Skip to main content

OLD FLAT RENOVATION

Renovating an older or resale flat: costs, pipework, rewiring, building and window inspections

  • Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
  • Browse prices for 117 work itemsSelect work items online to see an indicative budget
  • 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty

Pipes, wiring and kitchen or bathroom waterproofing can account for more than visible flooring and furniture in an older flat. At end-2025, 9,402 private domestic buildings were at least 50 years old and many predated the ban on unlined galvanised iron pipes. HK Create Design inspects before quoting, separates essential concealed work from finishes and explains the requirements for plumbing, electrical work and asbestos.

Data verification date:2026-11-02・Numbers are accompanied by sources

Design rendering: renovation of an older second-hand flat
Design renderings and plan reference

WHAT TO CLARIFY FIRST

There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.

REAL PROJECT PHOTOS

Photographs of our completed projects

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Completed wall painting and floor awaiting self-levelling at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026
  • Fresh floor screed outside a kitchen at Dandenong Mansion, Wan Chai
    Site photoWan Chai · Older property renovation · July 2026
  • Removal of unauthorised building works at a flat in Mong Kok
    Site photoKam Fong Street, Mong Kok · Older property renovation · May 2026
  • Room strip-out and ceiling plastering at a flat in Tai Kok Tsui
    Site photoTai Kok Tsui · Older property renovation · May 2026
  • Completed custom storage wall and ceiling lights at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Detail of an open compartment in custom cabinetry at Melody Garden, Tuen Mun
    Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026
  • Wall tiles and wood-effect floor tiles after a whole-home renovation
    Completed project photosHong Kong · Whole-home renovation · July 2021
  • Completed custom media wall cabinets and pendant light in a living room
    Completed project photosHong Kong · Whole-home renovation

DESIGN RENDERS

Design renderings for reference

These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.

  • Design rendering: a 50-year-old flat after renovation, with new aluminium windows, replastered and repainted walls and a platform cabinet at the window
    Design renderingCompleted older-flat renovation (design concept)
  • Design rendering: rewiring in new wall chases, new distribution board and pipes after full strip-out
    Design renderingRewiring and repiping an older flat (design concept)

Compare the scope shown in the photos

Illustrated comparison of options

  • A residential room during site protection and after the wall and floor finishes were completed.
    Plan floors, walls and ceilings togetherFor a full renovation, list what can stay and what needs replacing so the team can price each item.

WORKED EXAMPLE

Estimate your older-flat renovation cost

Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.

Older-flat budget: rebuild one kitchen and one bathroom and renew pipes and wiring in a two-bedroom flat

  • E01 strip, skim and repaint, HK$39 per sq ft. Estimated paint area is saleable floor area × 3.
  • A09 and A10 kitchen and bathroom strip-out, HK$9,950 each including haulage. Waterproofing: C02 HK$4,850 and C03 HK$4,300.
  • G05 whole-flat repiping HK$22,300. H01 HK$770, H09 HK$6,800 and 8 sets of H02 sockets × HK$640.
  • Kitchen and bathroom wall and floor tiling, about 250 sq ft × HK$78 (D01/D02 labour and bedding materials, tiles excluded), K06 sanitary fitting installation HK$5,650 and L02 insurance HK$6,700.
  • Excludes living and bedroom flooring, furniture, kitchen cabinets, tiles and management fees.
  1. Strip, skim and repaint the whole flat (E01)Saleable area × 3 × HK$39HK$46,800
  2. Dismantling the kitchen and toilet (A09+A10)HK$9,950 × 2HK$19,900
  3. Kitchen and toilet waterproofing (C02+C03)HK$4,850+HK$4,300HK$9,150
  4. Whole-flat repiping (G05)HK$22,300HK$22,300
  5. Electrical inspection, board replacement and additional sockets (H01 + H09 + H02)HK$770+HK$6,800+8 × HK$640HK$12,690
  6. Kitchen and bathroom tiling (D01/D02)Approximately 250 sq ft × HK$78HK$19,500
  7. Bathroom sanitary fittings and hardware installation (K06)HK$5,650HK$5,650
  8. Insurance (L02)HK$6,700HK$6,700

Indicative cost of concealed works and kitchen and bathroom reconstruction in an older flatHK$142,690

At 400 sq ft, the indicative total is HK$142,690, subject to site measurement and written quotation. Our licensed plumber handles the WSD application. Newly exposed problems are assessed and quoted separately. Allow about 20% as your own budget contingency. [15][8]

Light refurbishment budget: retain kitchen and bathroom, repaint, lay SPC and replace doors

  • E02 patch and repaint, HK$21 per sq ft, using saleable floor area × 3 for paint area. J01 SPC flooring on level existing tiles, HK$60 per sq ft.
  • J04 skirting about 150 linear ft × HK$10. L03 two internal doors × HK$3,000. FUR45 old cabinet removal, 8 linear ft × HK$170.
  • H01, G01 and C04 electrical, plumbing and waterproofing checks to establish whether the kitchen and bathroom can be retained.
  • Excludes custom furniture, light fittings and building management fees
  1. Patch and repaint the whole flat (E02)Saleable area × 3 × HK$21HK$28,350
  2. SPC flooring (J01)Useable area × HK$60HK$27,000
  3. Skirting (J04)Approximately 150 linear ft × HK$10HK$1,500
  4. Electrical, plumbing and waterproofing checks (H01 + G01 + C04)HK$770+HK$930+HK$1,400HK$3,100
  5. Internal door replacement (L03)2 × HK$3,000HK$6,000
  6. Remove old cabinets (FUR45)8 linear ft × HK$170HK$1,360

Indicative cost of a light refurbishmentHK$67,310

At 450 sq ft, the indicative total is HK$67,310, subject to measurement and written quotation. Plumbing, electrical or waterproofing defects may need partial or full refurbishment. Hollow or uneven tiles require preparation before flooring. J03 levelling is HK$22 per sq ft. [15]

HOW WE HELP

How can we help you

Inspect before quoting

We inspect plumbing, electrics, waterproofing and walls before recommending work. The quote separates essential and deferrable items.

Compliant repiping and rewiring

Our licensed plumbing partner applies to WSD for pipe replacement and we coordinate the process. Registered electrical workers carry out the electrical work and issue WR1 on completion.

Complete waterproofing before tiling.

Strip the kitchen and bathroom to the substrate, install Sika waterproofing and flood-test before tiling with Optimix adhesive.

Item-by-item public price list

Our public schedule contains 117 items. Each quotation sets out quantities, rates and materials. We quote separately in writing for issues only visible after strip-out.

Coordinate with building-wide works.

Where building or window inspections or main replacement are underway, we coordinate timing and connection points with management.

One-year workmanship warranty

One-year warranty excluding deliberate damage. Coverage includes paint cracking, blistering and peeling, detached hinges, loose runners, screws coming out and swollen furniture doors. RenoClean 170°C steam cleaning can be arranged.

BEFORE / AFTER

Drag the slider to compare the layouts

Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.

After concept: the same room with light wood-effect flooring, white walls, a plasterboard ceiling with cove lighting and downlights, a fitted TV cabinet and new internal doors.
Before concept: an older two-bedroom flat’s living and dining room with yellowed, cracked walls, beige floor tiles, fluorescent lighting, an old TV cabinet and a floral sofa.
Illustration before workIllustration of the proposed result
Design illustration · Design concept: fully renovated living and dining room with new walls, floor, ceiling and furniture
After-renovation illustration: the same kitchen with light woodgrain wall units, white base units, pale stone worktop, large pale grey wall tiles, under-cabinet lighting and built-in hob
Before-renovation illustration: narrow older-flat kitchen with beige base and wall units, stained grey worktop, patterned white wall tiles, an old cooker hood and fluorescent light
Illustration before workIllustration of the proposed result
Design illustration · Design concept: rebuilt older-flat kitchen. The proposed works start with strip-out, pipe replacement and waterproofing.
After concept: the same wall with concealed pipes and wiring, new sockets, a covered distribution board, white paint and new white tiles.
Before concept: exposed ageing wiring, yellowed sockets, untidy distribution board wiring and rusty surface-mounted pipes in an old kitchen corridor.
Illustration before workIllustration of the proposed result
Design illustration · Design concept: old exposed pipes and wiring replaced with concealed services and a new distribution board

KEY NUMBERS

Older-flat renovation figures to check before work starts

government/official

9,402 buildings

Private composite and domestic buildings aged 50 years or more

Hong Kong had 36,546 such buildings at end-2025. A further 6,751 were aged 40–49, bringing the total aged 40 or above to 16,153, about 44%.

[1]

government/official

8,600 buildings

Private buildings issued mandatory building inspection notices by end-2025

About 3,400 buildings had complied, 3,700 were undergoing inspection or repair and 500 had yet to appoint a registered inspector or contractor. From 2020, the Buildings Department increased its annual selection target from 400 to 600 buildings.

[1]

government/official

10 years

Building age threshold for the Mandatory Window Inspection Scheme

Eligible private buildings aged 10 years or more. Complete prescribed inspection and repairs to individual flat windows within six months of the notice date. No further notice for those windows within five years of compliance.

[3][4]

government/official

December 1995

Ban on unlined galvanised iron pipes began.

WSD notes that older buildings with original pipes are more prone to rusty water. The registered consumer or agent should obtain the department’s approval before replacing pipes.

[8]

government/official

47,299 cases

Water seepage complaints received by the Joint Office in 2024

39,555 cases in 2022 and 45,033 in 2023. In 2024, 2,200 cases were referred to the Buildings Department and 1,236 to the Water Supplies Department.

[9]

government/official

100Amperes

Approved load threshold for five-yearly testing of domestic electrical installations

An approved loading above 100 A requires inspection and testing at least every five years. Most individual domestic flats fall below this threshold. EMSD still recommends periodic checks by a registered electrical contractor.

[10]

government/official

28 days

Minimum written notice to the EPD before asbestos removal, in days

Hong Kong banned the import, supply and use of asbestos from 4 April 2014. Premises owners or occupiers must appoint registered asbestos contractors for removal. We coordinate with registered asbestos consultants.

[12]

company public price

free

Site measurement and professional advice (limited-time offer)

On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Initial consultations on WhatsApp are free.

[15]

CHARTS

Older-flat renovation figures at a glance

Mandatory building inspection notice compliance at end-2025, approximate number of private buildings(Unit: buildings)
Notice issued
8,600
Inspection or repair underway
3,700
Compliance completed
3,400
Notice still within its compliance period
1,000
Selected, notice pending
600
Work has yet to begin.
500

Buildings Department Legislative Council estimates reply DEVB(PL)156. Of buildings issued notices, 6,500 were at least 50 years old. Coordinate flat renovation with external wall, window and communal pipe works during inspection and repair. [1]

FULL GUIDE

Older-flat renovation guide: sequence, work and practical considerations

How does renovating an older flat differ from renovating a second-hand flat?

An older-flat renovation usually tackles ageing pipes, wiring, kitchen and bathroom waterproofing and walls. A second-hand flat renovation prepares a previously occupied property for move-in. It may be newer, but retains the previous owner’s fittings or alterations. In both cases, budget for concealed conditions before cosmetic work.

Buildings Department figures submitted to the Legislative Council show 36,546 private composite and domestic buildings at end-2025. Of these, 6,751 were aged 40–49 and 9,402 were at least 50 years old. More than 40% were at least 40. Many predate the 1995 prohibition on unlined galvanised iron pipes and may lack modern residual current protection.

See the whole-flat renovation page for the full sequence, or the plumbing and electrical page for services-only work.

[1][8]

Second-hand flat checks before purchase and after handover

Before buying a resale flat, check whether it has been altered. The Buildings Department's Building Information Centre provides access to private building records, minor works records and occupation permits. Register online through BRAVO to view electronic records at HK$36 per file. Comparing the approved plans with the flat can reveal changes to partitions, balconies or the kitchen.

The Buildings Department requires an authorised person and registered structural engineer and prior approval for structural work, including removal of structural walls, beams or columns. Unapproved building works can result on conviction in a HK$400,000 fine and two years’ imprisonment. A new owner may inherit responsibility for earlier unauthorised alterations.

We inspect concealed conditions before work so that unexpected problems can be budgeted for.

  • Compare room layout, kitchen position, balcony and utility platform with the approved drawings.
  • Ask management about building inspections, repairs, pipe replacement, renovation rules and deposits.
  • Inspect the board for old fuses and a residual current device (RCD).
[6][5][15]

Older-flat repiping: galvanised iron, rusty water and WSD approval

Since December 1995, WSD has prohibited unlined galvanised iron pipes and fittings in new fresh water systems and replacements in existing buildings. Buildings completed or repiped after 1995 use corrosion-resistant pipes, so discolouration from rust is less common. Investigate the condition of original pipes in older flats.

WSD advises the registered consumer or agent to obtain approval before replacing pipes. Installation or alteration of fresh water plumbing must be carried out by a designated person such as a licensed plumber. Unauthorised work is an offence. Our licensed plumbing partner prepares the application and HK Create Design coordinates it.

Coordinate the flat’s connections with any planned communal main replacement.

Our rates: G01 local opening-up pipe inspection HK$930 per item, G03 kitchen hot and cold pipework HK$13,300, G04 bathroom hot and cold pipework HK$13,300, and G05 whole-flat supply and drainage replacement for kitchen and bathroom HK$22,300 including pressure testing. Concealed pipe reconstruction and wall chasing are quoted separately. Subject to measurement and written quotation.

Our fresh water installations use copper. Typical pipe brands are Wednesbury (CYH, BS EN 1057), Kembla (Kempress), LAWTON, OTTO and OPAL. Fittings include Pegler Yorkshire and Tectite/ENDEX push-fit and capillary fittings. We select certified products that satisfy WSD requirements. Our licensed plumbing partner undertakes the work and we coordinate the WSD application.

[8][15]

Older-flat rewiring: distribution board, circuits and WR1 completion certificate

Older flats may have fuse boxes, no RCD, too few kitchen sockets, frequent trips or hot outlets. EMSD recommends having a registered electrical contractor assess proposed additions or alterations, future demand and whether the electricity supplier should be asked to increase the approved load.

After new installation, additions, alterations or repairs, a registered electrical worker inspects and tests before energisation and issues a Work Completion Certificate (WR1). The user keeps the certificate and need not submit it to EMSD. Our work is carried out by registered electrical workers. Keep the WR1 for future sale, letting or insurance queries.

Domestic installations with an approved loading exceeding 100 A require five-yearly testing. Most individual flats are below the threshold, but EMSD also recommends periodic checks. Refurbishment provides an opportunity.

H01 electrical inspection HK$770 per visit, or HK$1,650 for a comprehensive multi-circuit or open-kitchen check. H09 replace an old fuse box with an MCB/RCD board HK$6,800, H06 new dedicated circuit HK$3,350 and H02 new 13 A single socket HK$640 per set. Increases to the incoming supply are quoted separately.

Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.

[11][10][15]

Water seepage and waterproofing in older flats

Water seepage is a common source of disputes in older buildings. The Joint Office received 39,555 complaints in 2022 and 47,299 in 2024. In 2024, 2,200 cases involving building safety or defective drainage were referred to the Buildings Department and 1,236 involving possible supply pipe leaks to WSD.

Older kitchen or bathroom waterproofing can fail after decades, especially at tile joints, shower edges and drains. After strip-out, renew waterproofing and check for seepage downstairs before tiling. C05 bathroom strip-out and waterproofing costs HK$13,000 per room, including flood testing and excluding tiling. C02 bathroom waterproofing is HK$4,850 for two coats of SikaTop Seal-107 and a 24-hour flood test, with Optimix tile adhesive for tiling. C03 kitchen waterproofing is HK$4,300 per room.

If seepage comes from above, contact management and the upstairs owner, and the Joint Office if necessary. We repair and repaint after the source is addressed. See the waterproofing page.

[9][15]

How mandatory building and window inspections affect your renovation

The Mandatory Building Inspection Scheme covers private buildings at least 30 years old, except domestic buildings of three storeys or less. On receiving a notice, owners appoint a registered inspector for common parts, external walls and other specified areas. By end-2025, around 8,600 private buildings had received notices and around 3,700 were undergoing inspection or repair.

The Mandatory Window Inspection Scheme covers eligible private buildings aged 10 years or more. After notice, appoint a qualified person to complete prescribed window inspection and repairs within six months for individual flats, or nine months for common parts. The Buildings Department will not issue another notice for the same windows within five years of compliance.

If external scaffolding is planned, coordinate window replacement and air-conditioner positions with the building. If the flat has a window inspection notice, deal with hinges, catches and perimeter finishing during renovation. See our aluminium window page for replacement options.

The Buildings Department’s Building Safety Loan Scheme offers owners up to HK$1 million per unit for qualifying improvements including building or window inspection and repair. Eligible applicants may receive interest-free loans. Confirm eligible works with the department before applying.

[2][3][4][1][7]

Consider asbestos before major renovations in older buildings.

Since 4 April 2014, Hong Kong has banned import, transhipment, supply and use of all types of asbestos and asbestos-containing materials. Older buildings may still contain them. Before major renovation, the EPD recommends a survey and management plan by a registered asbestos consultant. For newer buildings, ask the developer, architect or management company about known or suspected materials.

If asbestos-containing material is confirmed for removal, the premises owner or occupier must appoint a registered asbestos contractor and notify the EPD in writing at least 28 days before work starts. Dispose of asbestos as chemical waste separately from construction rubble.

We work with registered asbestos consultants and do not hold registration as an asbestos contractor. If suspected material is exposed, we stop work, isolate the area and arrange a registered consultant and contractor. Work resumes once the area is confirmed safe.

[12][13]

Budgeting for an older flat: concealed services before finishes

Budget in this order: strip-out, plumbing and electrical, waterproofing, masonry and plaster, ceilings and painting, flooring, then furniture. The first four stages affect concealed work that is costly to reopen. Later finishes can be phased.

Examples from our rates: E01 strip, skim, moisture-treat, sand and paint, HK$39 per sq ft for peeling, mouldy or previously damp walls. E02 patch, moisture-treat, sand and paint sound walls, HK$21 per sq ft. A09 kitchen or A10 bathroom removal and disposal, HK$9,950 per room. A11 debris disposal, HK$4,200 per load. L02 third-party and employees’ compensation insurance, HK$6,700 per policy.

The examples cover kitchen and bathroom reconstruction with new pipes and wiring, and a lighter refurbishment retaining both rooms. Both are indicative and subject to survey and written quotation. We price conditions exposed during strip-out, such as spalled concrete or rerouted concealed pipes, separately in writing. Allow about 20% of your own budget as a contingency.

[15]

Extra arrangements for walk-ups and older buildings without management

Some older buildings have no lift or management office. Materials and debris must be carried on stairs. Furniture delivery attracts FUR43 at HK$300 per flight. Tell neighbours the work dates before starting.

The EPD states that noise from domestic renovation during daytime, 7 am–7 pm excluding public holidays, is outside these Noise Control Ordinance restrictions. Powered mechanical equipment requires a Construction Noise Permit from 7 pm to 7 am or on public holidays. Management or the owners’ corporation may set shorter hours. Follow the building rules.

[14][15]

How HK Create Design renovates older flats

We have 15 years of experience renovating older buildings, tong lau tenements and resale flats. We start with a free WhatsApp discussion, then inspect the plumbing, wiring, waterproofing and walls on site. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. The quotation gives quantities, unit prices and materials for each item, with concealed work and visible finishes listed separately.

Our materials include SikaTop Seal-107, Optimix TA313/WP515, Fosroc Nitocote, Nippon and Dulux. Custom furniture uses standard ENF boards and Blum fittings. Registered electrical workers issue WR1. Our one-year warranty covers paint cracking, blistering and peeling, detached hinges, loose runners, screws coming out and swollen door panels, excluding deliberate damage. Partner RenoClean can provide post-renovation cleaning with 170°C steam.

Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Monday–Saturday 10:00–18:00. We also undertake minor repairs, with a minimum call-out of HK$2,000. Send photos to WhatsApp 5243 7747 for an estimate.

[15][11]

COMPARE

Comparing older-flat renovation options

Three approaches to renovating a second-hand flat

practiceSuitable propertyMain work stagesReference price itemsPay attention to
Light refurbishmentPlumbing and electrical tests satisfactory, kitchen and bathroom in good conditionPatch and repaint, lay SPC flooring, replace internal doors and install custom wardrobesE02 HK$21 per sq ft, J01 HK$60 per sq ft and L03 HK$3,000 per doorOld tiles must be level and free from hollows. Prepare and level them first if necessary (J03, HK$22 per sq ft).
Partial renovationWorn kitchen or bathroom, or defective plumbing or electrical systemsRebuild the kitchen or bathroom, waterproof, repipe and rewire.A10 HK$9,950、C02 HK$4,850、G04 HK$13,300、H09 HK$6,800Flood-test kitchen and bathroom waterproofing before tiling.
Full renovationOlder flats with multiple defects, for long-term owner occupationWhole-flat strip-out, plumbing, electrical, waterproofing, plastering, ceilings, flooring and furnitureG05 HK$22,300, E01 HK$39 per sq ft and A11 HK$4,200 per loadAllow about 20% for conditions revealed after strip-out. Asbestos and structural issues require separate assessment.

Indicative price, subject to site measurement and written quotation. [15]

Common older-flat defects: symptoms, checks and remedial work

SymptomsPossible causeHow to inspectCorresponding work and indicative price
Discoloured water or low pressure at tapsCorroded or deteriorating pipesRun water and open a specified location to inspect the pipe.G01 HK$930. G05 HK$22,300, with our team arranging the WSD application.
Frequent tripping or hot socketsOverloaded circuits, old fuse box or missing RCDElectrical inspection and circuit measurementsH01 HK$770, H09 HK$6,800 and H06 HK$3,350 per circuit
Water staining on the downstairs ceilingFailed kitchen or bathroom waterproofing or a leaking drain connectionFlood-test for 24–48 hoursC04 HK$1,400. C05 HK$13,000 per room.
Peeling or mouldy wallsSeepage, damp and failed paintIdentify the water source, then check for loose plaster.E05 HK$1,250 per wall face. E01 HK$39 per sq ft.
Spalling ceiling concrete and exposed reinforcementCorroding reinforcement expandsTap-test the affected areaB06 mason’s day rate HK$2,700 for localised repairs. Seek professional assessment for extensive or structural defects.

Indicative rates, subject to measurement and written quotation. See WSD’s maintenance guidelines for fresh water plumbing systems for replacement requirements. [15][8]

Statutory requirements affecting older-flat renovations

ItemApplicable situationsrequestEffect on the renovation
Mandatory building inspectionPrivate buildings aged at least 30 years, except domestic buildings of three storeys or lessAfter notice, appoint a registered inspector for common parts, external walls and other specified areas.Coordinate external wall and air-conditioner works with the building.
Mandatory window inspectionPrivate buildings aged 10 years or aboveComplete window inspection and repairs in the flat within six months.Coordinate window hinge, catch and perimeter repairs with renovation.
Replacement of fresh water pipesReplace pipework inside the flat.Obtain WSD approval first. A designated person such as a licensed plumber carries out the work. We coordinate the application.Allow time for approvals.
Electrical workNew installations, additions, alterations or repairsA registered electrical worker tests the installation and issues a WR1.Collect and retain the WR1 at completion.
Structural alterationsRemoval of structural walls, beams or columnsAppoint an authorised person and registered structural engineer and obtain Buildings Department approval.Check approved plans before removing a kitchen wall.
asbestosRemoval of asbestos-containing materialsUse a registered asbestos contractor and notify the EPD in writing at least 28 days before work starts.Stop work if suspect material is found and arrange a registered asbestos consultant.
[2][3][4][8][11][5][12]

SITE SOP

Older-flat renovation standards and handover checklist

The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.

Company Site Code

Concealed-condition checks after taking possession and before work begins

  1. 1. Check the approved plans

    Check the plans through the Buildings Department's BRAVO service or Building Information Centre. Compare them with the actual layout, kitchen position and balcony, and mark any apparent alterations.

  2. 2. Ask building management

    Obtain renovation rules, deposit requirements and permitted hours. Ask about mandatory building or window inspections and communal pipe replacement.

  3. 3. Check water quality and pressure

    Run taps to check for discoloured water and adequate pressure. With all taps closed, a moving meter may indicate leakage.

  4. 4. Inspect the distribution board and socketsshutdown checkpoint

    Check for an old fuse box and RCD protection, test the RCD and inspect sockets for overheating or discolouration.

  5. 5. Check kitchen and bathroom waterproofingshutdown checkpoint

    Check the downstairs ceiling for water stains. If necessary, arrange a 24–48-hour flood test.

  6. 6. Inspect walls and ceilings

    Tap for hollows, inspect peeling, mould, cracks or concrete spalling and photograph their locations.

  7. 7. Check floors

    Tap-test tiles for hollows and check flatness before deciding whether SPC can be laid directly.

  8. 8. Check for suspected asbestos-containing materialsshutdown checkpoint

    Leave suspected material undisturbed. We arrange assessment by our registered asbestos consultant.

  9. 9. Prepare the report and agree priorities

    Separate essential concealed work from cosmetic work that can be phased, then issue a written quotation.

Acceptance Checklist 0/4

[6][8][13][15]

Company Site Code

Inspection points for older-flat repiping and rewiring

  1. 1. Confirm scope and approvalsshutdown checkpoint

    Distinguish pipes inside the flat from communal pipes. Our licensed plumbing partner applies to WSD for fresh water pipe replacement. Obtain management consent for work on communal mains or stop valves.

  2. 2. Isolate water and electricity and cap the services

    Isolate water and electricity and cap services before demolition to prevent flooding or electric shock.

  3. 3. Chase walls and install pipes and wiring

    Follow the services drawings for wall chases. Separate hot and cold pipes, install wiring in concealed conduits and divide circuits according to electrical demand.

  4. 4. Pressure-test pipesshutdown checkpoint

    Pressure-test before closing walls and photograph pipe routes and readings.

  5. 5. Test the electrical installationshutdown checkpoint

    A registered electrical worker inspects and tests before energisation.

  6. 6. Waterproof and carry out a flood testshutdown checkpoint

    Renew kitchen and bathroom waterproofing and confirm a leak-free flood test before tiling.

  7. 7. Handover documents

    Hand over the WR1 completion certificate, concealed services photos and warranty information.

Acceptance Checklist 0/5

[8][11][15]

MATERIALS

Related materials: We know how to use them and can also help you with construction

  • Post-handover checks: water quality and pressure, distribution board, waterproofing, walls and floors
  • Older-flat services: supply and waste pipes, distribution board, circuits and sockets
  • Strip and rebuild the kitchen and bathroom, including waterproofing and flood testing.
  • Strip, skim and repaint, replace flooring, finish ceilings and install custom furniture

BEFORE A SITE VISIT

Before the survey, you may wish to prepare these questions.

  1. 01

    How old is the flat, and have the pipes or distribution board been replaced?

  2. 02

    Has the building received mandatory building or window inspection notices, or planned communal pipe replacement?

  3. 03

    Do you want a light refurbishment or a full renovation including kitchen and bathroom? How long will you live here?

FAQ

Frequently asked questions

How much does an older-flat renovation cost?

Using our published rates, stripping and repainting a 400 sq ft two-bedroom flat, rebuilding and waterproofing the kitchen and bathroom, repiping, replacing the board and adding sockets costs about HK$142,690. Living and bedroom flooring, furniture and tiles are excluded. A lighter 450 sq ft refurbishment retaining the kitchen and bathroom costs about HK$67,310. Subject to measurement and written quotation.

What should I check before renovating a second-hand flat?

Check approved plans for alterations. Ask management about building and window inspections or communal pipe replacement. Test services and waterproofing, then separate essential work from items that can wait.

At what age should water pipes be replaced?

There is no fixed replacement age. WSD prohibited unlined galvanised iron pipes from December 1995. Older buildings with original pipes are more prone to rusty water. Investigate discolouration, low pressure or a meter that continues to turn with all taps closed.

Does repiping an older flat require an application?

Obtain WSD approval first and use a designated person such as a licensed plumber. Our licensed plumbing partner handles the application and we coordinate it for you.

Does rewiring an older flat always require a new distribution board?

It depends on inspection. An old fuse box, missing residual current protection or insufficient circuits can justify an MCB/RCD board (H09, HK$6,800). A registered electrical worker tests the work and issues a WR1.

Can I coordinate renovation with a mandatory window inspection notice?

Yes. For windows in individual flats, appoint a qualified person and complete inspection and necessary repairs within six months of the notice date. Coordinate hinges, catches and perimeter finishing with the renovation.

Could an older flat contain asbestos, and what should I do?

Older buildings can contain asbestos. Removal requires a registered asbestos contractor and written notice to the EPD at least 28 days before work. We work with registered asbestos consultants, stop if we find suspected material and arrange professional assessment and removal.

Can I just repaint and lay flooring, leaving the kitchen and bathroom in place?

Yes, if plumbing, electrical and waterproofing checks are satisfactory and the tiles are level without hollow areas. J01 SPC flooring costs HK$60 per sq ft and can be laid over sound tiles. Resolve downstairs seepage complaints first.

Can I remove a kitchen wall to create an open kitchen in an older flat?

Check the approved plans first. The Buildings Department notes that kitchen enclosure walls and doors may be structural or require fire resistance. A fire-rated enclosure shown on the approved plans must be retained.

Is there a charge for on-site measurement?

On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send photos or a floor plan to WhatsApp 5243 7747 for a free initial consultation.

AFTER RENOVATION

RenoClean | Specialist cleaning and aerospace-grade air purification

After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.

  • Cleaning and testing are listed separately

    The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.

START WITH THE REAL CONTEXT

Want to discuss this project?
First, bring us the situation of the unit.

You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.

Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.

WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-up

Free site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.

Sources

  1. Official sourceExamination of the 2026–27 Estimates of Expenditure, reply DEVB(PL)156: number of private buildings by age at the end of 2025 and compliance with Mandatory Building Inspection notices · Buildings Department· Accessed 2026-11-02
  2. Official sourceMandatory Building Inspection Scheme · Buildings Department· Accessed 2026-11-02
  3. Official sourceMandatory Window Inspection Scheme · Buildings Department· Accessed 2026-11-02
  4. Official sourceOverview of the Mandatory Window Inspection Scheme · Buildings Department· Accessed 2026-11-02
  5. Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-02
  6. Official sourceBuilding Information Centre: private building records and fees · Buildings Department· Accessed 2026-11-02
  7. Official sourceBuilding Safety Loan Scheme frequently asked questions · Buildings Department· Accessed 2026-11-02
  8. Official sourceGuidelines for maintenance of fresh water plumbing systems · Water Supplies Department· Accessed 2026-11-02
  9. Official sourceLegislative Council Question 14 on the Joint Office for Investigation of Water Seepage Complaints, written reply of 2 July 2025 · Hong Kong SAR Government press release· Accessed 2026-11-02
  10. Official sourcePeriodic testing of fixed electrical installations · Electrical and Mechanical Services Department· Accessed 2026-11-02
  11. Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
  12. Official sourceAsbestos control · Environmental Protection Department· Accessed 2026-11-02
  13. Official sourceGreen property management: asbestos removal · Environmental Protection Department· Accessed 2026-11-02
  14. Official sourceFrequently asked questions about environmentally friendly property management (noise from renovation of residential premises) · Environmental Protection Department· Accessed 2026-11-02
  15. CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02

Why talk to HK Create Design?

Understand your Whole-home renovation before you decide.

Start with the current condition

Tell us what you want to keep and what needs replacing. Once the scope is clear, we can compare costs and arrangements.

Compare the budget line by line

Use online rates and calculators as an initial reference. Confirm site conditions, exclusions and the final price in a written quotation.

View project calculators ↗

Project photos and a local showroom

Browse photos of our projects or book a meeting at our Wong Tai Sin showroom and bring your plans. The written agreement sets out acceptance and warranty terms.

View project photos ↗ Showroom details ↗