01

How much does a painter earn per day in 2026?

For an official benchmark, use the Census and Statistics Department’s monthly average daily wages reported by main contractors on public-sector projects. The average for painters and decorators was HK$1,322.7 in July 2026[2], compared with HK$1,372.6 in January 2026[3], with HK$1,342.9 in April[4]. In July 2025, a year earlier, the same series stood at HK$1,440.4[5].

The series is compiled from main contractors’ own monthly returns on public-sector projects. The department uses it principally to track public-sector wage costs. It does not represent wages across the whole construction industry[2]. Quotes for a privately owned home, a small flat repaint or stripping and skimming an older flat may differ substantially from that average.

A painter’s daily wage represents just one component of a residential quote, which usually includes labour, primer, topcoat, filler, protective materials, cleaning and warranty. HK Create Design charges by wall and ceiling surface area: E03 direct repainting HK$12 per sq ft, E02 local repairs with damp-resistant primer HK$21 and E01 stripping and skim coating HK$39[1]. A daily wage and a per-square-foot quote measure different things.

  • See Census and Statistics Department figures for official public-sector wages
  • These figures do not represent private residential market rates
  • A daily wage covers labour. Quotations also reflect materials and the work specified.
Average daily wages by trade on public construction projects (July 2026)

You can swipe left or right on your phone to view the complete table.

Trade (Census and Statistics Department classification)Average daily wageDifference from the wage for a painter and decoratorCommon residential renovation tasks
Painter and decoratorHK$1,322.7—Stripping, skim coating, primer and topcoats
Electrical fitter (including electrician)HK$1,451.2+HK$128.5Rewiring or adding sockets (requires a registered electrical worker)
PlumberHK$1,538.8+HK$216.1Replacing or rerouting pipes
BricklayerHK$1,171.3−HK$151.4Wall construction and plaster repairs
General labourerHK$1,224.8−HK$97.9Moving, cleaning and protection

The figures are reported by main contractors on public-sector construction projects. The department says the series does not represent the entire industry and some trades can vary considerably month to month [2]. [2]

02

How to read the Census and Statistics Department’s daily wage figures for painters

The department’s average daily wage table covers public projects under the Architectural Services, Civil Engineering and Development, Drainage Services, Electrical and Mechanical Services, Environmental Protection, Highways, Housing and Water Supplies Departments[2]. The government uses the series to calculate changes in wage costs. Its official trade category is “painter and decorator”, covering workers commonly called painters.

The department cautions that some occupations may show large monthly fluctuations. Only a few public projects may hire those trades in a given month, and the skills and experience required can differ substantially[2]. Use several months to see the trend. A single month is a poor benchmark.

The average fell by HK$49.9 over six months, from HK$1,372.6 in January 2026 to HK$1,322.7 in July[3][2], a fall of HK$117.7 compared with July 2025[5]. This trend covers a public-sector sample. Residential painting quotes can move independently.

Media reports on the Hong Kong Construction Industry Employees General Union’s 2026–2027 wage adjustments give a range of HK$1,150 to HK$2,930 per day across 18 major trades from 1 November 2026, including painting[7]. The report gives no separate daily rate for painters. Its figures provide industry background only.

  • The figures come from public-sector projects
  • Compare several months to understand the trend
  • Union figures provide background context
Average daily wage for painters and decorators on public construction projects(Unit:HK$ per day)
July 2025
HK$1,440.4
January 2026
HK$1,372.6
April 2026
HK$1,342.9
July 2026
HK$1,322.7

Main contractors report these figures for public-sector building and construction projects. The department uses them to track wage costs in that sector. They cannot stand in for industry-wide wages or private residential painting quotes. [5][3][4][2]

03

Painters’ daily wages compared with other renovation trades

The July 2026 figures also give daily averages of HK$1,451.2 for electrical fitters (including electricians), HK$1,538.8 for plumbers, HK$1,171.3 for bricklayers and HK$1,224.8 for general workers[2]. Painters and decorators are near the middle at HK$1,322.7.

Trade wage comparisons help explain renovation costs because painting is seldom the only trade involved. For example,Rewiringrequires the chase to be filled and repainted afterwards.Pipe replacementrequires wall chasing and replastering. Electricians and plumbers generally earn more than painters, and these jobs need qualified personnel. A low figure for painting may leave out the precedingPlumbing and electrical workAn unclear scope can still lead to overspending.

The Labour Department sets the statutory minimum wage at HK$43.1 per hour from 1 May 2026[6]. At eight hours a day, the statutory floor works out to HK$344.8, well below skilled trade rates. Tradespeople’s wages reflect their experience and responsibilities and differ from general labour rates.

  • Electricians and plumbers generally have higher daily wages
  • Painting is often budgeted together with electrical, plumbing and plastering work
  • The minimum wage is the statutory floor
Worked example 1

Example 1: checking a day-work quotation against official daily wage statistics

Assumptions

  • Suppose a quotation specifies two painters for four working days, with materials charged separately.
  • This illustration uses the Census and Statistics Department’s average public-sector painter and decorator wage of HK$1,322.7 per day for July 2026 [2].
  • This illustrates how a quote is built up. It gives neither a private residential market rate nor our company’s charge.

How to calculate quantities

  1. Labour: 2 workers × 4 days = 8 worker-days.
  2. Illustrative labour: 8 × HK$1,322.7 = HK$10,581.6.
  3. Add materials such as primer, topcoats, filler, sandpaper and masking tape, itemised in the quotation.
  4. Ask whether the four days include drying and whether extra days will be charged if the work runs over.

At the official average daily wage, eight worker-days cost about HK$10,581.6 before materials. Check that the quote specifies the work and maximum days.

The Census and Statistics Department covers public-sector construction only, and some trade figures vary significantly by month [2]. Private residential pricing depends on the scope, floor and degree of preparation. Refer to the written quote. [2]

Use your square footage instead and see a reference budget

「The official daily wage is a reference. Residential work is usually quoted by area or room. Compare stripping, skim coating, sealing and topcoat counts as well as labour.」

Painting Works Supervisor, HK Create Design
Completed skim coating and painting in a Jordan bedroom
Completed project photo: bedroom walls after skim coating and painting, checked for evenness under light from the side. Select an image to enlarge
Wall condition before painting | HK Create Design
Site photo: Painting work on site. HK Create Design. Select an image to enlarge

04

Why is residential painting usually priced by surface area?

Paintingrequires time between stages. Filler must dry before sanding, primer before topcoating, and topcoats before recoating. For example, Nippon Paint 2nd Generation Super 5-in-1 specifies 2 to 3 hours between coats at 25°C and 7 days for full cure[14]. Nippon Paint Odour-less Wall Putty requires at least 12 to 24 hours between coats[16]. Daywork can lead to disputes over charges during drying and delays in humid weather.

An area-based quote states how much surface will receive each treatment. Our three categories are E03 repainting for sound surfaces, E02 repairs for local cracks, and E01 stripping and rebuilding the finish for peeling or mouldy walls. Each has a defined scope and minimum charge[1]. This lets you compare two companies’ quotations by category.

Daywork suits small repairs or work whose extent becomes apparent as it progresses. Agree the crew size, maximum days, who buys materials and the number of coats in writing. Without a cap, extra days are difficult to dispute mid-job.

  • Painting needs substantial drying time
  • Compare per-square-foot rates by treatment category
  • Specify the maximum number of days and materials for daywork
Company painting rates: inclusions and exclusions

You can swipe left or right on your phone to view the complete table.

ItemCompany rateincludeExclusions and extras
E03 Repaint the existing finish throughoutHK$12 per sq ft, minimum charge HK$3,700Clean the wall, fill nail holes, sand lightly and apply two topcoatsAn extra coat for a dark-to-light change costs HK$4 per sq ft. Stripping and mould treatment
E02 Moisture-proof polishing oilHK$21 per sq ft, minimum charge HK$4,650Partially remove loose spots, repair cracks and chips, apply moisture-proof primer, polish, and topcoat 2 timesExtensive stripping and repairs to the source of seepage
E01 Strip back, skim, damp-proof, sand and paintHK$39 per sq ft, minimum charge HK$7,450Strip old paint back to plaster, apply damp-resistant primer, skim 2–3 times, sand and apply 2–3 topcoats. The standard interior finish is Nippon Paint 2nd Generation Super 5-in-1Repairing the source of seepage or the waterproofing layer
E04 Paint a timber door and frameHK$1,650 per setSanding, patching holes, primer and topcoatReplacing doors or hinges
E05 Partial mildew removal with heavy oilHK$1,250 per wall faceMould treatment, anti-mould primer and topcoatLeak investigation costs extra. A separate small job carries a minimum call-out charge of HK$2,000
Nippon Paint Odour-less Kids Paint (The Little Prince) upgradeAdd HK$4 per sq ft of work surfaceUpgrade all topcoats to Nippon Paint children’s paintApplies only to the area under E01 / E02 / E03

Company’s 2026 published rates apply to the wall and ceiling surface area. Site measurement and the written quotation determine the final amount [1]. [1]

Wall repairs and skim coating at Treasure Spot Palace, Tai Po
Site photo: Patching and skim-coating a wall at Treasure Spot Palace, Tai Po, June 2026. HK Create Design. Select an image to enlarge

05

Company painting rates: inclusions and exclusions

Our painting price list uses rates per sq ft, per set or per affected surface. We do not publish a daywork rate. E03 whole-flat repainting costs HK$12 per sq ft, minimum HK$3,700. It covers cleaning, filling nail holes, light sanding and two topcoats on sound walls. A dark-to-light change adds HK$4 per sq ft for an extra coat[1].

E02 at HK$21 per sq ft, minimum HK$4,650, includes local stripping, crack and chip repairs, damp-resistant primer, sanding and two topcoats. E01 at HK$39 per sq ft, minimum HK$7,450, includes stripping back to plaster, damp-resistant primer, 2 to 3 skim coats, sanding and 2 to 3 topcoats. All three systems use Nippon Paint 2nd Generation Super 5-in-1 as the standard interior topcoat[1].

Other items include E04 painting a timber door and frame at HK$1,650 per set, E05 local mould treatment and repainting at HK$1,250 per surface, and E06 decorative paint at HK$110 per sq ft, minimum HK$2,800[1]. A whole-flat upgrade to Nippon Paint Odour-less Kids Paint (The Little Prince) adds HK$4 per sq ft of E01, E02 or E03 painting surface. Single-room and bamboo charcoal formaldehyde-reducing upgrades are quoted separately. The minimum small-job call-out charge is HK$2,000.

For a preliminary estimate, we multiply saleable area by 3 to obtain total wall and ceiling area. We measure on site for the formal quote. Higher ceilings, more rooms and fewer windows can increase the surface area. Specify coverage behind and above cabinets and inside false-ceiling light troughs.

  • Three categories: E03 / E02 / E01
  • Each category has a minimum charge
  • Use the total surface area to be painted
Wall skim coating and painting in progress at Mount Parker Lodge
Site photo: a painter skim coating a residential wall. The depth of stripping and skimming depends on wall condition. Select an image to enlarge

06

Seven factors affecting painting labour and quotations

First, wall condition. Sound, yellowed paint can be repainted. Loose paint, hollow plaster or mould requires further preparation, potentially multiplying the labour. Second, area and ceiling height. Elevated ceiling work is slower, and the high ceilings of older flats add paintable area.

Third, furniture and protection: an empty flat is quickest. An occupied flat needs extra time and labour for moving furniture, covering it and working room by room. Fourth, colour: a dark-to-light change needs an extra coat for coverage. Dulux also advises that bright or dark colours may require additional coats[18]. Fifth, weather affects the schedule. Nippon Paint advises against painting above 85% relative humidity. High humidity and low temperatures prolong drying[15]. Hong Kong Observatory figures for 1991–2020 give average relative humidity of 83% in April and May[13], so leave extra time around the humid spring season.

Sixth, material prices vary for children’s paint, anti-mould paint and formaldehyde-reducing paint. The Consumer Council recommends checking for supplements on special-function finishes[11]. Seventh, coordinate other trades. Complete plaster repairs to wiring chases or walls exposed by cabinet removal before painting.

  • Wall condition determines how much preparation is needed
  • Ceilings, ceiling height and furniture affect labour
  • Allow more time in humid spring weather
Published company painting rates(Unit:HK$ per sq ft)
E03 Turn oil directly
HK$12
E02 Local repairs and damp-resistant primer
HK$21
E01 Full preparation with stripping and skim coating
HK$39

Labour and materials are included, based on the wall and ceiling surface area. The respective minimum charges are HK$3,700, HK$4,650 and HK$7,450. [1]

07

Official guidance and requirements when hiring painters

The Labour Department’s safety guidance for renovation and maintenance reminds owners and tenants to check that workers have completed mandatory basic construction safety training and hold a valid Green Card. Before work starts, ask the contractor to show current employees’ compensation insurance. Working without the required certificate or insurance is unlawful[8].

The same document explains that ladders are designed for access. Use a suitable work platform, such as a mobile working platform, step platform or hop-up platform, for elevated tasks[8]. The Labour Department’s overview of work-at-height safety treats work at 2 metres or higher as work at height and says a ladder must not be used to carry it out[9]. Standing on top of a stepladder to paint a high wall or ceiling is a safety issue.

The Environmental Protection Department sets VOC limits for regulated architectural paints, including 50 g/L for matt coatings, 150 g/L for non-matt coatings and 200 g/L for primers, sealers and undercoats[10]. Stating the brand and model lets you check product compliance.

The Consumer Council recommends stating whether supply-and-apply pricing includes primer and topcoats, listing each coat count separately and specifying whether old walls will be stripped[11]. The Consumer Council study also found that 49% cited insufficiently detailed quotations as a concern[12].

  • Check Green Cards and employees’ compensation insurance
  • Use a work platform for elevated tasks and keep ladders for access
  • List paint brands, models and coat counts in the quote
Worked example 2

Example 2: painting budget by area for a 400 sq ft flat

Assumptions

  • Saleable area: 400 sq ft.
  • Our preliminary method: saleable area × 3 ≈ total wall and ceiling surface area.
  • Mostly sound walls with local cracks require E02 at HK$21 per sq ft [1].
  • Excludes furniture moving, timber door painting and seepage repairs.

How to calculate quantities

  1. Paintable surface area: 400 × 3 = 1,200 sq ft.
  2. E02 works cost: 1,200 × HK$21 = HK$25,200.
  3. This exceeds the HK$4,650 E02 minimum, so the calculated amount applies.
  4. For Nippon Paint children’s paint throughout, 1,200 × HK$4 = HK$4,800 extra, bringing the total to HK$30,000.

For a 400 sq ft flat, local repairs with damp-resistant primer are estimated at HK$25,200, or about HK$30,000 with children’s paint. Both include labour and materials.

The ×3 method is preliminary. Ceiling height, partition count and whether walls behind cabinets are included affect the surface area. The written quote after site measurement is definitive [1]. [1]

Use your square footage instead and see a reference budget

08

Six common pitfalls in painting labour quotations

Pitfall 1: specifying only the number of painter-days leaves the scope and coats open, making extra days or skipped coats hard to challenge. Pitfall 2: reimbursing materials at cost without naming brands makes it hard to check which paint was used or how many cans were supplied.

Pitfall 3: treating saleable area as painting area. A 500 sq ft flat has much more than 500 sq ft of walls and ceilings. An understated area can lead to extras. Pitfall 4: accepting a basic repaint quote for a wall that needs stripping. New paint can peel away with the loose old film.

Pitfall 5: an unusually low small-job quote. Travel and preparation take time. Our small-job minimum is HK$2,000. Check whether a much lower price excludes materials, warranty or insurance. Pitfall 6: overlooking the warranty. Our quotation specifies one-year coverage, as detailed in the inspection and warranty section below.

  • For daywork, specify the scope, coat count and maximum number of days
  • Specify the brand and model of each material
  • Measure the surfaces to be painted
  • Check minimum charges for small jobs
Painting quotations compared: day rate, area rate and fixed price

You can swipe left or right on your phone to view the complete table.

Pricing methodHow is it calculated?BenefitsWatch for
Daywork (daily rate)Number of workers × days × daily rate, usually with materials charged separatelyFlexible for small repairs or an uncertain scopeThe job may run longer, and materials reimbursed at cost are hard to compare
Per square footSurface area × unit rate, by wall conditionEasier to compare equivalent work when labour and materials are specifiedAgree how area is measured and whether ceilings and walls behind cabinets are included
Lump sumOne total for the entire scopeBudgeting is straightforwardDisputes often arise when work stages, coat counts and materials are left unspecified

The Consumer Council recommends listing primer and topcoat counts separately. Only four contractors in its survey gave this information [11]. [11]

09

How can you check whether each painting stage was completed?

Use daylight or shine a portable light across the wall to reveal ripples, trowel marks and sanding scratches. Viewed straight on from a metre away, the surface should look smooth and even in colour, with no obvious joins. Check for straight corners, a clean ceiling line and no paint on switches, skirting or window frames.

Ask the painter to keep empty cans or photograph batch numbers so you can compare brands and models with the quote. It is hard to count topcoats visually once finished. Agree on photos after each coat or inspect after the first.

Our painting work has a one-year warranty covering cracking, blistering and peeling, except deliberate damage. Non-paint defects caused by leaks or seepage are excluded. We can provide a separate repair quote at a preferential rate.

  • Check for trowel marks and ripples under light from the side
  • Check the brand and model on empty cans
  • Photograph each completed coat
  • Include the warranty scope in the quote
Worked example 3

Example 3: call-out cost for mould on one wall

Assumptions

  • One bedroom wall has mould beside a window, with no ongoing seepage confirmed.
  • E05 local mould treatment and repainting: HK$1,250 per affected surface [1].
  • Minimum call-out charge for a small job: HK$2,000.

How to calculate quantities

  1. E05: 1 surface × HK$1,250 = HK$1,250.
  2. Below the minimum small-job call-out charge of HK$2,000.
  3. A separate visit for this item is charged at HK$2,000.
  4. Several walls or other small jobs can be priced together.

Treating one mouldy wall on a separate visit costs the minimum HK$2,000. Combining the work with other items can be more economical.

If a wall remains damp, address the seepage source first. Non-paintwork issues caused by seepage fall outside the painting warranty. WhatsApp photos to 5243 7747 for a quote. [1]

Use your square footage instead and see a reference budget
Dark green paint being applied to a wall with a concealed door
Site photo: Dark green paint being applied to a wall with a concealed door, Hong Kong painting project, November 2022. HK Create Design. Select an image to enlarge

10

From enquiry to completion: the timeline for hiring a painter

First, send us photos of each room's walls and ceilings on WhatsApp, along with the flat area and intended scope. We can assess the likely level of work. The next step is a site measurement. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. On site, we scrape, tap and take moisture readings to decide whether each wall needs E03, E02 or E01.

Step three is a written quote listing the area, category, unit rate and materials for each room. Step four is floor protection, furniture covering and masking. Step five is painting, following the specified drying times between coats. Step six is inspection and handover of product names and colour codes for future touch-ups.

Duration depends on the area, treatment and weather. Direct repainting is faster. After stripping, each skim coat needs to dry, especially in humid spring conditions. We inspect first and include an estimated programme in the quote.

  • Send photos → site measurement → written quotation
  • Protect the work area before starting
  • Provide the paint brands and colour codes
Documents and arrangements to check before a painter starts

You can swipe left or right on your phone to view the complete table.

ItemWhy it mattersOfficial guidance or requirement
Green Card (Construction Industry Safety Training Certificate)Workers must hold a valid certificate. Working without one is unlawful.Labour Department guidance on safety in renovation and maintenance work [8]
Insurance under the Employees’ Compensation OrdinanceAsk the contractor to show a valid insurance policy before work startsLabour Department guidance on safety in renovation and maintenance work [8]
Work platform for elevated tasksUse ladders for access only. For elevated work use a mobile working platform, step platform or hop-up platformLabour Department [8]
VOC content in paintVOC limits: 50 g/L for matt coatings and 150 g/L for non-matt coatingsEnvironmental Protection Department [10]
written quotationSpecify the area, work stages, coat counts and materialsConsumer Council recommendations [11]

These are basic pre-work checks. Arrange qualified personnel in accordance with Labour Department guidance and relevant regulations for external walls, scaffolding or electrical work. [8][10][11]

11

How HK CreateDesign manages painting work

HK CreateDesign opened in 2019. The team started as young tradespeople learning on site, has over 10 years of project experience and works with longstanding trade contractors. The designer defines the scope and details, while painters assess the work and finish on site. Water-based sealer and wall putty are specified separately to suit the substrate[17][16]. We use Nippon Paint topcoats throughout residential interiors. The standard is 2nd Generation Super 5-in-1, with optional bamboo charcoal formaldehyde-reducing or Odour-less Kids Paint (The Little Prince) finishes.

We carry outWhole-flat renovation, Older flat renovation, painting work andMasonry and tilingare considered together. Schedule repairs to wiring chases and walls exposed by cabinet removal before painting to avoid reopening finished walls. At completion we remove debris, carry out basic cleaning and clear the site.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. For minor works and repairs, send photos for an initial quotation or book a site visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Designer and tradespeople have separate responsibilities
  • Coordinate painting with plumbing, electrical and plastering work
  • Send photos to WhatsApp 5243 7747 for a quotation

Advice from our tradespeople

「The official daily wage is a reference. Residential work is usually quoted by area or room. Compare stripping, skim coating, sealing and topcoat counts as well as labour.」

Painting Works Supervisor, HK Create DesignHK Create Design project team

「We list the work stages and paint products in every quote so customers can compare each item. A lower quote may include one fewer skim coat or topcoat.」

Project Manager, HK Create DesignHK Create Design project team

「Ask how the painter finishes around windows and ceiling corners. Neat edges in these difficult areas are a good indication of workmanship.」

Painting Works Supervisor, HK Create DesignHK Create Design project team

FAQ

12 practical questions answered

01What is a painter's daily rate in 2026?

Census and Statistics Department public-sector construction figures give an average daily wage for painters and decorators of HK$1,322.7 in July 2026[2]. This is a public-sector average. Private residential rates may differ.

02Are painters' daily wages rising?

Not necessarily. The same series was HK$1,440.4 in July 2025 and HK$1,322.7 in July 2026[5][2]. The Census and Statistics Department advises looking at trends because monthly wages for some trades fluctuate considerably.

03Which type of painting quote is preferable, a day rate or an area rate?

Area-based prices are easier to compare for identical scopes. Daywork suits small repairs or uncertain scopes. Specify crew size, maximum days, materials and coat counts.

04How does HK Create Design charge for painting?

HK Create Design prices the total wall and ceiling surface area. E03 direct repainting is HK$12 per sq ft, E02 local repairs HK$21 and E01 stripping and skim coating HK$39. The respective minimum charges are HK$3,700, HK$4,650 and HK$7,450[1].

05Do the company's rates include paint materials?

Yes. E01, E02 and E03 include labour and materials with Nippon Paint 2nd Generation Super 5-in-1 as the standard interior topcoat. E01 and E02 specify damp-resistant primer. E03 covers sound existing paint with two topcoats. A whole-flat upgrade to Nippon Paint Odour-less Kids Paint (The Little Prince) adds HK$4 per sq ft of E01–E03 surface. Bamboo charcoal formaldehyde-reducing paint or individual rooms are quoted separately[1].

06What is the minimum charge to repair one wall?

Our small-job call-out minimum is HK$2,000. Send photos by WhatsApp to 5243 7747 for a preliminary quote.

07Do painters need a licence?

Painting has no trade registration equivalent to that for electrical work. The Labour Department requires workers to have valid Green Cards and contractors to carry employees’ compensation insurance[8].

08Can a ladder be used to paint a ceiling?

The Labour Department advises using ladders only for access. Use a mobile working platform, step platform or hop-up platform for elevated work. Do not work from ladders at 2 metres or above[8][9].

09How many working days does it take to paint a 500 sq ft flat?

It depends on wall condition and weather. Direct repainting is faster. Stripping and skim coating requires 12 to 24 hours between skim coats[16]. We provide an estimated programme after measuring on site.

10How does the minimum wage relate to a painter's pay?

The statutory minimum wage from 1 May 2026 is HK$43.1 per hour[6]. Skilled trades generally earn well above that level.

11How can I tell whether work or materials have been cut back?

Use light from the side to check for trowel marks and ripples, inspect product labels on empty cans and request photos after each coat. The quote should list primer and topcoat counts[11].

12Does the painting work have a warranty?

Yes. Our one-year painting warranty covers cracking, blistering and peeling unless intentionally damaged. It excludes non-paintwork problems caused by leaks or seepage. We can quote for these repairs at a discounted rate.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design 2026 detailed renovation estimates and published prices (117 items) Accessed: 2026-11-03
  2. [2]Census and Statistics Department: Average daily wages of workers on public construction projects, as reported by main contractors (July 2026, 2021 series) Accessed: 2026-11-03
  3. [3]Census and Statistics Department: Average daily wages of workers on public construction projects, as reported by main contractors (January 2026, 2021 series) Accessed: 2026-11-03
  4. [4]Census and Statistics Department: Average daily wages of workers on public construction projects, as reported by main contractors (April 2026, 2021 series) Accessed: 2026-11-03
  5. [5]Census and Statistics Department: Average daily wages of workers on public construction projects, as reported by main contractors (July 2025, 2021 series) Accessed: 2026-11-03
  6. [6]Labour Department: Minimum Wage Ordinance (Cap. 608) Accessed: 2026-11-03
  7. [7]Hong Kong Business Times: Daily wages of HK$1,150–HK$2,930 for construction workers, with one trade receiving a 6.67% rise in 2026 Accessed: 2026-11-03
  8. [8]Labour Department: Occupational safety in renovation and maintenance work for owners and tenants of commercial and residential premises Accessed: 2026-11-03
  9. [9]Labour Department: Overview of Work-at-Height Safety Accessed: 2026-11-03
  10. [10]Environmental Protection Department: Volatile organic compound content limits for regulated construction paints Accessed: 2026-11-03
  11. [11]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03
  12. [12]Consumer Council: home renovation study press release Accessed: 2026-11-03
  13. [13]Hong Kong Observatory: Monthly averages of meteorological elements in Hong Kong (1991-2020) Accessed: 2026-11-03
  14. [14]Nippon Paint Hong Kong: 2nd Generation Super 5-in-1 Interior Emulsion Paint Technical Data Sheet Accessed: 2026-11-03
  15. [15]Nippon Paint Hong Kong: Odour-less 5-in-1 (Moisture-Proof) Interior Emulsion Paint Technical Data Sheet Accessed: 2026-11-03
  16. [16]Nippon Paint Hong Kong: Nippon Paint Odour-less Wall Putty Accessed: 2026-11-03
  17. [17]Chamco Chemical: Kangaroo Water Based Sealer Accessed: 2026-11-03
  18. [18]Dulux Hong Kong: Dulux Pentalite Upgrade Emulsion Paint Accessed: 2026-11-03