OLD FLAT RENOVATION
Renovating an older or resale flat: costs, pipework, rewiring, building and window inspections
- Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
- Browse prices for 117 work itemsSelect work items online to see an indicative budget
- 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty
Pipes, wiring and kitchen or bathroom waterproofing can account for more than visible flooring and furniture in an older flat. At end-2025, 9,402 private domestic buildings were at least 50 years old and many predated the ban on unlined galvanised iron pipes. HK Create Design inspects before quoting, separates essential concealed work from finishes and explains the requirements for plumbing, electrical work and asbestos.
Data verification date:2026-11-02・Numbers are accompanied by sources

WHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
REAL PROJECT PHOTOS
Photographs of our completed projects
These photographs were taken on actual HK Create Design projects. Client details have been removed.

Site photoWan Chai · Older property renovation · July 2026 
Site photoWan Chai · Older property renovation · July 2026 
Site photoKam Fong Street, Mong Kok · Older property renovation · May 2026 
Site photoTai Kok Tsui · Older property renovation · May 2026 
Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026 
Completed project photosMelody Garden, Tuen Mun · Whole-home renovation · April 2026 
Completed project photosHong Kong · Whole-home renovation · July 2021 
Completed project photosHong Kong · Whole-home renovation
DESIGN RENDERS
Design renderings for reference
These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.
Compare the scope shown in the photos
Illustrated comparison of options

Plan floors, walls and ceilings togetherFor a full renovation, list what can stay and what needs replacing so the team can price each item.
WORKED EXAMPLE
Estimate your older-flat renovation cost
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
Older-flat budget: rebuild one kitchen and one bathroom and renew pipes and wiring in a two-bedroom flat
- E01 strip, skim and repaint, HK$39 per sq ft. Estimated paint area is saleable floor area × 3.
- A09 and A10 kitchen and bathroom strip-out, HK$9,950 each including haulage. Waterproofing: C02 HK$4,850 and C03 HK$4,300.
- G05 whole-flat repiping HK$22,300. H01 HK$770, H09 HK$6,800 and 8 sets of H02 sockets × HK$640.
- Kitchen and bathroom wall and floor tiling, about 250 sq ft × HK$78 (D01/D02 labour and bedding materials, tiles excluded), K06 sanitary fitting installation HK$5,650 and L02 insurance HK$6,700.
- Excludes living and bedroom flooring, furniture, kitchen cabinets, tiles and management fees.
- Strip, skim and repaint the whole flat (E01)Saleable area × 3 × HK$39HK$46,800
- Dismantling the kitchen and toilet (A09+A10)HK$9,950 × 2HK$19,900
- Kitchen and toilet waterproofing (C02+C03)HK$4,850+HK$4,300HK$9,150
- Whole-flat repiping (G05)HK$22,300HK$22,300
- Electrical inspection, board replacement and additional sockets (H01 + H09 + H02)HK$770+HK$6,800+8 × HK$640HK$12,690
- Kitchen and bathroom tiling (D01/D02)Approximately 250 sq ft × HK$78HK$19,500
- Bathroom sanitary fittings and hardware installation (K06)HK$5,650HK$5,650
- Insurance (L02)HK$6,700HK$6,700
Indicative cost of concealed works and kitchen and bathroom reconstruction in an older flatHK$142,690
At 400 sq ft, the indicative total is HK$142,690, subject to site measurement and written quotation. Our licensed plumber handles the WSD application. Newly exposed problems are assessed and quoted separately. Allow about 20% as your own budget contingency. [15][8]
Light refurbishment budget: retain kitchen and bathroom, repaint, lay SPC and replace doors
- E02 patch and repaint, HK$21 per sq ft, using saleable floor area × 3 for paint area. J01 SPC flooring on level existing tiles, HK$60 per sq ft.
- J04 skirting about 150 linear ft × HK$10. L03 two internal doors × HK$3,000. FUR45 old cabinet removal, 8 linear ft × HK$170.
- H01, G01 and C04 electrical, plumbing and waterproofing checks to establish whether the kitchen and bathroom can be retained.
- Excludes custom furniture, light fittings and building management fees
- Patch and repaint the whole flat (E02)Saleable area × 3 × HK$21HK$28,350
- SPC flooring (J01)Useable area × HK$60HK$27,000
- Skirting (J04)Approximately 150 linear ft × HK$10HK$1,500
- Electrical, plumbing and waterproofing checks (H01 + G01 + C04)HK$770+HK$930+HK$1,400HK$3,100
- Internal door replacement (L03)2 × HK$3,000HK$6,000
- Remove old cabinets (FUR45)8 linear ft × HK$170HK$1,360
Indicative cost of a light refurbishmentHK$67,310
At 450 sq ft, the indicative total is HK$67,310, subject to measurement and written quotation. Plumbing, electrical or waterproofing defects may need partial or full refurbishment. Hollow or uneven tiles require preparation before flooring. J03 levelling is HK$22 per sq ft. [15]
HOW WE HELP
How can we help you
Inspect before quoting
We inspect plumbing, electrics, waterproofing and walls before recommending work. The quote separates essential and deferrable items.
Compliant repiping and rewiring
Our licensed plumbing partner applies to WSD for pipe replacement and we coordinate the process. Registered electrical workers carry out the electrical work and issue WR1 on completion.
Complete waterproofing before tiling.
Strip the kitchen and bathroom to the substrate, install Sika waterproofing and flood-test before tiling with Optimix adhesive.
Item-by-item public price list
Our public schedule contains 117 items. Each quotation sets out quantities, rates and materials. We quote separately in writing for issues only visible after strip-out.
Coordinate with building-wide works.
Where building or window inspections or main replacement are underway, we coordinate timing and connection points with management.
One-year workmanship warranty
One-year warranty excluding deliberate damage. Coverage includes paint cracking, blistering and peeling, detached hinges, loose runners, screws coming out and swollen furniture doors. RenoClean 170°C steam cleaning can be arranged.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.






KEY NUMBERS
Older-flat renovation figures to check before work starts
government/official
9,402 buildings
Private composite and domestic buildings aged 50 years or more
Hong Kong had 36,546 such buildings at end-2025. A further 6,751 were aged 40–49, bringing the total aged 40 or above to 16,153, about 44%.
[1]government/official
8,600 buildings
Private buildings issued mandatory building inspection notices by end-2025
About 3,400 buildings had complied, 3,700 were undergoing inspection or repair and 500 had yet to appoint a registered inspector or contractor. From 2020, the Buildings Department increased its annual selection target from 400 to 600 buildings.
[1]government/official
10 years
Building age threshold for the Mandatory Window Inspection Scheme
Eligible private buildings aged 10 years or more. Complete prescribed inspection and repairs to individual flat windows within six months of the notice date. No further notice for those windows within five years of compliance.
[3][4]government/official
December 1995
Ban on unlined galvanised iron pipes began.
WSD notes that older buildings with original pipes are more prone to rusty water. The registered consumer or agent should obtain the department’s approval before replacing pipes.
[8]government/official
47,299 cases
Water seepage complaints received by the Joint Office in 2024
39,555 cases in 2022 and 45,033 in 2023. In 2024, 2,200 cases were referred to the Buildings Department and 1,236 to the Water Supplies Department.
[9]government/official
100Amperes
Approved load threshold for five-yearly testing of domestic electrical installations
An approved loading above 100 A requires inspection and testing at least every five years. Most individual domestic flats fall below this threshold. EMSD still recommends periodic checks by a registered electrical contractor.
[10]government/official
28 days
Minimum written notice to the EPD before asbestos removal, in days
Hong Kong banned the import, supply and use of asbestos from 4 April 2014. Premises owners or occupiers must appoint registered asbestos contractors for removal. We coordinate with registered asbestos consultants.
[12]company public price
free
Site measurement and professional advice (limited-time offer)
On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Initial consultations on WhatsApp are free.
[15]CHARTS
Older-flat renovation figures at a glance
Buildings Department Legislative Council estimates reply DEVB(PL)156. Of buildings issued notices, 6,500 were at least 50 years old. Coordinate flat renovation with external wall, window and communal pipe works during inspection and repair. [1]
FULL GUIDE
Older-flat renovation guide: sequence, work and practical considerations
How does renovating an older flat differ from renovating a second-hand flat?
An older-flat renovation usually tackles ageing pipes, wiring, kitchen and bathroom waterproofing and walls. A second-hand flat renovation prepares a previously occupied property for move-in. It may be newer, but retains the previous owner’s fittings or alterations. In both cases, budget for concealed conditions before cosmetic work.
Buildings Department figures submitted to the Legislative Council show 36,546 private composite and domestic buildings at end-2025. Of these, 6,751 were aged 40–49 and 9,402 were at least 50 years old. More than 40% were at least 40. Many predate the 1995 prohibition on unlined galvanised iron pipes and may lack modern residual current protection.
See the whole-flat renovation page for the full sequence, or the plumbing and electrical page for services-only work.
[1][8]Second-hand flat checks before purchase and after handover
Before buying a resale flat, check whether it has been altered. The Buildings Department's Building Information Centre provides access to private building records, minor works records and occupation permits. Register online through BRAVO to view electronic records at HK$36 per file. Comparing the approved plans with the flat can reveal changes to partitions, balconies or the kitchen.
The Buildings Department requires an authorised person and registered structural engineer and prior approval for structural work, including removal of structural walls, beams or columns. Unapproved building works can result on conviction in a HK$400,000 fine and two years’ imprisonment. A new owner may inherit responsibility for earlier unauthorised alterations.
We inspect concealed conditions before work so that unexpected problems can be budgeted for.
- Compare room layout, kitchen position, balcony and utility platform with the approved drawings.
- Ask management about building inspections, repairs, pipe replacement, renovation rules and deposits.
- Inspect the board for old fuses and a residual current device (RCD).
Older-flat repiping: galvanised iron, rusty water and WSD approval
Since December 1995, WSD has prohibited unlined galvanised iron pipes and fittings in new fresh water systems and replacements in existing buildings. Buildings completed or repiped after 1995 use corrosion-resistant pipes, so discolouration from rust is less common. Investigate the condition of original pipes in older flats.
WSD advises the registered consumer or agent to obtain approval before replacing pipes. Installation or alteration of fresh water plumbing must be carried out by a designated person such as a licensed plumber. Unauthorised work is an offence. Our licensed plumbing partner prepares the application and HK Create Design coordinates it.
Coordinate the flat’s connections with any planned communal main replacement.
Our rates: G01 local opening-up pipe inspection HK$930 per item, G03 kitchen hot and cold pipework HK$13,300, G04 bathroom hot and cold pipework HK$13,300, and G05 whole-flat supply and drainage replacement for kitchen and bathroom HK$22,300 including pressure testing. Concealed pipe reconstruction and wall chasing are quoted separately. Subject to measurement and written quotation.
Our fresh water installations use copper. Typical pipe brands are Wednesbury (CYH, BS EN 1057), Kembla (Kempress), LAWTON, OTTO and OPAL. Fittings include Pegler Yorkshire and Tectite/ENDEX push-fit and capillary fittings. We select certified products that satisfy WSD requirements. Our licensed plumbing partner undertakes the work and we coordinate the WSD application.
[8][15]Older-flat rewiring: distribution board, circuits and WR1 completion certificate
Older flats may have fuse boxes, no RCD, too few kitchen sockets, frequent trips or hot outlets. EMSD recommends having a registered electrical contractor assess proposed additions or alterations, future demand and whether the electricity supplier should be asked to increase the approved load.
After new installation, additions, alterations or repairs, a registered electrical worker inspects and tests before energisation and issues a Work Completion Certificate (WR1). The user keeps the certificate and need not submit it to EMSD. Our work is carried out by registered electrical workers. Keep the WR1 for future sale, letting or insurance queries.
Domestic installations with an approved loading exceeding 100 A require five-yearly testing. Most individual flats are below the threshold, but EMSD also recommends periodic checks. Refurbishment provides an opportunity.
H01 electrical inspection HK$770 per visit, or HK$1,650 for a comprehensive multi-circuit or open-kitchen check. H09 replace an old fuse box with an MCB/RCD board HK$6,800, H06 new dedicated circuit HK$3,350 and H02 new 13 A single socket HK$640 per set. Increases to the incoming supply are quoted separately.
Our standard cable brands include Hilly and ei8ht for insulated cables, network and control wiring. Prysmian or Nexans are upgrade options and Belden is available for higher-spec network and signal cabling. We use brands with product certification such as 3C. Installation follows the EMSD Code of Practice for the Electricity (Wiring) Regulations. A registered electrical worker inspects and tests the completed installation and issues form WR1. Schneider is commonly used for switches and sockets.
[11][10][15]Water seepage and waterproofing in older flats
Water seepage is a common source of disputes in older buildings. The Joint Office received 39,555 complaints in 2022 and 47,299 in 2024. In 2024, 2,200 cases involving building safety or defective drainage were referred to the Buildings Department and 1,236 involving possible supply pipe leaks to WSD.
Older kitchen or bathroom waterproofing can fail after decades, especially at tile joints, shower edges and drains. After strip-out, renew waterproofing and check for seepage downstairs before tiling. C05 bathroom strip-out and waterproofing costs HK$13,000 per room, including flood testing and excluding tiling. C02 bathroom waterproofing is HK$4,850 for two coats of SikaTop Seal-107 and a 24-hour flood test, with Optimix tile adhesive for tiling. C03 kitchen waterproofing is HK$4,300 per room.
If seepage comes from above, contact management and the upstairs owner, and the Joint Office if necessary. We repair and repaint after the source is addressed. See the waterproofing page.
[9][15]How mandatory building and window inspections affect your renovation
The Mandatory Building Inspection Scheme covers private buildings at least 30 years old, except domestic buildings of three storeys or less. On receiving a notice, owners appoint a registered inspector for common parts, external walls and other specified areas. By end-2025, around 8,600 private buildings had received notices and around 3,700 were undergoing inspection or repair.
The Mandatory Window Inspection Scheme covers eligible private buildings aged 10 years or more. After notice, appoint a qualified person to complete prescribed window inspection and repairs within six months for individual flats, or nine months for common parts. The Buildings Department will not issue another notice for the same windows within five years of compliance.
If external scaffolding is planned, coordinate window replacement and air-conditioner positions with the building. If the flat has a window inspection notice, deal with hinges, catches and perimeter finishing during renovation. See our aluminium window page for replacement options.
The Buildings Department’s Building Safety Loan Scheme offers owners up to HK$1 million per unit for qualifying improvements including building or window inspection and repair. Eligible applicants may receive interest-free loans. Confirm eligible works with the department before applying.
[2][3][4][1][7]Consider asbestos before major renovations in older buildings.
Since 4 April 2014, Hong Kong has banned import, transhipment, supply and use of all types of asbestos and asbestos-containing materials. Older buildings may still contain them. Before major renovation, the EPD recommends a survey and management plan by a registered asbestos consultant. For newer buildings, ask the developer, architect or management company about known or suspected materials.
If asbestos-containing material is confirmed for removal, the premises owner or occupier must appoint a registered asbestos contractor and notify the EPD in writing at least 28 days before work starts. Dispose of asbestos as chemical waste separately from construction rubble.
We work with registered asbestos consultants and do not hold registration as an asbestos contractor. If suspected material is exposed, we stop work, isolate the area and arrange a registered consultant and contractor. Work resumes once the area is confirmed safe.
[12][13]Budgeting for an older flat: concealed services before finishes
Budget in this order: strip-out, plumbing and electrical, waterproofing, masonry and plaster, ceilings and painting, flooring, then furniture. The first four stages affect concealed work that is costly to reopen. Later finishes can be phased.
Examples from our rates: E01 strip, skim, moisture-treat, sand and paint, HK$39 per sq ft for peeling, mouldy or previously damp walls. E02 patch, moisture-treat, sand and paint sound walls, HK$21 per sq ft. A09 kitchen or A10 bathroom removal and disposal, HK$9,950 per room. A11 debris disposal, HK$4,200 per load. L02 third-party and employees’ compensation insurance, HK$6,700 per policy.
The examples cover kitchen and bathroom reconstruction with new pipes and wiring, and a lighter refurbishment retaining both rooms. Both are indicative and subject to survey and written quotation. We price conditions exposed during strip-out, such as spalled concrete or rerouted concealed pipes, separately in writing. Allow about 20% of your own budget as a contingency.
[15]Extra arrangements for walk-ups and older buildings without management
Some older buildings have no lift or management office. Materials and debris must be carried on stairs. Furniture delivery attracts FUR43 at HK$300 per flight. Tell neighbours the work dates before starting.
The EPD states that noise from domestic renovation during daytime, 7 am–7 pm excluding public holidays, is outside these Noise Control Ordinance restrictions. Powered mechanical equipment requires a Construction Noise Permit from 7 pm to 7 am or on public holidays. Management or the owners’ corporation may set shorter hours. Follow the building rules.
[14][15]How HK Create Design renovates older flats
We have 15 years of experience renovating older buildings, tong lau tenements and resale flats. We start with a free WhatsApp discussion, then inspect the plumbing, wiring, waterproofing and walls on site. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. The quotation gives quantities, unit prices and materials for each item, with concealed work and visible finishes listed separately.
Our materials include SikaTop Seal-107, Optimix TA313/WP515, Fosroc Nitocote, Nippon and Dulux. Custom furniture uses standard ENF boards and Blum fittings. Registered electrical workers issue WR1. Our one-year warranty covers paint cracking, blistering and peeling, detached hinges, loose runners, screws coming out and swollen door panels, excluding deliberate damage. Partner RenoClean can provide post-renovation cleaning with 170°C steam.
Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon, Monday–Saturday 10:00–18:00. We also undertake minor repairs, with a minimum call-out of HK$2,000. Send photos to WhatsApp 5243 7747 for an estimate.
[15][11]COMPARE
Comparing older-flat renovation options
Three approaches to renovating a second-hand flat
| practice | Suitable property | Main work stages | Reference price items | Pay attention to |
|---|---|---|---|---|
| Light refurbishment | Plumbing and electrical tests satisfactory, kitchen and bathroom in good condition | Patch and repaint, lay SPC flooring, replace internal doors and install custom wardrobes | E02 HK$21 per sq ft, J01 HK$60 per sq ft and L03 HK$3,000 per door | Old tiles must be level and free from hollows. Prepare and level them first if necessary (J03, HK$22 per sq ft). |
| Partial renovation | Worn kitchen or bathroom, or defective plumbing or electrical systems | Rebuild the kitchen or bathroom, waterproof, repipe and rewire. | A10 HK$9,950、C02 HK$4,850、G04 HK$13,300、H09 HK$6,800 | Flood-test kitchen and bathroom waterproofing before tiling. |
| Full renovation | Older flats with multiple defects, for long-term owner occupation | Whole-flat strip-out, plumbing, electrical, waterproofing, plastering, ceilings, flooring and furniture | G05 HK$22,300, E01 HK$39 per sq ft and A11 HK$4,200 per load | Allow about 20% for conditions revealed after strip-out. Asbestos and structural issues require separate assessment. |
Indicative price, subject to site measurement and written quotation. [15]
Common older-flat defects: symptoms, checks and remedial work
| Symptoms | Possible cause | How to inspect | Corresponding work and indicative price |
|---|---|---|---|
| Discoloured water or low pressure at taps | Corroded or deteriorating pipes | Run water and open a specified location to inspect the pipe. | G01 HK$930. G05 HK$22,300, with our team arranging the WSD application. |
| Frequent tripping or hot sockets | Overloaded circuits, old fuse box or missing RCD | Electrical inspection and circuit measurements | H01 HK$770, H09 HK$6,800 and H06 HK$3,350 per circuit |
| Water staining on the downstairs ceiling | Failed kitchen or bathroom waterproofing or a leaking drain connection | Flood-test for 24–48 hours | C04 HK$1,400. C05 HK$13,000 per room. |
| Peeling or mouldy walls | Seepage, damp and failed paint | Identify the water source, then check for loose plaster. | E05 HK$1,250 per wall face. E01 HK$39 per sq ft. |
| Spalling ceiling concrete and exposed reinforcement | Corroding reinforcement expands | Tap-test the affected area | B06 mason’s day rate HK$2,700 for localised repairs. Seek professional assessment for extensive or structural defects. |
Indicative rates, subject to measurement and written quotation. See WSD’s maintenance guidelines for fresh water plumbing systems for replacement requirements. [15][8]
Statutory requirements affecting older-flat renovations
| Item | Applicable situations | request | Effect on the renovation |
|---|---|---|---|
| Mandatory building inspection | Private buildings aged at least 30 years, except domestic buildings of three storeys or less | After notice, appoint a registered inspector for common parts, external walls and other specified areas. | Coordinate external wall and air-conditioner works with the building. |
| Mandatory window inspection | Private buildings aged 10 years or above | Complete window inspection and repairs in the flat within six months. | Coordinate window hinge, catch and perimeter repairs with renovation. |
| Replacement of fresh water pipes | Replace pipework inside the flat. | Obtain WSD approval first. A designated person such as a licensed plumber carries out the work. We coordinate the application. | Allow time for approvals. |
| Electrical work | New installations, additions, alterations or repairs | A registered electrical worker tests the installation and issues a WR1. | Collect and retain the WR1 at completion. |
| Structural alterations | Removal of structural walls, beams or columns | Appoint an authorised person and registered structural engineer and obtain Buildings Department approval. | Check approved plans before removing a kitchen wall. |
| asbestos | Removal of asbestos-containing materials | Use a registered asbestos contractor and notify the EPD in writing at least 28 days before work starts. | Stop work if suspect material is found and arrange a registered asbestos consultant. |
SITE SOP
Older-flat renovation standards and handover checklist
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Company Site Code
Concealed-condition checks after taking possession and before work begins
- 1. Check the approved plans
Check the plans through the Buildings Department's BRAVO service or Building Information Centre. Compare them with the actual layout, kitchen position and balcony, and mark any apparent alterations.
- 2. Ask building management
Obtain renovation rules, deposit requirements and permitted hours. Ask about mandatory building or window inspections and communal pipe replacement.
- 3. Check water quality and pressure
Run taps to check for discoloured water and adequate pressure. With all taps closed, a moving meter may indicate leakage.
- 4. Inspect the distribution board and socketsshutdown checkpoint
Check for an old fuse box and RCD protection, test the RCD and inspect sockets for overheating or discolouration.
- 5. Check kitchen and bathroom waterproofingshutdown checkpoint
Check the downstairs ceiling for water stains. If necessary, arrange a 24–48-hour flood test.
- 6. Inspect walls and ceilings
Tap for hollows, inspect peeling, mould, cracks or concrete spalling and photograph their locations.
- 7. Check floors
Tap-test tiles for hollows and check flatness before deciding whether SPC can be laid directly.
- 8. Check for suspected asbestos-containing materialsshutdown checkpoint
Leave suspected material undisturbed. We arrange assessment by our registered asbestos consultant.
- 9. Prepare the report and agree priorities
Separate essential concealed work from cosmetic work that can be phased, then issue a written quotation.
Acceptance Checklist 0/4
Company Site Code
Inspection points for older-flat repiping and rewiring
- 1. Confirm scope and approvalsshutdown checkpoint
Distinguish pipes inside the flat from communal pipes. Our licensed plumbing partner applies to WSD for fresh water pipe replacement. Obtain management consent for work on communal mains or stop valves.
- 2. Isolate water and electricity and cap the services
Isolate water and electricity and cap services before demolition to prevent flooding or electric shock.
- 3. Chase walls and install pipes and wiring
Follow the services drawings for wall chases. Separate hot and cold pipes, install wiring in concealed conduits and divide circuits according to electrical demand.
- 4. Pressure-test pipesshutdown checkpoint
Pressure-test before closing walls and photograph pipe routes and readings.
- 5. Test the electrical installationshutdown checkpoint
A registered electrical worker inspects and tests before energisation.
- 6. Waterproof and carry out a flood testshutdown checkpoint
Renew kitchen and bathroom waterproofing and confirm a leak-free flood test before tiling.
- 7. Handover documents
Hand over the WR1 completion certificate, concealed services photos and warranty information.
Acceptance Checklist 0/5
MATERIALS
Related materials: We know how to use them and can also help you with construction
SCOPE
This communication can first cover
- Post-handover checks: water quality and pressure, distribution board, waterproofing, walls and floors
- Older-flat services: supply and waste pipes, distribution board, circuits and sockets
- Strip and rebuild the kitchen and bathroom, including waterproofing and flood testing.
- Strip, skim and repaint, replace flooring, finish ceilings and install custom furniture
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
- 01
How old is the flat, and have the pipes or distribution board been replaced?
- 02
Has the building received mandatory building or window inspection notices, or planned communal pipe replacement?
- 03
Do you want a light refurbishment or a full renovation including kitchen and bathroom? How long will you live here?
FAQ
Frequently asked questions
How much does an older-flat renovation cost?
Using our published rates, stripping and repainting a 400 sq ft two-bedroom flat, rebuilding and waterproofing the kitchen and bathroom, repiping, replacing the board and adding sockets costs about HK$142,690. Living and bedroom flooring, furniture and tiles are excluded. A lighter 450 sq ft refurbishment retaining the kitchen and bathroom costs about HK$67,310. Subject to measurement and written quotation.
What should I check before renovating a second-hand flat?
Check approved plans for alterations. Ask management about building and window inspections or communal pipe replacement. Test services and waterproofing, then separate essential work from items that can wait.
At what age should water pipes be replaced?
There is no fixed replacement age. WSD prohibited unlined galvanised iron pipes from December 1995. Older buildings with original pipes are more prone to rusty water. Investigate discolouration, low pressure or a meter that continues to turn with all taps closed.
Does repiping an older flat require an application?
Obtain WSD approval first and use a designated person such as a licensed plumber. Our licensed plumbing partner handles the application and we coordinate it for you.
Does rewiring an older flat always require a new distribution board?
It depends on inspection. An old fuse box, missing residual current protection or insufficient circuits can justify an MCB/RCD board (H09, HK$6,800). A registered electrical worker tests the work and issues a WR1.
Can I coordinate renovation with a mandatory window inspection notice?
Yes. For windows in individual flats, appoint a qualified person and complete inspection and necessary repairs within six months of the notice date. Coordinate hinges, catches and perimeter finishing with the renovation.
Could an older flat contain asbestos, and what should I do?
Older buildings can contain asbestos. Removal requires a registered asbestos contractor and written notice to the EPD at least 28 days before work. We work with registered asbestos consultants, stop if we find suspected material and arrange professional assessment and removal.
Can I just repaint and lay flooring, leaving the kitchen and bathroom in place?
Yes, if plumbing, electrical and waterproofing checks are satisfactory and the tiles are level without hollow areas. J01 SPC flooring costs HK$60 per sq ft and can be laid over sound tiles. Resolve downstairs seepage complaints first.
Can I remove a kitchen wall to create an open kitchen in an older flat?
Check the approved plans first. The Buildings Department notes that kitchen enclosure walls and doors may be structural or require fire resistance. A fire-rated enclosure shown on the approved plans must be retained.
Is there a charge for on-site measurement?
On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send photos or a floor plan to WhatsApp 5243 7747 for a free initial consultation.
AFTER RENOVATION
RenoClean | Specialist cleaning and aerospace-grade air purification
After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.
- Cleaning and testing are listed separately
The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.
RELATED READING
Read the relevant key points first
Quotes and budgets10 sections · 7FAQ
Budgeting for an older flat: checking site conditions, measuring the work and comparing quotations
Before asking for a whole-flat figure, check hidden substrates, pipes, wiring, strip-out and management requirements. Official guidance, a quotation comparison and two repeatable calculations help prioritise safety, durability and household needs.
See data, scope and practical examples
Moving in and maintenance12 sections · 9FAQ
Second-hand flat handover and renovation checklist: services inspections, leaks and old cabinet removal
Older wiring, rusty pipes, seepage and previous owners' alterations can remain hidden when buying a flat. From handover day, decide what to inspect, record, remove and address first, using Buildings Department and EMSD references.
See data, scope and practical examples
Aluminium windows, plumbing and electrical work11 sections · 6FAQ
Planning electrical work for a Hong Kong renovation: rewiring, circuits, quotations and completion checks
Determine whether a flat needs rewiring by checking site conditions, appliance loads, wet areas, registration, documents, quotations and handover records. The company's 2026 rates are for initial budgeting and do not represent market-wide prices.
See data, scope and practical examples
Aluminium windows, plumbing and electrical work10 sections · 6FAQ
Mandatory window inspections and aluminium window replacement in Hong Kong: from statutory notice to quotation
A mandatory inspection can lead to prescribed repairs without replacing every window. Follow the statutory notice, appointment of a qualified person and repair recommendations, then consider optional waterproofing or upgrades separately.
See data, scope and practical examples
Aluminium windows, plumbing and electrical work10 sections · 7FAQ
Kitchen and bathroom plumbing in Hong Kong: planning water supplies, drainage, waterproofing and quotations
Kitchen and bathroom plumbing covers supplies, drains and connections to common stacks, as well as interfaces with waterproofing. Use drawings, quantities, test records and written variations to compare quotes and trace future problems.
See data, scope and practical examples
Painting and masonry12 sections · 7FAQ
Repairing spalled concrete and corroded reinforcement: causes, work stages and acceptance checks
Falling concrete and exposed rusted reinforcement are common defects in older Hong Kong buildings. Review the causes of spalling, repair stages, when to seek professional help and what to inspect, using Buildings Department, rehabilitation and manufacturer references.
See data, scope and practical examplesSTART WITH THE REAL CONTEXT
Want to discuss this project?
First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-upFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.
Sources
- Official sourceExamination of the 2026–27 Estimates of Expenditure, reply DEVB(PL)156: number of private buildings by age at the end of 2025 and compliance with Mandatory Building Inspection notices · Buildings Department· Accessed 2026-11-02
- Official sourceMandatory Building Inspection Scheme · Buildings Department· Accessed 2026-11-02
- Official sourceMandatory Window Inspection Scheme · Buildings Department· Accessed 2026-11-02
- Official sourceOverview of the Mandatory Window Inspection Scheme · Buildings Department· Accessed 2026-11-02
- Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-02
- Official sourceBuilding Information Centre: private building records and fees · Buildings Department· Accessed 2026-11-02
- Official sourceBuilding Safety Loan Scheme frequently asked questions · Buildings Department· Accessed 2026-11-02
- Official sourceGuidelines for maintenance of fresh water plumbing systems · Water Supplies Department· Accessed 2026-11-02
- Official sourceLegislative Council Question 14 on the Joint Office for Investigation of Water Seepage Complaints, written reply of 2 July 2025 · Hong Kong SAR Government press release· Accessed 2026-11-02
- Official sourcePeriodic testing of fixed electrical installations · Electrical and Mechanical Services Department· Accessed 2026-11-02
- Official sourceHome Electrical Safety Handbook: New Installation, Addition or Renovation · Electrical and Mechanical Services Department· Accessed 2026-11-02
- Official sourceAsbestos control · Environmental Protection Department· Accessed 2026-11-02
- Official sourceGreen property management: asbestos removal · Environmental Protection Department· Accessed 2026-11-02
- Official sourceFrequently asked questions about environmentally friendly property management (noise from renovation of residential premises) · Environmental Protection Department· Accessed 2026-11-02
- CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02