FLOORING
Floor replacement in 2026: prices, SPC, timber, vinyl and floor levelling
- Free on-site measurement (limited time)Until 31 December 2026 · Two or more work items · No deposit required
- Supply and install stone plastic composite (SPC) flooring: HK$60 per sq ftPublished prices · Estimate the cost of 117 work items online
- 15 years' experience · One-year warranty after completionWong Tai Sin showroom · Coverage is set out in the written warranty
A floor’s substrate determines the cost and finish. We inspect existing tiles, level differences and thresholds before deciding on removal. HK Create Design has 15 years of renovation experience and itemises removal, levelling, laying, skirting and waste. This guide compares SPC, laminate, vinyl and wood-effect tiles, shows three 400 sq ft budgets, and covers self-levelling, the revised wood flooring emission standard and noise restrictions.
Data verification date:2026-11-02・Numbers are accompanied by sources

Related before-and-after photos
Tap a photo to see the details. Send us a photo of your own space to ask about similar work.

Corridor flooring installation 
Joint between the wall base and floor tiles 
Bedroom flooring installation
View all project comparisons and customer reviews →
Send photos on WhatsApp for a quote on similar workWHAT TO CLARIFY FIRST
There’s no rush to compare a total price before you start. It is easier to confirm the scope of the project and follow-up arrangements by first clearly explaining the current situation, reserved projects, site restrictions and the desired results.
REAL PROJECT PHOTOS
Photographs of our completed projects
These photographs were taken on actual HK Create Design projects. Client details have been removed.

Completed project photosWan Chai · Self-levelling floor work · August 2026 
Site photoWan Chai · Self-levelling floor work · July 2026 
Completed project photosMount Parker Lodge, Sai Wan Ho · Flooring · July 2026 
Completed project photosHK Create Design showroom · Flooring · July 2026 
Site photoMount Parker Lodge, Sai Wan Ho · Floor and subfloor work · July 2026 
Site photoHK Create Design floor preparation photos 
Site photoHK Create Design floor preparation photos 
Site photoHK Create Design floor preparation photos 
Site photoDandenong Mansion, Wan Chai · Floor and subfloor work · July 2026 
Site photoDandenong Mansion, Wan Chai · Floor and subfloor work · July 2026 
Site photoDandenong Mansion, Wan Chai · Floor and subfloor work · July 2026 
Site photoDandenong Mansion, Wan Chai · Floor and subfloor work · July 2026
DESIGN RENDERS
Design renderings for reference
These renderings illustrate possible finishes and layouts. We will confirm the work for your kitchen after the site survey and provide a written quotation.
Compare the scope shown in the photos
Illustrated comparison of options

Corridor floor replacementDoor clearance, thresholds and the condition of the existing substrate determine feasible flooring options.
WORKED EXAMPLE
Estimate your floor replacement costs
Enter the figures of your organization and see the calculation of each step instantly; the results are for budget reference only, and the official price shall be based on the written quotation after measurement.
400 sq ft: lay SPC over existing floor tiles
- Sound existing tiles without hollow spots: removal unnecessary
- J03 self-levelling, HK$22 per sq ft, minimum HK$2,800
- J01 SPC flooring, supply and installation HK$60 per sq ft, minimum 200 sq ft
- J04 skirting at HK$10 per linear ft, assuming about 120 linear ft of wall perimeter
- No debris haulage. Furniture moving, door trimming and management deposits are excluded.
- Self-levelling and SPC flooring (J03 + J01)Area × (HK$22 + HK$60)HK$32,800
- Skirting (J04)120 linear ft × HK$10HK$1,200
Indicative cost of replacing a floor with SPCHK$34,000
At 400 sq ft: HK$32,800 + HK$1,200 = HK$34,000. Below 200 sq ft, J01 still charges 200 sq ft and J03 has a HK$2,800 minimum. This calculator does not apply the minimum charges automatically. Subject to measurement and written quotation. [1]
400 sq ft: remove existing timber flooring and lay laminate
- A08 timber floor removal, HK$22 per sq ft. Backing boards or thick adhesive add HK$5 per sq ft, excluded here.
- J03 Level the floor with self-levelling compound: HK$22 per sq ft
- J02 laminate flooring, supply and installation HK$82 per sq ft, minimum 200 sq ft
- J04 skirting, about 120 linear ft × HK$10
- A11 one load of debris removal, HK$4,200, including government disposal charges
- Remove old timber, level and lay laminate (A08 + J03 + J02)Area × (HK$22 + HK$22 + HK$82)HK$50,400
- Skirting (J04)120 linear ft × HK$10HK$1,200
- Rubble removal (A11)1 load × HK$4,200HK$4,200
Indicative cost of replacing timber flooring throughout a flatHK$55,800
At 400 sq ft: HK$50,400 + HK$1,200 + HK$4,200 = HK$55,800. Resolve seepage or hollow areas exposed during removal before laying. Confirm disposal loads and skirting length on site. Subject to measurement and written quotation. [1]
400 sq ft: remove existing tiles and lay wood-effect plank tiles
- A01 remove floor tiles down to cement bedding, HK$30 per sq ft
- B02 Floor leveling HK$22/sq.ft.
- D03 wood-effect plank tiles, HK$98 per sq ft for labour and bedding materials. Tiles are separate.
- A11 One truckload of rubble: HK$4,200
- Straight or staggered layout. Herringbone or chevron adds 24% to the D-item subtotal.
- Tile removal, levelling and wood-effect tile installation labour and bedding (A01 + B02 + D03)Area × (HK$30 + HK$22 + HK$98)HK$60,000
- Rubble removal (A11)1 load × HK$4,200HK$4,200
Indicative cost of replacing tiles with wood-effect tiles, excluding the tiles themselvesHK$64,200
At 400 sq ft: HK$60,000 + HK$4,200 = HK$64,200, excluding tiles. Firmly bonded tiles requiring breaking back to concrete add HK$10 per sq ft to A01. Subject to measurement and written quotation. [1]
HOW WE HELP
How can we help you
Measure and inspect the existing floor
Measure the area, perimeter and differences in level, then tap-test each zone for hollows before recommending retention or removal.
Itemised pricing
We itemise removal, levelling, flooring, skirting, trims and disposal using our published rates.
Choose materials and edge details
Select SPC, wood or tiles according to household members, pets and wet-area locations. Agree threshold details before work.
Building management and scheduling
Help submit the renovation application and schedule demolition and noisy work within management and EPD hours.
One-year warranty
We follow up workmanship issues such as buckling, open joints or loose skirting during the warranty period.
BEFORE / AFTER
Drag the slider to compare the layouts
Drag the centre line left or right with a finger or mouse. Each image is labelled as a project photo or a design concept.




KEY NUMBERS
Floor replacement figures to check before work starts
company public price
HK$60/ sq. ft.
Indicative price for SPC flooring, supplied and installed
J01 includes a moisture barrier, click-lock installation and edge trims. Minimum 200 sq ft. Indicative price, subject to measurement and written quotation.
[1]company public price
HK$82/ sq. ft.
Indicative price for laminate flooring, supplied and installed
J02 includes a moisture barrier, click-lock installation and edge trims. Minimum 200 sq ft. Indicative price, subject to measurement and written quotation.
[1]company public price
HK$22/ sq. ft.
Indicative self-levelling rate, minimum charge HK$2,800
J03 covers floor cleaning, primer and self-levelling compound. B02 cement-sand screeding is also HK$22 per sq ft, minimum HK$1,850. Differences over 30 mm are quoted separately.
[1]government/official
7types
Common flooring materials identified by the Consumer Council
The Consumer Council groups flooring into solid wood, engineered wood, fibreboard or laminate, vinyl, tile, marble and granite. It warns that uneven substrates or poor installation can leave vinyl floors uneven.
[2]Factory technical information
1–10mm
Application thickness range for an example rapid-setting levelling product
Mapei ULTRAPLAN technical data gives a 1–10 mm application thickness, light foot traffic after around 3 hours and around 12 hours before laying tile, resilient or timber flooring.
[3]government/official
2026-06-01
Effective date of GB 18580-2025, the revised national formaldehyde standard for wood-based panels
The revised standard covers wood-based panels and finished products for indoor use, including wood flooring. Finished products must meet the E0 formaldehyde emission limit.
[4]government/official
7pm–7am
Restricted hours for powered equipment in domestic renovations
The EPD requires a Construction Noise Permit for renovation work using powered mechanical equipment between 7 pm and 7 am or at any time on public holidays.
[6]government/official
HK$71–200/metric tons
Government charges for construction waste disposal
EPD charges per tonne are HK$71 at public fill reception facilities, HK$175 at sorting facilities and HK$200 at landfill, minimum one tonne. Old flooring and tiles must be disposed of lawfully.
[7]CHARTS
Floor replacement figures at a glance
J01 and J02 include labour and flooring. D items cover labour and bedding materials, with tiles priced separately. Allow separately for removal, levelling, skirting and disposal when comparing totals. Prices are indicative, subject to measurement and written quotation. [1]
FULL GUIDE
Floor replacement guide: sequence, materials and practical considerations
Inspect the substrate before choosing replacement flooring.
The condition of the existing floor affects the result. Uneven substrates load SPC and laminate click joints unevenly, causing raised seams or noise over time. Hollow existing tiles can loosen under new ones. The Consumer Council also notes that vinyl floors can be uneven where the substrate is poorly prepared or workmanship is inadequate.
We measure each room and its perimeter, check levels with a straightedge and tap-test tiles for hollow areas. This determines whether we can retain and level the floor or need to strip to bedding or concrete. That decision affects much of the budget, programme and noise.
[2]Comparing SPC, wood, vinyl and tile flooring
The Consumer Council identifies seven common materials: solid wood, engineered wood, fibreboard, vinyl, tile, marble and granite. Common domestic choices include SPC (a type of vinyl), laminate (fibreboard), solid or three-layer engineered wood, and tiles including wood-effect planks.
SPC has a rigid mineral-and-PVC core with a printed surface and wear layer. It resists water and insects and suits households with pets or children. Laminate has a scratch-resistant surface over high-density fibreboard. It can swell in standing water and cannot be sanded or waxed back. Solid wood feels warmer but needs maintenance, including waxing, and is more sensitive to insects and humidity. Tiles are durable and easy to clean, feel cooler and need level joints, especially in plank formats.
The Consumer Council suggests wood-effect or fibreboard flooring for homes with children or older people because a softer surface and underlay can cushion falls. For pets, consider wear resistance, slip resistance and low water absorption.
Our custom SPC flooring comes in a commonly used 6 mm thickness, an 8 mm version with acoustic underlay, and a 10 mm version. Thicker boards need more door clearance. We measure door bottoms and floor variations before installation.
- For quicker installation without strip-out, lay SPC or laminate over levelled existing tiles.
- For a wood-like feel, choose laminate. Solid timber needs a larger budget and more maintenance.
- Wood-effect plank tiles for a consistent finish including the kitchen and bathroom
- Wet areas: floor tiles with waterproofing and drainage falls
How floor replacement costs are calculated
Allow for removal, levelling, flooring, skirting and trims, and disposal. Our published 2026 rates are HK$60 per sq ft for SPC and HK$82 for laminate. Both include moisture barrier, click-lock installation and trims, minimum 200 sq ft. Self-levelling costs HK$22 per sq ft (minimum HK$2,800) and skirting HK$10 per linear ft.
Removal costs HK$22 per sq ft for wood flooring, HK$30 for tiles or HK$52 to break out bedding to concrete. Disposal is HK$4,200 per load including government charges. Tile installation rates per sq ft are HK$78 for standard, HK$98 for wood-effect plank and HK$120 for large tiles, including labour and bedding materials. Tiles cost extra. Herringbone or chevron adds 24% to the tiling subtotal.
Prices are indicative, subject to measurement and written quotation. Check levelling, skirting, doorway trims and waste removal when comparing quotes. In a Consumer Council assessment of 40 draft renovation quotations, the average score was 58 and just 38% listed every work item.
[1][9]Whole-flat floor replacement: keeping or removing the existing floor
For a 400 sq ft flat, levelling and laying SPC over sound existing tiles costs about HK$34,000 including skirting. Replacing old timber with laminate costs about HK$55,800 including levelling, skirting and one debris load. Replacing old tiles with wood-effect plank tiles costs about HK$64,200 for labour, bedding and disposal, excluding the tiles. Adjust the example areas below.
Keeping the floor is faster, quieter and produces less waste, but raises the level. Doors may need trimming and thresholds or balconies may need transition profiles. Removal exposes seepage and hollow areas and can preserve existing levels, useful in older flats with defects. Coordinate flooring with the sequence on our whole-flat renovation page.
[1]Preparing a floor for screeding or self-levelling compound
Cement-sand screed rebuilds bedding after tile removal or forms wet-area falls. B02 costs HK$22 per sq ft, minimum HK$1,850, with differences over 30 mm quoted separately. Self-levelling compound smooths small variations on a generally sound floor before click-lock flooring. J03 costs HK$22 per sq ft, minimum HK$2,800.
Self-levelling compounds have specific thickness and curing limits. Mapei ULTRAPLAN, for example, applies at 1–10 mm, takes light traffic after around 3 hours and needs around 12 hours before tile, resilient or timber flooring. Beyond the specified thickness, or over cracks or hollows, repair or screed the base first.
HK Create Design uses self-levelling and bonding products from brands including Optimix and Sika. We name the specific product in the quotation and follow its thickness and curing instructions. The ULTRAPLAN figures above illustrate how to read product data.
[1][3]Formaldehyde in wood flooring: the revised 2026 national standard
The Indoor Air Quality Information Centre identifies pressed wood, adhesives, particleboard and medium-density fibreboard as indoor formaldehyde sources. Prolonged exposure may cause allergic reactions and harm the respiratory system. Laminate has a fibreboard core, so check its emissions specification when buying.
Mainland China’s National Forestry and Grassland Administration says GB 18580-2025 took effect on 1 June 2026 and expressly covers wood flooring. Wood-based panels must achieve E1 (≤0.124 mg/m³) and finished panel products E0. Many flooring products sold in Hong Kong are manufactured on the mainland. Ask suppliers for evidence of compliance, ventilate after installation and consider optional RenoClean post-renovation cleaning.
[5][4]Flooring in kitchens and bathrooms and at balconies
Kitchen and bathroom thresholds need careful transitions. Wet floors typically sit lower and need drainage falls, so avoid self-levelling those falls or laying laminate. A common solution uses SPC or wood in living areas and bedrooms, tiles in wet rooms and threshold trims between them. Wood-effect tiles can continue from the living room into the kitchen.
If removal exposes water ingress in a kitchen or bathroom, resolve the source and renew waterproofing before covering. See our waterproofing and masonry pages for details of waterproofing, tile removal and bathroom retiling.
Arrange management approval, noise controls and debris disposal before starting
The Buildings Department classifies home renovation work such as installing tile finishes as exempt from prior approval under the Buildings Ordinance. The work must still comply with building regulations, including structural safety requirements. Replacing a floor usually leaves the structure untouched, but adding thickness across a large area increases the load on the slab and limits how high we can raise the floor.
The EPD prohibits powered mechanical equipment from 7 pm to 7 am or at any time on public holidays without a Construction Noise Permit. Management often imposes shorter hours and requires an application. Dispose of tile debris lawfully. EPD charges range from HK$71 to HK$200 per tonne, minimum one tonne.
[8][6][7]How HK Create Design replaces floors
We have 15 years of experience. For floor replacement we measure each room, wall perimeter, level differences and hollow areas before quoting. The quotation itemises stripping, levelling, flooring, skirting, finishing and debris removal. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
Works come with a one-year warranty. Use calculator items J01 or J02 for a budget, WhatsApp 5243 7747 to arrange measurement, or visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Monday–Saturday 10:00–18:00 to view samples.
[1]COMPARE
Comparing floor replacement options
Compare common flooring materials before replacing a floor
| Material | Our indicative price | Construction and characteristics | Pay attention to | more suitable |
|---|---|---|---|---|
| SPC stone plastic floor | J01: HK$60 per sq ft supplied and installed, minimum 200 sq ft | A click-lock vinyl floor with a mineral-and-PVC core, printed surface and wear layer | Uneven substrates can leave uneven joints. Level the floor before laying. | Homes with children, older people or pets, or projects with a short programme |
| Laminate or fibreboard flooring | J02: HK$82 per sq ft supplied and installed, minimum 200 sq ft | High-density fibreboard core, woodgrain decorative paper and a scratch-resistant wear layer | Prolonged contact with standing water can cause swelling or distortion. The surface cannot be sanded back. | Bedrooms and living rooms where a wood-like feel is preferred |
| Lay timber-effect plank tiles | D03: HK$98 per sq ft for labour and bedding materials. Tiles are separate. | Fired tiles resist water and insect attack. | Long plank tiles can bow slightly. Keep adjacent edges level. Tiles feel cooler underfoot. | One consistent floor covering throughout the flat, including the kitchen and bathroom |
| Floor tiles up to 600 × 600 mm | D01: HK$78 per sq ft for labour and bedding materials. Tiles are separate. | Fired tiles come in many finishes and are easy to maintain. | Wide grout joints may darken over time. D08 epoxy grout is available at HK$21 per sq ft. | Wet areas such as kitchens, bathrooms and balconies |
| Lay large-format tiles (600 × 1,200 or 800 × 800 mm) | D04: HK$120 per sq ft for labour and bedding materials. Tiles are separate. | Fewer joints give a more uniform appearance. | Requires back-buttering, levelling clips, two-person handling and a flat substrate. | For a large, consistent finish in living and dining rooms |
| Solid timber, three-layer engineered timber and glue-down PVC vinyl | No fixed unit rate. Price depends on the selected product. | Thicker solid wood wears well but needs waxing. Engineered wood is less affected by expansion and contraction. | Solid timber is sensitive to pests and humidity. Glue-down vinyl needs a carefully prepared substrate. | For homes with specific requirements, advise after site measurement. |
Material characteristics are based on the Consumer Council’s flooring guide. HK Create Design’s published 2026 prices are indicative, subject to measurement and written quotation. The quote specifies the product, thickness and wear layer. [2][1]
Retain or remove the existing floor?
| Existing floor condition | Common approach | Our indicative price | Impact |
|---|---|---|---|
| Sound old tiles, no hollow areas and minor variations in level | Retain and clean the existing surface, level locally or with compound, then lay SPC or laminate. | J03 self-levelling compound, HK$22 per sq ft, minimum HK$2,800 | The floor level rises. Plan door clearances and kitchen and bathroom thresholds in advance. |
| Old wood flooring is buckled, mouldy or smells damp. | Strip the surface boards, underboards and adhesive, then clean and level the floor. | A08 Timber floor removal at HK$22 per sq ft. Add HK$5 per sq ft for a base layer or thick adhesive. | Water ingress may only become visible after strip-out. Address the source first. |
| Cracked tiles or widespread hollows where new tiles are planned | Strip tiles to the cement bed and apply a new levelling screed. | A01 tile removal HK$30 per sq ft, plus HK$10 per sq ft for firmly bonded tiles or breaking back to concrete. Add B02 at HK$22 per sq ft. | Allow for debris disposal and several extra days for cement-sand screed drying. |
| Loose cement bedding or a need to lower the floor level | Break out the cement bed to structural concrete, then re-screed. | A02 break out down to structural concrete, HK$52 per sq ft. Deep breaking and sunken slabs are quoted separately. | Most noise and debris. Observe building management and EPD hours. |
Measure level differences, hollow areas and substrate moisture on site before choosing a method. The Buildings Department exempts ordinary tiling from prior approval, subject to requirements including structural safety. [1][8]
Cement-sand screeding and self-levelling compared
| Item | Cement-and-sand floor screed (B02) | Level the floor with self-levelling compound (J03) |
|---|---|---|
| indicative price | HK$22 per sq ft, minimum HK$1,850 | HK$22 per sq ft, minimum HK$2,800 |
| Suitable for the situation | Rebuilding bedding after tile removal, forming drainage falls or correcting larger variations | Generally sound floor with minor unevenness, ready for SPC or timber flooring |
| Thickness | Level differences greater than 30 mm require separate agreement | Depends on the product. Mapei ULTRAPLAN, for example, applies at 1–10 mm. |
| Waiting time | Wait for cement-sand screed to dry before covering. Timing depends on thickness and weather. | ULTRAPLAN allows light foot traffic after around 3 hours and flooring after around 12 hours. |
| Surface finish | Screeded by hand, with flatness dependent on workmanship | Flows to a level surface suitable for click-lock flooring. |
Repair hollows, cracks or seepage before applying self-levelling compound. Keep the drainage falls in kitchens and bathrooms. [1][3]
SITE SOP
Floor replacement installation and handover checklist
The "shutdown checkpoint" requires you or the foreman to look at it and confirm it before proceeding to the next step. You can check items one by one during acceptance.
Company Site Code
Our on-site flooring installation sequence
- Site measurement and inspection of the old floorshutdown checkpoint
Measure room areas and perimeters. Use a level and straightedge to check variation, tap-test tiles for hollows and measure door, wet-room and balcony thresholds.
- Confirm the material, colour and finishing details.
Choose the finish, laying pattern (straight, staggered or herringbone) and skirting colour. Record trims or angled doorway transitions on the quotation.
- Management application and protection
Submit the management application, confirm permitted hours and protect lifts, corridors and retained furniture or cabinets.
- Removal, if required
Remove old tiles or wood flooring, bag the debris and take it down for collection at management-approved times.
- Levellingshutdown checkpoint
Clean and prime the substrate, then apply self-levelling compound or cement-sand screed. Wait the time specified for the material before covering.
- Lay the moisture barrier and floor covering.
Install SPC or laminate on a moisture barrier using click-lock joints, allowing expansion at walls. For tiles, set out and lay to the tile layout drawing.
- Skirting and edge finishing
Fit skirting over expansion gaps and transition strips at doorways. Check doors for rubbing and trim only if necessary.
- Handover and cleaningshutdown checkpoint
Walk each room with the owner and record defects. RenoClean post-renovation cleaning is available separately.
Acceptance Checklist 0/5
Adapted according to the factory construction instructions
Checks before and after self-levelling, based on product technical data
- Clean the substrate
Remove loose cement, oil and dust, and repair cracks and hollow areas first.
- Confirm the application thickness range.shutdown checkpoint
Measure the high and low points and check the thickness range of the specified product, such as an Optimix or Sika compound. ULTRAPLAN’s example range is 1–10 mm. Apply a cement-sand base first where the required depth exceeds the product range.
- Apply bonding primer
Apply the primer or bonding agent specified for the product and allow it to dry before pouring.
- Mix and pour
Use the water ratio on the packaging, pour within the working time, spread with a smoothing tool and remove bubbles using a spiked roller.
- Allow to cure and protect the surface.shutdown checkpoint
Protect curing material from traffic, direct sunlight and strong draughts. ULTRAPLAN permits light foot traffic after around 3 hours and covering after around 12 hours.
Acceptance Checklist 0/3
DELIVERABLES
The design drawings you will receive
Written quotation
Record the work item, quantity, unit price and flooring style.
Floor finish layout plan
Show the material, laying direction and doorway transition for each room.
Completion and acceptance record
Inspect each room’s joints, skirting and door operation and record any defects.
MATERIALS
Related materials: We know how to use them and can also help you with construction
SCOPE
This communication can first cover
- Measure, check differences in level and tap-test existing tiles for voids.
- Remove old tiles or timber and dispose of debris lawfully.
- Cement-sand screeding or self-levelling
- Lay SPC, laminate or tiles, including skirting and doorway transitions.
BEFORE A SITE VISIT
Before the survey, you may wish to prepare these questions.
- 01
Are the old tiles cracked or hollow, or sound enough to cover?
- 02
Do children, older people or pets in the home need slip- and scratch-resistant flooring?
- 03
How should thresholds at kitchens, bathrooms and balconies be finished?
FAQ
Frequently asked questions
How much does replacement flooring cost?
Our 2026 supply-and-install rates are HK$60 per sq ft for SPC and HK$82 for laminate, minimum 200 sq ft. Self-levelling adds HK$22 per sq ft. For 400 sq ft, SPC over existing tiles with skirting is about HK$34,000. Replacing old timber with laminate is around HK$55,800. Subject to site measurement and written quotation.
Can I lay a new floor over old tiles?
Yes, if the old tiles are sound, there are no extensive hollow areas and differences in level can be corrected. Keeping them saves removal and disposal costs and reduces noise. It raises the finished floor, so plan transitions and clearances at entrance, internal, kitchen and bathroom doors. We tap-test the tiles in each room before advising.
Are SPC and vinyl flooring the same?
SPC is a rigid click-lock vinyl flooring with a mineral-and-PVC core. Traditional vinyl can be flexible and glued down. The Consumer Council notes that uneven substrates or poor installation can leave vinyl uneven. Level the floor first for either system. J01 covers SPC. Glue-down vinyl is quoted by product.
Should I choose SPC or laminate?
SPC is rigid and water-resistant, useful near kitchens or in homes with children or pets. Laminate’s high-density fibreboard core gives a more wood-like feel, but prolonged water exposure can cause swelling. Both are click-lock surfaces and cannot be sanded back. SPC costs HK$60 per sq ft and laminate HK$82 per sq ft.
How long does whole-flat floor replacement take?
Without removal, levelling and laying can usually be completed in a few days. Observe the product’s waiting period. ULTRAPLAN, for example, needs about 12 hours before floor covering. Tile removal and new cement-sand screed add demolition and drying time. Confirm the actual programme after measurement.
How does self-levelling differ from cement-sand screeding?
Both methods cost HK$22 per sq ft in our price list. B02 cement-sand screeding, minimum HK$1,850, rebuilds stripped floors or forms drainage falls. J03 self-levelling, minimum HK$2,800, smooths small variations in a sound substrate before click-lock flooring. Differences over 30 mm are quoted separately.
Does new wood flooring release formaldehyde?
Laminate has a fibreboard core and is a finished wood-based panel product. The Indoor Air Quality Information Centre lists pressed wood and adhesives as indoor formaldehyde sources. Mainland standard GB 18580-2025, effective 1 June 2026, requires E0 emissions for finished products including wood flooring. Ask the supplier for proof of compliance and ventilate after installation.
Can I use wood flooring in the kitchen or bathroom?
Timber and laminate are poor choices where standing water is likely. Laminate may swell and solid wood responds to humidity. SPC resists water at the surface, but self-levelling would flatten required falls. Floor tiles usually suit wet areas. Choose wood-effect planks for visual continuity, and specify bathroom waterproofing separately. See the waterproofing page.
Do I need to move all my furniture before flooring work?
Clear the area being laid. Fixed wardrobes and kitchen units normally stay in place, with the floor finished to their bases using skirting or trims. Move loose furniture by zone or remove it before work. We protect retained cabinets and appliances.
What noise restrictions apply to floor replacement?
The EPD requires a Construction Noise Permit for powered renovation equipment between 7 pm and 7 am or at any time on public holidays. Management may impose shorter hours, for example no work on Saturday afternoons or Sundays. Submit a renovation application before starting.
How is old flooring waste disposed of?
Old tiles and timber flooring must be disposed of lawfully. EPD construction waste charges range from HK$71 per tonne for public fill to HK$200 for landfill. A11 costs HK$4,200 per load including carrying downstairs, haulage and government disposal charges. Smaller jobs may be priced by bag, with a HK$2,000 minimum.
Is replacement flooring covered by a warranty?
HK Create Design offers a one-year workmanship warranty. We visit to address buckling, open joints, loose skirting and other installation issues covered by the written quotation.
What thicknesses of SPC flooring are available?
We can supply custom SPC flooring. The common thickness is 6 mm, the 8 mm option has an acoustic underlay, and 10 mm is also available. We check substrate flatness, door clearance and your preferred feel. J01 SPC supply and installation costs HK$60 per sq ft, subject to measurement and written quotation.
AFTER RENOVATION
RenoClean | Specialist cleaning and aerospace-grade air purification
After the project is completed, the joint venture RenoClean will take over post-renovation cleaning, dust removal and air treatment, and conduct a room-by-room inspection before handing over the building.
- Cleaning and testing are listed separately
The cleaning scope, treatment methods and air testing are different items; the quotation will be clearly stated in each item, and a single reading will not guarantee the safety of the stay.
RELATED READING
Read the relevant key points first
design and space12 sections · 7FAQ
SPC flooring in Hong Kong homes: advantages, limitations and prices
How does SPC flooring perform in a Hong Kong home? Compare its construction, advantages, limitations, specifications, subfloor flatness and cost using Consumer Council, indoor air quality and manufacturer information.
See data, scope and practical examples
Painting and masonry12 sections · 7FAQ
Tile adhesive or cement-and-sand mortar? Differences, suitable uses and costs
Compare the uses of tile adhesive and cement-and-sand mortar. Weber and MAPEI technical data, Buildings Department and Consumer Council guidance cover quantities, large tiles, when to level the substrate and what belongs in the quote.
See data, scope and practical examples
construction and safety12 sections · 7FAQ
Renovation noise and permitted working hours in Hong Kong: legislation, building rules and quieter works
Can drilling take place freely between 7 am and 7 pm on weekdays? Check the law, building management rules and neighbours' needs separately. Environmental Protection Department guidance covers hours, permits and penalties, with tips on scheduling and quieter tools.
See data, scope and practical examples
Painting and masonry19 sections · 15FAQ
Floor levelling prices in 2026: HK$22 per sq ft for screeding and when timber flooring needs a self-levelling compound
Cement-and-sand screeding and self-levelling both list at HK$22/sq ft, but their thickness ranges, uses and minimum charges differ. Compare our rates and Optimix data to choose a method and budget.
See data, scope and practical examples
Painting and masonry19 sections · 16FAQ
Tiling costs in 2026: comparing labour, bedding materials, finish tiles and strip-out, with an inspection checklist
Tile size, laying pattern and location affect the rate. Compare labour and bedding for wall, floor, large-format and sintered tiles, mosaics, decorative grouting and shower bases. Worked examples cover bathrooms, living rooms and herringbone patterns.
See data, scope and practical examples
Painting and masonry9 sections · 6FAQ
Can tiles be laid over existing tiles? Conditions for avoiding demolition, floor height and retiling costs
Tiling over an existing floor requires a sound substrate, resolved seepage, suitable finished levels and compatible junctions. Use three scenarios and five quote items to decide what to inspect first.
See data, scope and practical examplesSTART WITH THE REAL CONTEXT
Want to discuss this project?
First, bring us the situation of the unit.
You can sort out the approximate area, region, current situation photos and priorities first; the actual scope and arrangements are subject to on-site understanding and written confirmation.
Contact the HK Create Design construction team for a free professional quotation.Other work has a one-year warranty after completion. Demolition is excluded. The written agreement sets out the scope of cover.
WhatsApp 5243 7747 for a free quotation Leave your information and make an appointment for follow-upFree site measurement through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Online estimates and enquiries are free.
Sources
- CompanyHK Create Design 2026 detailed project budget and public price list · HK Create Design· Accessed 2026-11-02
- Official sourceConsumer Council guide to fibreboard and other flooring types · consumer council· Accessed 2026-11-02
- ManufacturerULTRAPLAN rapid-setting self-levelling compound technical data · MAPEI· Accessed 2026-11-02
- Official sourceNew national standard tightens formaldehyde limits for artificial panel products (GB 18580-2025) · National Forestry and Grassland Administration· Accessed 2026-11-02
- Official sourceIndoor Air Quality Information Centre FAQs on formaldehyde · Environmental Protection Department Indoor Air Quality Information Centre· Accessed 2026-11-02
- Official sourceFrequently asked questions about domestic renovation noise · Environmental Protection Department· Accessed 2026-11-02
- Official sourceConstruction Waste Disposal Charging Scheme · Environmental Protection Department· Accessed 2026-11-02
- Official sourceFrequently Asked Questions about Alterations and Additions to Domestic Premises · Buildings Department· Accessed 2026-11-02
- Official sourceConsumer Council recommends four measures to strengthen home renovation regulation. · consumer council· Accessed 2026-11-02


