01

2026 floor levelling rates: two methods with the same unit price

HK Create Design publishes two floor levelling rates: cement-and-sand screeding (B02) andSelf-levelling floorslevelling (J03). Both cost HK$22 per sq ft. The minimum charges are HK$1,850 for cement-and-sand screed and HK$2,800 for self-levelling compound. Both cover labour and base materials. Tiles, SPC and timber flooring are separate.

Both methods have the same rate but suit different work. Cement-and-sand screed can correct larger level differences and form falls in bathrooms, kitchens and floors to be tiled. A thin self-levelling layer gives a smooth base for SPC, laminate or vinyl flooring.

The largest floor levelling costs can arise before screeding starts. Check whether the old floor must be removed, the depth of removal and the rubble volume. Removing tiles and screed down to concrete costs HK$52 per sq ft, more than twice the levelling rate.

The Consumer Council advises thatMasonry and tilingRates are generally per square foot. Itemise each operation and distinguish base materials from finishes.[3] Compare the levelling, old floor removal, final covering and waste disposal as separate parts of the quotation.

For dusty or hollow subfloors, uneven levels or car park repairs, compare theIllustrated guide to self-levelling and floor repairsto distinguish substrate repair, levelling and the finished surface.

  • Distinguish cement-and-sand screed from self-levelling compound
  • Check the minimum charge
  • Ask whether the old floor must be removed
Completion photo: the smooth self-levelled floor is ready for the subsequent SPC or timber finish.
Completion photo: the smooth self-levelled floor is ready for the subsequent SPC or timber finish. Select an image to enlarge

02

When cement-and-sand screed is suitable

Traditional screeding uses cement and sand or a pre-bagged screed mortar. The mason spreads and strikes it off with a straightedge. It accommodates a range of thicknesses, can address larger level differences and can form falls where needed.

For example, OPTIMIX specifies FS151 at 10–50 mm thick, about 1.8 kg/mm/m² and about 30 MPa compressive strength. Water-cure the screed for several days after laying.[2] This thickness range suits rebuilding a base after tiles have been removed or correcting uneven floors in older buildings.

Wet-area floors in bathrooms, kitchens and on balconies need falls towards the drain. Ponding can increase long-term seepage risk. Our standard B02 work includes forming drainage falls in wet areas.

Cement-and-sand screed has a relatively coarse finish that suits subsequent tiling becauseTile adhesivecan compensate for minor irregularities. For SPC or timber installed directly over the base, the screed may need grinding or a further self-levelling coat to achieve the required smoothness.

Our published rates require a separate quote for level differences above 30 mm. Increased thickness means more material, added weight, longer curing and possibly several layers.

  • Use screed for larger level differences
  • Form falls in wet areas
  • Cement-and-sand screed before tiling
  • Separate quote above 30 mm
Our 2026 rates for floor levelling and associated work

You can swipe left or right on your phone to view the complete table.

ItemUnit priceMinimum chargeincludeExclusions and points to check
B02 Cement-and-sand floor screedingHK$22 per sq ftHK$1,850Level with a cement–sand screed and form falls to drainage in wet areasLevel differences greater than 30 mm require separate agreement
J03 Level the floor with self-levelling compoundHK$22 per sq ftHK$2,800Clean and prime the floor, then apply self-levelling compoundFor thin levelling. The floor covering is extra.
A02 Remove tiles and underlying screed down to the concreteHK$52 per sq ft—Remove tiles and hack the cement bed back to concreteDeep chisel and caisson position are discussed separately
A01 Remove floor tilesHK$30 per sq ft—Remove old tiles down to the cement bedAdd HK$10 per sq ft where hacking back to concrete is required
A08 Remove timber flooringHK$22 per sq ft—Remove the flooring, backing board and adhesive residueAdd HK$5 per sq ft for a backing board or thick adhesive
A11 Rubble removalHK$4,200 per truckloadSmall jobs priced by the bag, with a HK$2,000 minimumCarry waste downstairs, dispose of it lawfully and pay government disposal fees—

Rates cover labour and base materials. Tiles and flooring are extra. The written quote after site measurement governs. [8]

Floor levelling prices: key figures illustrated | HK Create Design
Floor levelling prices: key figures at a glance | HK Create Design Select an image to enlarge

03

When self-levelling compound is suitable

Self-levelling compound flows readily when mixed with water and spreads to form a smooth surface. OPTIMIX specifies 3–20 mm for SF818, ideally 5–8 mm, with consumption of about 1.7 kg/mm/m². SF80 primer is recommended. It can be used beneath timber, vinyl, ceramic tiles and carpet.[1]

Our J03 self-levelling service includes cleaning, primer and compound. The primer promotes adhesion to the old base and limits rapid water absorption that could weaken the compound.

Self-levelling compound often prepares floors for SPC or laminate, which require a flat base. Uneven support can cause noise underfoot and damage click joints. If the base is already fairly level, a thin coat can correct minor irregularities.

Because the compound flows level, it cannot form falls. Avoid it as the final layer in bathrooms or kitchens requiring drainage falls. It also has a thickness limit. For large level differences, first build up a cement-and-sand or proprietary screed, then finish with self-levelling compound.

  • Self-levelling compound before SPC or timber flooring
  • Apply a suitable primer
  • Unsuitable for forming falls in wet areas
  • Observe the maximum thickness
Our per-square-foot rates for floor works(Unit:HK$ per sq ft)
B02 Cement-and-sand screed
HK$22
J03 Self-levelling compound
HK$22
A08 Remove timber flooring
HK$22
A01 Remove floor tiles
HK$30
A02 Strip floor build-up back to concrete
HK$52

HK Create Design's published 2026 prices. Minimum HK$1,850 for B02 and HK$2,800 for J03.

Site photo: forming a cement-and-sand bathroom screed with falls to the drain before tiling.
Site photo: forming a cement-and-sand bathroom screed with falls to the drain before tiling. Select an image to enlarge

04

How to estimate material quantities

Use the manufacturer's published coverage to estimate material quantities. SF818 uses about 1.7 kg/mm/m².[1] For a 400 sq ft flat (about 37.16 m²), an average depth of 5 mm requires about 37.16 × 5 × 1.7 ≈ 316 kg. At 8 mm, the quantity rises to about 505 kg.

FS151 floor screed uses about 1.8 kg/mm/m².[2] At 30 mm thick, 150 sq ft (about 13.94 m²) requires about 753 kg. Thickness has the greatest effect on material consumption. A larger difference in floor levels increases both material and handling costs.

Several hundred kilograms of material may have to be carried upstairs in a walk-up building. The Labour Department advises using mechanical aids wherever possible and team lifting when needed to reduce manual handling injuries.[4] Confirm material and waste handling arrangements before the quotation.

These theoretical quantities exclude wastage, depressions and edge details. Measure on site to establish actual quantities.

  • Thickness has the greatest effect on quantities
  • Estimate quantities from the manufacturer's consumption rate
  • Clarify access and handling arrangements
Floor preparation at Dandenong Mansion, Wan Chai | HK Create Design
Site photo: Flooring at Dandenong Mansion, Wan Chai, July 2026. HK Create Design. Select an image to enlarge

05

Before levelling: does the old floor need to come up?

Decide what to do with the existing floor. A sound, flat surface may take self-levelling compound before new flooring. If only the tiles need removal and the cement bed is sound, lift the tiles under A01 at HK$30 per sq ft and level. For several old layers, extensive hollow areas or excessive height, strip back to concrete under A02 at HK$52 per sq ft and rebuild.

Building over sound tiles saves on removal and waste but raises the floor. Check doors and bathroom thresholds. Hollow old tiles can cause the new build-up to fail. Stripping back to concrete is more thorough but costs more, produces more rubble and creates more noise.

A08 timber floor removal costs HK$22 per sq ft. Add HK$5 per sq ft for a backing board or thick adhesive. Clean off any exposed adhesive residue before applying self-levelling compound.

Floor demolition produces heavy debris. The Environmental Protection Department charges disposal by weight: HK$71 per tonne at public fill facilities, HK$175 at sorting facilities and HK$200 at landfills, subject to a minimum of one tonne.[5] Our A11 rubble removal rate is HK$4,200 per truckload, including carrying the waste downstairs and government disposal fees.

  • Tap-test the floor for hollow areas first
  • Decide whether to strip to the cement bed or the concrete
  • Check clearance below the doors
  • Budget for rubble removal
Worked example 1

Example 1: screed and tile a 150 sq ft living and dining room

Assumptions

  • Suppose the old tiles have been removed and the level difference is about 15–25 mm, within 30 mm.
  • Area: 150 sq ft.

How to calculate quantities

  1. B02:150 × HK$22 = HK$3,300。
  2. The amount exceeds the HK$1,850 minimum, so the measured price applies.
  3. Then lay 600 × 600 mm tiles under D01: 150 × HK$78 = HK$11,700, excluding the tiles.
  4. Screeding and tile laying, including labour and base materials: HK$15,000.

Screeding HK$3,300, or HK$15,000 with tile laying, excluding the tiles and rubble removal.

A separate quote applies where the level difference exceeds 30 mm. [8]

Use your square footage instead and see a reference budget

06

What explains differences in floor levelling quotations?

1. Thickness: a quote that only says “levelling” may assume the shallowest depth. Uneven floors can require considerably more material.

2. Substrate treatment: cleaning and priming before applying self-levelling compound are essential for adhesion. Omitting them can cause debonding or cracks.

3. Falls: forming wet-area falls takes more work than laying a level floor. Confirm whether the quote includes them.

4. Removal and rubble: stripping the old floor and removing debris often cost more than levelling. If the quote only mentions levelling, ask what happens to the old floor.

5. Curing: screed requires water curing and levelling compounds need time before covering. Rushing the work can affect strength and flatness.

6. Dust and noise: hacking out a floor creates considerable dust. Labour Department guidance recommends source controls such as wet methods and extraction.[6] Building working-hour restrictions also affect how many hours are available each day.

  • Ask about thickness
  • Ask about substrate preparation and priming
  • Ask about falls
  • Ask about lifting the old floor and removing rubble
  • Ask about curing time

07

Professional and official guidance

The following references are publicly available documents from government departments, public bodies and manufacturers.

OPTIMIX specifies 3–20 mm for SF818 self-levelling compound, ideally 5–8 mm, at about 1.7 kg/mm/m². The manufacturer recommends SF80 primer.[1]

OPTIMIX specifies 10–50 mm for FS151 Floor Screed, consumption of about 1.8 kg/mm/m² and compressive strength of about 30 MPa. Water curing is required.[2]

The Buildings Department identifies laying tiles as work generally exempt from prior approval. It must still comply with the Buildings Ordinance.[7] Significantly thickening the floor increases the load on the slab. Have a qualified person assess extensive or unusual work first.

Consumer Council: itemise the work and materials. Masonry work is generally measured in square feet.[3]

Our team frequently finds several layers of old tiles in older flats. Each raises the floor and reduces door clearance. We measure both at the site visit before deciding whether to remove the old floor.

  • Follow the manufacturer's thickness range
  • Assess substantial increases in floor thickness first
  • Itemise the quotation
Cement-and-sand screed and self-levelling compound compared

You can swipe left or right on your phone to view the complete table.

compareCement-and-sand screeding (B02)Self-levelling (J03)
Application thicknessThicker build-up for larger level differences. Above 30 mm is quoted separately.Thin coat: SF818, for example, is applied at 3–20 mm, ideally 5–8 mm. [1]
Fall towards the drainFalls can be formed for bathrooms, kitchens and balconiesThe compound flows level and cannot form drainage falls
Finished surfaceFlat, with a coarser textureVery smooth, suitable for laying SPC or timber flooring directly
Minimum chargeHK$1,850HK$2,800
Typical floor finish laid afterwardstilingSPC, laminate and vinyl flooring

Product data shown are OPTIMIX examples. Select the system for the measured level differences and proposed finish. [1]

Whole-home renovation on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

08

Common floor levelling problems

1. Using self-levelling compound in wet areas. A level top layer in a bathroom will allow water to pond. Use a cement-and-sand screed to form falls to the drain.

2. Leaving old adhesive. After lifting timber flooring, remove adhesive residue and apply the appropriate primer so the levelling compound can bond.

3. Laying flooring too early. A dry surface does not guarantee that the levelling compound has dried throughout. Trapped moisture may deform SPC or timber flooring. Follow the manufacturer's waiting times.

4. Overlooking door clearances. Raising the floor may require bedroom and bathroom doors to be shortened or adjusted. Check the clearances at the measuring visit.

5. Bathroom threshold. The bathroom floor should sit slightly lower than the adjoining floor to contain water. Plan this difference when levelling a whole flat.

  • Avoid using self-levelling compound as the finish where falls are required
  • Remove adhesive residue and prime
  • Wait until the substrate is dry before laying flooring
  • Measure door clearance
  • Plan a level difference at the bathroom threshold

09

Handover checklist

Place a long straightedge or spirit level in different directions and look for significant gaps. Self-levelling compound should be smooth. A cement-and-sand screed can be rougher but must still be flat.

Pour a little water on wet-area floors and check that it runs to the drain without pooling.

Tap lightly with a hard object. A solid sound indicates good contact. A hollow sound can indicate poor adhesion to the layer below.

Check for cracking and friability. The surface should have no obvious cracks or excessive loose sand when lightly brushed by hand.

Check door clearances, bathroom thresholds and level changes between rooms against the agreed arrangement. Keep completion photos and the quotation for the one-year workmanship warranty.

  • Check flatness with a straightedge
  • Check falls by pouring water
  • Listen for hollow render
  • Check for cracking and a dusty, friable surface
  • Measure door clearance
Worked example 2

Example 2: re-form drainage falls in a 30 sq ft bathroom

Assumptions

  • Suppose a 30 sq ft bathroom floor needs new falls to direct water to the floor drain.

How to calculate quantities

  1. B02:30 × HK$22 = HK$660。
  2. The calculated price is below the minimum, so HK$1,850 applies.
  3. Bathroom screeding is usually coordinated with waterproofing and tiling. Waterproofing is priced separately.

HK$1,850 minimum charge.

Set the falls to suit the drain location. Moving the floor drain also requires drainage pipework. [8]

Use your square footage instead and see a reference budget

10

Scheduling floor works

A typical sequence is to remove the existing floor build-up, complete concealed services and bathroom drainage, waterproof wet areas, screed, allow curing, then lay tiles or flooring. Complete concealed pipework before levelling.

Allow for curing after laying a cement-and-sand screed. Screed mortar needs water curing for several days.[2] Self-levelling compounds dry relatively quickly. Follow the manufacturer's covering time and account for site humidity.

Whole-flat renovation, levelling normally follows strip-out and concealed services and precedes painting and fitted furniture. We coordinate floor works withwall renderingand tiling can be scheduled together so the masonry team can work continuously and reduce mobilisation days.

  • Install concealed pipes before levelling
  • Waterproof wet areas first
  • Allow time for curing
Estimating material quantities before wastage

You can swipe left or right on your phone to view the complete table.

Site conditionsAreaThicknessCalculateEstimated material quantity
SF818 self-levelling compound400 sq ft (about 37.16 m²)5mm37.16 × 5 × 1.7About 316 kg
SF818 self-levelling compound400 sq ft (about 37.16 m²)8mm37.16 × 8 × 1.7About 505 kg
FS151 floor screed150 sq ft (about 13.94 m²)30mm13.94 × 30 × 1.8About 753 kg

Consumption rates are from OPTIMIX data. [1][2] Allow extra for uneven substrates and wastage. [1][2]

11

Older buildings, public rental flats, Home Ownership Scheme flats and new developments

Older flat renovation: Older floors often have multiple layers of tiles and may have settled. Tap-test for hollow areas, then decide whether to strip to the cement bed or concrete. In walk-ups, allow for carrying materials up and rubble down.

Public rental flat renovation: Check Housing Department requirements for floor alterations in public rental flats. Consult the estate office before extensive hacking. If the aim is to lay SPC over a suitable existing floor, a thin self-levelling coat may suffice.

Home Ownership Scheme flat renovation: Home Ownership Scheme flats often retain their original tiles. Keep or remove them according to their condition. Check management rules on working hours and rubble disposal.

Village houses and walk-ups vary considerably in age and construction. Floors may have a marked slope. Measure the whole area before selecting a method.

New flats: floors are generally flatter, althoughFlat inspection, hollow tiles or isolated high and low spots may only require local treatment rather than levelling the whole flat.

  • Check older floors for hollow areas first
  • Ask the estate office before altering a public rental flat
  • Check management rules for Home Ownership Scheme flats
  • Local repairs in new developments
Site photo of a masonry partition under construction | HK Create Design
Site photo of masonry work | HK Create Design Select an image to enlarge

12

Choosing between cement-and-sand screed and self-levelling compound

Ask three questions. What finish follows? Cement-and-sand screed generally suits tiles, while self-levelling compound suits SPC or timber flooring. How deep are the low spots? If they exceed the compound's thickness range, first build up the base with screed. Is it a wet area? Use a cement-and-sand screed for the final layer where falls are needed.

Both methods are sometimes needed. An uneven floor in an older flat may need a base screed followed by a self-levelling coat beneath SPC. The two items are priced separately.

Consider minimum charges. On a small area such as 30 sq ft, cement-and-sand screeding has a HK$1,850 minimum and self-levelling a HK$2,800 minimum. A HK$2,700 day rate may suit one or two small repairs.

Choose the final finish before levelling. Tiles and other floor coverings need different substrates, finished heights and textures. Changing the sequence can mean rework or an extra layer of material.

  • What finish will go on top?
  • What is the difference in levels?
  • Is it a wet area?
  • Consider a day rate for small areas
Worked example 3

Example 3: replace timber flooring with SPC throughout a 400 sq ft flat

Assumptions

  • Suppose the old laminate must be removed. The substrate is generally flat and only needs a thin levelling layer.
  • Area: 400 sq ft.

How to calculate quantities

  1. A08 Remove timber flooring: 400 × HK$22 = HK$8,800.
  2. J03 Self-levelling compound: 400 × HK$22 = HK$8,800.
  3. J01 Supply and lay SPC flooring: 400 × HK$60 = HK$24,000.
  4. Total: HK$8,800 + HK$8,800 + HK$24,000 = HK$41,600.

HK$41,600, excluding rubble removal. Add HK$5 per sq ft for timber floor removal if the adhesive layer is thick.

If removal reveals large differences in levels, cement-and-sand screed or a layered build-up may be needed instead. [8]

Use your square footage instead and see a reference budget

13

Finished floor heights at doors, cabinets and bathroom thresholds

Finished floor height is often overlooked. Self-levelling compound adds a few millimetres, then SPC flooring and underlay add more. Screed, tile adhesive and tiles together can raise the floor by 20–30 mm or more. Check room doors, sliding tracks, fitted cabinet bases and the bathroom threshold.

Room doors: existing clearances are often small. Raising the floor may require trimming or adjusting the doors. Size new doors to suit the finished floor level. Decide whether sliding-door tracks will be recessed or surface-mounted before finishing the floor.

Fitted wardrobes and kitchen cabinets: levelling after installation can trap cabinet feet in the screed and complicate replacement. If levelling first, allow for adjustable feet. The usual sequence is to finish the floor before cabinets. Coordinate timing with the cabinet fitter.

Bathroom threshold: keep the bathroom floor slightly lower than the adjoining floor, with falls towards the drain to contain water. Coordinate finished levels across the whole flat. We measure the rooms and set out the proposed threshold height difference in the quotation.

  • Calculate the total finished floor height
  • Plan door clearance and sliding tracks in advance
  • Level the floor before installing cabinets
  • Maintain a level difference at the bathroom threshold

14

Complete underfloor pipework and wiring first

Complete changes to bathroom or kitchen drains and any underfloor electrical conduits before levelling. Reopening a finished floor wastes material and introduces joints that can increase the risk of hollow areas and leaks.

When moving a waste pipe, check its fall so wastewater drains freely. For a relocated bathroom floor drain, coordinate pipework, waterproofing and screed falls together. HK Create Design uses copper supply pipes installed by its licensed plumbing partners and handles Water Supplies Department submissions. Drainage arrangements depend on site conditions.

Electrical cables under a floor generally run in protective conduit beneath the screed. A registered electrical worker must carry out the electrical work and test it afterwards. Photograph the routes before covering them so they can be avoided during future drilling or repairs.

Levelling covers the substrate. Complete and inspect everything beneath it first.

  • Complete changes to drainage positions first
  • Design the waterproofing, falls and drain together
  • Use a registered electrical worker for electrical conduit work
  • Photograph concealed services before covering
Combined levelling and flooring rates per sq ft

You can swipe left or right on your phone to view the complete table.

CombinationLevellingfloorCombined rate per sq ft
Self-levelling and SPC flooringHK$22HK$60HK$82
Self-levelling and laminate flooringHK$22HK$82HK$104
Cement-and-sand screed with 600 × 600 mm tilesHK$22HK$78HK$100
Cement-and-sand screed with 800 × 800 mm tilesHK$22HK$120HK$142

HK Create Design's published 2026 rates. Tiles are excluded. [8] [8]

Custom storage cabinets throughout a flat | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

15

Checking floor levelling work against the quotation

Check the quoted area against the measurements, the levelling method, expected thickness or level differences, substrate preparation, wet-area falls, old floor removal, rubble charges, minimum charges, curing and covering dates, and the warranty period.

A quote that simply says “floor levelling, XXX sq ft” leaves important details open. Ask for each item to be confirmed. The Consumer Council also recommends itemising the quote to reduce later extras.[3]

HK Create Design itemises demolition, levelling, laying the finish and debris removal. Each item shows the unit rate, quantity and minimum charge, so you can see where the money goes.

  • Check the measured area
  • Check the method and thickness
  • Check substrate treatment and falls
  • Check rubble removal and minimum charges

16

Site measurement and quotation

A reliable quotation starts with level measurements on site. We measure several points, record the highest and lowest and use the difference to select the method and thickness.

Before booking, gather floor photos, the existing material, intended finish, door clearances and building working-hour restrictions. More complete information makes for a better estimate.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Measure differences in level
  • Specify the intended floor finish
Worked example 4

Example 4: strip a 500 sq ft floor in an old building back to concrete, screed and tile

Assumptions

  • Suppose an older flat has several tile layers and the floor must be stripped back to the concrete.
  • Area: 500 sq ft, assuming one truckload of rubble.

How to calculate quantities

  1. A02 Remove tiles and screed back to concrete: 500 × HK$52 = HK$26,000.
  2. B02 Floor screeding: 500 × HK$22 = HK$11,000.
  3. D01 Lay floor tiles: 500 × HK$78 = HK$39,000, excluding the tiles.
  4. A11 Rubble removal: 1 × HK$4,200 = HK$4,200.
  5. Total: HK$80,200.

HK$80,200, excluding the tiles.

The truckload count is an assumption. A thicker old floor produces more rubble. [8]

Use your square footage instead and see a reference budget

17

What if the level difference exceeds 30 mm?

Larger level differences require more material and add load to the slab. Our price list requires a separate quote above 30 mm[8]and we provide a written quotation after measuring on site so the cost is clear before work starts.

In an older building, the floor may have a recessed slab or loose old screed that needs hacking out. Discuss this work before quoting.

  • Measure differences in level
  • Check whether the slab is recessed
  • Get a written quote for level differences above 30 mm
Worked example 5

Example 3: self-levelling and SPC flooring for a 400 sq ft two-bedroom flat

Assumptions

  • Illustrative example.
  • The existing floor is already clear. No tile removal required.

How to calculate quantities

  1. Self-levelling: 400 × HK$22 = HK$8,800. [8]
  2. SPC:400 × HK$60 = HK$24,000[8]
  3. Flooring can be laid after about 12 hours for this product. [9]

About HK$32,800

Old tile removal is extra. Waste disposal is charged under the government scheme. [5] [8][9][5]

Use your square footage instead and see a reference budget
Project photo of completed bespoke kitchen cabinets | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

18

Drainage falls for kitchen and bathroom floors

Kitchen and bathroom wet floors should fall towards the drain. Ponding encourages mould and may contribute to leakage below. Our wet-area screeding includes forming drainage falls[8].

For a drainage check, pour a bucket of water onto the floor and check that it flows freely to the drain without ponding.

  • Slope towards the floor drain
  • Water drainage test
  • No ponding

19

Why choose HK Create Design for floor levelling?

Our online calculator publishes HK Create Design's floor levelling rates, inclusions, exclusions and minimum charges before work starts.[8] HK Create Design’s quotations list materials, work stages and acceptance checks so you can compare other quotations line by line.

HK Create Design offers a one-year warranty after completion under the terms of the written quotation. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

For a project estimate, send photos and the approximate area to HK Create Design on WhatsApp 5243 7747. You can also see samples and discuss options at our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.

  • Published, itemised prices
  • List inclusions and exclusions in the written quotation
  • One-year workmanship warranty
  • Send photos to WhatsApp 5243 7747 for a quotation

FAQ

15 practical questions answered

01How much does floor levelling cost?

Cement-and-sand screed costs HK$22 per sq ft (minimum HK$1,850). Self-levelling is also HK$22 per sq ft (minimum HK$2,800). Both include labour and base materials.

02How does cement-and-sand screeding differ from self-levelling?

Cement-and-sand screed accommodates larger level differences and can form drainage falls for tiles and wet areas. A thin self-levelling coat gives the smooth surface required by SPC or timber.

03How thick can self-levelling be?

For example, Optimix SF818 can be applied at 3–20 mm, with an optimum thickness of 5–8 mm.[1]

04Can self-levelling compound be used in a bathroom?

It is unsuitable as the final layer where falls are needed because it leaves the bathroom floor level and water can pond. Form the drainage falls with a cement-and-sand screed.

05What if the floor levels vary substantially?

Our B02 rate requires a separate quote above a 30 mm level difference. Multiple layers or a proprietary screed may be needed, such as FS151 for a 10–50 mm application.[2]

06How much does floor removal cost?

Removing tiles down to the cement bed costs HK$30 per sq ft. Removing tiles and screed back to concrete costs HK$52. Lifting timber flooring costs HK$22 per sq ft.

07How is rubble removal charged?

A11 rubble removal costs HK$4,200 per truckload, including carrying the debris downstairs and government disposal fees. Small quantities can be priced by the bag, subject to a HK$2,000 minimum.

08How soon can the floor covering be laid after levelling?

It depends on the material and site humidity. Screed mortar must be water-cured for several days.[2] Observe the manufacturer's covering time for the levelling compound.

09Can SPC be laid directly over old tiles?

If the old tiles are firmly bonded with no hollow areas, they may be levelled before laying SPC. Check how the added height affects door clearance.

10Does floor levelling need an application?

Laying tiles is generally exempt from prior approval but must comply with the Buildings Ordinance.[7]

11How much will levelling raise the floor?

It depends on the method and thickness. Self-levelling can add a few millimetres to over 10 mm. Screed and tiles together can add 20–30 mm or more. Measure door clearances and the bathroom threshold before work starts.

12Why is the minimum charge higher for self-levelling?

Self-levelling requires cleaning, priming and pouring the compound in one operation. Even a small area needs similar preparation and set-up time, hence the HK$2,800 minimum.

13How do I inspect a levelled floor?

Check flatness with a straightedge, falls with water and bonding with a tap test. Measure door clearances too.

14Is there a warranty?

The work carries a one-year warranty after completion, subject to the terms of the written quotation.

15How can I make an appointment?

WhatsApp 5243 7747. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]OPTIMIX SF818 self-levelling compound technical data Accessed: 2026-11-03
  2. [2]OPTIMIX FS151 Floor Screed technical data Accessed: 2026-11-03
  3. [3]Consumer Council, CHOICE issue 529: how to read a renovation quotation across 12 categories Accessed: 2026-11-03
  4. [4]Labour Department: Manual Handling Operations – A Guide for Employees Accessed: 2026-11-03
  5. [5]Environmental Protection Department: Construction Waste Disposal Charging Scheme Accessed: 2026-11-03
  6. [6]Labour Department guidance on preventing silicosis among quarry and construction workers Accessed: 2026-11-03
  7. [7]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-11-03
  8. [8]HK Create Design’s published 2026 prices: masonry, waterproofing, demolition and miscellaneous work Accessed: 2026-11-03
  9. [9]MAPEI Hong Kong: ULTRAPLAN rapid-setting self-levelling compound technical data Accessed: 2026-11-03
  10. [10]Consumer Council guide to choosing flooring Accessed: 2026-11-03