01

Agree on the handover condition before deciding how much to paint

Gather the lease, original handover photos and agreed requirements. Record colours, areas and fixtures to keep or change. Clarify any disagreement before commissioning the work to avoid an unacceptable finish. This article does not allocate payment responsibility.

  • Distinguish the work scope from responsibility for payment
  • Keep the agreed version and its date

02

Number each wall and take an overview before photographing details

For example, label an overview photo “Living room, wall A” and add close-ups of nail holes, stains and peeling. Close-ups alone cannot show the location or number of defects. Record wall height, width and openings. Saleable floor area gives background only.

  • Keep before-and-after photos of each location
  • Remove personal belongings before taking photos
Vacant handover repainting scope sheet

You can swipe left or right on your phone to view the complete table.

locationWhat to recordItems to confirm
Living room, wall AOverview, holes and stainsLocal repairs or a full-wall repaint
Bedroom, wall BExisting colour and paint detailsKeep the existing colour or specify a change
Ceiling and door framesWork required?State what is included and excluded

Use this format to build your own checklist. The examples do not establish the site's condition or tenancy responsibilities.

03

Assess nail holes, stains and peeling separately

Small holes may suit spot repairs. Widespread peeling or loose substrates need further assessment. Trace the source of water stains or recurring mould first. An extra coat cannot resolve every defect. Separate repairs from repainting in the quotation.

  • Mark the location of defects. “Repair wall” alone is too vague.
  • Agree on a variation before addressing a newly discovered problem
Illustrative scenario or worked example 1

Scenario A: several picture-hook holes on one living room wall

Assumptions

  • Planning example only. The other walls are assumed to have no known defects, subject to site inspection.

Checks to make

  1. Mark the holes on an overview of the same wall.
  2. Confirm the original paint details and handover requirements.
  3. Compare filling and touching up the holes with filling the holes and repainting the entire wall.

Compare the same full-wall scope. A price per hole alone gives an incomplete picture.

Photos alone cannot establish colour differences or substrate condition. They do not determine tenancy responsibility.

04

Touch up or repaint the whole wall? Check where the new paint will meet the old.

Touch-ups may stand out because of paint batches, application tools or the texture of repairs.[3] If the original paint is unknown or the colour is changing, compare repainting the whole wall to its natural edges. Check a test patch on site. A completely invisible touch-up cannot be guaranteed.

  • Keep the paint brand, range, colour code and sheen
  • Confirm the colour-change area up to corners or finishing edges
Painting before rental handover: nail holes, colour changes and handover checks — enquiry and confirmation process
The enquiry and confirmation process described here gives no fixed duration or guaranteed result. Select an image to enlarge

05

Work back from handover and allow separate dates for painting, inspection and snagging

Work back from handover to plan inspection, snagging, cleaning and painting. Drying times depend on the products and conditions. Moving, clearing rooms, key handover and building management arrangements affect the start date. If time is short, revise the agreed scope or schedule so that essential steps can still be completed.

  • Set a separate first inspection date
  • Keep a follow-up plan for outstanding items
Compare local repairs and full-wall repainting

You can swipe left or right on your phone to view the complete table.

PlanWhen to assess this option firstAgree in advance
Patch repair and paint touch-upA few defects and the original paint details are availablePatch edges and colour differences may remain visible
Repaint the entire wallDefects spread across the wall, or a consistent finish is wanted across the whole wallNatural finishing edges, materials and repair area
Colour changes in several roomsRoom colour change confirmedWhether the rooms will be empty and whether ceilings and door frames are included

Confirm the scope first. An individual handover may have specific acceptance requirements.

06

A clear quotation also lists exclusions

The Consumer Council recommends itemising renovation quotations in detail.[2] List repairs, materials, protection, cleaning and waste removal by room and wall. Confirm door frames, ceilings and areas behind fixed cabinets separately. The formal quote should also give quantities and explain how variations will be approved.

  • List areas excluded from the work
  • Use the same scope when comparing both options
Illustrative scenario or worked example 2

Scenario B: changing two rooms from a dark colour to a light colour

Assumptions

  • This example assumes both parties have agreed on a colour change and that the flat will be empty. It does not represent a completed transaction.

Checks to make

  1. Record the chosen range, colour code, sheen and limits of application.
  2. Schedule furniture removal, painting, inspection, snagging and handover separately.
  3. Check ceilings and door frames separately. “Repaint two bedrooms” can refer to different surfaces.

Base the quotation on the agreed checklist and stages.

Confirm the primer, topcoat and preparation against the site condition and product requirements.

Finished wall surface on a previous project in Jordan
Existing project photo of a finished room in Jordan, showing edge details. The project is separate from the rental handover example. Select an image to enlarge

07

Handover inspection: colour, edge finishes, cleaning and outstanding work

Check each wall against the agreed finish. Record colour and patch edges, whether repairs sit flush, and any marks around windows, skirtings and floors. Take overview photos in normal lighting and close-ups of issues. List outstanding items, follow-up dates and the person confirming them.

  • Complete the work handover record first
  • The parties handle tenancy obligations separately

08

Handover painting enquiries: send the details together

Provide the district, room and wall references, current condition, required colours, dates available for work and handover date. If both parties have agreed a checklist, remove personal details and share the work-related parts for a comparable quote.PaintingTaking on the job and scheduling depend on confirmation.

  • Say whether the flat has been cleared
  • Provide overview photos and close-ups of defects

FAQ

6 practical questions answered

01Does a flat always need a full repaint before handover?

This article does not determine tenancy obligations. Check the lease, original records and both parties' agreed requirements before deciding the work scope.

02Is filling the nail holes enough?

It depends on the agreed acceptance standard. Check evenness, texture and colour after filling. Filling the holes alone may fall short.

03Can white paint go straight over the existing colour?

Confirm the specified colour code, substrate condition and paint system. Whites also vary.

04Can you guarantee my full deposit back?

No. The quotation and completion record cannot guarantee a tenancy or deposit outcome.

05How many days before the flat can be handed back after repainting?

Timing depends on the rooms, surface preparation, product drying requirements and when the space is cleared. There is no single duration.

06Which photos do you need for a quote?

Send an overview of each room, a photo of each problem wall, close-ups of defects and the original paint label if available.

CHECK THE BASIS

Data and technical basis, sources can be verified