison photos
    Living and dining room wall and ceiling renovation

View all project comparisons and customer reviews →

Send photos on WhatsApp for a quote on similar work

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Completed custom storage wall and ceiling lights at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Detail of an open compartment in custom cabinetry at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Wall tiles and wood-effect floor tiles after a whole-home renovation
    Completed project photosHong Kong · Whole-home renovation · July 2021
  • Completed custom media wall cabinets and pendant light in a living room
    Completed project photosHong Kong · Whole-home renovation
  • Completed wall painting and floor awaiting self-levelling at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026
  • Fresh floor screed outside a kitchen at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026
  • Removal of unauthorised building works at a flat in Mong Kok
    Site photoKam Fong Street, Mong Kok · Older property renovation · May 2026
  • Room strip-out and ceiling plastering at a flat in Tai Kok Tsui
    Site photoTai Kok Tsui · Older property renovation · May 2026
  • Completed wood-effect living room floor tiles in Yat Man House, Ho Man Tin Estate
    Completed project photosYat Man House, Ho Man Tin Estate · Tiling · June 2026
  • Protective sheeting covering newly laid floor tiles in Yat Man House, Ho Man Tin Estate
    Site photoYat Man House, Ho Man Tin Estate · Whole-home renovation · June 2026
  • Chases at the base of the wall for rewiring in Yat Man House, Ho Man Tin Estate
    Site photoYat Man House, Ho Man Tin Estate · Plumbing and electrical work · May 2026
  • Building a brick partition in an Upper Wong Tai Sin Estate flat
    Site photoUpper Wong Tai Sin Estate · Partition work · June 2026
  • Site photo of a completed bathroom renovation | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo
  • Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo
  • Site photo of bathroom tiling and shower renovation | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo
  • Site photo of a completed custom bathroom cabinet | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo
  • Site photo of a completed bathroom renovation | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo
  • Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
    Completed project photosHK Create Design · Bathroom renovation site photo

DESIGN RENDERS

Design renderings for reference

These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.

  • Design rendering of a renovated hallway with plain white doors, a full-height timber-effect cabinet and light grey floor tiles.
    Design renderingHallway in a whole-flat renovation (design concept)
  • Design rendering of a renovated flat of about 450 sq ft with an open kitchen, timber-effect flooring and built-in storage.
    Design renderingCompleted whole-flat renovation (design concept)

Compare the scope shown in the photos

Illustrated comparison of options

  • A residential room during site protection and after the wall and floor finishes were completed.
    Plan floors, walls and ceilings togetherFor a full renovation, list what can stay and what needs replacing so the team can price each item.

WORKED EXAMPLE

Estimate the cost of whole-flat renovation for your own project

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Estimated whole-flat renovation budget including kitchen, bathroom, plumbing and electrical work

  • A01 Removal of old floor tiles in the whole house HK$30/square foot, B02 Floor leveling HK$22/square foot, D01 Installation of floor tiles HK$78/square foot (manual base material included, surface tiles are extra)
  • E02 Whole-house plastering and oiling HK$21/sq. ft., estimated expanded area based on usable area × 3
  • A09 strip-out of one kitchen and A10 strip-out of one bathroom, HK$9,950 per room, HK$19,900 in total.
  • C02 toilet waterproofing HK$4,850, C03 kitchen waterproofing HK$4,300
  • G05 Whole house water pipe replacement HK$22,300, H09 Electrical box replacement HK$6,800
  • A11 one truckload of rubble HK$4,200 and L02 insurance HK$6,700
  • Excludes custom-made furniture, kitchen and toilet wall tiles, sanitary ware, lighting and management office fees
  1. Removal of floor tiles + leveling + laying of floor tilesSaleable area × (HK$30 + HK$22 + HK$78)HK$65,000
  2. Whole House Paint (E02)Saleable area × 3 × HK$21HK$31,500
  3. Dismantling the kitchen and toilet (A09+A10)HK$9,950 × 2HK$19,900
  4. Kitchen and toilet waterproofing (C02+C03)HK$4,850+HK$4,300HK$9,150
  5. Plumbing and electrical work (G05 + H09)HK$22,300+HK$6,800HK$29,100
  6. Rubble removal and insurance (A11 + L02)HK$4,200+HK$6,700HK$10,900

Reference project cost for whole house renovation (excluding furniture)HK$165,550

This is a rough estimate of the public unit price; the actual number of cars, expansion area, kitchen and toilet wall tiles, sockets and lamp positions must be measured and confirmed on site. It is recommended to leave about 20% as a planning reservation; the final quotation shall be subject to written quotation. [11]

HOW WE HELP

How can we help you

One-stop design and construction

The designer produces the floor plan, coordinated services and furniture drawings and VR views. Our site team works from the agreed drawings and coordinates the trades.

Item-by-item public price list

All 117 price items are disclosed, and the quotations list the quantity, unit, unit price and material model item by item, making it easy for you to compare and add or subtract.

There is an inspection position in the process

We pause for inspection before services are enclosed, after waterproofing tests and before furniture installation. Photographs document these checks.

Payment and progress

Installment payment corresponds to the completed process, and all changes to the project will be confirmed in writing, and there will be no unforeseen amounts during settlement.

Handling Management Office and Regulations

First read the building renovation regulations and coordinate the application and construction time. If minor projects or structural changes are involved, the requirements will be clarified to professionals first.

Completion and clearance

We remove rubbish, sweep and provide basic cleaning. Our specialist cleaning partner handles deep cleaning and formaldehyde treatment. The one-year post-completion warranty covers paint cracking, blistering and peeling, loose hinges, runners or screws, and swollen cabinet fronts, except where damage was deliberately caused.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same room with light wood-effect flooring, white walls, a plasterboard ceiling with cove lighting and downlights, a fitted TV cabinet and new internal doors.
Before concept: an older two-bedroom flat’s living and dining room with yellowed, cracked walls, beige floor tiles, fluorescent lighting, an old TV cabinet and a floral sofa.
Illustration before workIllustration of the proposed result
Design illustration · Plan reference: whole house renovation

KEY NUMBERS

Whole-flat renovation: figures to check before work begins

government/official

1,205 cases

Consumer Council Home Renovation Complaints 2017–2023

More than HK$270 million in total and over HK$230,000 per case on average (Consumer Council home renovation study, February 2024).

[1]

government/official

38%

The quotation has the proportion of detailed sub-items of all the projects

The Consumer Council evaluated 40 draft quotations: only 38% had detailed breakdown, 28% listed the quantity, and 20% had the unit price of each item, with an average score of 58/100.

[1]

government/official

61%

Among those with disputes, the proportion of delayed completion

About 19% of the 505 respondents had had disputes with renovation companies; the most common reasons were delayed completion (61%), defective projects (39%), and non-compliance (30%).

[1]

government/official

347 cases

Consumer Council "Renovation and Home Maintenance Works" Complaints 2025

There were 400 cases in 2024 and 352 in January–September 2026. The separate furniture and furnishing category recorded 656 cases in 2025.

[2]

government/official

24,874 buildings

Private residential and mixed-use buildings aged 30 years or above

As of the end of 2025, there were a total of 36,546 buildings in Hong Kong, of which 9,402 were 50 years or older.

[3]

government/official

1,719Thousands

Private housing units at the end of March 2025

Hong Kong had approximately 3.047 million housing units. The average household had 2.6 people in 2024.

[4]

company public price

free

Site measurement and professional advice (limited-time offer)

No deposit is required for the limited-time site measurement offer on two or more types of work through 31 December 2026. Afterwards, the HK$500 fee is credited against the works if you place an order. Initial WhatsApp consultations are free.

[11]

CHARTS

Whole-flat renovation figures at a glance

Number of private mixed-use and residential buildings (by building age, as of the end of 2025)(Unit: buildings)
19 years or less
6,475
20–29 years
5,197
30–39 years
8,721
40–49 years
6,751
50 years or more
9,402

Buildings Department Legislative Council Estimate Reply DEVB(PL)156; It is based on the number of buildings, not the number of units. There are 24,874 buildings aged 30 years or above, accounting for about 68%. [3]

Consumer Council evaluates 40 draft renovation quotations: proportion of the following contents are listed(Unit:%)
Total price (one lump sum)
All (40 of 40)
payment terms
93%
Detailed breakdown of all projects
38%
Project quantity
28%
Unit price of each item
20%
Declaration of compliance with statutory regulations
20%
Comply with management office renovation requirements
8%

Consumer Council press release on its home renovation study, 21 February 2024. [1]

FULL GUIDE

Whole-flat renovation: stages and points to check

How many people in Hong Kong have encountered the problem of whole house renovation?

In its 2024 study, the Consumer Council reported 1,205 home renovation complaints from 2017 to 2023 involving more than HK$270 million in total and over HK$230,000 per case on average. Of 505 people surveyed who had renovated or planned to renovate, 19% had experienced a dispute with their contractor. The most common issues were delayed completion (61%), defective work (39%) and refusal to rectify defects (30%).

The latest complaint statistics from the Consumer Council show that there were 400 cases in the "Renovation and Home Maintenance Works" category in 2024, 347 cases in 2025, and 352 cases in the first nine months of 2026; there were also 656 cases in the "Furniture Renovation" category in 2025. The number may not be large, but each case usually involves tens to hundreds of thousands of project dollars.

At the end of March 2025 Hong Kong had around 3.047 million housing units, including about 1.719 million private units. By the end of 2025, 24,874 private domestic and composite buildings were at least 30 years old. Whole-flat refurbishment is common after buying an older property or after occupying it for a decade or two.

[1][2][4][3]

Whole house renovation process: 10 steps from inquiry to settlement

Plan a whole-flat renovation in sequence to avoid rework. We start with a WhatsApp discussion, measure on site, prepare designs and drawings, agree an itemised quote and contract, and apply to management. Work then proceeds through strip-out, concealed services, waterproofing and masonry, ceilings, painting and flooring, then furniture, sanitaryware and lighting. We inspect and rectify defects before clearing and handing over.

Install services before rendering or closing ceilings because conduits and pipes must be in place first. Flood-test waterproofing before tiling. Fit cabinets near the end of flooring and painting to avoid dust and damage.

The quotation includes the work sequence and an approximate schedule. We invite you to check on site or review photos before services are enclosed, after waterproofing tests and before furniture goes in.

  • 1. WhatsApp 5243 7747 Free initial consultation
  • 2. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
  • 3. Floor plans, coordinated building services drawings, furniture drawings and VR views
  • 4. Quote item by item, confirm material model, and sign contract
  • 5. Apply to the management office for renovation and pay deposit (if any)
  • 6. Demolition and rubble removal
  • 7. Photograph and inspect plumbing, wiring and other concealed work
  • 8. Waterproofing, flood testing and tiling
  • 9. False ceiling, paint, floor and furniture installation
  • 10. Trash collection, garbage removal, basic cleaning, and handover
[11]

Time estimate? Some processes have the greatest impact on time

Duration depends mainly on the scope, including kitchen and bathroom demolition or layout changes, the furniture production lead time and the building's permitted hours. Painting and replacing flooring take a different length of time from reconstructing the wet areas and renewing services. We confirm the likely programme after seeing the flat.

Some time cannot be compressed. For example, after the bathroom is waterproofed, it needs to be closed and tested for 24-48 hours (listed in our public price list C04) to confirm that there are no leaks before laying tiles; each layer of plastering, plastering, and painting must wait for drying; for custom-made furniture, materials must be cut and produced after the dimensions are confirmed. If you insist on rushing the work, the most common consequences are bubbling paint, hollow brick bottoms, or insufficient waterproofing time.

Noise regulations will also affect the daily hours during which work can be carried out. The Environmental Protection Department pointed out that the noise emitted by residential renovation between 7 am and 7 pm on weekdays is not controlled by the Noise Control Ordinance. However, between 7 pm and 7 am the next day or at any time on public holidays, contractors are not allowed to use motorized equipment for renovation unless they have been issued a construction noise permit. In addition, many building management offices have their own renovation time (for example, construction is not allowed during designated periods on weekdays, Sundays and holidays), so the actual days when construction can start will be shorter than the calendar.

Consumer Council surveys show that "delay in completion" is the most common dispute, so we will indicate the process sequence and approximate schedule in the quotation; if the customer adds or subtracts the project midway, we will use a written change order to update the price and time at the same time.

[11][8][1]

Management Office Application: What to prepare before starting construction

Most residential buildings in Hong Kong have their own renovation codes. Hong Kong Government One Stop recommends that residents contact the property management company before renovation and ask them to inform other residents. The management company will also provide information on the residents' rights and responsibilities during the project. The Environmental Protection Agency's guidance to property managers also suggests that buildings can require owners to apply for a renovation permit before starting work, limit extremely noisy equipment, and control construction time.

Management usually asks for a renovation application, the scope and hours, contractor details and a worker list. Some buildings require a deposit and lift and corridor protection. Confirm debris routes and goods lift slots beforehand. We check each estate's rules and schedule accordingly.

Building management consent and Buildings Department approval serve separate purposes. Ordinary plastering, tiling and sanitaryware replacement are generally exempt from prior approval. Qualifying non-loadbearing masonry partitions and drainage alterations require minor works procedures. Structural changes to walls, beams or columns require an Authorised Person and Registered Structural Engineer, approved plans and consent before the registered contractor starts.

[6][7][5]

Budget for whole house renovation?

A whole-flat quotation should itemise demolition, plumbing, electrics, waterproofing, masonry, ceilings, painting, flooring, fitted furniture, sanitary and lighting installation, insurance and waste removal. Of 40 draft quotations assessed by the Consumer Council, 38% detailed all work, 28% stated quantities and 20% included unit rates. Without these details, like-for-like comparison is difficult.

Our rates specify the unit: A01 wall or floor tile removal HK$30 per sq ft, B02 floor screeding HK$22 per sq ft, D01 straight-laid floor tiles up to 600 × 600 mm HK$78 per sq ft, and E02 patch skimming, moisture-resistant primer, sanding and painting HK$21 per sq ft of measured walls and ceilings. A09/A10 kitchen or bathroom strip-out and removal cost HK$9,950 per room. C02 bathroom waterproofing HK$4,850 per room, G05 whole-flat supply and drainage pipe replacement HK$22,300 per job, H09 distribution board replacement HK$6,800 each, A11 rubble removal HK$4,200 per load including government fees, and L02 third-party and employees' compensation insurance HK$6,700 per whole-flat project.

Bespoke furniture is often one of the largest items in a whole-flat budget. Published linear-foot rates include FUR01 tall cabinets at HK$2,900, FUR05 wardrobes at HK$2,900, FUR14 kitchen base cabinets at HK$1,300 and FUR15 wall cabinets at HK$1,250. ENF-grade boards have been standard since 2026 at no extra charge.

Our quick plan would add a 20% planning allowance to cover the first problems we see after tearing it apart, such as rusty ducts and hollow floors. This is not charged by the company, it is just to allow you flexibility in your budget.

[1][11]

Installment payment: What is the safety first?

Research by the Consumer Council shows that during the construction phase, respondents are most worried about unfinished projects (73%), defective projects (61%), and the company leaving after all the money has been spent (59%). Therefore, the principle of payment arrangement is very simple: each installment should correspond to the process that has been completed and has been accepted by you. It is not good to issue most of the payment before the work has started.

Payments commonly follow milestones: deposit, completion of demolition and concealed services, masonry and painting, furniture installation, and final defects handover. Our written quotation and contract specify the actual proportions. Check what work triggers each payment before signing.

The Consumer Council found that nearly three in ten respondents believed a quotation did not need updating after changes. For any addition or omission, we issue a written variation stating the item, quantity, unit price and effect on the schedule. Work on it starts after your confirmation, so you can reconcile the final account.

  • Each installment of payment corresponds to the completed and accepted processes.
  • The deposit, the proportion of each period, the mantissa and the execution arrangements are written into the contract.
  • All additions and subtractions must be done first after confirmation of the written change order.
  • Keep all receipts, photos and acceptance records
[1]

Demolition and rubble removal: what to allow for

Whole-flat renovations usually start with removing old tiles, kitchen and bathroom fittings, cabinets and paint. Identify structural walls, isolate and secure affected services, and protect retained doors, windows and common corridors. Before A04 non-loadbearing brickwall demolition at HK$69 per square foot, minimum HK$2,800, confirm the wall is non-structural and follow applicable Buildings Department Minor Works procedures.

Construction waste must go to an authorised facility. The EPD scheme lists HK$71 per tonne at public fill facilities, HK$175 at sorting facilities and HK$200 at landfills, generally with a one-tonne minimum. Our A11 rate of HK$4,200 per truckload includes carrying debris downstairs, transport, lawful disposal and government charges. Small jobs can be charged by the bag, with a HK$2,000 minimum. Kitchen and bathroom strip-out items A09 and A10 already include carrying out debris.

[5][9][11]

Coordinating plumbing, electrical work, waterproofing, masonry and joinery

Set out sockets, lights, circuits, hot/cold outlets and drains on the coordinated services drawings before closing walls, laying tiles or fitting the false ceiling. The registered electrical worker must inspect and test applicable fixed electrical work before energising. Obtain the signed and endorsed WR1 completion certificate.

Waterproofing and masonry are coordinated. Form the kitchen and bathroom floor levels and drainage falls, apply waterproofing and flood-test before tiling. Our published C02 rate of HK$4,850 for one bathroom of about 30–40 sq ft includes the whole floor, 6 ft wall upstands, full shower walls, two coats of Sika 107 and a 24-hour flood test.

After painting, false ceilings and floors, you can go to the custom-made furniture first. The dimensions of furniture generally need to be measured after the cement and ceiling are completed, and the materials are cut and produced first, so that the cabinets are first attached to the walls. Finally, install sanitary ware, lamps and electrical appliances first, and perform drain cleaning and cleaning.

Our standard cables are Hilly or ei8ht, with Prysmian and Nexans upgrades, Belden for higher-spec network cabling and commonly Schneider for switches and sockets. Fresh-water supply pipes are copper, with Pegler or Tectite fittings. Waterproofing uses Sika or OPTIMIX. For stripped walls, we apply Kangaroo water-based sealer, two to three thin coats of Nippon low-odour wall filler, then seal, prime and paint. We use DOWSIL mould-resistant silicone in kitchens and bathrooms and a bonding primer before tiling. Our own Foshan factory produces our ENF-grade boards. A partner export factory supplies our quartz worktops with quality assurance and a choice of colours. You generally choose your sanitaryware and taps, and we charge for installation.

[10][11]

New buildings, old buildings and public housing estates: the renovation points of the whole house are different

A new flat, especially a first-hand property, usually has newer structure and services. Fitted furniture, lighting and local adjustments are often the main tasks. Check the developer's warranty period and management's fit-out rules.

Old buildings require a lot of hidden work: original wires and fuse boxes, galvanized iron pipes, aging bathroom waterproofing, hollow floors, etc. As of the end of 2025, there will be 9,402 private residential and mixed-use buildings that are 50 years old or above. When renovating such units, we usually recommend that water, electricity and waterproofing be treated in one go.

Check Housing Authority or management company renovation rules for public rental and HOS flats. Wall demolition and changes to plumbing or wiring may have restrictions or need prior application. We review the relevant rules with you before quoting.

[3]

8 things to ask before signing a contract

The Consumer Council found that only 20% of the quotations stated that they complied with statutory regulations, and 8% stated that they met the renovation requirements of the management office. Before signing a contract, you can use the following list to check item by item. It is best not to just look at the total price.

  • Is the quantity, unit and unit price listed for each project?
  • Are the material brand, model, and color number clearly written?
  • Are there any other aspects that are not included (such as the management office deposit, additional electricity, and the sanitary ware itself)?
  • How is the process sequence similar to the approximate schedule?
  • What process does installment payment correspond to?
  • Is the written confirmation of the change project sample the same as the price?
  • Is insurance (third-party insurance and labor insurance) covered?
  • What are the arrangements for completion cleaning, cleaning and maintenance?
[1][11]

How HK Create Design handles your whole-home renovation

We are a design company with our own site team. Our designers and tradespeople, including specialists with more than 15 years' experience, can discuss the plan free of charge. Fitted furniture includes layout and services drawings, furniture drawings, VR views and production drawings.

All 117 prices are public. Use the website calculator (/calculator) or AI quotation assistant (/ai-quote) for an initial budget, then discuss it with us on WhatsApp 5243 7747. Site visits can be arranged. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. The written quotation after the tradesperson's site measurement confirms the final price.

After every order is completed, we will remove the trash, sweep clean, and do basic cleaning. Deep cleaning and formaldehyde removal will be followed up by a professional cleaning company, so you don't have to hire another person.

[11]

COMPARE

Compare options for whole-flat renovation

Common whole-house renovation projects: Do I need to notify the Buildings Department?

EngineeringBuildings Department ClassificationWhat to dowho is responsible
Cleaning dust, laying bricks, replacing sanitary equipment, demolishing non-structural wallsExemption from approval projectsNo prior approval required, but must comply with fire protection, structural and drainage standardsGeneral renovation contractor
Erection of brick non-load-bearing wallsminor projectsNotify the Buildings Department before commencement and/or after completion in accordance with the minor works control systemPrescribed building professionals and/or prescribed registered contractors
Modify kitchen and toilet related drainage pipesminor projectsNotify the Buildings Department as required and properly lay waterproof layersPrescribed registered contractor
Demolish or modify structural walls, beams and columnsConstruction projects requiring approvalAppoint an authorized person and a registered structural engineer, and start construction after the drawings are approved and agreed.Registered Contractor
Change to open kitchenSubject to plan approvalCheck the approved plans first. Kitchen walls/doors cannot be demolished if they are fire-resistant.Consult a construction professional first

It is organized according to the frequently asked questions of the Buildings Department's "Alteration and Addition Works to Domestic Premises"; individual project classifications are subject to the judgment of the Buildings Department and professionals. [5]

Public unit prices for main types of whole house renovation work (2026)

Type of workProject examplesThe company’s public unit priceHow it is calculated
Strip-outA01 Remove wall/floor tilesHK$30 per sq ftBy area
Strip-outA09/A10 Dismantle and clear the kitchen or toiletHK$9,950 per roomAccording to the room, even transport
ClearanceA11 Rubble removalHK$4,200 per truckloadIncludes government disposal charges. Small jobs can be priced by the bag, with a HK$2,000 minimum.
Plumbing and electrical workG05 Whole house water pipe replacement (kitchen and toilet)HK$22,300 per itemPress item, test pressure
Plumbing and electrical workH09 Replace the electrical boxHK$6,800 per unitClick one
WaterproofingC02 Waterproof toilet (one room)HK$4,850 per room24-hour water test included
MasonryB02 floor leveling + D01 floor tilesHK$22+HK$78/square footBy area
PaintingE02 Moisture-proof polishing oilHK$21 per sq ftExpand the area according to the wall and ceiling
furnitureFUR01 tall cabinet / FUR05 wardrobeHK$2,900 per linear ftPer linear foot, with ENF-grade boards as standard
insuranceL02 Third party insurance and labor insuranceHK$6,700 per policyWhole house project

Preliminary estimate only. The final price is the written quotation after measurement. [11]

Common disputes reflected in Consumer Council data, here are some tips on how to prevent them

Frequently asked questionsConsumer Council datapreventive practices
Delay in completion61% of those with disputesThe quotation is attached with the process sequence and approximate schedule; the change order is updated at the same time
The project is defective39%Taking photos for acceptance before sealing the concealed project, and testing the water by closing the water for waterproofing
Don't hold on to leaks30%At the time of settlement, the list of missing items shall be carried out item by item, and the last number shall be closed first after follow-up.
Quotations are difficult to compare58% of respondents find it difficult to compare quotation formatsItemize quantity, unit, unit price, material model
Changes do not update quotesNearly 30% think it is not necessaryAll additions and subtractions must be done after written confirmation
[1]

SITE SOP

Whole-flat renovation: work standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Our whole house renovation process and inspection points

  1. 1. Free initial consultation

    WhatsApp 5243 7747 Send floor plan or photos, budget and needs.

  2. 2. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

    Measure the scale, check the water, electricity and waterproofing conditions, and understand the building renovation regulations.

  3. 3. Design and drawshutdown checkpoint

    Review the floor plans, building services drawings, furniture drawings and VR views before quotation.

  4. 4. Item-by-item quotation and signingshutdown checkpoint

    List the quantity, unit price, material model, excluded items, installment payment and schedule.

  5. 5. Application to the Management Office

    Submit the renovation application and worker list. Arrange common-area protection and waste transport times.

  6. 6. Demolition and removal

    Confirm the wall is non-structural and have services isolated and made safe before strip-out. Dispose of rubble lawfully.

  7. 7. Concealed plumbing and electrical workshutdown checkpoint

    Route cables and pipes, pressure-test the pipework and photograph the concealed work before closing the wall.

  8. 8. Waterproofing and flood testingshutdown checkpoint

    The kitchen and toilet are waterproof. Turn off the water and test the water to make sure there is no leakage. Lay the tiles first.

  9. 9. Masonry, ceilings, painting and flooring

    Construction is carried out in sequence, with each layer waiting to be dry.

  10. 10. Furniture resizing, production and installation

    Cut materials according to furniture production drawings, install and adjust hardware on site.

  11. 11. Execute leakage acceptance, WR1, clearing and deliveryshutdown checkpoint

    If the items are missed item by item, submit WR1; rubbish removal, sweeping, and basic cleaning.

Acceptance Checklist 0/6

[11][10]

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Come to your home to measure and understand the condition of the unit and building renovation regulations
  • Prepare floor plans, building services drawings, furniture drawings and VR views
  • Item-by-item quotation, listing quantity, unit price, materials and payment arrangements
  • Carry out construction and acceptance according to the process, remove garbage and clean up the site after completion

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    What's the approximate budget? Is there any furniture or partitions that must be retained?

  2. 02

    When do you want to join? Does the management office have designated construction time periods?

  3. 03

    Do the kitchen, toilet, water, electricity and waterproof systems need to be renovated at the same time?

FAQ

Frequently asked questions

Can I renovate the other rooms while keeping my existing kitchen and bathroom?

List the work by room. Before quoting, check transitions between retained and new floors, door clearances and connections between existing and new sockets and pipework. Itemise kitchen and bathroom protection, debris routes and finishing details so you can compare quotations.

How much does it cost to renovate a whole house?

It depends on scope. The example uses published rates for demolition, flooring, painting, kitchen and bathroom strip-out, waterproofing, plumbing and electrics, waste removal and insurance. Fitted furniture is excluded. Change the area for an initial estimate, then confirm the written quotation after site measurement.

How long does it take to renovate a whole house?

Duration depends on kitchen and bathroom strip-out, service alterations, fitted furniture and building working hours. Flood tests (24–48 hours) and the drying time for skim coats and paint need to be allowed for. Our quote sets out the sequence and indicative programme.

Do I need to apply to the Buildings Department?

Ordinary plastering, tiling, sanitaryware replacement and removal of qualifying non-structural partitions may be exempt from prior approval. Qualifying new non-loadbearing masonry walls and alterations to kitchen or bathroom drainage fall under minor works procedures. Structural changes to walls, beams or columns require an Authorised Person to submit plans for approval.

What should I prepare for the management office application?

It usually includes a renovation application form, project scope, construction time, contractor and worker information. Some buildings require deposits and public area protection. Each housing estate has different regulations. We will first look at the renovation regulations of your building.

How to pay in installments safely?

Each installment of payment should correspond to the completed and accepted processes. It is not best to pay most of the work before it has started. Our installment ratio will be included in the written quotation and contract, and any changes to the project will also be confirmed with a written change order.

Can we start work on Sundays or nights?

The Environmental Protection Department pointed out that between 7 p.m. and 7 a.m. the next day or on public holidays, unless a construction noise permit is issued, no mechanical equipment can be used for renovation; most management offices also have their own construction time restrictions.

Is it possible to renovate the whole house if I live tight?

It can be done in stages, but there will be dust and noise during the demolition, water, electricity, and painting periods, and there will also be water and power outages. Government One-Stop recommends setting up hoardings to isolate dust and maintain ventilation during construction. We will recommend a phased plan based on your situation.

Do you do small projects?

Yes. We can remove one or two cabinets, replace a distribution board or paint one room. The minimum charge for a tradesperson’s small site job is HK$2,000. Whole-flat design and bespoke work are our main services.

Do you have to clean it yourself after finishing?

No. After every order is completed, we will remove the garbage, sweep clean, and do basic cleaning and clearance; deep cleaning or formaldehyde removal will be followed up by a professional cleaning company.

How to start?

WhatsApp 5243 7747 for a free consultation, or use the calculator (/calculator) and AI quotation assistant (/ai-quote) for an initial budget. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

Ask for a whole-flat renovation quotation on WhatsApp Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. Official sourceHome Renovation Industry — Better Governance for Creating Comfortable Homes (Home Renovation Industry Research Report Press Release) · consumer council· Accessed 2026-11-01
  2. Official sourceComplaint Numbers: Complaint Statistics from 2024 to 2026 · consumer council· Accessed 2026-11-01
  3. Official sourceExamination of Estimates of Expenditure 2026–27, reply DEVB(PL)156 — private buildings by age at the end of 2025 · Buildings Department· Accessed 2026-11-01
  4. Official sourceHousing Statistics 2025 · Housing Bureau· Accessed 2026-11-01
  5. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-01
  6. Official sourceEco-friendly tips for home renovations · Hong Kong Government One Stop· Accessed 2026-11-01
  7. Official sourceGuidelines for property managers in formulating housekeeping codes to protect the environment: renovation works · Environmental Protection Department· Accessed 2026-11-01
  8. Official sourceFrequently asked questions about environmentally friendly property management (noise from renovation of residential premises) · Environmental Protection Department· Accessed 2026-11-01
  9. Official sourceConstruction Waste Disposal Charging Scheme · Environmental Protection Department· Accessed 2026-11-01
  10. Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-01
  11. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-01

Why talk to HK Create Design?

Understand your Renovation quotation / budget before you decide.

Start with the current condition

Tell us what you want to keep or replace. We can then check the work stages, materials, waste removal and exclusions item by item.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.