Start by dividing your budget into three wallets instead of leaving one vague miscellaneous expense
The first wallet is safety and functionality that cannot be postponed: known leaks, failed drains, hazardous electrical conditions, substructure that must be repaired, and matters that must be addressed first by code or building requirements. The second is a cost-effective update before construction is started, such as reorganizing local pipes, reserving enough sockets, or replacing aging accessories when the wall is already opened. The third is optional finishes, hardware upgrades and styling. If the cash flow is limited, the third wallet can be adjusted, but the first wallet cannot be used to "calculate later".
List the risks that are not visible during the scale as "to-be-checked items": location, what to take apart, who provided the photos or test records, possible solutions, and who can approve them. This is much more useful than writing a line saying "Miscellaneous extras" at the end of the quote. The retainer should be the amount planned by the homeowner, not a blank check that the contractor can use on its own. Any changes should first explain the scope, unit price or calculation method, and the impact on the construction period, and obtain written confirmation.
The budget sheet should also separate construction costs and homeowner purchase costs. Whether ceramic tiles, sanitary ware, lighting fixtures, electrical appliances, management office deposits, insurance or transportation are included cannot be inferred from the word "work and materials included". The Consumer Council reminds that if the project details, quantity, unit price and itemized charges are not clearly stated, it will be difficult for consumers to calculate the total charges and compare quotations.[4]
- Each item is marked as required, optional, or deferrable
- The item to be checked indicates the opening/test location and triggering conditions.
- Any post-processing work must have written scope, pricing and approval records.

02
Prepare six pieces of information before measuring, so that you won’t quote on the spot based solely on impressions.
Bring the unit floor plan, management office renovation manual, existing utility bills, photos of water seepage or broken switches, a list of doors, windows and furniture you want to keep, as well as the size and power rating of the scheduled appliances. The photos should take panoramic views, close-ups and positional relationships, such as electrical box and air-conditioning levels, kitchen water levels and drain levels, bathroom doorways and floor. This information does not replace an on-site inspection, but it will allow you to get to the key points more quickly.
Check permitted hours, lift and common-area protection, temporary debris storage, deposits, worker registration and noise limits with management. Give these items the same column in each quotation for comparison. Separately check any building and professional requirements that apply.
Private building owners can first check the approved plans and minor works records of the Buildings Department to understand the structural layout, kitchen fire-resistant structure, room and drainage configuration; they should also check whether the deed of mutual covenant and related documents require the consent of the corporation or management company first.[1] For an uncertain wall, door or opening, do not write it as a "non-main wall" by word of mouth.
- Collect plans, management office manuals, current condition photos and electrical appliance lists
- Include management office costs, conservation, transportation and construction time in the comparison table
- For changes to walls, kitchens and drainage, check the records first without drawing conclusions first.
You can swipe left or right on your phone to view the complete table.
| Project scope | The quantity/boundary to be stated in the quotation | Common pricing methods | Must-ask unpackaged or handover items | The risk of not writing it down first |
|---|---|---|---|---|
| Demolition and construction waste | List of items to be retained and demolished; square feet of wall and floor tiles; number of dump trucks or bags; protection of public areas | By square foot, per room or per car | Does it include removal from the building, legal disposal, protection, gas installation disassembly and damage treatment? | Treating "demolition" as a fixed price, the depth of demolition, transportation and management requirements can easily turn into disputes later. |
| Plumbing and sanitary ware | Which gate or position to start from; open or concealed pipe; route length; each sanitary ware and accessories | By feet, space or per piece | Who supplies and installs pipes and accessories, grooving and repairing, old pipe transfers, and sanitary ware? | Confusing minor repairs with non-minor plumbing work may miss licensed plumbers, applications or repair arrangements |
| electricity | The number and location of sockets, switches, lamp positions, dedicated circuits, distribution boxes and fixed electrical appliances | Group by point, line or project | Panel model, slot repair, temporary power, load assessment, testing and WR1 | Just counting sockets without listing electrical appliances and circuits cannot determine whether new additions or modifications are sufficient and who is responsible for testing. |
| Plastering, waterproofing and tiling | Actual construction area separated from wall and ground; waterproof position; closing; brick size and laying method | By square feet or by item | Separate substrate and finish materials, repairs, waterproofing products, coverage and tests, and special finishing details. | "Liangongbao materials" does not specify the fabric or base layer, and there is no comparable benchmark for the completion effect and total amount. |
| Paint and custom furniture | Paint spread area, shovel level, number of primer and topcoat layers; width, height, depth, boards and hardware of each cabinet | Paint is measured by unfolded area; cabinets are often measured by square feet or number of pieces. | Old basement treatment, partial or whole house shoveling; drawings, samples, transportation, installation and hardware | Using saleable area or overall cabinet length alone can miss differences in preparation, dimensions and fittings. |
This table is a comparison framework for homeowners, not a flat fee schedule. The Consumer Council recommends that the quotation specify the project details, quantity, unit price, materials, payment and contract terms; for water pipes and electricity, qualified persons and documents should be checked according to the nature of the project. [2][3][4]



03
Changing partitions and open kitchens: first determine whether structural and fire resistance requirements are involved
Skimming, tiling and repairing or replacing sanitaryware can generally be exempted work. The relevant structural, fire and drainage standards still apply.[1] This does not mean that all interior changes can be started directly. New construction or alteration of non-structural walls may be minor works and may require notification and qualified persons due to the nature, scale, complexity and safety risks of the works.
If structural walls, beams or columns are involved, the Buildings Department's guidelines require the appointment of an authorized person and a registered structural engineer to assess the feasibility, submit drawings, and have the construction carried out by a registered contractor after obtaining approval and consent.[1] Homeowners should ask separately for the costs of professional assessment, design, application, construction and restoration, rather than lumping them into the general demolition unit price.
Especially for open kitchens, you can’t just look at whether the walls are load-bearing. The Buildings Department pointed out that the wall or door enclosing the kitchen may also be fire-resistant; changes may affect escape routes or fire protection requirements. Check the approved drawings first, and then have them evaluated by professionals before deciding whether to include them in the design and budget.[1]
- Obtain the plan verification results before remodeling walls, doors or kitchens
- If you have any structural or fire-resistant questions, please consult an appropriate professional first. Do not demolish the wall yourself.
- Itemize approvals, professional services, and construction responsibilities into the budget
04
Demolition is not a project: what is retained, which floors are demolished and how it is removed will all change the budget
List each cabinet, door, sanitary fitting, window surround and appliance to retain. State which finished surfaces, cement beds or concrete faces to expose, and where only an exploratory opening is needed. Deeper removal can add levelling, rendering, making good and waste. Mark the physical limits on site photos.
Confirm who bags the debris, carries it downstairs, stores it temporarily, transports it and arranges lawful disposal. Agree protection for corridors, lifts, door frames and retained furniture. The Consumer Council notes that waste handling, temporary protection and government construction waste charges can be significant demolition costs.[4] If the management office specifies a route or time, it should be given to the contractor before quoting.
gas installations,Aluminium windowsand work at height or hazardous demolition should not be carried out by the homeowner to save money. The quotation should specify who appoints qualified professionals, arranges safety measures and coordinates handover. Aluminium windows fall outside the company's quick fixed-rate estimate and need separate assessment of photos, sizes, faults and site conditions.[5]
- Attached is a list of items to be retained/removed and photos of their current condition.
- Specify the depth of demolition, repair boundaries, soil head and protection of public areas
- Aluminum window, gas and high risk clearances are handled by appropriately qualified persons
Example one: separating the subtotal and allowance for flooring and painting in a 400 sq ft flat
Assumptions
- This is a planning trial calculation based on the company's 2026 public reference unit price. It is not the company's completed case, official quotation or the average price in the Hong Kong market.
- Assuming that the usable area is 400 square feet, only the removal of old bricks, floor leveling, standard floor tiles of 600×600 mm or below, and the painting process are calculated based on the usable area multiplied by 3.
- Excludes complete kitchen and bathroom remodeling, waterproofing, plumbing resurfacing, custom furniture, tile fabrics, insurance, management office fees and any unselected items.
How to calculate quantities
- Tile removal: 400 × HK$30 = HK$12,000. Levelling: 400 × HK$22 = HK$8,800. Tiling: 400 × HK$78 = HK$31,200.
- The initial spread area of the paint is 400 × 3 = 1,200 square feet; based on HK$21/square foot, it is HK$25,200.
- Total for four items: 12,000 + 8,800 + 31,200 + 25,200 = HK$77,200.
- If the homeowner chooses a 15% planning allowance, 77,200 × 0.15 = HK$11,580. The upper budget is 77,200 + 11,580 = HK$88,780.
The subtotal of the selected projects is HK$77,200; the cash flow limit after adding the 15% planning reservation is HK$88,780. Retention funds are not automatically added by the company and should be retained until listed risks are discovered on site and confirmed in writing before being used.
400 square feet is not the actual amount of wall, roof, brick or base work. This calculation also does not address structural, leakage, management, material selection or professional engineering needs; formal prices and scope must be measured on site and confirmed in writing. [5][6]

05
When making decisions about water pipes, you must first define the nature of the project. You cannot just ask "How much does it cost to replace the whole house?"
Define pipework start and end points: the first stop valve inside the flat, the floor meter or an existing bathroom or kitchen connection. Separate exposed and concealed pipes, chasing, making good and hot and cold routes. Even if fixtures stay put, specify responsibility for valves, drains, taps, traps, fitting and testing.
The Water Supplies Department explains that in principle, the construction, installation, alteration or dismantling of internal water supply systems involves written permission and designated persons; only minor alterations or repairs that meet the specified conditions are exempted. Non-minor works should be submitted to a licensed plumber first and carried out by a designated person.[3] Therefore, house owners should not judge on their own that a certain pipe modification must be minor work, but should leave the content of the proposed modifications to a licensed plumber’s judgment.
Identify the source of water ingress and who is responsible. Fresh paint, sealant or local cosmetic repairs may leave problems with supply pipes, drains, an upstairs flat or an external wall unresolved. Budget separately for investigation, opening up, repair and reinstatement. Flag any unknowns for confirmation rather than assuming they can be fixed with waterproofing orPainting stagesalone.
Our fresh water pipes are copper. We do not use galvanised iron. We use Pegler or Tectite/ENDEX fittings. Our partner licensed plumber carries out fresh water pipe replacement, and we handle Water Supplies Department applications.
- Mark the starting and ending points of each water supply and drainage section, the light and dark pipes, and the repair area.
- Before any changes are made, a licensed plumber will check whether the works are minor in nature.
- Break down leakage investigation, source repair and finish restoration

06
The power budget is deduced from the electrical appliance list and WR1 is put into the delivery list
First list the air conditioners, water heaters, cooking equipment, range hoods, washers and dryers, refrigerators, network equipment and lighting that are expected to be used at the same time, and then indicate the locations of sockets, fixed electrical appliances, switches and dedicated circuits on the floor plan. This does not require homeowners to do their own wiring, but allows registered electrical contractors to have complete information when conducting feasibility and load assessments. Comparing only "a few sockets" will miss distribution boxes, circuits, conduits, panels and tests.
EMSD states that renovation electrical work should be undertaken by a registered electrical contractor. Assess feasibility before a new installation, addition or alteration. After completion and before energising, a registered electrical worker inspects and tests the work and issuesWR1completion certificate.[2] The quotation should state who will arrange the registered contractor, whether the certificate will be kept by the homeowner, and the scope of handover between the new equipment and the old power distribution.
High-power electrical appliances should not be handled solely by drag strips. The Electrical and Mechanical Services Department recommends that electrical appliances with large power consumption use independent fixed sockets, and reminds residential units that distribution boxes, circuits, switches, sockets and fixed electrical appliances powered by non-sockets are all electrical installations in the unit.[2] If the switch frequently jumps, the socket becomes hot, or there is moisture problem, you should inform the registered contractor of the situation for inspection and do not change the wiring on your own.
Our usual wiring brands are Hilly and ei8ht, with Prysmian or Nexans available for higher-specification work. We choose brands with product certifications such as 3C. A registered electrical worker inspects and tests the completed installation and issues WR1.[7].
- Provide electrical appliance model or rated power, placement and expected usage
- The quotation is divided into points, circuits, distribution boxes, slot repair and testing.
- Receive the WR1 and test delivery materials, and do not verbally say that they have been accepted.
You can swipe left or right on your phone to view the complete table.
| Selected project scope | Sample engineering quantities | Public reference pricing | Subtotal according to the formula | Unpackaged/field variables |
|---|---|---|---|---|
| Remove old wall or floor tiles down to the cement bed | 400 square feet | HK$30 per sq ft | 400 × 30 = HK$12,000 | If the old bricks are firmly adhered or need to be chiseled until concrete is visible, the page states that an additional HK$10/sq. |
| Floor levelling | 400 square feet | HK$22 per sq ft | 400 × 22 = HK$8,800 | Only represents the selected leveling project; the ground condition, depth and other repairs must be confirmed on site |
| Standard floor tiles 600×600 mm or below | 400 square feet | HK$78 per sq ft | 400 × 78 = HK$31,200 | Ceramic tile fabrics and specified patterns, special arrangements or closings should not be assumed to include |
| Ashing, moisture-proof, sanding and painting | 1,200 square feet preliminary expanded area | HK$21 per sq ft | 400 × 3 × 21 = HK$25,200 | The area multiplied by 3 is just a preliminary calculation for the company's quick estimate; the final decision needs to be based on the actual measurement of the wall and sky, the condition of the old floor and the confirmation process. |
The total of the four items is HK$77,200, which is just a recalculation of the calculation conditions displayed on the company details page one by one. The page also states that complete kitchen and toilet rebuilding, waterproofing and plumbing resurfacing, custom-made furniture, ceramic tile fabrics, insurance, management office deposits and handling fees, etc. are not included in the express plan; therefore, it cannot be called a whole-house all-inclusive price or market average price. [5][6]


07
Waterproofing, masonry and painting: specify substrate preparation and tests before finishes.
Quotes for bathrooms, kitchens and other wet areas should at least separately list the location of work, treatment of old finishes, base repairs, waterproofing materials, coverage, connection with drains and thresholds, as well as testing and photo records. The Consumer Council also recommends that the quotation state the location of the waterproofing, the materials used, the height of the waterproofing layer and the leakage test.[4] This article does not set any "legally unified water closing hours" or universal slope, as actual requirements depend on design, product instructions, site and professional judgment.
Give separate wall and floor tile areas, sizes, laying patterns, bedding and finish materials, grout and edge details. For owner-supplied tiles, agree delivery, carrying, wastage, returns and storage. A lower quote can omit the tiles, levelling, repairs or special finishing.
When painting, ask about the old base first: how to deal with local blisters, mildew spots or loose areas; whether to remove the base partially or completely; how many layers of primer and topcoat to make. New materials and paint should be ventilated and dried according to specific product instructions and arranged according to on-site conditions; formaldehyde removal or oil painting services cannot guarantee indoor air, health results, or immediate safe occupancy.
- Waterproof listing location, material, handover location, testing and records
- When paving tiles, ask about the base material, fabric, size, arrangement and closing.
- Paint lists base treatment, primer, topcoat and the extent of each layer
08
How to use a company’s quick estimate: Use it to filter the scope first, don’t treat it as an all-inclusive commitment
Our quick version uses saleable area for basic whole-flat renovation, repainting and floor tiling. Flooring starts from total saleable area and paint area from saleable area × 3. Both figures need confirming against actual measurements.[5] If the unit is only a partial project, you should go to the detailed version and adjust the quantity item by item, instead of applying the entire house area to one wall or one bathroom.
The quick version excludes complete kitchen and bathroom reconstruction, waterproofing, replumbing and rewiring, furniture, finish tiles, works insurance and management deposits or administration fees.[5] Detailed unit rates still depend on minimum charges, dimensions, substrate and site conditions. Use the estimate to identify unselected work and discuss it during measurement and formal quotation.
Online calculations, downloadable estimates and enquiries are free. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send the location, dimensions, photos and items you want to keep on WhatsApp 5243 7747.[5] The company description catalog has 117 options, 116 of which have reference unit prices, and another rooftop package must be overpriced; this does not mean that a unit automatically includes all options.[5]
Setting a planning reservation of up to 20% in addition to the estimated subtotal is just the upper limit that the homeowner can set aside for cash flow before the foundation is unknown, and it is not an additional charge.[5] When problems are discovered on-site, photos, project quantities, treatment plans and written price estimates should be used to decide whether to use them, instead of calling all the differences as reservations afterwards.
- Select the processes you really need first, then look at the subtotals instead of just the total
- Mark each item that is not included in the express version as self-purchased, hired by another person, pending price review, or not included.
- When measuring, please bring the summary of the estimate and change it item by item to the actual measured quantity on site.
Example two: comparing the ×3 paintable-area estimate with measured quantities
Assumptions
- This is a hypothetical scenario, not a completed case by the company: the unit has a usable area of 500 square feet, and in the initial stage, the paint spread area was only planned according to the company's quick estimate of "useful area × 3".
- After further assuming the measurements, both parties confirmed that the actual wall-to-ceiling area calculated using the same HK$21/square-foot process was 1,350 square feet. This figure is only used to demonstrate the difference in quantity and is not a general ratio for any unit.
- Comparison does not include shovel depth, repair coverage, number of primer and topcoat layers, treatment of water seepage sources, or changes to different paint products.
How to calculate quantities
- Initial estimate: 500 × 3 = 1,500 sq ft.
- Initial calculation amount: 1,500 × HK$21 = HK$31,500.
- Assume the actual measured amount: 1,350 × HK$21 = HK$28,350.
- The difference between the two is: 31,500 − 28,350 = HK$3,150.
Under this assumption, the initial calculation is HK$3,150 higher than the actual measurement. It shows that "multiplying by 3" is suitable for grasping the planned amount first, and should not regard it as the final construction area; after measuring, the actual walls, ceilings, doors and windows should be deducted and re-signed for the basic process.
Even if the measurements are the same, loose old soles, mold spots or continued water seepage may change the workmanship. Painting is not a substitute for identifying and treating the source of water seepage and does not constitute a guarantee against formaldehyde, indoor air, or ready occupancy. [5][6]

09
The correct order for comparing three quotes: first align the range, then look at the unit price and total price
Give each company the same plan, retention list and material specification. First check for demolition, protection, removal, services, waterproofing, masonry, painting, furniture, cleaning, insurance, management arrangements and specialist trades. Then compare quantities, units and rates. Check minimums and exclusions for finishes, transport, scaffold, submissions and changes.
Don't think that "bao shengzi" or "real quantity" is necessarily better. The former needs to define what is included and how it will be calculated if it exceeds the scope; the latter needs to have the measurement method, unit and unit price so that the homeowner can review it. The Consumer Council pointed out that if the quantity and unit price of items such as custom-made cabinets, electrical switches and grouting are not clearly stated, it will be difficult to accurately calculate the total charges.[4]
Tie payments to visible milestones such as approval of drawings and materials, inspection of concealed work, installation, and acceptance after defects are fixed. The Consumer Council cites a suggested 4-stage arrangement, ideally with a deposit of no more than 40% and the balance paid after final acceptance.[4] This is a consumption reminder, not a legally uniform proportion for each contract; the actual payment terms must still be clearly agreed upon by both parties in a written contract.
- Compare using the same drawing, the same material level and the same project scope
- Divide "continuous packaging materials" into processes, base materials, fabrics, transportation and protection
- Payment nodes link to acceptable results rather than vague completion percentages
10
There are four acceptance points after the start of construction. Keeping records is more useful than arguing afterwards.
The first level is after clearance or opening. The contractor uses photos and written descriptions of substructure, pipes or wiring that are not originally visible to propose retention, repair or replacement plans and price calculations. Before the homeowner decides on this step, don’t rush to close the deal or agree verbally.
The second level is before the concealed engineering sealing, backfilling or paving. Check whether the locations of water pipes, drains, waterproofing, electrical conduits, sockets and fixed electrical appliances are consistent with the confirmed plans, and receive applicable test or delivery records. Before electrical modifications are completed, they must be inspected, tested and issued a WR1 by a registered electrical engineer.[2]
The third checkpoint is confirmation of materials and dimensions.Bespoke furnitureBefore production, confirm drawings, width, height, depth, boards, colours, hardware, door swings and appliance cut-outs. Confirm tile, sanitaryware and light fitting models and who installs them. The fourth stage is final inspection. Use the quotation, drawings and variation orders to list defects, photos, deadlines and balance payment arrangements.
The content of the contract, rights and obligations will be affected by individual facts and terms. This article only provides general planning and question information, not legal advice. If you encounter disputes over scope, payment or quality, you should retain quotations, photos, messages, receipts and acceptance records, and seek independent professional or legal advice as necessary.
- If the demolition is found, please review the price in writing first and then do it after the owner confirms it.
- Check concealed works before sealing and paving and keep records
- Acceptance will be carried out item by item based on quotations, drawings and change orders, and there will be a deadline for implementation.
FAQ
7 practical questions answered
01Is it necessary to set aside a fixed percentage for additional fees when renovating an old building?
There is no legal or market uniform ratio that applies to all units. Planning reservations can be set up first for projects that cannot be seen from the scale, but every move should have trigger conditions, on-site photos, project quantities, price calculations and written approval. The maximum 20% of our express version is the upper limit of planning reservation and is not an automatic surcharge.[5]
02I am only remodeling the bathroom or kitchen, can I start work directly?
It cannot be generalized. Tiling or replacement of sanitary fittings can generally be exempted, but must still comply with relevant structural, fire protection and drainage standards; changes to the structure, fire-resistant construction, escape arrangements, drainage or internal water supply systems may involve professional assessment, notification or application.[1] [3] First check the approved plans, management office requirements and corresponding professional opinions.
03How do you know if a wall can be demolished?
Wall thickness, tapping and a visual check alone cannot establish whether a wall is structural. Consult the approved plans. For work involving a structural wall, beam or column, obtain assessment by an authorised person and registered structural engineer and the applicable approvals and consent before starting.[1] Even if a wall appears to be non-structural, it still needs to be checked first if it involves fire-resistant kitchen enclosures or other code requirements.
04When adding sockets or replacing electrical boxes in an old unit, is it enough to state "electricity included" in the quotation?
Not enough. Points, circuits, distribution boxes, conduits, fixed electrical appliances, slotting repairs, tests and who provides WR1 should be listed. The electrical work involved in the renovation must be handled by a registered electrical contractor; after the new installation, addition or modification is completed, it must be inspected, tested and issued a WR1 before powering on.[2] Homeowners are advised to provide a list of electrical appliances for contractors to evaluate rather than wiring them themselves.
05How many hours after waterproofing is done must the water be closed for testing?
This article does not provide a uniform number of hours claimed to apply to all Hong Kong projects. The quotation should first state the waterproofing location, materials, construction scope, handover with drains and thresholds, test methods and records; the actual test arrangement must be determined by the design, product instructions, site conditions and relevant professional judgment. The Consumer Council also recommends that the waterproofing location, material, height and leakage test be specified in the quotation.[4]
06Are company online estimates free? Is on-site measurement free?
Online calculations, downloadable estimates and enquiries are free. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Enquire on WhatsApp 5243 7747.[5] The online figures are preliminary estimates, and the official project scope and price are still subject to on-site measurements and written quotations.
07Why estimate paint area as saleable area × 3? Is this the final area?
This is our company's quick version of the initial calculation method, which is used to convert the practical floor area into the approximate expansion amount of the wall and ceiling, not the final construction amount.[5] Door and window deductions, spacing, ceiling height, old bottom condition, partial shoveling and repairs will all change the actual measured area and process; the measurement should be recalculated based on the confirmed range.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]FAQs on alteration and addition works to domestic premises | Buildings Department Accessed: 2026-10-21
- [2]Household Electrical Safety Manual | Electrical and Mechanical Services Department Accessed: 2026-10-21
- [3]Minor works | Water Supplies Department Accessed: 2026-10-21
- [4]Don’t want to overspend again? Read the renovation quotation! | Consumer Council Accessed: 2026-10-21
- [5]HK CREATE DESIGN 2026 Quick Estimate and Pricing Instructions Accessed: 2026-10-21
- [6]HK CREATE DESIGN 2026 detailed project budget and public price list Accessed: 2026-10-21
- [7]Safety information | Electrical and Mechanical Services Department Accessed: 2026-11-02