01
Single item or whole room? Compare quotes with matching scopes
These are published company rates. They do not set the minimum or total for every partial demolition. Before choosing a package, mark what you want to retain.[2]
You can swipe left or right on your phone to view the complete table.
| Plan | Company reference rates and measurements | Check before comparing |
|---|---|---|
| A06 Remove kitchen or bathroom cabinets | HK$170 per linear ft of horizontal length | Cabinet, worktop, plumbing and electrical connections, and haulage limits |
| A09 whole-kitchen demolition | HK$9,950 per room | Wall and floor tiles, kitchen cabinets and handling. Open kitchens are assessed by actual scope |
| A10 whole-bathroom demolition | HK$9,950 per room | Wall and floor tiles, sanitaryware, vanity and handling |
If the vanity is already in the agreed A10 scope, do not add A06 for the same item. Record retention, repairs and additions in writing. [2]
02
Cabinet removal prices: how are kitchen cabinets and built-in units measured?
A06 kitchen and bathroom cabinet removal uses horizontal length in linear feet. A07 built-in wardrobe or tall cabinet removal uses front height × width and item count, with a minimum per piece. The two units cannot be compared directly.[2]
Send an overview, fixed connections and items to keep, then check subsequent repairs, haulage and plumbing or electrical connections. If dimensions are unknown, first go toDemolition services pageChoose “Cabinet removal or partial kitchen and bathroom demolition”. To compare multiple work items, seeDemolition price list.
- How many cabinet units are there, and what is the approximate height and width of each?
- Are the worktop, mirror, lights or adjacent cabinets to stay?
- Is only clearance required after removal, or wall repair and painting as well?
03
How to describe partial demolition clearly
For partial demolition, distinguish items to remove, retain, temporarily remove and reinstate, or confirm later.
Identify the location and item rather than just naming the room
“Bathroom demolition” can mean removing one vanity or taking out sanitaryware, wall tiles and floor tiles too. Number the photos, identify each item and quantity, and specify the removal depth so that contractors can quote the same scope.
Keeping an item in place and removing it for reinstallation are different tasks
Protecting a door in place differs from taking it down, storing it and rehanging it. If reuse is uncertain, agree on the inspection, alternatives and process for approving costs in advance.
Removal line item for a 6 linear ft vanity
Assumptions
- Assume a confirmed A06 measurement of 6 linear ft.
Checks to make
- 6 × HK$170=HK$1,020。
- Check whether protection, connections, haulage and later reinstatement are listed.
HK$1,020 illustrates only this cabinet removal item. It is neither a minimum nor an all-inclusive charge for all partial work.
This hypothetical example illustrates planning only. It represents neither an actual job nor an agreed price or schedule. The site assessment determines the actual plan. [2]
Get a free cabinet removal quote based on cabinet length and what you want to keep04
Which areas should be checked before keeping old pipes and door frames?
Assess concealed sections and the needs of follow-on trades before retaining old pipes or door frames.
Visible features show only part of the existing condition
Pipes behind cabinets, concealed wall connections and substrates may be hidden at quotation. Record what can be confirmed and what remains unknown. Avoid guaranteeing that every old pipe and surrounding finish can be retained undamaged.
Assign responsibility for plumbing and electrical work separately
Cabinet removal does not automatically include all disconnections, plumbing alterations or electrical work. Agree who isolates, disconnects, reinstates and tests services. Check the applicable qualifications and requirements for regulated work, however small the job.[1]
You can swipe left or right on your phone to view the complete table.
| Category | Example wording | Confirmation required |
|---|---|---|
| Strip-out | Photo A: remove the base cabinet and worktop | Horizontal length, connections and clearance scope |
| Retain | Photo B: keep the door frame and floor tiles outside the door | Existing damage, protection and edge finishes |
| Temporary removal and reinstatement | Photo C: remove reusable fittings | Who stores it, can it be reused and who reinstalls it? |
| To be confirmed | Pipe locations and substrate behind the cabinet | When inspection takes place and how changes are approved |
The company price list gives indicative rates. The confirmed scope determines the planning checklist and the formal all-inclusive quotation. [2]

05
Price partial and whole-room demolition separately
Individual items and full-room packages cover different scopes. Avoid charging twice for the same work.
Use the company's published items as a starting point
Published A06 removal of kitchen or bathroom cabinets is HK$170 per linear ft of horizontal cabinet length. A09 whole-kitchen and A10 whole-bathroom demolition and clearance are each HK$9,950 per room and have different scopes.[2]
These company reference items cover specific scopes. Confirm the applicable item and inclusions before adding cabinet or tile removal charges to a full-room package.
Check protection, repairs and haulage separately
Protection and junction repairs may need different trades and materials. Match the handling described in the kitchen or bathroom package to any extra haulage. Ask how unlisted work will be charged.
Want to remove only part of the fittings and keep the rest? Send an overview on WhatsApp and add two lists: “remove” and “must retain”. We will review your requirements and then check feasibility on site.
You can swipe left or right on your phone to view the complete table.
| Common omissions | Details to agree |
|---|---|
| Outside the entrance and in common areas | Responsibility for protection, carrying and clearance |
| Junction between new and existing work | How much making good is required after demolition? |
| Plumbing and electrical connections | Scope for isolation, capping, reinstatement and testing |
| Waste | Whether the package includes it, the reason for extras and the number of trips or visits |
The company price list gives indicative rates. The confirmed scope determines the planning checklist and the formal all-inclusive quotation. [2]
06
Record existing conditions before work starts
The pre-work condition record should include retained items and common areas.
Photograph existing damage so handover can be checked against a record
Record scratches, cracks and stains on frames, floor tiles, sanitaryware and adjacent cabinets. Keep the location and date with each photo and use a separate list for each flat.
Confirm building management arrangements and technical requirements separately
Follow building management rules for work and loading. Structural, fire-safety and drainage issues may require separate professional assessment. Building permission alone does not complete every applicable procedure.[1]
07
How should demolition be handed over to the next trade?
Identify finished and outstanding work at handover so the next trade can take over.
List outstanding items at handover
Record exposed connections, substrates needing repair and unresolved questions. This gives the plastering, tiling, plumbing and electrical trades more information than “demolition finished”.
A vanity removal charge appears after selecting A10
Assumptions
- Assume the same vanity is already included in the agreed A10 scope.
Checks to make
- Check the A10 description of wall and floor tiles, sanitaryware, bathroom cabinets and handling.
- Ask whether the additional charge covers genuinely new work.
Avoid double-counting included work. Confirm unlisted items before proceeding.
This hypothetical example illustrates planning only. It represents neither an actual job nor an agreed price or schedule. The site assessment determines the actual plan. [2]
08
How do cabinet linear feet differ from square feet of wall or floor?
A06 uses the horizontal cabinet length. Wall and floor tile removal use the relevant surface areas. Mark how upper and base cabinets, corners and worktops are measured on a plan attached to the quote.[2]
An item included in a whole-room package should not be charged again without a defined addition to the scope. Mark uncertain quantities as pending measurement. Keep different measurement units separate from the start.
09
What happens if an existing item cannot be reused?
Keep the photos and inspection findings. Distinguish existing deterioration, removal constraints and necessary work. Confirm the replacement model, supplier and additional costs before proceeding.
Demolition has no warranty. Still record contract completion, damage responsibility and outstanding items individually. Subsequent new work or installation follows its own written warranty terms.
10
Partial demolition enquiries: four columns to define the work
Use one list for removal, retention, temporary removal and reinstatement, and pending decisions. Match each entry to a photo number.
Compare related workBathroom tiling arrangements.
- Work location, items and quantities
- Items to keep and existing damage
- Who will handle follow-on masonry, plumbing, electrical work or installation?
- Clearance scope and building management's permitted work hours
FAQ
6 practical questions answered
01Can you guarantee the surrounding surfaces will be free of scratches during partial demolition?
No guarantee of that kind is possible. Agree on protection, record existing conditions and assign responsibility for accidental damage.
02If old pipes do not leak, can we keep them all?
Check the condition, connections and follow-on work. Opening up may reveal more.
03Does removal include new rendering or painting?
Only work listed in the written scope is included. Completion of demolition alone does not establish the scope of follow-on work.
04Can I enquire about removing just one vanity?
Send dimensions and photos of the location and connections. Acceptance, schedule and cost are subject to confirmation.
05Can cabinet removal be priced using the whole flat's floor area?
No. A06 uses linear feet of horizontal cabinet length. Record the quantity using the agreed measurement method.[2]
06Is there a warranty on demolition?
Demolition has no warranty. Check scope, handover, damage responsibility and outstanding items against the written agreement. List warranties for new works separately.