1. Define the work before starting: finishes only, or changes to structure and drainage?
In private residences, plastering, laying tile finishes, and repairing or replacing sanitary fittings are generally exempted from approval under the Building Ordinance; this does not mean that structural, fire protection or drainage standards can be ignored. The Buildings Department also pointed out that if structural walls, beams or columns are involved, the owner must appoint an authorized person and a registered structural engineer to assess, and only after approval and consent can the construction be carried out by a registered contractor.[1]
Moving a pipe during bathroom or kitchen retiling can be more involved than expected. For applicable drainage alterations, the Buildings Department requires the Minor Works Control System procedures and appointment of a prescribed registered contractor. Detail the waterproofing properly to avoid leakage into the flat below.[1] Therefore, it is more useful to indicate the floor drain, sanitary ware, threshold, kitchen location and the parts you want to move on the floor plan before quoting, rather than asking for a price per square foot first.
Get the building renovation rules, permitted hours, lift protection, debris storage and deposit requirements from management. Photograph door frames, corridors, existing cracks and water marks before work so everyone shares a record of the starting condition and protected areas.
For dusty or hollow subfloors, uneven levels or car park repairs, compare theIllustrated guide to self-levelling and floor repairsto distinguish substrate repair, levelling and the finished surface.
- Draw out the location of floor drains, toilets, shower stalls, thresholds, floor boundaries and any proposed drain changes on the floor plan.
- Obtain written requirements from management, especially construction schedules, lifts, corridor protection and clearance arrangements.
- If beams, columns, a possible structural wall, slab reinforcement or a proposed opening are involved, pause for a qualified assessment and establish the statutory procedure before accepting a masonry price.

02
2. Assess hollow-sounding tiles by their location and the consequences of failure
Tapping with a hard object and hearing the sound change can help you find out where you need to look again, but you should not ask for the whole house to be demolished just by tapping it once, nor should you ignore the problem just because it looks smooth. A more useful approach is to mark each suspicious point with paper tape, take close-up photos and panoramic photos, record whether it is in the dry area, wet area, corner, next to the floor drain or at the door, and mark whether there is looseness, cracks, chipping, water seepage marks or height differences.
Then ask the contractor to answer three questions area by area: what is the basis for judgment, which piece or section should be removed for repair, and how to re-inspect after repair. If the problem is close to a wet area, a pipe root, or a wall-to-floor junction, don't just talk about the knocking sound; you must also check the waterproofing, closing and water sources. On the other hand, a single hollow sound cannot prove that the water leakage must be caused by the bricks.
Show local repairs on a marked plan with quantities. Photograph before and after and record the substrate seen after opening up. If the same area cracks later, both parties can consult the records.
- Use plan drawings or photo numbers to record suspected hollows, cracks, chipping and moisture marks.
- Each requirement indicates partial repaving, re-pasting or temporary observation, as well as the deadline for completion.
- Issues with wet areas, floor drains, thresholds, and wall-to-floor interfaces are assessed along with waterproofing and drainage.
You can swipe left or right on your phone to view the complete table.
| Project scope | How to write quantity and pricing | Processes/materials that should be explained in the quotation | Common unincluded items or risks | Key points for homeowners’ acceptance |
|---|---|---|---|---|
| Remove old bricks and base layer | Give separate wall and floor areas. Specify tile removal only or hacking through the mortar bed to concrete. | Protection, temporary storage in bags, transportation routes, whether removal is included | Reinforcement of old bricks, deep cutting, hidden pipelines, additional dump trucks and management office restrictions may change the scope | Photograph the substrate, pipe positions and existing damp marks after demolition. Investigate before closing them again. |
| Leveling and sloping | Calculated based on actual square feet or specific items; additional thickness assumptions and whether low-lying areas need to be repaired are also listed | Coordination methods for base treatment, leveling materials, floor drains and threshold elevations | The increase in thickness to accommodate floor drains and the impact on door leaves or sanitary ware cannot be covered by a single floor unit price. | Before tiling, check drainage direction using a straightedge, level marks and local flow checks. The appropriate fall depends on the installation. |
| Waterproofing and details | List the actual range of the floor, walls and corners; indicate the system, number of layers and test arrangements. | Subgrade condition, pipe roots, wall-to-floor junctions, sills, strips or sealing fittings, and product data sheets | It only says "waterproofing" without mentioning the system and testing; caulking material is not a substitute for the waterproof layer | Take photos, check product batches and written test records before covering; test methods and duration are specified in the project plan |
| Tiling and cutting | Walls, floors, and baseboards are arranged separately; indicate brick size, layout direction, cutting and loss, and who supplies or is responsible for the loss. | Adhesive or bedding materials, spacers or levelling tools, internal and external corners, mitred tile edges and other special finishes | Facing tiles, transporting, loading, special patterns, large size tiles and trimming are all part of the regular paving process | Check the flatness, brick joints, pattern alignment and corners before filling; record suspected looseness or cracks by location |
| Caulking, elastic closing and sanitary ware junction | Break down the joint filling area or explain according to the tiling range; the junction sealing material is independently confirmed | Caulking material color, usage location, wall-to-floor junction and closing practices around sanitary ware | Rigid grout alone at a junction between different materials can crack with movement. Sanitaryware installation may fall outside the masonry scope. | Check whether the brickwork is complete, clean and consistent, and check the responsibilities of floor drains, door frames and sanitary ware sides one by one. |
| Conservation, removal and management arrangements | List in terms of protection location, train number, number of bags or actual items. Do not just vaguely mention the total price. | Protection of common areas, lift hours, legal disposal, completion clean-up and restoration responsibilities | Deposits/handling fees from the management office, additional transportation, unavailability of lifts or unforeseen trains usually require additional confirmation. | Take photos of corridors, elevators and door frames before and after the start of construction; check the clearance documents or the cleaning scope confirmed by both parties when delivering |
Use the table to compare quotations and check inclusions. The company's published rates are its own prices. Its calculator separates demolition, masonry, protection and debris removal. Manufacturers' wet-area systems also distinguish levelling, waterproofing, adhesive, tiles, grout and sealant. [4][5][6]



03
3. Inspect the actual direction of drainage and verify the required falls
Whether the floor slopes towards the floor drain is only part of the drainage judgment. When actually used, water has to cross brick gaps and avoid high points, and is affected by the floor drain grille, floor drain height, shower screen edge, threshold and the amount of water during cleaning. Different bathroom layouts, brick sizes and existing elevations vary, so a so-called "universal slope" should not be regarded as the legal answer in Hong Kong.
The leveling/grading stage before laying bricks is the best time to confirm: whether the floor drain is at the lowest point, whether there is reverse water conduction at the door, how to handle the boundary between the shower area and the dry area, and whether the floor drain cover can be removed and washed in the future. After laying the tiles, use a small amount of clean water to test the perimeter of the floor drain, the corners, the shower area and the threshold; record the direction of the water flow and the location of the puddles. The purpose is not to do destructive testing on your own, but to hand over the visible phenomena to the construction party to correct them according to the plan.
If you've seen watermarks on the ceiling or complaints downstairs, don't treat new caulking or resurfacing as a diagnosis just yet. Common sources of water seepage listed by the Buildings Department include water supply pipes, drainage pipes, floor waterproofing layers or bathtub edges. Water may also enter from rooftops, exterior walls or windows.[2] The same stain can have several causes. Establish the source before deciding whether to remove tiles.
- List floor drains, doorways, shower areas and corners as observation points for zoning water drainage.
- Before leveling is completed and bricks are laid, check the elevation and drainage direction to avoid problems being covered by the brick surface.
- The water discharge record shall indicate the date, location and phenomenon; do not modify the floor drain or cut open the floor slab by yourself.
04
4. Waterproofing: verify the system, substrate and pre-covering records as well as the number of coats
The key to waterproofing acceptance is traceability: what system is used, whether the base layer is suitable before construction, how the corners of walls and floors and pipe roots are handled, when they can be covered, and how the test is recorded. The original wet area system example separates screed, waterproofing, adhesive, tiles, caulking and sealing into different levels; this reminds homeowners not to mistake caulking or ware edge sealing for the entire waterproofing solution.[6]
Product information must look at the specific product rather than just the brand. Take the Mapelastic Aquadefense listed on MAPEI Hong Kong as an example. The page states that the minimum applicable thickness is 0.8 mm, in two layers, and comes with conditions such as 23°C, 50% relative humidity, and a dry leveling layer. The waiting time between the first and second layers and before paving is also part of the product conditions.[6] This example is used to illustrate "why you need to request a technical data sheet". It is not a designated brand, nor is it a legally uniform thickness or construction period in Hong Kong.
Don’t assume Hong Kong has a uniform 24 or 48-hour water closure rule. The products used in the project, substrate, test methods, test scope, observation time, who was present and records of retesting after passing/repairing should be listed in the written project plan. Photograph thresholds, pipe roots, wall and floor corners and affected locations on lower floors before and after the test; any findings are recorded first and then judged by appropriate personnel.
We prepare the substrate with a bonding treatment before tiling and use DOWSIL mould-resistant silicone at kitchen and bathroom tile edges, sanitaryware and finishing joints. Silicone finishes those joints and cannot replace the waterproofing membrane.
- Obtain product name, batch/purchase information, technical data sheet and construction photos before laying tiles.
- Include wall-to-floor junctions, pipe roots, thresholds, floor drain perimeters and corners in construction and testing records.
- Specify the testing methods and observation arrangements for the case in writing; do not regard the number of hours rumored online as a contract term.
Example one: establish the bathroom floor quantity before planning purchases and work stages
Assumptions
- This is an assumption for illustrating the purpose and does not mean that the company has completed the case or made a formal quotation.
- It is assumed that the floor that can be paved in the bathroom is rectangular, with a length of 1.80 meters and a width of 1.50 meters; the wall, threshold, tub, floor drain cutting and skirting are additional.
- For the purpose of discussing procurement, a 10% cutting reserve is used as a demonstration; the actual loss must be verified according to the brick size, pattern, bevel angle and layout plan.
How to calculate quantities
- Net floor area: 1.80 × 1.50 = 2.70 m².
- Example purchase quantity: 2.70 × 1.10 = 2.97 m².
- Mark 2.70 square meters as the starting point of the construction floor, and mark 2.97 square meters as the sample procurement communication volume; require suppliers and contractors to confirm the actual amounts of tiles, adhesives, caulking and cutting respectively.
The clear floor area in this example is 2.70 square meters, and after using the 10% example reservation, it is 2.97 square meters. The quantity must be clarified first to avoid mistaking "one package of materials" or "fixed price" for including all walls, floors, consumables and processes.
10% is not an industry uniform rate, nor is it a company guarantee; this example does not estimate any unit price or construction period. If a waterproofing system is specified, the dosage should be checked based on the product's technical data, base layer, and construction conditions on that day. The thickness and consumption of specific products listed by MAPEI only apply to the conditions of that product and cannot be directly transferred to other materials. [6]

05
5. Five inspection stages, each completed before the next layer goes on
First inspect after strip-out. Photograph the exact removal depth, substrate, pipes, existing cracks and stains, and refer significant findings to the relevant professional. Next check the relative levels of floor drain, threshold, sanitaryware and tile build-up so falls can be corrected before tiling.
The third level is before waterproof covering. Check the products, corners, pipe roots and written test arrangements; without records, it is not appropriate to start laying bricks just by saying "done" verbally. The fourth level is before laying bricks, caulking, and installing sanitary ware. At this time, check the layout, seams, flatness, closing and suspected loose locations. Repairs will not damage the final caulking and sealing.
The fifth level is delivery. Check the caulking, elastic closing, floor drain removable and washable, door sill edge and sanitary ware periphery area by area; organize photos, product information, agreed repair list and contact information. Any issues are described with location, photo, responsible party and date to avoid "it'll be too late" statements that have no traceable content.
- Each level is recorded with photo number, date and location; do not leave all mid-stage confirmations until the completion day.
- Before caulking or installing sanitary ware, deal with any visible layout, smoothing or closing issues.
- The delivery list contains the location, responsible person and re-acceptance date for outstanding repairs.

06
6. Compare quotations using the same scope, quantities and exclusions
Before comparing prices, define measurable work: which old tiles come out, whether the cement bed is hacked, whether levelling includes falls, which surfaces are waterproofed, who supplies and carries tiles, mitres or special cuts, rubble by truck or bag and corridor protection. A tile-laying rate per square foot captures only part of the job.
The company's 2026 details page breaks down certain demolition, leveling and standard tiling processes by square feet. This can be used as a way to read a demolition quote, but it does not represent the Hong Kong market average or your final price. The public page also reminds: Customer-supplied materials such as tiles and sanitary ware, management office fees and unselected items are not included.[5] Therefore, next to any number, you should ask "what is included, what is the basis of the quantity, and how to approve the excess."
Changes are most likely to occur after disassembly. The contract or project confirmation should state that when hidden problems are discovered, they will be described with photos, the scope and amount of the increase or decrease will be listed, and who will approve it and how, and then arrange the next step. This is general engineering communication advice, not a legal conclusion; if there are disputes or complex rights and responsibilities, additional legal or professional advice should be obtained.
- Each quote is required to itemize units, quantities, materials, minimum spend, inclusions and exclusions.
- Check the brick size, layout, cutting, crabapple angle, transportation, clearing and management arrangements one by one.
- Only accept changes after written confirmation; do not replace quantity and responsibility with verbal "almost".
You can swipe left or right on your phone to view the complete table.
| method | available quantity basis | What to decide first | Not included or still needs to be confirmed | Risk control when using |
|---|---|---|---|---|
| Quick version sample solution | Saleable area. Total saleable area is a rough starting figure for flooring. | First understand the magnitude of the three examples of whole-house foundation renovation, paint renovation, or floor tiling. | Actual wall and floor areas still need measuring. Complete kitchen and bathroom reconstruction, services, furniture and finish tiles are excluded. | Mark the results as preliminary calculations. They are only used to decide whether to proceed to item-by-item verification and are not used to place orders. |
| Detailed computer item selection | Can be modified according to the square feet, square feet, number of pieces or number of rooms of each project | Compare quantities, minimum costs and subtotals for selected operations | Unselected items, on-site hidden problems, management office arrangements and customer-supplied materials have not been automatically resolved. | Store assumptions item by item; check selection status of tiles, removal, handling and protection with counterparty |
| On-site measurement and photo verification | Actual measured dimensions, elevation, floor drains, thresholds, base and handling conditions | Determine whether the demolition depth, leveling amount, layout and hidden risks need to be changed. | Unknown problems will not automatically disappear; if structural or drainage changes are found, they must still be handled according to legal and professional procedures. | The company's published visit fee is HK$500, credited when you place an order. When booking, check eligibility for the limited-time free measurement offer. |
| Written quotation/project confirmation confirmed by both parties | Confirmed project quantities, drawings, materials, changes and acceptance records | Define who does what, when it will be accepted, how issues will be recorded and changes approved | Not a warranty against all hidden conditions and does not replace professional responsibility for structural, electrical or drainage | Before work starts, attach photos, product data, exclusions, the change-order procedure and contacts. Ask for an itemised masonry scope. |
The quick calculator uses saleable area × 3 for paint area. Owners can set a planning reserve of up to 20%. Confirm any budget through site measurement and a written scope. [4][5]


07
7. Using the company's published budget for an initial estimate
The quick calculator shows basic whole-flat renovation, repainting and floor tiling. It roughly estimates the floor using total saleable area and estimates the painted surface using saleable area × 3.[4] Both are assumptions to help you organize your budget. They are not the actual measured area on site, nor can they replace the actual quantities of walls, bathrooms, kitchens or local projects.
The quick examples exclude complete kitchen and bathroom reconstruction, waterproofing, replumbing, rewiring, furniture, finish tiles, sanitaryware, works insurance, management deposits and renovation administration fees.[4] Entering the whole flat's area does not make the estimate a complete renovation price. Compare the detailed masonry items, adjust measured quantities and list the exclusions.
The company page allows you to add up to 20% of the planned reservation to the cap, and clearly states that this is not a company charge or surcharge.[4] Use this as a budget allowance pending site verification. List any missing work separately. Online estimates and enquiries are free. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Enquire on WhatsApp 52437747 and confirm the arrangements before booking.
- First save the computer result as "preliminary calculation", and list the uninclusive items at the same time, and do not change the total to the all-inclusive price.
- When entering the detailed version item by item, fill in demolition, leveling, waterproofing, tiling, removal and protection separately.
- When booking a measurement, provide the location, dimensions, tile sample, photos, floor and lift arrangements. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
08
8. Standing water, leaks and musty smells: trace the source before choosing which layer to remove
When water seepage occurs, the most valuable information is the timeline: what day it started, whether it is related to showering/water use/raining, which locations upstairs and downstairs were affected, and when the photos and videos were taken. The Buildings Department recommends that owners directly hire construction technicians or licensed plumbers to determine the cause and repair it as soon as possible; common causes include water supply and drainage pipes, waterproof layers, bathtub edges, and rainwater seeping from rooftops, exterior walls, or windows.[2]
Grout, mould removal and repainting cannot guarantee healthy occupancy or a permanent solution. If a leak starts at a pipe or external wall, surface repairs may only conceal the signs. Formaldehyde removal, mould treatment and ventilation must be evaluated separately for products and site conditions. Do not assume thatTiling workcan guarantee healthy occupancy.
When neighboring households are involved, notify the relevant tenants, management office or corporation first and keep records. Government information explains that if there is minor or intermittent water seepage and the investigation cannot identify the source, intervention may be terminated; government procedures do not replace the owner's need to find suitable personnel for repairs.[2] Therefore, clarifying the cause with traceable records first can often reduce duplicate expenses more than immediate extensive resurfacing.
- Record the time of occurrence, water usage, weather, affected location and original photo/video files.
- Let a construction technician or licensed plumber first find the source before deciding whether to remove bricks, waterproof or repair pipes.
- Keep written records of communications with neighbors, management offices or corporations to avoid covering up evidence first.
Example two: an itemised subtotal and planning allowance for three floor operations over 400 sq ft
Assumptions
- This is a calculation example based on the company's 2026 public price list, not the company's completed cases, official quotations or the Hong Kong market average.
- Assuming that the entire 400 square feet can be calculated based on three public standards: removal of wall/floor tiles is HK$30/square foot, floor leveling is HK$22/square foot, and labor for laying standard floor tiles of 600×600 mm or below is HK$78/square foot.
- Assumes no hacking back to concrete, deep hacking, special layout or special finishing. Excludes finish tiles, sanitaryware, waste removal, haulage, management fees, kitchen and bathroom reconstruction, waterproofing, plumbing and electrical work.
How to calculate quantities
- Existing tile removal: 400 × HK$30 = HK$12,000.
- Levelling: 400 × HK$22 = HK$8,800.
- Labour for laying floor tiles straight: 400 × HK$78 = HK$31,200.
- Three-item total: HK$12,000 + HK$8,800 + HK$31,200 = HK$52,000.
- If the owner chooses a 20% planning allowance, set aside HK$10,400 for an upper budget of HK$62,400. The HK$10,400 is not an automatic company charge.
The subtotal of the three hypothetical processes is HK$52,000; the upper limit of the self-use budget after adding 20% planning reserve is HK$62,400. This difference should be reserved for the scope that has yet to be confirmed by the scale, rather than being treated as a necessary charge if it does not occur.
The company page clearly states that the public calculation is a budget reference and is not an official quotation. This example does not apply if the floor needs to be dug, the size/pattern of bricks is changed, waterproofing is required, the number of cleaning trucks is increased, or the management office has designated arrangements, and the measurements should be re-opened and written confirmation must be obtained. [4][5]

09
9. When to stop work: structural elements, electrical work, aluminium windows and demolition need the relevant specialists
If you find suspected structural walls, beams, columns, or floor steel bars after disassembly, or if the project requires large openings, cutting of floor slabs, or changes to the kitchen enclosure, you should first stop that part and conduct a professional evaluation. The Buildings Department clearly states that structural changes must be assessed by authorized persons and registered structural engineers, plans submitted and approved and agreed before they can be carried out by registered contractors.[1]
Where work reaches cables, sockets, distribution equipment or changes to a circuit, plan and verify the electrical work before the masonry. Use the Electrical and Mechanical Services Department register to confirm a contractor's registration in Hong Kong.[3] This article does not provide electrical DIY methods; the appropriate person should be asked to arrange isolation, protection and follow-up inspections.
Aluminium windows, gas, work at height and extensive demolition likewise need appropriate professionals and site safety arrangements. The company lists no fixed aluminium window rate. Assessment depends on the fault, number of windows and site conditions. An unpriced item is not a reason to remove window parts yourself.[4]
- Stop the affected work if a possible structural member, reinforcement, unidentified pipe or cable is exposed. Photograph and mark the location.
- Separate the quotations for electrical work and grouting work, and check the contractor's information on the Electrical and Mechanical Works Directory.
- A safety and feasibility assessment of aluminum windows or high-altitude locations must be carried out first. Do not dismantle windows, modify pipes or make holes by yourself.
10
10. At handover, collect the project records as well as inspecting the finished surfaces
Before the final inspection, divide the unit into living rooms, kitchens, bathrooms, entrances and terraces/work areas and check them one by one. In each grid, look at the brick surface, brick grate, corners, floor drains, thresholds and sanitary ware junctions; if you have any questions, number them with photos to correspond to the earlier construction stages. Deliverable information shall include at least the final scope, repair list, key material information, photos and mutually agreed upon maintenance/liaison arrangements.
At the same time, keep the official quotation, confirmation of any changes, measurement records and test records. The purpose of these documents is not to precipitate arguments, but to let you know what materials were used, where the repairs were made, and how the responsibilities are divided when bricks need to be patched, leaks checked or repaired in the future. The company has not provided actual project results, licenses, customer ratings or years of experience in this article, and any such information should not be inferred from the public estimate page.
Having a record does not mean that problems will not arise in the future. Brick materials, base layers, water use and building conditions will all change. If cracks, looseness, persistent water accumulation or water seepage are found, judgment should still be based on the location and source, rather than just relying on the past acceptance to make a conclusion.
- Take completed photos by area and match each photo with the location map and unfinished items.
- Collect written quotation, change confirmation, material information, test records and follow-up contact information.
- If there are any abnormalities after delivery, save the phenomenon and location first, and then contact the corresponding construction or professionals to handle it.
FAQ
6 practical questions answered
01If you hear a hollow sound, do you have to resurface the entire bathroom or house?
uncertain. Knocking sounds are only suitable for preliminary screening; they should be judged together with looseness, cracks, chipping, wet marks, location and use risks. Mark the doubtful points on the photos and location diagrams, and ask the construction party to propose the scope, reasons and re-inspection methods of partial repairs or repaving. When it is close to wet areas, pipe roots, floor drains or there is water seepage, check the waterproofing and water source first, do not just deal with the brick surface.
02As long as the bathroom floor has a specified slope, it must be drained?
no. This article does not regard the unverified universal slope as a statutory rule in Hong Kong. Actual drainage is also affected by floor drain elevation, high points on the brick surface, brick joints, thresholds, shower screens and grille obstructions. The more feasible acceptance check is to check the elevation during the leveling period. After laying bricks, release a small amount of water in different areas to observe the flow direction and puddles, and record the abnormal locations to the construction party for processing.
03Is it legally stipulated that waterproof testing must be done for 24 or 48 hours?
This shouldn't be said. The official information reviewed for this article does not provide a uniform 24 or 48 hour rule that can be applied to all residential plastering work. The test should be determined by the design, product information, base layer and construction plan of the case, and the test method, scope, observation time, witness/record and handling of failure should be clearly stated in the written project scope. The waiting time in the product data sheet also only applies under the conditions stated in it.[6]
04Can the company's online calculation results be regarded as a formal quotation or an all-inclusive price for the whole house?
No. The quick calculator provides three example schemes for budgeting. It approximates flooring from saleable area and painting from saleable area × 3. Full kitchens and bathrooms, waterproofing, services replacement, furniture, finish tiles, sanitaryware, works insurance and management fees may be outside the chosen scheme.[4] The results should be used as a starting point for discussion, followed by confirmation with actual measurements, item-by-item quantities and written quotations.
05Is on-site measurement free? What should I prepare so that I don’t do it in vain?
As of 2026-10-21, the company's online estimates and enquiries were free. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[4] When making an appointment, you can provide the floor plan, construction location, usable area, bathroom/kitchen photos, brick dimensions or samples, floor drain and sanitary ware locations, floor and lift arrangements via WhatsApp 52437747. The more complete the data, the easier it is to put the hypothesis into writing.
06After laying the bricks, there is water seepage downstairs. Can I just redo the waterproofing?
Don't rush to cover up the problem with surface repairs or repaving. Common sources listed by the Buildings Department include water supply pipes, drainage pipes, floor waterproofing, bathtub edge sealing and rainwater infiltration. Dates, photos, water conditions and affected locations should be kept first, and then construction technicians or licensed plumbers can find the cause.[2] If neighbors are involved, you can communicate with the management office/corporation simultaneously. Government investigations have their own procedures and limitations and are not a substitute for private maintenance diagnostics.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Buildings Department: Alteration and addition works to domestic premises Accessed: 2026-10-21
- [2]Buildings Department: Water seepage problem Accessed: 2026-10-21
- [3]Electrical and Mechanical Services Department: Registered Electrical Contractor Accessed: 2026-10-21
- [4]HK Create Design: 2026 Quick Estimate and Project Scope Description Accessed: 2026-10-21
- [5]HK Create Design: 2026 detailed project budget and price benchmark Accessed: 2026-10-21
- [6]MAPEI Hong Kong: Mapelastic Aquadefense product information and wet area system Accessed: 2026-10-21