01

How does general residential pricing work? Examples for a 200 sq ft wall area and a 500 sq ft flat

General residential items E01–E03 illustrate minimum charges. For 200 sq ft of sound existing paint, repainting at HK$12 per sq ft gives HK$2,400. The higher E03 minimum makes the guide cost HK$3,700. Local repairs to the same 200 sq ft give 200 × HK$21 = HK$4,200. The E02 minimum makes the guide cost HK$4,650. These are two alternatives for the same surface area.[6]

For a 500 sq ft flat, this general catalogue example uses saleable floor area × 3, or about 1,500 sq ft of walls and ceilings. Assuming one treatment throughout, repainting is about HK$18,000, local repair about HK$31,500 and full stripping and skim-coating about HK$58,500.[5][6] Conditions may vary by room. The formal quotation should measure each area separately and specify the treatment.

The three figures above compare treatment budgets. Confirm additional scope and cost for moving large furniture, addressing ongoing leaks, painting timber doors or changing dark colours to light ones.

General residential catalogue treatments and minimum charges

You can swipe left or right on your phone to view the complete table.

Wall condition and treatmentPriced quantity/unitGeneral residential catalogue guide priceThe quotation should clearly include the processShould not be assumed to include/main risks
The original paint film is strong and only needs to be oiled directlyWall + ceiling spread area; per square footE03: HK$12/square foot; minimum HK$3,700Clean, patch holes, lightly sand, and top coat 2 timesIt does not mean that it includes shoveling, removing mold, finding leaks or converting dark color to light color; the price list for the latter is listed as adding a layer
Generally stable but partially cracked, chipped or looseWall + ceiling spread area; per square footE02: HK$21/square foot; minimum HK$4,650Partially remove loose spots, repair cracks and chips, apply moisture-proof primer, polish, and topcoat 2 timesWhether the local area has expanded, the cause of cracks, and continued moisture exposure should be recorded first and then confirmed with a change order.
Walls that are peeling, moldy or water seeping require deeper treatment.Wall + ceiling spread area; per square footE01: HK$39/square foot; minimum HK$7,450Strip old paint to the skim base, apply moisture-resistant primer, skim 2–3 times, sand and apply 2–3 topcoatsPainting cannot be considered as a cure for water leaks; the investigation and repair of water sources, hollows or structural problems must be separately defined
Wooden door or door frame renovationper setE04: HK$1,650/setSanding, patching holes, primer and topcoatIt should not be assumed that hardware disassembly, door leaf repair, door replacement or switch panel processing are included; the location of each piece should be listed in the quotation form

These October 2026 HK Create Design catalogue descriptions and minimum charges are company figures. They do not represent Hong Kong market averages or a formal quotation. The three wall treatments are alternatives for the same surface. Confirm area, causes of seepage, furniture protection and management requirements on site. [6]

02

First separate the "usable area" and "paintable area"

Saleable area describes the flat, while painters treat wall and ceiling surfaces. They may price by actual surface, room, door frame or lump sum. Similar totals calculated from different areas may cover different work. Ask for separate entries for living areas, bedrooms, outside faces of kitchen and bathroom walls, ceilings, frames, window reveals and behind cabinets.

For a roughly 400 sq ft two-bedroom flat, estimate using saleable floor area × 3.5.[10] General catalogue examples for other layouts use × 3. For example, a 500 sq ft flat has an estimated 1,500 sq ft of painted surface.[5] Ceiling height, layout, openings, fixed cabinets and how much of the ceiling needs painting affect the surface area. Check each room after measurement.

Before asking for a price, you can prepare the floor plan, panoramic photos of each room, recent photos of the ceiling and windows, whether there are people living in it, which furniture will not be moved, and the locations you want to keep or not build. The more specific the information, the easier it is to turn "approximately how much it will cost" into a confirmable project list.

  • Specify whether the rate is based on saleable area, measured surface area, sets or individual tasks.
  • Mark the walls, ceilings, door frames, behind cabinets and non-construction locations room by room.
  • Include the minimum purchase, starting and ending measurement points and last measurement date in the quotation
Comparing painting quotes: check scope, substrate preparation, materials and work sequence
Compare painting quotes on the same scope, substrate preparation, materials and work sequence. Select an image to enlarge

03

Inspect the substrate before choosing stripping, local filling or direct repainting

Direct repainting, local repairs and full stripping depend on whether the substrate can support the new paint. Stains and nail holes may just need cleaning, filling, light sanding and repainting. Record loose, powdery, blistered, mouldy, cracked or hollow areas and previous flooding. Ask whether to strip to the old paint, plaster or a deeper substrate, and define the areas in writing.

Skim coating fills and smooths minor defects. Specify how small, stable surface cracks will be repaired. Investigate recurring cracks, water marks, spalled concrete or extensive hollow areas for moisture, seepage or building defects. Photograph before and after repairs. If a new defect appears, pause to confirm scope, price and programme rather than leaving an underlying problem as a paint snag.

The Consumer Council's quotation guidelines specifically mention that when treating old walls, it should be clearly stated whether the plastering layer or concrete layer has been shoveled down, while for new walls, the number of layers of plastering, primer and wall/ceiling topcoat should be specified.[1] This is a transparent quotation principle and does not mean that each unit should be fully shoveled or must be to the same depth.

  • Divide "partial shovel" and "full shovel" into items, and mark the location and area
  • Indicate the removal of the termination layer, the number of dust removal passes, polishing and dust removal arrangements.
  • If you encounter watermarks, hollows, peeling or repeated cracks, first define the cause and responsibility and do not cover it with paint.
Wall skim coating and painting in Jordan | HK Create Design
Site photo: Painting in Jordan, June 2026. HK Create Design. Select an image to enlarge
Painting quotations: key figures illustrated | HK Create Design
Painting quotations: key figures at a glance | HK Create Design Select an image to enlarge

04

What should a quote specify for standard Nippon paint and the two upgrade options?

There is insufficient information on "Oil Three Layers" itself. The owner should ask whether there is one layer of primer and two layers of topcoat, or three layers of topcoat; which brand, series, gloss and color number are used for each layer; what base layer is used for construction; and whether changing from dark to light color increases the number of layers due to hiding power. The function of the primer, the scrub resistance or the anti-mildew function of the topcoat all depend on the specified product and base layer. It is not appropriate to generalize the functions of one brand to all paints.

Our standard residential interior finish is Nippon Paint Super 5-in-1 II. The manufacturer states theoretical coverage of 13–15 m² per litre per coat, recommends two topcoats and specifies at least 2 hours between coats at 25°C.[4] The quotation lists each room's primer, topcoat, colour code and number of coats. Roughness, absorbency and the difference between old and new colours affect actual paint consumption.

If you want to choose low-VOC or aqueous paint, first ask for the product label or technical information to confirm the actual series instead of just hearing "environmentally friendly paint". The Environmental Protection Agency recommends choosing lower VOC or aqueous paints and paying attention to labels, while using proper ventilation to reduce odor nuisance.[2] Low VOC does not mean odorless, nor does it constitute a guarantee that it is safe to move in on the same day; move-in arrangements still depend on product instructions, drying status, ventilation and the actual needs of the residents.

For repairs or stripping, seal and fill according to wall condition. For typical residential interior walls, apply Nippon Paint odour-less wall filler in layers to level the surface. Once dry, sand, remove dust and select a Nippon primer compatible with the substrate and topcoat.[7] Check which walls require this preparation and which need only direct repainting.

For new cabinets, ask about upgrading to Nippon Paint Odour-less Anti-Formaldehyde 5-in-1 with bamboo charcoal. For children's rooms where handprints need frequent cleaning, consider Nippon Paint Odour-less Kids Paint (Little Prince). A whole-flat upgrade to the specified children's paint adds HK$4 per sq ft of painted surface. Upgrades to a single room, individual walls or the bamboo-charcoal option are quoted separately by scope.[8]

  • Write down the brand, series, gloss, color number and number of layers separately for the primer and topcoat.
  • Ask for product labels or technical information, and don’t make empty promises about “zero odor” or “mildew-proof”
  • The covering arrangements for dark to light colors, bright colors and repair locations must be confirmed before construction.
Worked example 1

Example 1: turning a floor area estimate into a measurable painting quantity

Assumptions

  • This is a fictitious 500-square-foot residential measurement exercise. It is not a completed case by the company, nor is it a formal project quantity.
  • Using the general catalogue estimate for this 500 sq ft flat gives 500 × 3 = 1,500 sq ft of painted surface.
  • Assume that the total measurable wall length is 94 feet, the floor length is 8.5 feet, the ceiling is 500 square feet, and the total unpainted openings such as doors and windows are 120 square feet.

How to calculate quantities

  1. Wall area = 94 × 8.5 = 799 square feet.
  2. Measured paintable area = 799 (walls) + 500 (ceilings) − 120 (openings) = 1,179 sq ft.
  3. Difference compared to initial calculation = 1,500 − 1,179 = 321 square feet; difference ratio = 321 ÷ 1,500 = 21.40%.

The initial calculation for this example was 1,500 square feet and the assumed measurement was 1,179 square feet, making the initial calculation 321 square feet (21.40%) higher. Therefore, "usable area × 3" is suitable for sorting out the budget direction first, and is not enough to replace the formal engineering quantities after measuring the walls, ceilings, windows, doors and cabinet back positions room by room.

Corridors, wall twists, false ceilings, construction behind cabinets, actual floor floors and crack repair areas are not taken into account; nor is any unit price applied. The final quantity shall be determined by on-site measurements and the scope confirmed by both parties. [5]

Use your square footage instead and see a reference budget

05

Before comparing total amounts, break the quotation into five groups of verifiable information.

A comparable paint quote should expose you to at least five groups of information: work volume, base preparation, materials and layers, protective cleaning, and changes and delivery. The table "Split the joint work package materials into comparable quotation fields" can be used directly to compare the two quotations. If one party only writes "whole house renovation with work and materials included," and the other party lists the area and materials room by room, the two are not at the same level of accuracy. In this case, the former should be asked to supplement, rather than just deciding based on the minimum total amount.

In a 2020 study, the Consumer Council found that whether primer and topcoat are included, the number of coatings, and the shoveling to the plaster or cement layer will directly affect materials and labor; it also recommended that payment, changes, construction schedules, insurance and terms be written into documents.[1] This study is not a 2026 market price survey and is cited in this article to let property owners know what information should be written clearly.

Create one scope table with both bidders' quantities, units, work steps, exclusions and minimum charges. Ask in writing about blank cells. This helps control later extras more effectively than simply asking for a lower total.

  • Only use the same unit for comparison at the same location, such as all expanded square feet or all by items.
  • Write "includes" and "excludes" as a checkable list
  • For any verbal commitment, first add an attachment to the quotation and then use it as a comparison condition

06

From the painting calculator estimate to a free quote

Choose a calculation method. For a roughly 400 sq ft two-bedroom flat, compare starting prices or ranges for four treatments. If you have measured the walls and ceilings, use that surface area directly.[10] For other layouts, use the general catalogue and applicable item minimum for an initial estimate.[5][6] When sending photos for a free quote, include the room, wall condition and treatment you want to check.

For example, if the flat has about 1,500 sq ft of painted surface and only the child's bedroom needs Little Prince paint, name the room and surfaces in your enquiry. The estimate starts with standard paint. The written quote should list each room's materials and extras such as furniture moving, special protection, timber doors or additional coats.[6][8]

Online estimates, photo reviews and quotation enquiries are free. The published measurement offer runs until 31 December 2026 for two or more work items. After that, measurement costs HK$500, credited against an order. Before booking, check the terms for a singlePaintingitem. On WhatsApp, include photos, the district, occupancy arrangements and the desired completion date so that inclusions and the total can be checked room by room.[5][9]

  • Save the selected items, unselected items and assumptions of the online budget as a separate file, not just screenshot the total amount
  • Check the estimated area, minimum charges and any management fees.
  • If problems are found on site, we will first receive a supplementary quotation, and then add it to the budget after confirmation.
Split "work and materials package" into comparable quotation fields

You can swipe left or right on your phone to view the complete table.

rangeHow to write quantity and pricing methodAt least the content to be checkedCommon unincluded items or variablesProof that owners should keep
Wall and ceiling engineering quantitiesRooms are divided into walls, ceilings, door frames or special walls; indicate square feet, units or by itemMeasurement start and end points, work behind cabinets, opening deductions and minimum chargeHigh floors, false ceilings, fixed furniture, window edges and hidden wallsPlans with dimensions, site photos and final measurements
Basement and RepairLocal or full-wall area, stripping depth, number of skim coats and extent of sandingHow to deal with chalking, bubbling, hollowing, cracks and watermarks respectively?Find the source of leakage, structural cracks, re-approval, and mold removal scopeRecent photos of the problem location before construction begins and change orders after confirmation
Primer, Topcoat and ColorList the brand, series, gloss, several layers of primer and topcoat; color matching is listed separately.Product name, batch or color number, dilution and construction requirements, dark and light color conversionSpecial function paints, additional covering layers, color swatches and touch-up materialsSigned color swatches, product labels and remaining material delivery records
Conservation, Cleaning and WasteList the protection scope of the unit, public areas and furniture; pay according to item or actual reimbursementWho is responsible for the daily cleaning of floors, doors, windows, electrical panels, corridors, elevators and so on?Moving/relocating furniture, additional dustproofing, plastering, management office deposit and handling feeManagement office rules, protected area photos and removal arrangements
Changes, payments and deliveryEach new or deleted item must have quantity, unit price, impact on construction period and confirmation date.Definition of start, stop and completion; default, final payment, insurance and maintenance conditionsVerbal color changes, additions after wall conditions were revealed, third-party project delaysSigned quotation, each supplementary quotation, progress photos, payment receipt and acceptance list

The Consumer Council's quotation study pointed out that the primer, topcoat, number of layers and depth of paint should be clearly listed, and consumers were reminded to explain payment, contract, construction period, insurance and changes in writing. The study was published in 2020. This article only relies on its transparent quotation principle and does not regard its findings as 2026 prices. [1][6]

07

How to look at public unit prices: Use process comparisons instead of taking them as market averages

The October 2026 general residential catalogue uses the combined surface area of walls and ceilings. E03 repainting is HK$12 per sq ft. E02 local repairs, damp-resistant treatment, sanding and topcoat are HK$21 per sq ft. E01 stripping, skim-coating, damp-resistant treatment, sanding and topcoat are HK$39 per sq ft. Each has its own minimum charge.[6] These are the price benchmarks of the same company with specified construction descriptions. They are not the average price per square foot in Hong Kong, nor can they be directly applied to another company's quotation without leaving the process.

The general residential catalogue table compares the work, charging unit and exclusions. Match the treatment to the substrate. Pricing a wall that needs only local filling as full stripping will overstate the budget. Pricing widespread peeling or damp as direct repainting can leave additional work to pay for later.

The price list also lists the applicable situations of E01 including peeling, moldy or water seepage walls, but it also states that serious water seepage or structural cracks require prior notification and separate quotation.[6] Therefore, "moisture-proof primer" is not a promise to cure water leakage. Find out the cause first, decide who will handle it, and whether other professional work is needed before you can narrow down the scope of painting.

  • Compare the construction description, minimum spend and applicable conditions next to the published price
  • Confirm whether E01, E02, E03 are alternatives or sub-projects at different locations
  • Do not use one company's unit price to estimate the market average or promise that another company must follow the price.

08

Payments, changes and deadlines: protect both parties with verifiable nodes

Before signing, clearly define the definitions of project start, site access, construction completion and acceptance completion. The statement "completed in three days" does not indicate whether it includes moving furniture, drying each floor, waiting for the management office, rainy and wet weather, and suspension after leakage is discovered. The reference value is very low. This article does not provide the so-called minimum standard construction period, because the base layer, product requirements, ventilation, work type connection and site constraints will change the arrangement.

Tie payments to verifiable milestones, such as preparation completed in specified rooms, listed materials delivered or defined areas that passed initial inspection. “30% complete” alone is difficult to check. The Consumer Council recommends a deposit of no more than 40% of the contract sum, with the final balance paid after acceptance.[1] This is a consumer risk management suggestion, not a legal payment ratio; the actual terms must still be confirmed by both parties based on the project and contract.

Changes are most likely to occur after scraping away old paint. The ideal approach is: take photos of the problem location, list the new or deleted quantity, unit price, materials, construction period and who approved it; do not perform unauthorized construction before confirmation. Quotations and change orders are general engineering documents, and this article does not draw legal conclusions on any terms; when there are major disputes or high liabilities, appropriate independent opinions should be obtained.

  • Map each installment to verifiable processes and documents rather than general percentages
  • New projects must indicate price, quantity, impact on construction period and confirmation date
  • Keep quotation versions, receipts, photos, message records and signed acceptance lists
Worked example 2

Why do filling and local stripping have different budgets in a 400 sq ft two-bedroom flat?

Assumptions

  • Assume the walls and ceilings of a 400 sq ft two-bedroom flat are painted throughout. An estimate of 400 × 3.5 gives about 1,400 sq ft of painted surface. [10]
  • The examples assume either filling and repainting or local stripping throughout, so both treatments can be compared over the same area.

How to calculate quantities

  1. Filling and repainting ranges from about 1,400 × HK$15 = HK$21,000 to 1,400 × HK$18 = HK$25,200.
  2. Local stripping, filling and repainting ranges from about 1,400 × HK$22 = HK$30,800 to 1,400 × HK$26 = HK$36,400.

For generally sound walls with small chips, allow about HK$21,000–25,200. If loose paint needs local stripping and repair, the same area is about HK$30,800–36,400.

Wall conditions can vary by room. Price stripping, filling and direct repainting separately by the actual area required. Confirm furniture moving, leak repairs and special protection separately. [10]

Use your square footage instead and see a reference budget
Painting quotations: checklist illustrated | HK Create Design
Painting quotations: checklist | HK Create Design Select an image to enlarge

09

Safety, Ventilation and Regulatory Boundaries: Don’t mix issues beyond paint into one package

General criticism is an example of simple household projects cited by the Buildings Department, but it must still comply with relevant building regulations; if the project involves modifications to structural walls, beams or columns, the owner must appoint an authorized person and a registered structural engineer to assess, obtain approval and consent before the project is carried out by a registered contractor.[3] Therefore, when you see wall demolition, window modification, kitchen and toilet partition modification, electricity or water pipes in the painting quotation, you should not just look at the price of "convenient packaging", but separately check the responsibilities, professional qualifications, documents and management office requirements.

Electrical work, gas work,Aluminium windows, structural work, drainage and work at height need separate assessment beyond an ordinary painting quote. Windows and external walls are particularly hazardous. Do not remove fittings yourself or ask unqualified workers to take risks. The Buildings Department advises owners to check their deed of mutual covenant and related documents and obtain consent from the owners' corporation or management company where necessary.[3]

During construction, the Environmental Protection Agency recommends choosing lower VOC or aqueous paints, maintaining ventilation, and sealing door panels to reduce the impact of odor and dust on neighbors.[2] Solvents and paints are subject to chemical waste regulations and cannot be poured into storm drains or sewers; disposal and leftover materials arrangements should be made clear before the project. Formaldehyde removal services, even if purchased separately, should not be promoted as a health or immediate occupancy guarantee.

  • Check painting and wall demolition, electricity, water pipes, gas, aluminum windows and structural works item by item
  • Obtain construction period, protection, lift and waste arrangement requirements from management before work begins
  • Ventilate and store according to product instructions; do not handle hazardous windows, solvents or professional work on your own

10

From start of construction to acceptance: turn quality requirements into visible records

Before starting work, take pictures of the walls, floors, window frames, doors, electrical switch panels and fixed furniture in each room, and confirm the scope of protection. During construction, don’t just look at the results on the last day: base repair, primer, topcoat, and removal of masking all have visible nodes. If the color, gloss, dust filling range or behind-the-cabinet practices need to be changed, this should be confirmed before the next process.

The acceptance inspection can be carried out under natural light and indoor lighting to check whether there are oil leaks, sags, obvious color differences, pinholes, sand grains, uneven edges, paint stains on window frames or switches, protective damage, and uncleaned locations. For each item, write down the location, photo, date, and expected treatment. Don't just write "beautiful." The visual differences of the same color in different lights or on old and new walls should also be discussed in advance when confirming the color palette.

If mildew, blistering or cracks reappear within a short period of time after completion, first determine whether it is a coating problem, continued moisture, water seepage, base movement or other engineering impacts, and then handle it according to the written maintenance terms. Calling all problems paint maintenance will not identify the cause and may delay the work that really needs to be done.

  • Take a set of photos with location marks before the start of construction, after the base layer, after the primer, and before delivery.
  • Record issues, photos, handlers, and completion dates in a partition execution list
  • Before making the final payment, check the process, materials, cleaning and deliverables item by item according to the signed quotation

FAQ

7 practical questions answered

01Can the 2026 paint quotation be directly multiplied by the usable area of the whole house and the price per square foot?

For a 400 sq ft two-bedroom flat, use saleable floor area × 3.5 for an initial estimate of about 1,400 sq ft, then multiply by the rate for the selected treatment.[10] General catalogue examples for other layouts use a factor of × 3.[5] When dimensions are available, measure the walls and ceilings to be painted and check the scope around doors, windows, cabinet backs and retained finishes.

02Is it enough to quote "three layers of oil"?

Ask the painter to specify the primer, topcoat and number of coats. For our standard Nippon Paint Super 5-in-1 II, the manufacturer recommends two topcoats and at least 2 hours between coats at 25°C. The quotation should identify walls that need sealing, filling or extra coats for coverage.[4][6]

03Does the whole house have to be shoveled? How to choose between partial shoveling and comprehensive shoveling?

Not always. Sound paint with minor defects may need only cleaning, filling, light sanding and finishing coats. Price isolated cracks or loose patches by location and area. Widespread peeling, chalking, hollow render, mould or damp calls for a substrate assessment. Specify where to strip, how far and why.[1]

04Does low VOC, odorless or formaldehyde removal mean that it can be moved in after oiling?

This cannot be guaranteed. The Environmental Protection Agency recommends using low-VOC or aqueous paint, paying attention to labels, and providing adequate ventilation.[2] But product drying, actual ventilation, humidity, odor and occupant conditions all need to be considered. Recoating or drying information for a specific product also does not equate to full house occupancy time. Formaldehyde removal services should not be construed as a complete elimination of health risks; if in doubt, avoid using the affected space and seek appropriate advice.

05After the online estimate shows the budget, what else might not be included?

First look at what projects you actually chose. The specified plan for the quick estimate is not all-inclusive; complete kitchen and toilet reconstruction, waterproofing and plumbing resurfacing, furniture, tile fabrics, sanitary ware, other finishing materials, insurance, management office deposits or handling fees, etc. should not be assumed to be included.[5] Also check furniture moves, extra protection, tracing leaks, rubble, minimum charges and concealed defects.

06What is the difference between on-site measurement charges and online enquiry?

The company's online estimates and enquiries are free. Use the information to organise work locations and initial options. The published terms also cover site assessments. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[5] You can make an appointment and submit photos via WhatsApp 5243 7747, but the formal quotation in writing shall be subject to confirmation by both parties.

07If watermarks, wall demolition or electrical problems are discovered during the painting project, can the painter be called in to deal with them as well?

Different risks should not be lumped into one paint addition. The watermark must first be clarified whether there is still water seepage; changes to structural walls, beams, columns, etc. involve legal procedures and professional assessments, and the Buildings Department has explained it.[3] Electricity, gas, aluminum windows, drainage and work at height must also be handled by corresponding qualified persons or contractors. Painting quotes should clearly define the scope of surface repair only, with independent verification of responsibilities, documentation and costs for other work.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-10-21
  2. [2]Environmental Protection Department: Pollution Problems and Solutions – Paint Accessed: 2026-10-21
  3. [3]Buildings Department: Alteration and addition works to domestic premises Accessed: 2026-10-21
  4. [4]Nippon Paint Hong Kong | User guide to Super 5-in-1 II interior emulsion Accessed: 2026-11-22
  5. [5]HK Create Design 2026 Quick Renovation Budget Calculator Accessed: 2026-10-21
  6. [6]HK Create Design renovation price list, October 2026 Accessed: 2026-10-21
  7. [7]Nippon Paint Odour-less Wall Putty | Nippon Paint Hong Kong Accessed: 2026-11-02
  8. [8]Compare standard Nippon 5-in-1, bamboo-charcoal anti-formaldehyde paint and Little Prince children's paint Accessed: 2026-11-22
  9. [9]HK Create Design painting | Send photos for a free quote Accessed: 2026-11-22
  10. [10]HK Create Design | Four published painting rates for a 400 sq ft two-bedroom flat Accessed: 2026-11-22