Where does a HK$270,000 renovation budget go?

HK Create Design’s full renovation example for a 450 sq ft two-bedroom flat comes to about HK$270,980[1]. The breakdown is HK$74,240 for a full kitchen renovation (27.4%), HK$55,540 for a full bathroom renovation (20.5%) andBespoke furniture HK$48,760 (18.0%), whole-flat painting HK$28,350 (10.5%) and SPC flooring HK$22,800 (8.4%).

Other items: electrical work (Distribution board replacement, extra sockets and spotlights) HK$13,740 (5.1%), false ceilings HK$7,650 (2.8%), cleaning and formaldehyde treatment HK$7,200 (2.7%), insurance HK$6,700 (2.5%) and room doors HK$6,000 (2.2%)[1].

The kitchen and bathroom account for nearly half the total, 47.9%. Their condition and scope therefore drive the budget. Keeping sound kitchen and bathroom elements can reduce costs by over HK$100,000 compared with fully rebuilding both.

Furniture ranks third by cost and offers the most scope for adjustment. Wardrobe lengths and TV cabinet designs can change, and some pieces can be added after move-in. Painting and flooring are largely determined by the measured area and rate.

  • Kitchen 27.4%, bathroom 20.5%
  • Kitchen and bathroom together take nearly half
  • Furniture takes 18% and offers the most flexibility
  • Painting and flooring are priced by area
Progress of the Wong Tai Sin showroom renovation | HK Create Design
Project photograph: renovation at the Wong Tai Sin showroom, July 2026, HK Create Design Select an image to enlarge

02

Four items to prioritise

1. Electrical safety. An old fuse box lacking residual-current protection can pose shock and fire risks. The Electrical and Mechanical Services Department requires electrical installation work to be arranged through a registered electrical contractor[5]. H09 distribution board replacement costs HK$6,800, about 2.5% of the full renovation example, and supports electrical safety throughout the flat[1].

2. Waterproofing.Bathroom waterproofing C02 HK$4,850 and C03 kitchen waterproofing HK$4,300[1], which together cost under HK$10,000. Poor workmanship can let water leak into the flat below. Removing the tiles and redoing the work can then cost tens of thousands of dollars, sometimes over HK$100,000.

3. Pipework. Buildings Department figures record 9,402 private buildings aged 50 years or more and over 24,800 aged 30 years or more[4]. Old galvanised pipes may already be corroded and restrict flow. Replacing them after tiling means opening up the new finishes. G05 supply and waste pipe replacement in the kitchen and bathroom costs HK$22,300[1].

4. Board material.Fitted furniture boardsdirectly affects indoor air quality. The Environmental Protection Department notes that new furniture can release volatile organic compounds[6]. HK Create Design specifies ENF-grade board as standard, with formaldehyde emissions ≤0.025 mg/m³ and no upgrade charge.

  • Electrical: distribution board replacement HK$6,800
  • Kitchen and bathroom waterproofing together, HK$9,150
  • Plumbing: consider full replacement in older flats with deteriorated pipes
  • ENF-grade board is standard
Cost breakdown for a full 450 sq ft renovation

You can swipe left or right on your phone to view the complete table.

ItemAmountShareFlexibility
Full kitchen renovationHK$74,24027.4%High flexibility (cabinet replacement example: HK$24,180)
Full bathroom renovationHK$55,54020.5%Moderate flexibility if there is no seepage and tiles can be kept
Bespoke furnitureHK$48,76018.0%High
Whole-flat paintingHK$28,35010.5%Moderate flexibility, depending on wall condition
SPC flooringHK$22,8008.4%Low
electricityHK$13,7405.1%Low flexibility for this safety item
Suspended ceilingHK$7,6502.8%High
Cleaning and formaldehyde treatmentHK$7,2002.7%Low
insuranceHK$6,7002.5%Low
Room doorHK$6,0002.2%High
TotalHK$270,980100%—

Based on HK Create Design's published 2026 prices. [1]

HK Create Design・Illustrated comparisonWhere to save and where to retain the budget
  1. PrioritiseElectrical work, waterproofing, pipes and board material
  2. Possible savingsWall finishes, lighting troughs and selected furniture
Kitchen and bathroom budget priorities (design rendering) | HK Create Design
Design illustration: Kitchen and bathroom budget priorities. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge
Whole-flat renovation budgets: key figures illustrated | HK Create Design
Whole-flat renovation budgets: key figures at a glance | HK Create Design Select an image to enlarge

03

Where the budget can be adjusted

1. Wall preparation. For generally sound walls, E02 filling, moisture-resistant preparation, sanding and painting costs HK$21 per sq ft, compared with E01 stripping at HK$39. Walls in good condition may suit E03 repainting at HK$12 per sq ft[1]. Across 1,350 sq ft of walls, E01 and E03 differ by HK$36,450.

Second, flooring. If the existing tiles are level, SPC flooring can be laid directly over them, saving demolition and debris-removal costs. J01 SPC costs HK$60 per sq ft, less than D03 wood-effect plank tiles at HK$98 per sq ft[1].

3. Decoration. Lighting troughs, decorative paint and feature walls can be deferred. F03 lighting troughs cost HK$460 per linear foot and E06 decorative paint is HK$110 per sq ft[1]. With a tight budget, defer it or confine it to one living-room wall.

4. Phase the furniture. Fit wardrobes and kitchen cabinets before moving in. Desks, shelves and sideboards can come later. Reserve their positions and sockets in the design so new wiring is unnecessary.

  • Use E02 or E03 if the walls are in suitable condition
  • Lay SPC over existing tiles if they are sufficiently flat
  • Lighting troughs and decorative paint can wait
  • Add selected furniture after move-in
HK Create Design・Figures at a glanceFull renovation of a 450 sq ft flat
  1. $270,980TotalExample
  2. 47.9%Kitchen and bathroom shareNearly half
  3. 18%Furniture shareMost flexible

Examples based on HK Create Design's published 2026 rates.

「When a client says their budget is HK$200,000, my first question is whether they have set anything aside for contingencies. If they have not, we allocate around HK$170,000 to the work first so that they can cover costs as the project progresses.」

Project supervisor, HK Create Design

04

Calculate the works allowance by dividing by 1.2

Avoid allocating every dollar to the works. HK Create Design suggests dividing the total budget by 1.2 to find the works allowance. The reserve is 20% of that allowance.

With a HK$300,000 total budget, allocate around HK$250,000 to work and keep HK$50,000 in reserve yourself. Any unused amount stays with you. If opening the walls reveals failing pipes or loose plaster, the reserve helps you weigh variations without arranging emergency finance.

Older buildings can conceal more defects. A reserve of 10–15% of the works allowance may suffice in a new or well-maintained flat. For a flat over 30 years old that has never been renovated, consider 20% or more.

The Consumer Council found that common renovation disputes involved delays, poor workmanship and refusal to rectify defects[2]. A contingency gives you room to address surprises without rushing decisions or choosing a lower-grade option purely for lack of funds.

  • Total budget ÷ 1.2 = amount available for the works
  • HK$300,000 budget: HK$250,000 for the work and HK$50,000 as a contingency
  • Allow a larger reserve for an older flat
  • The owner holds the contingency
Budget shares for a full 450 sq ft renovation(Unit:%)
kitchen
27.4%
Bathroom
20.5%
furniture
18.0%
Painting
10.5%
floor
8.4%
electricity
5.1%
ceiling
2.8%
clean
2.7%
insurance
2.5%
Room door
2.2%

Based on HK Create Design's published 2026 prices. [1]

HK Create Design・Work sequenceOrder for allocating the budget
  1. Safetyelectricity
  2. Wet areasKitchen and bathroom waterproofing and plumbing
  3. FinishesPainting and flooring
  4. furniturePrioritise wardrobes

05

How to allocate a HK$200,000 works budget

Take a 450 sq ft two-bedroom flat with around HK$200,000 for the works and a separate HK$40,000 contingency. Start with safety and wet areas, then move on to surface finishes, and leave the furniture until last.

Full bathroom renovation: HK$55,540, prioritised because of seepage risk. Kitchen cabinet replacement with sound tiles retained: HK$24,180, around HK$50,000 less than the full renovation example. H09 distribution board replacement: HK$6,800.[1].

Finishes: E02 whole-flat painting over 1,350 sq ft of wall costs HK$28,350, J01 SPC over 380 sq ft costs HK$22,800 and L01 cleaning and formaldehyde treatment costs HK$7,200[1]. Furniture includes two 6 ft wardrobes at HK$34,800 and a 6 ft low TV cabinet at HK$7,500, delivered with the kitchen cabinets. L02 insurance costs HK$6,700[1].

The total is about HK$197,890, leaving HK$2,110 of the HK$200,000 works budget. A full kitchen renovation, false ceiling, spotlights and replacement room doors are outside this example. These items can be considered later if funds allow.

  • Prioritise the full bathroom renovation
  • The 6 ft cabinet package and the 8 ft full kitchen renovation examples differ by HK$46,040
  • Painting, flooring and cleaning
  • Total: HK$197,890
Project photo of bespoke kitchen cabinets with worktop | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

06

How to allocate a HK$100,000 works budget

With around HK$100,000 for work, focus the scope. HK Create Design’s 450 sq ft light renovation example is about HK$107,110: E02 paint HK$28,350, SPC flooring HK$22,800, two wardrobes HK$34,800, low TV cabinet HK$7,500, tall hallway unit HK$5,800, cleaning HK$7,200 and delivery HK$660[1].

Light renovation excludes kitchen, bathroom, electrical and plumbing work. It assumes these areas are serviceable and the flat has a suitable distribution board with miniature circuit breakers. If a bathroom leaks, consider reducing the wardrobe allowance to fund waterproofing.

Another option is a bathroom refresh that keeps the tiles. D08 epoxy regrouting costs HK$21 per sq ft, E05 local mould treatment and repainting HK$1,250 per wall, K03 shower mixer replacement HK$970 and K01 toilet installation HK$1,300[1]. A few thousand dollars can already make a bathroom look much brighter and fresher.

With a HK$100,000 budget, concentrate on two or three priorities. Painting and flooring alone can transform the flat. Other work can follow as funds allow.

  • Light renovation example, HK$107,110
  • Kitchen and bathroom plumbing and electrics excluded
  • Refresh the bathroom while retaining the tiles
  • Focus on two or three priorities
Worked example 1

Example: 450 sq ft scheme with a works budget of HK$200,000

Assumptions

  • Bathroom seepage
  • Existing kitchen tiles in good condition
  • Old-style fuse box

How to calculate quantities

  1. Full bathroom renovation example: HK$55,540. Kitchen cabinet replacement example: HK$24,180.
  2. H09:HK$6,800
  3. E02:1,350 × HK$21 = HK$28,350;J01:380 × HK$60 = HK$22,800
  4. FUR05:12 × HK$2,900 = HK$34,800;FUR10:6 × HK$1,250 = HK$7,500
  5. L01:HK$7,200;L02:HK$6,700
  6. Total: HK$197,890

Illustrative total of about HK$197,890, with a separate owner-held reserve of around HK$40,000.

The estimate includes the listed items. Furniture delivery arrangements and any charges are subject to the written quotation after the site survey. [1]

Use your square footage instead and see a reference budget

07

Choosing the scope for the two largest budget items

Two itemised kitchen examples: about HK$24,180 for a 6 ft cabinet replacement with the tiles retained, or about HK$74,240 for a full 8 ft renovation. The HK$28,200 cabinet design package has a separate scope.[1]. The main differences are tile removal, waterproofing, plumbing and tiling. If the tiles are sound, there is no seepage and the pipes are in good condition, the smaller scope may suffice.

A bathroom refresh that retains the tiles starts from a few thousand dollars. A full renovation example of around HK$55,540 covers strip-out, waterproofing, tiling, plumbing, a vanity and installation of the sanitary fittings and shower screen. Supply of the screen, toilet and other sanitary fittings is charged separately.[1]. If water is seeping into the flat below, trace and repair the cause and allow for the necessary waterproofing and reinstatement.

Bathroom breakdown: tiling HK$14,430, pipework HK$13,300, strip-out HK$9,950, vanity HK$6,500, sanitary fitting installation HK$5,650, waterproofing HK$4,850 and shower screen installation HK$860.[1]. The breakdown shows that plumbing and tiling are major cost items.

Worktop material also affects cost. Published rates per linear foot are FUR19 solid surface HK$830, FUR20 quartz HK$1,200 and FUR21 sintered stone HK$1,700[1]. For an 8 ft worktop, changing from solid surface to sintered stone adds HK$6,960.

  • Kitchen examples: HK$24,180 for cabinet replacement or HK$74,240 for full renovation.
  • Bathroom: tile-retaining refresh from a few thousand dollars or a full renovation example at HK$55,540
  • Plumbing and tiling are the main costs
  • Worktop material can make a difference of several thousand dollars
Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

08

How to set a furniture budget

Furniture is one of the most flexible items. The 450 sq ft example allows HK$48,760: two 6 ft wardrobes HK$34,800, a 6 ft low TV cabinet HK$7,500, a 2 ft tall hallway unit HK$5,800 and delivery HK$660[1].

Wardrobes are used daily and are disruptive to install after moving in. FUR05 wardrobes are HK$2,900 per linear foot and a FUR34 internal pull-out basket is HK$1,000[1]. A small room can usePlatform bedsfor some of the storage otherwise provided by a wardrobe. FUR06 platform beds cost HK$340 per sq ft[1].

Keep TV units and shelves simple. FUR10 low TV cabinets are HK$1,250 per linear foot, over half less than FUR01 full-height units at HK$2,900 per linear foot[1].

FUR42 delivery costs HK$660 per trip. Separate deliveries are charged separately[1]. If furniture is produced and delivered together, only one delivery is charged in that example.

  • Furniture example, HK$48,760
  • Wardrobes are a worthwhile furniture priority
  • A low TV unit costs less than half the full-height unit rate
  • Consolidate deliveries to reduce transport costs
HK Create Design・Illustrated overviewHidden costs in a quotation
  1. Construction rubbleHK$4,200 per truckload.
  2. insuranceHK$6,700。
  3. cleanHK$16 per sq ft.
  4. depositBuilding management.
  5. Material upgradesprice difference.
  6. DeliveryHK$660 per delivery.
Whole-home furniture budget (design rendering) | HK Create Design
Design illustration: Furniture covered by a whole-home furnishing budget. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

09

Extra costs to check when they are missing from the quotation

A11 debris removal, HK$4,200 per truckload[1]. A full kitchen and bathroom strip-out usually takes one or two truckloads. L02 insurance costs HK$6,700 and is required by many building managers. L01 cleaning is HK$16 per sq ft[1].

Management deposits and fees vary by building. Some require a deposit of several thousand dollars, refundable after completion if nothing is damaged. Ask about the charges for protecting lifts and corridors too.

A quotation may simply say “tiles”. Selecting large-format D04 installation at HK$120 per sq ft costs over 50% more than D01 at HK$78[1]. Ask how each material choice changes the budget before selecting it.

The Consumer Council recommends a standard quotation template with an itemised scope so consumers can compare offers[2]. It also recommends checking scope, material brands and models, quantities, payment terms and warranties[3]. Ask about any item missing from the quotation.

  • Debris removal, insurance and cleaning
  • building management deposit
  • Price difference for a material upgrade
  • Ask about anything missing from the quotation
Where to save and where to retain the budget

You can swipe left or right on your phone to view the complete table.

CategoryItemReasonIndicative prices
Prioritisedistribution boardSafety provisionH09 HK$6,800
PrioritiseWaterproofingSeepage repairs can be expensiveC02 HK$4,850
Prioritisewater pipeOld pipes may require reopening finished walls laterG05 HK$22,300
Possible savingsWall preparation and finishSound walls may not need strippingE02 HK$21/E03 HK$12
Possible savingslight troughDecorativeF03: HK$460 per linear ft
Possible savingsSelected furnitureCan be added after move-inFUR09: HK$1,950 per linear ft

HK Create Design’s published prices for 2026. [1]

Completed custom floor-to-ceiling wardrobe | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

10

Compare quotations line by line

Quotes of HK$180,000, HK$250,000 and HK$300,000 may cover very different work. Compare scope before choosing on total price.

Align the scope, quantities and materials across quotes. For paintwork, E03 means direct repainting, E02 includes local filling and moisture-resistant preparation, and E01 includes stripping the old finish. Rates range from HK$12 to HK$39 per sq ft for different scopes[1].

For waterproofing, check the number of coats and whether a pond test is included. For the kitchen, check removal, waterproofing and pipes. Compare each quotation on the same scope and ask contractors to identify any missing items.

HK Create Design publishes its prices online[1]. The quote lists reference codes, quantities and unit prices so you can compare it with other offers.

  • Totals only make sense when the scope is comparable
  • Compare scope, quantities and materials for each item
  • Painting, waterproofing and kitchens often differ in scope
  • Published prices make quotes easier to compare

11

Environmental impact and long-term cost

A lower initial price can mean paying twice. E03 repainting may need repeating in a year or two if the base is unstable. Low-quality board can distort within a few years. Select the method for the condition and expected service life.

The Environmental Protection Department encourages retaining serviceable materials during renovation to reduce waste[7]. Lay SPC over existing tiles if they are suitably flat, replace only the doors on sound cabinet carcasses and repaint serviceable room doors. Reusing these items reduces both cost and waste.

LED lights, energy-efficient appliances and suitable curtains can cost more initially but reduce electricity bills over time.Whole-flat renovationis an investment you may make once a decade. Dividing the cost over ten years can help assess an upgrade. The full renovation example at around HK$270,000 works out at about HK$2,258 a month.

  • Look beyond the lowest initial price
  • Keep serviceable materials
  • Work out the monthly cost over ten years
  • Choose the method that suits the condition and expected use
Consumer Council: most common categories of renovation disputes(Unit:%)
Project delay
61%
Poor workmanship
39%
Refusal to fix defects
30%

Consumer Council study on home renovation (2024). [2]

12

Why small and large flats have different prices per square foot

A single price per square foot can mislead for both small and large flats. Renovating one kitchen and one bathroom can cost much the same in a 300 or a 600 sq ft flat, assuming similar scope.

Based on a combined HK$129,780 for full kitchen and bathroom renovation[1]: spread across a 300 sq ft flat, the cost is about HK$433 per sq ft. It falls to about HK$288 for a 450 sq ft flat and HK$216 for a 600 sq ft flat. A smaller flat therefore costs more per square foot even at the same rates.

Painting, flooring and cleaning vary with area. The total rises in a larger flat although the unit rate is broadly similar. E02 paint is HK$21 per sq ft of wall, J01 SPC is HK$60 per sq ft of floor and L01 cleaning is HK$16 per sq ft[1].

Estimate fixed items such as the kitchen, bathroom, distribution board and insurance separately from area- or quantity-based items such as paint, flooring, cleaning and furniture, then add them. HK Create Design’s online calculator uses the selected work items and dimensions[1].

Allow for both bathrooms in a two-bathroom flat, removal and making good for an approved open kitchen, and waterproofing for a balcony. Layouts vary, so final costs require a site measurement.

  • Kitchen and bathroom costs are relatively fixed
  • About HK$433 per sq ft when spread over a 300 sq ft flat
  • Painting and flooring are priced by area
  • Separate fixed and area-dependent costs
Renovation of a compact flat (design rendering) | HK Create Design
Design illustration: Refurbished small flat. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

13

When payments fall due

Whole-flat renovation is normally paid in instalments as work progresses. Knowing when payments fall due helps manage cash flow alongside a property deposit, legal fees and moving costs.

The first instalment is generally due at contract signing, along with a separate renovation deposit to management. The second follows strip-out and first-fix plumbing and wiring. The third follows wet trades, waterproofing and joinery. The final balance follows completion and acceptance. The quote should state the amount and stage of every payment.

Custom furniture is manufactured from approved production drawings, so a deposit is generally due once the design is confirmed. HK Create Design’s quote explains the furniture payment schedule and the work stage each instalment covers.

The Consumer Council recommended exploring escrow or trust arrangements for renovation payments[2], reflecting concern over payment protection among consumers and the industry. Avoid paying most of the contract sum upfront and inspect each stage on site before releasing its payment.

  • Link instalments to work progress
  • Prepare deposits before work starts
  • Pay the furniture deposit after approving the design
  • Check site progress before paying
Worked example 2

Example: calculating the works allowance from a HK$300,000 total budget

Assumptions

  • Total budget HK$300,000
  • Keep a contingency of 20% of the works budget

How to calculate quantities

  1. Works allowance = HK$300,000 ÷ 1.2 = HK$250,000
  2. Contingency = HK$300,000 − HK$250,000 = HK$50,000
  3. The HK$270,980 full renovation example exceeds the works budget by HK$20,980
  4. Adjustment: defer the HK$7,650 false ceiling, HK$6,000 room doors and HK$3,100 spotlights to save HK$16,750
  5. The remaining overrun is about HK$4,230. Consider local repainting under E03 or reducing a wardrobe by one foot

Plan on HK$250,000 for the work and retain HK$50,000 in reserve.

The contingency stays with the owner and is separate from company charges. [1]

Use your square footage instead and see a reference budget
Whole-flat renovation budgets: checklist illustrated | HK Create Design
Whole-flat renovation budgets: checklist | HK Create Design Select an image to enlarge

14

Additional expenses: moving, temporary accommodation and appliances

A flat is usually uninhabitable during a full renovation. The 450 sq ft example takes around eight to ten weeks, so allow for two to three months’ temporary rent if needed. Some households stay with relatives or start work before their previous tenancy ends.

Moving and storage can involve two moves, out and back, as well as storage fees. Decide which pieces you will reuse before booking transport.

Air conditioners, refrigerators, washing machines, cooker hoods, water heaters and decorative lights are usually outside the renovation quote. Allow a separate budget and provide model dimensions early for built-in ovens and electric water heaters so the cabinets and electrical supply can be planned.

Curtains, mattresses, sofas and other furnishings are often overlooked. Keep a separate move-in list and budget. Appliances and furnishings can be bought during sales rather than all at once during construction.

  • Temporary accommodation during construction
  • Moving out, storage and the return move
  • Appliances and light fittings are separate
  • List furnishings in the move-in budget

15

Ask HK Create Design to help allocate the budget

HK Create Design has served Hong Kong households since 2019. Our team includes designers and tradespeople with over 15 years of experience. After measuring, we help prioritise essential work and identify items that can wait. Prices are published online[1].

Free site measurement is available for two or more work items until 31 December 2026. Custom furniture includes design and whole-flat drawings. Work carries a one-year warranty and the minimum charge is HK$2,000.

Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. WhatsApp 5243 7747 with the size, age and budget for your flat. We can suggest an initial allocation and prepare a formal quote after measurement.

  • Set priorities for the budget
  • Prices published online
  • Free site measurement for a limited time
  • WhatsApp 5243 7747

Advice from our tradespeople

「When a client says their budget is HK$200,000, my first question is whether they have set anything aside for contingencies. If they have not, we allocate around HK$170,000 to the work first so that they can cover costs as the project progresses.」

Project supervisor, HK Create DesignHK Create Design project team

「Furniture can be phased, but plan the whole layout first. Reserve sockets and lighting points for future shelves and desks to avoid opening the walls again.」

Head of Design, HK Create DesignHK Create Design team

FAQ

11 practical questions answered

01How much does a whole-home renovation cost in a 450 sq ft flat?

Examples: light renovation around HK$107,110, intermediate renovation around HK$236,890 and full renovation around HK$270,980[1].

02Which part of a whole-home renovation costs the most?

The kitchen (27.4%) and bathroom (20.5%) account for nearly half, followed by furniture (18%)[1].

03Is HK$200,000 enough to renovate 450 sq ft?

A HK$200,000 works budget can cover a full bathroom, kitchen cabinet package, painting, flooring, distribution board, wardrobes and a TV unit. This example totals around HK$197,890. Set aside a separate contingency.[1].

04How much planning contingency should I allow?

A planning method is total budget ÷ 1.2 = works allowance, leaving a contingency of about 20% of that allowance. Older flats may need more, and a new flat may need 10–15%. The owner holds the contingency. It is not a company charge.

05Which items should I avoid cutting back?

Prioritise electrical work, waterproofing, pipes and board materials. Repairs after failure can cost much more than the initial saving[5].

06Where can I save money?

Where conditions allow, use E02 or E03 on sound walls, lay SPC over flat tiles, defer lighting troughs and decorative paint, and add selected furniture after move-in[1].

07How should I compare several quotes?

Compare scope, quantities, materials and warranties item by item[3].

08Why do small flats cost more to renovate per square foot?

The kitchen and bathroom are relatively fixed costs. A combined HK$129,780 works out at around HK$433 per sq ft in a 300 sq ft flat or HK$216 per sq ft in a 600 sq ft flat[1].

09Does a renovation quotation include appliances?

Air conditioning, a refrigerator, washing machine and decorative lighting are generally extra. Provide models and dimensions for built-in appliances in advance.

10Do I have to move out during renovation?

A full 450 sq ft renovation takes about eight to ten weeks and generally requires moving out. Remaining in the flat may be possible for partial work.

11What are the common sources of renovation disputes?

The Consumer Council study identified delays (61%), poor workmanship (39%) and refusal to rectify defects (30%) as the most common issues[2].

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
  2. [2]Consumer Council: 4 proposed measures to strengthen regulation of the home renovation industry (21 February 2024) Accessed: 2026-11-03
  3. [3]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03
  4. [4]Buildings Department: 2026–27 Estimates reply on numbers of private buildings by age Accessed: 2026-11-03
  5. [5]Electrical and Mechanical Services Department: Household Electrical Safety Handbook, new installations, additions and alterations Accessed: 2026-11-03
  6. [6]Environmental Protection Department: Indoor Air Quality Information Centre FAQs Accessed: 2026-11-03
  7. [7]Hong Kong GovHK: Environmentally Friendly Tips for Home Renovation Accessed: 2026-11-03