01

What about peeling stone? Recognize anything

Concrete is concrete with steel bars inside. Under normal circumstances, steel bars are encased in concrete and protected from rust. When moisture penetrates for a long time, the steel bars begin to rust. The rust will expand, crack the outer layer of concrete, and eventually fall into pieces, which is what we see as gravel peeling off. This process is usually very slow, and it may take a few years to turn from a fine line to a chip, so the earlier it is dealt with, the more extensive and expensive it is. The Buildings Department lists the symptoms of concrete spalling: water stains or rust stains or water seepage on the surface, cracks, peeling or peeling of facing bricks, surface bulges, large pieces of concrete peeling off, exposing rusty steel bars[1].

The most common locations in homes are bathroom ceilings, kitchen ceilings, under terraces and near window sills, because these places are chronically damp or are close to wet areas upstairs. If you see bubbling paint on the ceiling, brown water stains, or a hollow sound when it is knocked off, you should be alert. Many times before spalling, you will see a straight crack along the direction of the steel bar. Because the steel bar rusts and expands, it will crack the concrete along its position. This is a very useful early signal.

The Buildings Department's "Building Maintenance Manual" also points out that spalling or loosening of ceiling concrete usually occurs in aging old buildings. Symptoms include water damage, rust stains, cracks, surface bulges and exposed rusted steel bars.[3]. If you find this situation, you should not use a screwdriver to remove it yourself. You should first protect the people and objects below, and then arrange for inspection.

  • There are brown water stains or rust stains on the ceiling
  • Paint bubbling and loose paint
  • Knock out the hollow sound
  • Saw exposed rusty steel bars

02

Cause: water leakage, salt water concrete, overload

The building repair platform pointed out that continued water leakage will affect the steel bars embedded in the concrete; concrete mixed with salt water or overloaded will cause the concrete to spall.[2]. The Buildings Department's "Building Maintenance Manual" also lists the same causes: continuous water leakage affecting steel bars, concrete mixed with salt water, heavy loading[3].

In residential units, the most common "culprit" is water. Aging of the waterproof layer in the upstairs bathroom, leakage from the drain pipe, water intrusion from cracks in the exterior wall, and water seepage from the window will all cause the ceiling or walls to be damp for a long time. Common causes listed in the Buildings Department's FAQs on water seepage include leaks from drainage pipes or water pipes upstairs, adjacent to or in the own unit, inadequate floor waterproofing or bathtub edge sealing, and rainwater seeping through rooftops, exterior walls or windows.[9].

Therefore, before repairing concrete, the water source must be treated first. If the water is not stopped, the repaired area will explode again soon. If you suspect that the water seepage comes from the unit upstairs, you can first seek help from the management office; if you cannot solve the problem, you can call 1823 to seek help from the Joint Office of the Food and Environmental Hygiene Department and the Buildings Department.[9].

  • Check the upstairs bathroom and kitchen for leaks
  • Check whether there is water in the exterior wall near the window
  • Stop water first, repair later
  • If there is water seepage upstairs, call the management office first and then call 1823
The same key points for repairing concrete spalling

You can swipe left or right on your phone to view the complete table.

stepspracticeMain points
1. ProtectionMove or pack furniture and provide temporary support if necessaryIn-depth structures require professionals and temporary support[2]
2. Chisel outChipping away damaged or loose concrete to a solid base[4]It’s not good to just chip away at the surface
3. Rust removalRemove rust from the steel bars; if the diameter is significantly reduced, it must be replenished or replaced [4]Intermediate photo record
4. PrimerApply compatible primer or cementitious paint[4]Primer should be compatible with mortar
5. fillUse appropriate repair mortar to fill in layers[4][5]The thickness of each layer is according to the manufacturer’s data

Excerpted from the Building Maintenance Manual of the Buildings Department and information from the building repair platform and the manufacturer. The actual practice is based on on-site assessment [2][4][5]. [2][4][5]

Design illustration of a worker repairing a ceiling from a work platform. This is not a completed project photograph.
Design illustration of a worker repairing a ceiling from a work platform. This is not a completed project photograph. Select an image to enlarge

03

When to arrange repairs yourself and when to hire professionals

The Buildings Department divides building defects into four categories: non-structural cracks, concrete spalling, structural cracks and damage to exterior wall finishes. For concrete spalling, structural cracks and damage to exterior wall finishes, owners should arrange timely repairs and maintenance.[1]. For defects located in individual units, the relevant owners should hire construction professionals to coordinate repairs; if they are located in common parts, they should notify the corporation or management company, and the costs are generally shared according to the shares of the deed of mutual covenant of the building.[1].

The building repair platform reminds that if the problematic concrete is found to have penetrated deep into the structure, the affected structural parts need to be partially or completely demolished and reconstructed. In this case, the owner should hire construction professionals such as structural engineers to be responsible for designing, selecting materials, determining construction details and supervising the project. Temporary supports must also be ensured during construction.[2].

To put it simply: if the area is small, the surface is peeling, and the steel bars are slightly corroded, it can be partially repaired by an experienced plasterer according to the correct process; if the area is large, the steel bars are obviously thinned or broken at the location of beams and columns, and there are signs of expansion of cracks, it must be investigated by professionals first. The Buildings Department also recommends that owners hire registered contractors or registered minor works contractors to carry out the necessary repair works.[1].

  • Small area of surface peeling: can be partially repaired
  • The location and range of beams and columns are large: hire professionals first
  • The steel bars are obviously thinned or broken: structural evaluation is required
  • Public part: Notification to the corporation or management company
Masonry and rendering at Upper Wong Tai Sin Estate | HK Create Design
Site photo: Masonry and plastering at Upper Wong Tai Sin Estate, June 2026. HK Create Design. Select an image to enlarge

04

Correct patching process: five steps

The Buildings Department's "Building Maintenance Manual" explains the method of partial repair: first chip away the damaged or loose concrete until the solid bottom layer is exposed, and then fill it with suitable mortar to protect the steel bars from oxidation and rust.[4]. Repair mortar can use cement-based mortar, such as cement mortar or cement-based mortar with polyester.[4].

After completely chipping away the damaged concrete, the rust on the steel bars should be removed first; in particularly corrosive environments, cementitious paint or other specific primers should be applied to the surface of the steel bars, first filling with mortar.[4]. The Buildings Department specifically reminds that the primer must be of a specification that is compatible with the mortar and cannot be used indiscriminately, otherwise it will affect the bond between the concrete and the steel bars, making the entire repair in vain.[4].

If the diameter of the steel bars is significantly reduced after rust removal, the steel bars must be added or replaced before filling with mortar. The type of original steel bars must be determined and sufficient overlap between the old and new steel bars must be reserved.[4]. The process has five stages: provide protection and support, remove loose material back to sound concrete, remove rust and assess reinforcement loss, apply a compatible primer, then rebuild in layers with repair mortar. Allow it to cure before skim coating and painting.

  • Chill away all loose concrete to a solid base
  • Thorough rust removal of steel bars
  • Primer should be compatible with mortar
  • The steel bars become smaller and need to be added or replaced

05

Repair mortar selection: check the manufacturer’s technical information

There are special concrete repair mortars on the market, taking Sika MonoTop-612 as an example. The manufacturer's product data list states that open channel is a single-component, fiber-reinforced, polymer-modified structural repair mortar that complies with EN 1504-3 R3 level and is suitable for thick-layer repairs in vertical and ceiling (overhead) positions.[5].

The manufacturer's information lists several practical figures: the thickness of each layer is at least 5mm and at most 30mm; the dosage reference is about 18 kilograms of powder per square meter per centimeter of thickness; a pack of 25 kilograms of powder yields about 16 liters of mortar; 3.6 liters of water is added for every 25 kilograms of powder; the compressive strength is about 40 MPa[5]. He also reminded not to add more water than the recommended amount, and not to add more water when the surface is polished, otherwise it will discolor and crack.[5].

Regarding the construction environment, the factory states that the air temperature and the base surface temperature should be between 5 and 30 degrees Celsius, and the base surface should be thoroughly clean, free of dust, and free of loose materials.[5]. Use those figures to ask the contractor which product, thickness, number of coats and curing method are included. Record them in the quotation or method statement.

  • Use special repair mortar instead of dust.
  • The thickness of each layer is according to the manufacturer’s data
  • The amount of water is as recommended, don’t add it randomly
  • The temperature and base surface conditions meet the requirements
Worked example 1

Example one: a small area of spalling on a bathroom ceiling

Assumptions

  • Hypothetical examples, not actual cases or quotes.
  • The peeling area is about 0.3 square meters, and the average repair thickness is 2 cm; the water seepage upstairs has been dealt with.
  • The steel bars are slightly corroded and do not need to be replenished.

How to calculate quantities

  1. The amount of repair mortar (based on the manufacturer’s dosage reference): 18 kg × 2 cm × 0.3 square meters = 10.8 kg, which is less than a pack of 25 kg [5].
  2. "B06" Plasterer's work: HK$2,700/day × 1 = HK$2,700
  3. "E05" Partial mildew removal with heavy oil: HK$1,250/noodle × 1 = HK$1,250
  4. Subtotal HK$3,950, plus actual reimbursement for materials.

A day's labour plus ceiling mould treatment and repainting comes to about HK$3,950, with repair mortar charged separately.

If the steel bars are found to be noticeably smaller or larger in size after digging, they must be re-evaluated; repairs to the source of water seepage are additional. (see published rates)[5]

Use your square footage instead and see a reference budget
Self-levelling floor installation at Dandenong Mansion, Wan Chai | HK Create Design
Site photo: Flooring at Dandenong Mansion, Wan Chai, July 2026. HK Create Design. Select an image to enlarge

06

Price point meter: Used for public price points

Spalling repairs often cover small areas with variable conditions. Our price list has no fixed “spalling repair” package. We generally combine a plasterer's day rate with the work needed for the actual scope. B06 is HK$2,700 per day with materials charged at cost. A03, stripping a painted wall to concrete, is HK$18 per sq ft. B01, cement-sand wall rendering, is HK$43 per sq ft, minimum HK$2,350. (see published rates).

Reinstate the finish after repairing the concrete. For otherwise sound walls with local cracks, E02 covers patching, moisture treatment, sanding and painting at HK$21 per sq ft, minimum HK$4,650. For a mouldy bathroom ceiling, E05 covers local mould treatment and repainting at HK$1,250 per surface. Investigation of the leak source is separate. (see published rates).

Why can’t I quote a dead price from the beginning? Because before digging, you need to know how serious the steel bars are and how extensive they are. Our approach is to first check the scope when we come to the home to measure, tap to find the hollow position, and then state the repair scope, process and how to deal with it if the problem is more serious after digging out in the written quotation.

  • Small area work + restore paint
  • Indicate the repair scope and process
  • Indicate the treatment of points beyond the scope after cutting
  • Repair of water seepage source is additional
Design renderings: The concrete on the ceiling is peeling off, exposing rusty steel bars. The actual situation requires on-site investigation.
Design renderings: The concrete on the ceiling is peeling off, exposing rusty steel bars. The actual situation requires on-site investigation. Select an image to enlarge

07

Construction safety: ceiling work and dust prevention

Ceiling repairs involve working at height. The Labour Department identifies work at 2 metres or more above the ground as work at height. Ladders, including straight ladders and stepladders, are generally for access. Working from them has caused serious accidents. Ladders must not be used as work platforms at heights of 2 metres or above.[7].

The Labor Department recommends that when the working environment restricts a general workbench, a lightweight workbench, such as a platform ladder or step platform, may be considered; users should accept the safety training provided by the supplier, face the workbench and maintain three points of contact when getting on and off.[7]. Our masters will use a suitable workbench according to the site, instead of cutting the ceiling from the top of the folding ladder.

In addition, when cutting concrete, a large amount of dust and debris will fall. Before construction, you must move or wrap up the furniture underneath, close the door, and wear goggles and a mask. If the ceiling shows signs of loosening, avoid staying under it before repairing it, and provide temporary protection if necessary.

  • Do not use ladders when working at a height of 2 meters or above
  • Use a suitable workbench
  • Before construction, wrap up furniture and close doors to prevent dust.
  • Avoid lingering under loose ceiling
Related public prices

You can swipe left or right on your phone to view the complete table.

ItemPrice numberUnit priceRemarks
Mason’s day rateB06HK$2,700 per dayMaterials charged at cost against receipts
Strip painted walls back to concreteA03HK$18 per sq ft—
Apply cement–sand render to wallsB01HK$43 per sq ftMinimum HK$2,350
Patch the surface, damp-proof, sand and paintE02HK$21 per sq ftMinimum HK$4,650
Treat localised mould and repaintE05HK$1,250 per wall faceFind the source of water leakage separately

Figures are from our published price list. The final price is confirmed in a written quotation after an on-site measurement. (see published rates)

Renovation work in progress | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

08

Home Ownership Guarantee and Mandatory Building Inspection: Both sides are responsible

Home owners should note that the Housing Authority’s 10-year building structural safety guarantee for HOS flats (20 years in Tin Shui Wai) includes repairs of spalling and cracked concrete.[8]. If your unit is still within the warranty period and finds that the structural components have peeling concrete, you should first obtain an application form from the housing estate management office and return it with proof of ownership and photos.[8].

For private buildings, the Buildings Department's MandatoryFlat inspectionInspection Scheme requires owners of private buildings aged 30 years or more, excluding domestic buildings of no more than three storeys, to appoint a registered inspector for common areas, external walls, projections and signboards, and a registered contractor for prescribed repairs. Areas within private premises are excluded.[6].

The owners' corporation usually coordinates repairs to spalling in common areas and on external walls. Owners normally arrange repairs to ceilings and walls inside their flats. The Building Rehabilitation Platform notes that the Buildings Department can issue investigation orders under section 26A, repair orders under section 26, and inspection and repair notices under section 30B of the Buildings Ordinance.[2].

  • Home Ownership Scheme is within the guarantee period: report to the management office first
  • Public parts, exterior walls: corporate coordinator
  • In the unit: The owner arranges by himself
  • Pay attention to statutory orders of the Buildings Department

09

Acceptance: After repair, take a look at the sample

Inspect after breaking out and before filling. Ask for photographs showing the exposed area and reinforcement after rust removal. This is the opportunity to assess loss of steel section and check that unsound concrete has been removed to a sound base. Mortar will conceal both.

After completion, you can tap the repaired area and the surrounding area with your hands to hear if there is any hollow sound; the surface should be smooth and there should be no obvious cracks. Repair mortar must be maintained according to product requirements. If the paint is removed immediately before the maintenance is completed, shrinkage cracks may easily occur.

Finally, make sure the source of water seepage has been dealt with. If the peeling is due to a leak in the upstairs bathroom and the repair is not done upstairs, the repaired area will quickly become wet again. It is recommended that the owner save the photos before, during and after the repair, as well as the material information used, so that if problems arise in the future, there will be records for comparison.

Before installing a false ceiling or wall cabinets, allow repair mortar to cure and dry as specified. Avoid concentrating expansion fixings in a patched area. Have the contractor mark the repair on the plan for future reference.

  • Image after cutting and before filling
  • After repair, tap to check for hollowness
  • Maintenance according to product requirements
  • Save photos and material data
Project photo of bespoke wardrobes and storage cabinets | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

10

Prevention: Reduce spotting before peeling off

To prevent concrete from peeling off, the core is "keep it dry". Bathrooms and kitchens must have adequate ventilation, and exhaust fans must operate normally; the edge sealing tape on bathtubs and tubs must be replaced if it ages; if water stains are found on the ceiling, the source must be traced immediately, and it is best not to wait until it bubbles.

If your unit is undergoing renovations, it's a good time to address hidden issues. For example, when removing the old false ceiling, check the concrete ceiling; when redoing the waterproofing of the bathroom, check the condition of the ceiling and floor at the same time. The Buildings Department's guidelines also mention that improper sealing of bathtub edges is one of the common causes of water seepage.[9].

For exterior walls, window sills and terrace bottoms, you can pay attention to cracks and rust stains and report them to the management office. Regular inspections are much safer than waiting until pieces fall off, and repair costs are usually lower.

If you are planning to buy an old building or do a building inspection before moving in, you can pay special attention to the bathroom, kitchen and terrace ceilings. When inspecting the building, use a flashlight to shine on the ceiling slantingly. It is easy to see bulges or fine lines on the surface. If there is a hollow sound, note down the location and deal with it when quoting the renovation. In this way, hidden dangers can be solved before installing new false ceilings or painting, instead of dismantling them after renovation.

  • Keep the bathroom and kitchen ventilated
  • Replace the edge sealing glue after aging
  • Inspect the ceiling during renovation
  • Report cracks in the exterior wall to the management office
Worked example 2

Example two: local repairs and reinstatement where several areas of a living room ceiling have spalled

Assumptions

  • Hypothetical examples, not actual quotes.
  • The area to be repaired is about 1.5 square meters, with an average thickness of 2 centimeters, spread over a 60-square-foot ceiling.
  • Non-structural extensive damage has been confirmed and can be partially repaired by plasterers.

How to calculate quantities

  1. Mortar dosage: 18 × 2 × 1.5 = 54 kg, approximately 3 packages of 25 kg are needed[5].
  2. Each layer is up to 30mm, and 2cm can be completed in one or two layers [5].
  3. "A03" Shovel paint until concrete is visible: HK$18/square foot × 60 = HK$1,080
  4. "B06" Plasterer's work: HK$2,700/day × 2 = HK$5,400
  5. "E02" Moisture-proof polishing oil: HK$21/square foot × 60 = HK$4,650 (based on the minimum charge)
  6. Subtotal HK$11,130, plus actual reimbursement for materials.

The work comes to about HK$11,130 plus materials. The minimum painting charge applies because the area is small.

If it is a beam or a larger area, it must be investigated by a structural engineer first; the amount of material used is affected by the roughness of the base surface [5]. (see published rates)[5]

Use your square footage instead and see a reference budget

11

Common Mistakes: Five Ways That Make Patching a Waste

The first mistake is just skim coating and repainting. A ceiling can look sound after a cosmetic repair while the reinforcement inside continues to rust and expand. Spalling may return after a year or two and spread. The Buildings Department procedure calls for removing loose concrete back to sound material, treating rust and rebuilding with suitable mortar.[4], skipping any step will affect the effect.

The second mistake is not digging enough. If only the loosest piece on the surface is removed, and the surrounding concrete that has been separated from the steel bars is not treated, there will be gaps between the new and old materials, and moisture will still enter. A more stable approach is to drill until solid concrete is visible around the steel bars, and check how far the corrosion extends along the steel bars. The third mistake is that the primer is not compatible with the mortar. The Buildings Department specifically reminds the primer to be compatible with the mortar, otherwise it will affect the adhesion.[4].

The fourth mistake is too much water. In order to make it easier to apply, some masters add more water to the repair mortar, or sprinkle water when it is polished. The manufacturer's information clearly reminds you not to add more water than the recommended amount. Adding water during polishing will cause the surface to discolor and crack.[5]. The fifth mistake was to ignore the water source. After repairing it, I discovered that the upstairs bathroom still had a tight leak, which turned out to be a waste of effort.

To avoid these mistakes, it is easiest to clearly state the process in the quotation: depth of chisel removal, rust removal method, primer and repair mortar model, thickness of each layer, curing time, and restoration of the surface after completion. If it is written clearly, both parties will have standards to follow, and there will be no arguments during acceptance.

  • It's not good to clean it. It's greasy and greasy.
  • Chisel to the solid bottom
  • Primer should be compatible with mortar
  • The amount of water is as recommended by the manufacturer.
  • Treat the source of water seepage first
Project photo of kitchen cabinet installation | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

12

Let us help you deal with the peeling of concrete

HK Create Design (HK CREATE DESIGN) takes on jobs big and small, from repairing spalling concrete on ceilings and walls within the flat and repainting after seepage to re-waterproofing an entire bathroom. Our designers and tradesmen with over 15 years' experience will discuss plans with you for free; if the scope involves structure or common areas, we will advise you to consult a professional or the management office first.

Send ceiling or wall photos to WhatsApp 5243 7747 for a free consultation. Book a visit for a more accurate assessment. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. (see published rates). The AI quotation assistant and calculator with 117 published prices can provide a rough starting budget. The written quotation after site measurement confirms the price.

After completion, we will remove the trash, sweep and do basic cleaning so that the dust and debris from the repairs will not be left behind.

  • WhatsApp 5243 7747 Free consultation
  • HK$500 for on-site measurement (rebate upon order placement)
  • AI quotation/calculator is for reference only
  • When it comes to structures, find professionals first

FAQ

7 practical questions answered

01How dangerous is it to peel off gravel?

Concrete spalling is a common building defect listed by the Buildings Department and should be repaired in a timely manner[1]; Large pieces falling may injure people, and serious corrosion of steel bars may affect the structure, so inspections should be arranged as soon as possible after discovery.

02Can I directly use Pihui to make up for the refund?

Not recommended. The Buildings Department points out that the loose concrete must be chipped away to a solid base, rust removed, and a compatible primer applied, and then filled with suitable mortar.[4];The clean system will explode again very quickly.

03Is the steel bar rusty enough to become smaller?

After rust removal, the diameter of the steel bars is significantly reduced, and the steel bars must be added or replaced before filling with mortar.[2][4]; If the problem goes deep into the structure, it is necessary to hire a structural engineer[2].

04The peeling ceiling was caused by water seepage upstairs, who is responsible?

Ask the management office for assistance first; if you cannot solve the problem, you can call 1823 to ask the joint office for help.[9]. Before repairing the ceiling in your own unit, you should first deal with the source of water seepage.

05Can I contact the Housing Authority if the ceiling of a Home Ownership Scheme housing is peeling?

The 10-year building structural safety guarantee (20 years in Tin Shui Wai) includes repair of concrete spalling and cracks. Applications can be made to the estate management office[8].

06How thick should I apply the repair mortar?

Depends on product. For example, Sika MonoTop-612 manufacturer information states that each layer is at least 5mm and maximum 30mm, and the dosage is approximately 18 kg of powder per square meter per centimeter.[5].

07How much does it cost to repair concrete peeling?

For a small area, allow for B06 plasterer's labour at HK$2,700 per day plus repainting. (see published rates). Larger areas or potential structural issues require prior inspection and a written quotation.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: Building deficiencies Accessed: 2026-11-01
  2. [2]Urban Renewal Authority Building Rehabilitation Platform: Building Rehabilitation Platform: Concrete Spalling Accessed: 2026-11-01
  3. [3]Buildings Department: Building Maintenance Guidebook, Chapter 3 Accessed: 2026-11-01
  4. [4]Buildings Department: Building Maintenance Guidebook, Chapter 4 Accessed: 2026-11-01
  5. [5]Sika Hong Kong: Sika MonoTop-612 Product Data Sheet Accessed: 2026-11-01
  6. [6]Buildings Department: Coverage and Standards of Mandatory Building Inspection Scheme Accessed: 2026-11-01
  7. [7]Labor Department: Overview of Work-at-Height Safety Accessed: 2026-11-01
  8. [8]Hong Kong Housing Authority: Building Structural Safety Assurance (HOS/GSH Estates) Accessed: 2026-11-01
  9. [9]Buildings Department: Frequently Asked Questions on Water Seepage Problems Accessed: 2026-11-01
  10. PricesHK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-01