01

What are the 2026 painting rates, and how do you convert saleable floor area?

A colour change on a sound wall and widespread peeling in the same room need very different budgets. Choose the scope according to condition, then measure the affected walls and ceilings. If damp marks are still spreading, have the source investigated first.

HK Create Design's 2026 standard residential catalogue has three levels based on wall condition. Rates include labour and materials per sq ft of surface treated.

  • Stripping, skim coating, moisture-resistant priming, sanding and painting (E01)HK$39 per sq ft of paintable surface, with a HK$7,450 minimum. Strip the old paint to the filler base, apply moisture-resistant primer, skim 2–3 times, sand and apply 2–3 topcoats. Suitable for peeling or mould-affected walls once any source of seepage has been dealt with. The standard finish is Nippon's second-generation Super 5-in-1. This is a common option in older private or subsidised flats with peeling or mould.
  • Local patching, moisture-resistant priming, sanding and repainting (E02)HK$21 per sq ft of paintable surface, with a HK$4,650 minimum. Strip loose patches, repair cracks and chips, apply moisture-resistant primer, sand and apply 2 topcoats. Suitable for generally sound walls with localised cracking.
  • Whole-home repainting (E03)HK$12 per sq ft of paintable surface, with a HK$3,700 minimum. Clean the wall, fill nail holes, sand lightly and apply 2 topcoats. Suitable for sound walls only. An extra coat when changing from a dark to a light colour costs HK$4 per sq ft.

REAL PROJECT PHOTOS

Painting work in progress and completion photos

These photographs were taken on actual HK Create Design projects. Client details have been removed.

  • Completed skim coating and painting in a Jordan bedroom
    Completed project photosJordan · Painting · June 2026
  • Freshly painted bedroom walls and window ledge
    Completed project photosHong Kong · Painting · April 2022
  • Wall skim coating and painting in progress at Mount Parker Lodge
    Site photoMount Parker Lodge, Sai Wan Ho · Painting · July 2026
  • Dark green paint being applied to a wall with a concealed door
    Site photoHong Kong · Painting · November 2022
  • Wall repairs and skim coating at Treasure Spot Palace, Tai Po
    Site photoTreasure Spot Palace, Tai Po · Painting · June 2026
  • Wall condition before painting | HK Create Design
    Site photoHK Create Design painting project photos
  • Wall condition before painting in Jordan | HK Create Design
    Site photoJordan · Painting · June 2026
  • Wall skim coating and painting in Jordan | HK Create Design
    Site photoJordan · Painting · June 2026

02

How does a saleable-area estimate compare with actual wall area or the times-three method?

Paintable area is the actual wall and ceiling surface. Measure each wall's width × height and the ceiling separately. The quotation should explain deductions for doors, windows, tiled walls and areas behind fixed cabinets.

How it is calculatedHow to calculate itWhen to use it
Initial estimate using the standard catalogueSaleable area × 3, multiplied by the rate for the selected workFor a rough estimate at a viewing or before measurement. High ceilings, numerous partitions or work limited to certain rooms can produce a significant difference.
Paintable surface measured on siteMeasure the width × height of each wall and add the ceilings included in the workfor a written quotation setting out the measured work, deductions and minimum charge.

For one room, measure only its walls and any ceiling to be painted. Multiplying the whole flat's area by three would overstate the work. The minimum charge for a small room or a single wall may exceed the area multiplied by the unit rate.

03

What are the 5 most common hidden extras in renovation quotations?

Painting extras often arise from vague initial terms. Common issues include high-level ceiling work, how deeply to strip, straightening internal and external corners, protecting existing furniture, and responsibility for concrete repairs. Check each item in writing.

Check these 5 potential extras when reviewing a quotation.

  1. Ceilings.List which rooms include the ceiling and identify beams, suspended ceilings and double-height areas.
  2. Stripping back.Mark where only loose paint needs stripping and where the entire wall needs treating.
  3. Edges and junctions.Specify how window surrounds, skirting edges and wall corners will be straightened, repaired or finished.
  4. Furniture and flooring.Identify what needs covering or moving, who is responsible and whether the cost is included.
  5. Substrate.If seepage continues or concrete is spalling, assess the cause and repair scope before confirming the painting work.

04

How do painting budgets compare for flats from 300 to 700 sq ft?

These catalogue examples for 300, 500 and 700 sq ft flats use the rates for three different scopes. For an empty flat, saleable area × 3 gives a rough allowance for walls and ceilings. Each estimate assumes the same treatment throughout and excludes special protection, furniture moving and extra repairs.

Flat type and saleable areaEstimated paintable area (× 3)Stripping, skim coating and painting E01Patching and repainting E02Whole-home repainting E03
About 300 sq ft (studio or one bedroom)About 900 sq ftHK$35,100HK$18,900HK$10,800
About 500 sq ft (standard two-bedroom flat with living room)About 1,500 sq ftHK$58,500HK$31,500HK$18,000
About 700 sq ft (three bedrooms, living and dining rooms and an en suite)About 2,100 sq ftHK$81,900HK$44,100HK$25,200

The estimates above assume an empty flat. If you only want to repaint one room or will remain at home during the work, you canSelect the wall condition and rooms for a painting quote for your flat.

List stripping, skim coating, primer, topcoats and protection for each room. Record the agreed inspection and payment arrangements. At handover, use side lighting to check the walls, ceiling junctions and skirting, followingFinal inspection checklistRecord each location that needs touching up.

In HK Create Design uses itemised quotations. After measurement, we specify stripping depth, sealer model, number of skim coats and ceiling coverage. We undertake not to add unjustified charges midway unless the client changes the design.

How the estimates were preparedThe 2026 rates and examples come from HK Create Design's price list for an empty standard flat with a ceiling up to 9 ft high. The guide estimates paintable area as saleable area × 3 and specifies Nippon's second-generation Super 5-in-1. Wall moisture, ceilings over 10 ft, complex ceiling shapes or holiday noise restrictions that extend the programme may affect the cost. The measured, written contract determines the price.

Which guide should I read next?

2026 PRICE LIST

Standard residential catalogue, priced by the surface area treated

E01Strip back, skim, damp-proof, sand and paint

HK$39/ft from

Minimum charge: HK$7,450

Strip old paint back to the plaster, apply damp-resistant primer, skim 2–3 times, sand and apply 2–3 topcoats. Suitable for peeling or mould-affected walls, or walls where the source of seepage has been fixed. The standard interior finish is Nippon Paint Super Five-in-One, second generation.

E02Patch the surface, damp-proof, sand and paint

HK$21/ft from

Minimum charge: HK$4,650

Remove loose patches, repair cracks and chips, apply damp-resistant primer, sand and apply 2 topcoats. Suitable for generally sound walls with localised cracks. The standard interior finish is Nippon Paint Super Five-in-One, second generation.

E03Repaint the existing finish throughout

HK$12/ft from

Minimum charge: HK$3,700

Clean the walls, fill nail holes, sand lightly and apply 2 topcoats. Suitable for sound existing walls. The standard finish is Nippon Paint Super Five-in-One, second generation. An extra coat when changing from a dark to a light colour costs HK$4 per sq ft.

Rates are from our 2026 price list. Select only the items you need. A process already included in a package is charged once. We confirm final prices in writing after site measurement.Calculate each item

FAQ

PaintingFrequently asked questions

01Does a painting quotation normally include protecting furniture and floors?

List floor, window-frame and furniture protection separately. Specify who moves large furniture and who returns it and cleans up afterwards. For an occupied flat, provide wide shots of the rooms to plan phased work or moving arrangements.

02Why do some renovation companies quote unusually low rates per sq ft?

A very low quote may omit moisture-resistant sealer, reduce three skim and paint coats to two, or specify an unbranded emulsion. Waste disposal, transport and filler materials may also appear as extras. The eventual total can approach the usual market price with a lower specification.

03What should I budget to paint a public rental flat in its standard handover condition?

Start with the layout, the walls as handed over and which surfaces will be painted. In a two-bedroom flat of about 400 sq ft, roughly 1,400 sq ft of sound paintwork can be repainted from HK$14,000. For the same area with widespread peeling, stripping to the cement base, applying three skim coats and repainting is estimated at HK$49,000–56,000. Confirm the stripping scope after measurement.

04How should painting payments be staged?

A typical staged schedule has 3 to 4 payments: a deposit of about 10%–20%, 30% after site entry and stripping, 30%–40% after skim coating and sanding, and a final 10% after acceptance. The guide advises against paying over 50% before painting begins.

05Is labour-only painting cheaper if I buy the paint?

Savings are usually limited and responsibility can be disputed. Emulsion, sealer and fillers account for about 20% to 30% of the budget. Buying them yourself may save a small margin, but blistering or colour differences may then be attributed to the batch or storage. With labour and materials under one contract, the company coordinates the warranty.

06How are extra painting charges calculated for ceilings over 10 ft?

Provide photos of the highest point, stairs or platforms so the contractor can assess access, working platforms and extra protection. Ask for equipment, assembly, removal and labour to be priced separately and confirmed after measurement.