01

First identify whether you are receiving a statutory notice or a general promotion

Mandatory window inspection is a procedure that arises after the Buildings Department serves statutory notices to the owners of selected target buildings. Applicable buildings are generally private buildings with a building age of 10 years or more, except for residential buildings with no more than 3 floors. However, meeting the building age does not mean that every building must be inspected immediately, and it still depends on whether a notice is received.[2] When receiving a document, keep the original copy and check the address, individual premises or common parts, notification date and specified deadline.

Company flyers, management office notices, neighbor messages or "free window inspection" promotions cannot replace Buildings Department notices on their own. You can use the Buildings Department's notification search tool to check, or make inquiries directly to the Buildings Department. If the notification is for an individual unit, deal with the windows of your own unit first; if it involves public parts, you must also understand the coordination of the corporation or management office to avoid mistakenly placing the responsibility for public windows into the residents' private quotations.

The legal requirement is to inspect whether windows have become or could become hazardous and to carry out prescribed repairs if necessary; it is not a list of renovations requiring the use of a certain brand, a certain type of glass or the replacement of all windows at once. Even if you already have a renovation plan, you should first write down "complying with the notice" and "wanting to improve the quality of life" as two work lines.

  • Take a photo of the first page and deadline page of the notice, and note down the scope of the unit/common part and the date of the notice.
  • Do not assume that a statutory notice has been received because of "the building is approaching its age" or a cold call.
  • If you are a tenant, give the notice to the landlord as soon as possible and cooperate with the appointed person to enter and inspect if necessary.[4]
Design renderings: Window inspection scene in a safe position indoors.
Design renderings: Window inspection scene in a safe position indoors. Select an image to enlarge

02

Break down 6 or 9 months into an executable timetable

The current overview of the Buildings Department states that for windows in individual units, qualified persons must be appointed to complete prescribed inspections and necessary prescribed repairs within 6 months from the date of notification; for common parts, it is generally 9 months.[1] Practically speaking, don’t leave everything until the end. Quotation comparison, appointments, inspections, possible repairs, document verification and submission all take time, and the number of days required for each project will be confirmed separately based on window conditions, site access and safety arrangements.

It is recommended to set an internal deadline earlier than the legal deadline: check the notice and window list in the first week; then invite qualified persons to submit inspection and repair suggestions; and confirm the contractor's qualifications, construction arrangements and document responsibilities after the decision is made. Completion of the project does not mean the program is over. When the prescribed inspection and necessary repairs have been completed, the appointed competent person shall submit a certificate in the specified form to the Building Authority.[3]

If there are indeed reasonable reasons for failure to complete the project as scheduled, the owner or corporation may apply in writing to the Buildings Department for an extension and explain the reasons. Whether to accept the extension will be considered by the Buildings Department on a case-by-case basis.[4] Don’t assume that it can be extended, and don’t use the reason of not receiving the “qualification paper” as an excuse not to follow up. A general written certificate is not equivalent to the mandatory window inspection designated form.

  • Working backwards from legal deadlines: inspection date, quote selection, possible repairs and document tracking.
  • Include "who submits the specified form and when to provide copies" in the appointment or quotation document.
  • If an extension is necessary, submit it to the Buildings Department in writing as early as possible without making verbal assumptions.
Write "needs inspection, needs repair, wants to upgrade" separately into the quotation

You can swipe left or right on your phone to view the complete table.

Site conditionsPositioning under forced inspection windowAmount or evidence to be recordedHow quotations should be valued/presentedCommon items that are not included or need to be checkedOwner’s decision-making priorities
Broken glass panelIt is a prescribed inspection precaution; if it affects safety, it must be repaired or replaced accordingly.Window-by-window numbering, photos, glass location and dimensions; judgment by a qualified person.Break it down by each piece/size/installation arrangement, not just the total amount of "glass repair".Glass types, disassembly protection, handling, exterior construction and management arrangements.Confirm safe handling and documentation before comparing different glass or exterior upgrade options.
Window hinges are deformed, severely rusted, or screws/rivets are loose, missing, or corrodedIt is a prescribed inspection precaution; defective components that affect safety must be repaired or replaced.Hinge, screw/rivet location, wear and tear photos and sash number of each openable window.List the quantity according to the window sash, window hinge set or hardware position, and indicate who will inspect and supervise it.Sash adjustment, fitting compatibility, outside work, protection and submission of documents.Don’t think of “a batch of hardware” as a comparable amount of work; ask first which window is involved.
Water leakage due to deteriorated silicone, weather sealant or gasketsGenerally, it does not fall within the prescribed inspection and repair scope that affects safety; voluntary additional works can be performed.Location of water seepage, time after rain, indoor and outdoor photos; do not disassemble and inspect by yourself.It is listed separately from statutory repairs, and the "window inspection qualified" fee should not be mixed with the joint length, location and process description.Exterior wall interfaces, window sills, waterproofing sources, access methods and post-repair finishes.First clarify the source of water seepage; glue repair is not an automatic substitute for statutory window inspection, nor should it promise to permanently stop leakage.
The window frame or sash is obviously deformed, unstable, or repeatedly difficult to open and close safely.It may be necessary to have a qualified person assess whether it is a prescribed repair; full window replacement is a larger project option.The width, height, opening method, fixed or openable number of windows of each set of windows, and the condition of the windows and window sills.The demolition, supply, installation, glass, hardware, sealing, removal and supervision are divided into items and are not replaced by "whole house window replacement" one price.The condition of window openings or exterior walls, edge work, protection, management office procedures and whether other legal procedures are involved.Require an explanation as to why partial repairs are insufficient and the necessity of replacing each set of windows; the decision will not be based on the age of the building or a single photo.
Proactive upgrades for soundproofing, ventilation, appearance or renovationIt is a voluntary improvement and cannot be said to be a mandatory window inspection.List the features you want to retain or improve, the size of each set of windows and their relationship with furniture/air conditioning.Confirm the product system, glass and hardware model, quantity, construction scope and maintenance text separately.Design effect, interior closing, exterior wall repair, transportation, insurance and any management conditions.Complete the statutory portion of the written judgment first, then compare upgrade options with the same window list to avoid mixing needs with preferences.

This table is a quote disassembly framework, not a remote determination of repair methods based on photos. The Buildings Department requires a clear distinction between prescribed items that affect safety and non-structural/non-safety proposed items; the Consumer Council also recommends that the contract list the type, quantity and price of accessories. [2][5]

Design renderings: Aluminum window hardware and sealing details do not mean that they meet window inspection standards.
Design renderings: Aluminum window hardware and sealing details do not mean that they meet window inspection standards. Select an image to enlarge
Renovation work in progress on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge
Mandatory window inspections: key figures illustrated | HK Create Design
Mandatory window inspections: key figures at a glance | HK Create Design Select an image to enlarge

03

What to look for in inspections: Four types of security components and two common misconceptions

Key points listed by the Buildings Department include: whether the glass panels are cracked; whether the window frames and sash are deformed, unstable or difficult to open and close; whether the window hinges are deformed, missing or severely rusted; and whether the screws and rivets are loose, missing, gray-white powder or rust.[2] These are conditions that professionals need to assess during on-site inspections. They are not tasks for owners to try to dismantle, add screws, or climb out of the window to test.

The first misunderstanding is that "a leaky window must fail the inspection". Components that do not affect safety, such as waterproof sealants, waterproof gaskets or rubber strips, are usually outside the scope of prescribed inspections and prescribed repairs. They can still be dealt with due to water seepage, faulty switches or renovation needs, but the quotation should be marked as recommended or voluntary works, rather than lumping the cost together under the name of statutory window inspection.[2]

The second misunderstanding is that "if there is furniture in front of the window, there is no need to inspect it." Being blocked by renovation or fixed furniture is not a reason for exemption; the owner should arrange inspection access when it is safe and feasible, and let professionals explain the locations that cannot be inspected and follow-up arrangements.[4] The coverage of curtain walls and indoor partition glass panels is also different, and they cannot all be subject to mandatory window inspection based on their appearance.[2]

  • Each window is labeled with a room and number. Photograph visible problems inside. Do not photograph or measure dangers outside.
  • Ask whether each recommendation is a "prescribed repair necessary for safety" or an "optional improvement."
  • If there is a risk of broken glass, loose window sash or falling, stop using it and isolate the area nearby, and arrange for professional assessment.

04

Who can do it: Inspection, repair, supervision and documentation are not the same thing

Under the scheme, a qualified person can be an authorized person, a registered structural engineer, a registered inspector, a registered general building contractor, or a registered minor works contractor who has registered for the relevant class, type and project related to windows. The most important thing is that the appointed competent person must conduct the prescribed inspection in person; do not just look at the company name, verbal statements by frontline personnel or photos on social media platforms.[3]

If the inspection determines that prescribed repairs are necessary, the owner should appoint a registered general building contractor or a registered minor works contractor with corresponding window minor works qualifications to carry out the work under the supervision of a qualified person. The inspector and supervisor can be the same person or different persons, and the owner can decide, but each person's role, registration information and deliverables should be listed in the document.[3]

The safest approach is to check the name or company information on the building register before the appointment, ask for the window inspection card or relevant registration certificate on site, and save the screenshot or copy. After completion, keep the notification, window-by-window inspection results, before and after repair photos, detailed receipts, maintenance terms and a copy of the certificate of submission. The Buildings Department will conduct random inspections of submitted certificates and inspection reports. This is why documents cannot be handed over verbally.[2] [4]

  • Check the appointed person and contractor in the building register, not just the phone number.
  • Ask clearly "who personally inspects, who supervises, who submits the form, and who provides copies."
  • Save project-based quotations, payment records and before and after construction photos.
Worked example 1

Example 1: a measurement schedule for six window assemblies

Assumptions

  • This is purely a teaching assumption, and it is not a case that our company has completed, nor is it remotely determined that any windows must be repaired or replaced.
  • Assume three windows at 1.20 × 1.10 m, two at 0.75 × 0.95 m and one fixed window at 0.60 × 0.60 m.
  • The area is only for arrangement measurement, maintenance and quotation communication; the number of window sash, glass, hardware, exterior construction and safety arrangements still need to be verified by on-site professionals.

How to calculate quantities

  1. First window type: 1.20 × 1.10 × 3 = 3.9600 m².
  2. Second window type: 0.75 × 0.95 × 2 = 1.4250 m². Fixed window: 0.60 × 0.60 = 0.3600 m².
  3. Total: 3.9600 + 1.4250 + 0.3600 = 5.7450 m², approximately 61.84 sq ft.
  4. The measurement sheet should also record the room location, fixed/openable, opening method, visible problems and photo number of the 6 sets of windows at the same time, instead of just writing "windows throughout the house".

You can first submit a list of "6 groups, totaling 5.7450 square meters (approximately 61.84 square sq ft)" for reservation information. This allows different quotes to be compared based on similar window numbers, but does not equate to any unit price, repair conclusion or statutory compliance result.

Mandatory window inspection covers all regulated windows; the area cannot replace the physical inspection of glass, window frames, window sashes, window hinges, screws and rivets by a qualified person. If the window is at risk of loosening, cracking, or falling, stop using it and stay away from the relevant location. Do not measure the outside or dismantle parts by yourself. [2][3]

Use your square footage instead and see a reference budget
Interior lighting and ceiling finishes | HK Create Design
Project photograph: interior design, HK Create Design Select an image to enlarge

05

Repair or replace windows: decide based on the location and target of the failure, not guess based on the age of the building

If the problem focuses on individual safety components, such as a few window hinges, screws or rivets, and the condition of the window frame and sash has been inspected and can be safely handled, the prescribed repairs may be able to respond to the notification. On the contrary, if the condition of the frame or sash of an individual window makes the safety switch or fixing unreliable, a competent person should be asked to explain whether the local treatment is insufficient and the scope of the whole window replacement work. This is a professional judgment based on the current situation, rather than automatically equating "old building" with "the whole house must be replaced".[2]

If your real goal is to address long-term water seepage, noise, ventilation, appearance, or to accommodate new furniture, they should be clearly marked as voluntary improvements. Please list the window system/product name, glass and hardware model, quantity of each set, indoor and outdoor closings, maintenance content, and the scope of the supplier's technical information that can be verified. This is not to specify any product, nor is it to claim that a single product is suitable for all old buildings; the purpose is simply to make the two quotes comparable.

If the demolition project will involve window openings, exterior walls, facades, lifting or other modifications, the construction methods, management office conditions and possible required legal procedures must be judged on-site by qualified professionals and contractors. Homeowners should not remove windows themselves, inspect from outside, tape up hazardous window components, or require workers to rush work in an unsafe manner.

  • Each set of proposed replacement windows is required to have an independent reason, size, scope and photo correspondence.
  • Divide safety repairs, leak-stop improvements, and soundproofing/appearance upgrades into different subtotals.
  • If work involves outside or high places, ask the contractor how to arrange safety measures, insurance and coordination with the management office according to the site.
Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

06

Don’t just look at the total amount when quoting: first align the window list with the uninclusive items

A comparable quote should be available for each window or group of components. The inspection fee should indicate whether it covers all the windows in the notice, who inspected it, how the results will be delivered, and whether it includes the submission of documents; prescribed repairs should specify the location, quantity, materials and construction of the window sash or components; replacement of the entire window should include disassembly, supply, installation, glass, hardware, sealing, protection, removal, maintenance and any on-site safety arrangements. A "whole house window treatment" that doesn't list the quantity makes it difficult to fairly compare it to another window-by-window quote.

In particular, ask about uninclusive items. Exterior wall joints, interior finish repairs, furniture moving, window protection, management office deposits or procedures, public area protection, removals, exterior construction, and price changes due to hidden problems on site may all affect the total amount. Unknown items should not be written as HK$0, and do not use "all-inclusive" to cover up unverified conditions; please write them to be confirmed on site, and specify what to explain before submitting a price change.

The Consumer Council reminds that the type, quantity and price of replacement parts should be listed in the receipt or contract; if the cost includes the application for window inspection documents, it should also be stated. Ordinary "qualification paper" or "certificate" may not meet the program requirements. Owners should request a delivered copy of the specified form.[5] This is consumer information and is not a legal conclusion on individual contracts or obligations.

  • Use the same window-by-window list to request quotes from different service providers to reduce false parity caused by different scopes.
  • Each "price to be reviewed" item has trigger conditions, measurement methods and approval procedures.
  • Check before signing: registration information, materials and quantities, documents, payment nodes, maintenance and uninclusive items.
Different estimates and quotes, what should be compared instead of just comparing totals

You can swipe left or right on your phone to view the complete table.

Comparison objectKnown range and quantityPricing method/verifiable informationNot included or still to be confirmedRisks and next steps
Company free online renovation estimateBased on saleable area and selected items. The calculator has 117 options. Aluminium windows are outside the catalogue and quick estimate.Inquiries and online estimates are free, and you can check the applicable scope of the company's 2026 reference unit price.It gives neither a fixed window quotation nor an all-inclusive flat price. The exclusions include complete kitchen and bathroom reconstruction, replumbing, rewiring, furniture and finish materials.Other renovation processes can be planned first, but the windows must be provided with additional photos, quantity, size and on-site condition assessment.
Company on-site measurementIt is used to check the actual location, construction conditions and official scope; it is not automatically calculated after the online area.Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order.Aluminum window unit price, exterior work, management office conditions, protection and feasibility must still be confirmed by a formal written quotation.Submit the window list and photos of the problem before making an appointment; you can WhatsApp 52437747. Do not regard HK$500 as engineering fees or statutory window inspection fees.
Qualified persons for mandatory window inspection and prescribed repair quotationsAll windows covered by the notice; if deemed necessary by inspection, repair and supervision will be prescribed.Verify the name/registration information of the eligible person, window-by-window results, contractor qualifications, repair projects and submit a copy of the certificate.Non-security improvements, window upgrades, facades or other construction issues may not be included by default.Don't just accept the "qualification paper"; ask who submitted the specified form, when it was submitted, and how to obtain a copy.
Voluntary window replacement or waterproofing improvement quoteMeasure each window set and interface separately. Saleable area does not measure window work.Compare dismantling, supply, installation, glass, hardware, sealing, removal, protection, maintenance and any safety arrangements to see if they are itemized.The condition of window openings/exterior walls, entry methods, management office procedures, other engineering cooperation and legal procedures need to be verified on site.If there is a statutory notice at the same time, first indicate which parts are prescribed repairs and which parts are voluntary upgrades; verbal promises of "all-inclusive" for unlisted quantities will not be accepted.

The 117 catalogue items, exclusions, free online access and HK$500 measurement arrangement were company information as at 2026-10-21. They do not establish a Hong Kong market price for windows or a statutory inspection fee. After a statutory inspection, the qualified person submits the specified certificate as required. [3][4][5][6]

Made-to-measure wardrobe after installation | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

07

How to use the company's online budget so as not to mislead aluminum window decisions

Our free 2026 online tool lets owners plan by saleable area or selected tasks. The quick version covers basic whole-flat renovation, repainting and floor tiling. Paint area initially uses saleable area × 3. The optional 20% is your own contingency.[6] These settings are suitable for clarifying the overall renovation scope first, rather than calculating the amount of window work based on the residential area.

The website also states thatAluminium windowsWindow repair and replacement have no fixed unit rate and are excluded from the 117-item catalogue and quick budget. A separate assessment considers the problem, quantities, site conditions and safety.[6] Therefore, the total number of the calculator should not be called "window inspection and window replacement all-inclusive price", nor should the company's unit price of other types of work be applied to aluminum windows. It is not the Hong Kong market average price.

Online estimates and enquiries are free. Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order.[6] When making an appointment, you can WhatsApp 52437747 and first provide the number and size of windows, photos of visible problems, the condition of the windowsills and windows, and whether you have received statutory notices. This is more helpful in obtaining a verifiable range than just saying "windows need to be replaced in the 500-foot unit."

  • Think of the company's calculator as a preliminary budgeting tool for other renovation projects, not as a fixed price for aluminum windows.
  • The quick scheme excludes complete kitchen and bathroom reconstruction, replumbing and rewiring, fitted furniture and finish tiles. Check the specified scope.[6]
  • Prepare a window count, dimensions, photos and any statutory notice. Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order.
Project photo of kitchen cabinet installation | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

08

Site, management and safety arrangements before the start of construction

The difficulty of a window project depends on more than just the window area. Whether indoor furniture can be moved, whether there are debris on the windowsill, restrictions on moving on floors and public areas, management office working hours and application procedures, and whether outside work is involved will all change the process and cost. Submit this information to the service provider before making an appointment so that the assumptions are clearly stated in the formal quotation; do not commit to a certain erection, lifting or work method without confirmation.

The Buildings Department reminds owners to engage qualified persons and registered contractors, and pay attention to the contractors' preventive measures, personal protective equipment and appropriate insurance arrangements.[4] Owners can ask the person in charge of the project: Which locations are at risk of falling objects or heights, how to protect residents and common areas, who will coordinate with the management office, and how to deal with weather or site restrictions. These are inquiries about safety arrangements, not teaching owners to decide on their own high-altitude construction plans.

If the window frame is suspected to be loose, the glass is broken, the window hinges are severely damaged, or there is a risk of falling, the first step is to stay away from and limit the use of the window and nearby locations, and arrange for professionals to handle it as soon as possible. A falling window can cause serious consequences; do not use tape, temporary screws, repair welding by yourself, or stick out the window for "temporary repairs."

  • Confirm application, working hours, lift/corridor protection, deposit and waste arrangements with management.
  • The contractor is required to explain on-site safety, protection, insurance and contingency arrangements before starting work.
  • Hazardous windows should be deactivated and isolated first, and have them evaluated by qualified personnel. Do not DIY.
Worked example 2

Example 2: why a painting estimate for a 400 sq ft renovation cannot price aluminium windows

Assumptions

  • This is a planning calculation and not any completed project, official quotation or Hong Kong's average market price. Assume that the salable area of ​​the unit is 400 square feet.
  • The quick calculator uses saleable area × 3 for a preliminary paint-area estimate. Aluminium windows have no fixed unit rate and sit outside the 117-item catalogue and quick estimates.
  • The 20% is only regarded as a planning reserve ratio. It is not an automatic surcharge for the company, nor does it mean that the final window project will increase by 20%.

How to calculate quantities

  1. Estimated painting area: 400 × 3 = 1,200 sq ft. This estimates wall and ceiling area, not window area.
  2. For a 20% planning buffer, the multiplier is 1 + 0.20 = 1.20. For an agreed subtotal P covering other works, the planning allowance gives an upper figure of P × 1.20.
  3. Set the aluminum windows to the "To be evaluated on site" column, and list the 6 groups of windows or the actual quantity, size, faults, entry conditions and legal document requirements; do not fill in the guessed unit price in P.
  4. After the official quotation appears, the confirmed window projects, unpackaged items, and any optional improvements are added back to the budget one by one, and the original distinction between statutory repairs and voluntary upgrades is retained.

400 square feet yields 1,200 square feet of paint; the mathematical multiple allowed for planning is 1.20. Neither of these two figures can be used to deduce the cost of aluminum windows, which is just in time to avoid mistaking the whole-house renovation tool as an "all-inclusive including window inspection and window replacement" budget.

Actual paint area depends on partitions, ceilings, openings and substrate. Aluminium window scope, products and feasibility require a site check. The company's quick examples exclude full kitchen and bathroom reconstruction, replumbing, rewiring, fitted furniture and finish tiles. [6]

Use your square footage instead and see a reference budget
Mandatory window inspection checklist illustrated | HK Create Design
Mandatory window inspection checklist | HK Create Design Select an image to enlarge

09

After completion, it’s not just about whether it can be opened or closed: check the documents and traceability records

In cases of mandatory window inspection, the window-by-window results, completed prescribed repair items, before and after repair photos, receipts and maintenance documents should be returned during the inspection, and then confirm that the qualified person will submit or has submitted the specified form of certificate. If you only receive a piece of paper that generally says "window inspection passed," ask if it specifies a form, who signed it, when it was submitted, and how to obtain a copy.[3] [5]

Keep statutory documents separate from the maintenance of voluntary works. Completion of statutory procedures does not mean that waterproofing, sound insulation, aesthetics or other renovation results will automatically have the same maintenance; conversely, voluntary window replacement will not automatically replace the inspection and submission procedures of statutory notices. Warranty periods, parts covered, declaration methods and exclusions shall be subject to written terms.

The Buildings Department states that after a notice is complied with, a new notice for the same windows cannot be served before five years have elapsed.[1] This is not a reason to seal the file and ignore the situation. If you find abnormal switches, rusted hardware, or damaged glass, you should still seek professional evaluation as soon as possible.

  • Get a copy of the certificate of submission in the same file along with the notice, quote, payment, photos and maintenance.
  • Check the deliverables for statutory repairs separately from the maintenance terms for voluntary waterproofing/window replacement.
  • If new problems arise in the future, explain them to the service provider with the window-by-window number and old photos, and do not dismantle or repair them yourself.

10

An owner-centered decision-making sequence

The best savings are not necessarily the lowest total initially seen, but rather not treating unnecessary work as a legal necessity and not missing out on true safety and documentation responsibilities. Four things can be done in sequence: check the notice and deadline; have all areas inspected by a qualified person in person; compare the prescribed repairs with the voluntary improvement items; and finally confirm the construction, submission and maintenance in writing. In this way, even if you decide to renovate at the same time, you can still know what problem each dollar will solve.

The market cost information compiled by the government can be used as a starting point for comparison, but the Buildings Department also pointed out that the cost will be affected by the number, size, degree of damage and market environment of windows.[4] No honest fixed unit price can replace on-site conditions. If the other party states that the external conditions, quantities, or management requirements that have not been inspected are "all-inclusive," you should ask for a supplementary written scope instead of rushing to pay.

If you don't agree with the recommendations, keep the photos and quote and ask another qualified person for the same window listing. If you encounter suspected irregularities, improper or negligent services, you can report to the Buildings Department according to its guidelines; consumer transaction disputes can also be handled through relevant channels.[4] This article provides general planning information only and is not intended to draw legal conclusions about notifications, project qualifications, insurance or contractual liability.

  • Complete the notification verification and inspection before deciding whether to incorporate window replacement into the renovation.
  • Always align when comparing: window lists, quantities, documentation, items not included, maintenance and security arrangements.
  • Any arrangements involving heights, external walls, electricity or demolition shall be left to qualified persons and contractors to handle on-site.

FAQ

6 practical questions answered

01I have received a mandatory window inspection notice. Do I have to replace aluminum windows in the whole house?

no. The notice requires a prescribed inspection of the covered windows by a competent person and the carrying out of prescribed repairs if the inspection considers that the window has become dangerous or may become dangerous.[2] [3] If the problem is focused on individual safety components, it does not necessarily mean that the entire set of windows needs to be replaced. If it is recommended to replace the entire window, it is required to explain why the partial repairs are insufficient, which components are involved, and which are voluntary upgrades.

02Do seepage, ageing silicone or worn gaskets automatically fall under mandatory window inspection?

uncertain. The Buildings Department explains that components such as waterproof sealants and waterproof gaskets/adhesive strips that do not affect the safety of windows generally do not fall within the prescribed inspection and repair scope of mandatory window inspections.[2] Water seepage may still need to be treated, but it should be quoted separately from safety repairs to find out whether it comes from the window sash, frame edge, exterior wall or other locations; glue repair cannot guarantee that all leakage problems have been solved.

03How to verify that the person coming for window inspection is really qualified?

First search for the name or company in the building register and ask for the window inspection card or relevant registration certificate. The prescribed inspection must be carried out in person by an appointed competent person; if repairs are required, the contractor must also be a relevant registered general building contractor or a registered minor works contractor with corresponding window minor works qualifications.[3] It is not enough to see company promotions, business cards or verbal promises.

04I have already replaced the windows on my own, do I need to ignore the mandatory window inspection notices I receive in the future?

You cannot make assumptions on your own. Even if voluntary inspection or repair is carried out without receiving the notice, the Buildings Department explained that if the building is selected as a target building in the future, it will still serve a mandatory window inspection notice; it will be handled in accordance with the program standards and procedures.[4] Receipts, photos, product information and construction records of windows that have been replaced are still worth keeping to keep future qualified persons informed, but they should not be regarded as automatic exemptions.

05Does the absence of a "qualification paper" mean that the process is not completed? What should I get?

Don't just judge by the name "qualified paper". After completing the prescribed inspection and necessary repairs, the competent person shall submit a certificate in a specified form to the Building Authority.[3] The Consumer Council also reminds that ordinary written certificates are not equivalent to the documents required for the plan.[5] The other party should be asked to explain who will submit and when, and provide copies of submitted documents; at the same time, save window-by-window results, quotations and before and after repair photos.

06The company's online budget shows the renovation amount. Does it include window inspection, aluminum windows or whole-house work?

No. The calculator provides a preliminary budget. Aluminium windows have no fixed unit rate and sit outside the 117-item catalogue and quick estimate. The examples also exclude full kitchen and bathroom reconstruction, replumbing, rewiring, furniture and finish materials.[6] Online estimates and enquiries are free. Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order. Allow separately for the assessment of aluminium windows.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: Overview of Mandatory Window Inspection Scheme Accessed: 2026-10-21
  2. [2]Buildings Department: Coverage and Standards of Mandatory Window Inspection Scheme Accessed: 2026-10-21
  3. [3]Buildings Department: Mandatory Window Inspection Scheme Procedures Accessed: 2026-10-21
  4. [4]Buildings Department: Mandatory Window Inspection Responsibilities of Owners and Owners Corporations Accessed: 2026-10-21
  5. [5]Consumer Council: Don’t be fooled by window inspection, clarify the requirements and procedures Accessed: 2026-10-21
  6. [6]HK Create Design: 2026 Renovation Quick Budget and Aluminum Window Assessment Instructions Accessed: 2026-10-21