Check fixture categories before renovating a public rental kitchen or bathroom

The Housing Authority groups its fixtures into three categories. Tenants normally may not alter Category A fixtures. Category B requires prior approval and Category C requires no prior approval[2]. Kitchen and bathroom items fall into all three categories, so check each proposal before work begins.

Category A includes kitchen, toilet and bathroom partition walls (A1), soil, waste and vent stacks and floor drains (A6), pipe ducts (A7) and main pipes (A8)[2]. Public rental tenants cannot remove a kitchen partition to make it open-plan or relocate the floor drain under these rules.

Category B includes kitchen and bathroom floor tiles (B7), wall tiles (B8), vent and waste pipe branches (B9), shower trays, baths and toilet pans (B10), basins and sinks (B11), cooking benches (B12), branch pipes (B14) and tenant wiring and socket outlets (B15)[2]. Apply to the estate office before carrying out these items.

Category C includes the surface finish of the cooking bench (C7), showerheads, taps, plugs and chains, toilet seats, curtain rods and grab rails (C8), kitchen cupboards and base cabinets under sinks or basins (C9), and shower tray doors (C6)[2]. Cabinetry, a cooking bench surface finish, showerheads, taps and shower doors can generally be arranged without prior Housing Authority approval within the listed scope.

  • Category A — partition walls, main pipes and stacks may not be altered
  • Category B — approval required for tiles, sanitary fittings and branch pipes
  • Category C — cabinets, taps and grab rails generally require no prior approval
  • Check the category of each item before quoting
HK Create Design・Illustrated comparisonPublic rental kitchens and bathrooms — which changes require approval?
  1. No prior approval (Category C)Kitchen cabinets, base units, worktop surface finishes, showerheads, taps, grab rails and shower doors
  2. Prior approval required (Category B)Floor tiles, wall tiles, toilets, baths, basins, sinks and branch pipes
  3. Alterations prohibited (Category A)Kitchen and bathroom partition walls, main pipes, stacks and floor drains
Completed custom floor-to-ceiling wardrobe | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

02

Why public rental kitchen and bathroom tiles should usually stay in place

The Housing Authority's terms explain that kitchen and bathroom floor tiles cover a waterproof membrane. Lifting tiles or moving partition walls may damage it and allow water into neighbouring flats. Tenants can be liable for resulting damage to neighbours and the Housing Authority[2].

Private bathroom renovations often strip back tiles and renew waterproofing. In a public rental flat, floor tiles are Category B and need approval. Tenants take responsibility for future maintenance and replacement of fixtures they alter with permission[2].

For public rental flats, start by considering work that retains the tiles and membrane. Depending on the classified scope, this can include cabinets, worktop finishes, showerheads, grout, mould treatment and a shower door. This approach can shorten the job and reduce disruption.

If tiles are cracked or hollow or you suspect water ingress, report it to the estate office. For qualifying repairs for which the Housing Authority is responsible, its pledge is to start work within 12 days of the report[3]. Applying through the Housing Authority establishes responsibility for the work.

  • Waterproof membrane beneath kitchen and bathroom floor tiles
  • Tile removal is Category B and requires approval
  • Tenant is responsible for future repairs to approved alterations
  • Report damaged tiles to the estate office first
Public rental kitchen and bathroom fixture categories at a glance

You can swipe left or right on your phone to view the complete table.

ItemClassificationIs prior approval required?Remarks
Kitchen and bathroom partition wallsJiayiNot allowedWalls cannot be opened up
Main pipes, vertical stacks and floor drainsA6 / A8Not allowedRelocation is prohibited
Kitchen and bathroom floor and wall tilesYi seven / Yi eightPrior approval requiredWaterproof membrane below the tiles
Toilet pan, shower tray and bathB10Prior approval requiredTenant maintains the approved alteration
Washbasins and kitchen sinksB11Prior approval requiredReplacing cabinets while retaining the sink can remain Category C
Branch pipesB14Prior approval requiredWork by a licensed plumber
Surface finish of the cooking benchC7No approval requiredThe cooking bench surface finish can be changed
Showerheads, taps and grab railsC8No approval requiredPipe alterations still require a licensed plumber
Kitchen cabinets, base cabinetsBingjiuNo approval requiredUse moisture-resistant board
Shower tray doorC6No approval requiredSeal penetrations through tiles

Based on the Housing Authority's fixture categories. Confirm the applicable requirements with your estate office. [2]

Public housing kitchen and bathroom renovations: key figures illustrated | HK Create Design
Public housing kitchen and bathroom renovations: key figures at a glance | HK Create Design Select an image to enlarge

03

Kitchen upgrades — base and wall cabinets

A typical small public rental kitchen has one run of base units with a sink and cooking bench. Kitchen cupboards and base units fall under C9 and generally require no prior approval[2]. This can make the cabinets a worthwhile upgrade. FUR14 kitchen base cabinets cost HK$1,300 per linear foot, excluding the worktop. They include moisture-resistant carcasses, doors, soft-close hinges, adjustable feet and plinths[1].

FUR15 wall cabinets cost HK$1,250 per linear foot, with moisture-resistant carcasses and soft-close hinges[1]. Some public rental kitchens have few or no wall cabinets. A full-height run can make substantially more storage available. A typical gap above the worktop is 60–70cm. Follow the hob and extractor manufacturer's clearance requirements.

Old cabinet removal is separately priced under A06 at HK$170 per linear foot[1]. When removing cabinets, protect the sink and pipes. The sink is item B11 and branch pipes are B14[2]. Replacing the cabinet while leaving the sink and plumbing intact can stay within Category C. Replacing the sink or changing pipework requires prior approval.

Choose moisture-resistant board for a humid kitchen. HK Create Design uses ENF-grade panels as standard. The ENF formaldehyde emission limit is 0.025 mg/m³[9]. Adjustable feet and a plinth help keep the cabinet carcass off the floor and limit moisture exposure.

  • FUR14 base cabinet — HK$1,300 per linear foot
  • FUR15 wall cabinet — HK$1,250 per linear foot
  • A06 old cabinet removal — HK$170 per linear foot
  • Apply before replacing the sink or moving pipework
Internal floor areas of Housing Authority public rental flats in 2026(Unit:%)
Under 20 m²
13.3%
20–29.9㎡
23.9%
30–39.9㎡
47.0%
40 m² or more
15.8%

Housing Bureau, Housing in Figures 2026. Smaller homes need particularly careful planning of kitchen and bathroom space. [4]

「New cabinets, a worktop and refreshed grout can address many signs of age without lifting tiles or disturbing floor waterproofing. Check each proposed item against the estate rules.」

Public Housing Projects Supervisor, HK Create Design
Design rendering of upgraded cabinets in a public rental kitchen | HK Create Design
Design illustration: Refurbished kitchen cabinets in a public rental flat. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

04

Kitchen upgrades — worktops, pull-outs and cooker hoods

An old worktop can make a kitchen look dated. The finish to the cooking bench is C7[2], so replacing the surface finish can generally be arranged. HK Create Design lists FUR19 seamless solid surface at HK$830, FUR20 quartz at HK$1,200 and FUR21 sintered stone at HK$1,700 per linear foot. Each includes one sink and one hob cut-out[1].

Quartz is a popular mid-priced choice for resistance to heat, scratching and stains. Solid surface can form seamless corners in an L-shaped kitchen. Sintered stone resists heat but needs careful handling because of its weight and brittle edges. A typical worktop is 600mm deep to match the base units.

FUR34 standard kitchen pull-outs for dishes or spices cost HK$1,000 each and can make narrow units more accessible[1]. A spice pull-out beside the sink and a dish basket under the hob can make items easier to reach than fixed shelves.

K04 installation of a ducted cooker hood costs HK$860 per unit and includes mounting, exhaust duct, opening and testing. Removal and disposal of the old unit cost an additional HK$470[1]. Gas cookers and gas pipes are part of the gas installation. Repairs or alterations to pipework downstream of the meter require a registered gas contractor[2]. EMSD also advises using a registered gas contractor for gas cooker installation and maintaining ventilation[6].

  • FUR19 solid-surface worktop — HK$830 per linear foot
  • FUR20 quartz worktop — HK$1,200 per linear foot
  • FUR34 pull-out basket — HK$1,000 each
  • Gas pipework requires a registered gas contractor
Made-to-measure kitchen cabinets and wall units | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

05

Bathroom upgrades — five ways to retain existing tiles

First, consider epoxy grout for darkened joints in sound tiles. D08 costs HK$21 per sq ft, including removal of old loose grout, application and cleaning the tile faces[1]. At 60 sq ft of wall and floor tile surface, the example costs around HK$1,260.

Second, treat mould and repaint the ceiling. E05 local mould treatment and repainting costs HK$1,250 per surface, including treatment, mould-resistant primer and topcoat[1]. If water ingress is causing mould, find and repair the source first.

Third, replace the showerhead or tap. Both are C8 and generally need no prior approval[2]. Under the Housing Authority's terms, alterations to taps or pipes must use materials that meet Water Supplies Department requirements and be carried out by a licensed plumber[2]. The Water Supplies Department publishes a register of licensed plumbers[5]K03 Install a shower mixer: HK$970 per set[1].

Fourth, add a shower door or screen. Shower tray doors are C6[2]. K05 shower screen installation labour is HK$860 per set, or from HK$1,400 for thick frameless glass[1]. Option five is a mirror cabinet. FUR26 bathroom mirror cabinets cost HK$1,150 per linear foot[1]. Where the wall is tiled, the Housing Authority requires penetrations to be sealed with silicone to prevent water ingress[2].

  • D08 epoxy grouting — HK$21 per sq ft
  • E05 mould treatment and repainting — HK$1,250 per surface
  • K03 shower mixer installation — HK$970 per set
  • K05 shower screen installation — from HK$860
  • Apply silicone to holes through wall tiles
Worked example 1

Example — public rental kitchen update retaining the tiles

Assumptions

  • Existing sink, pipe positions and tiles retained
  • 6 ft single-wall kitchen
  • Quartz worktop and one spice pull-out
  • Replace the cooker hood (appliance supplied by customer)

How to calculate quantities

  1. A06:6 × HK$170 = HK$1,020
  2. FUR14:6 × HK$1,300 = HK$7,800;FUR15:6 × HK$1,250 = HK$7,500
  3. FUR20:6 × HK$1,200 = HK$7,200
  4. FUR34:HK$1,000;K04:HK$860
  5. FUR42:HK$660
  6. Total: HK$26,040

Illustrative total around HK$26,040. The listed items are Category C or retain the existing fixtures, subject to estate requirements.

Old cabinet removal is a separate HK$1,020 line in this example. The HK$28,200 custom kitchen design package is a separate offer. Sink replacement or pipe alterations are Category B and require prior approval. Removal of the old cooker hood costs an additional HK$470. [1][2]

Use your square footage instead and see a reference budget
HK Create Design・Illustrated overviewFive ways to update a bathroom while retaining the tiles
  1. Apply epoxy groutClean, light-coloured grout in place of dark joints.
  2. Mould treatment and repaintingMould-resistant ceiling primer.
  3. Replace the shower mixerCategory C — no prior Housing Authority approval.
  4. Add a shower screenSeparation of the wet and dry areas.
  5. Add a mirrored cabinetSeal wall penetrations with silicone.
  6. Install grab railsFall prevention for older residents.
Completed custom platform bed | HK Create Design
Site photo: Custom platform beds on site. HK Create Design. Select an image to enlarge
Design rendering of a public rental bathroom update retaining the tiles | HK Create Design
Design illustration: Bathroom refurbishment retaining existing tiles in a public rental flat. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

06

Bathroom upgrades — safety for older residents

Public rental housingOlder residentshouseholds account for a substantial share. Housing Bureau figures put elderly households in Housing Authority public rental housing at around 222,600, or approximately 27%, at the end of March 2026[4]. Wet bathroom floors increase the risk of falls. The Department of Health advises providing grab rails, using non-slip mats and keeping floors dry[7].

Grab rails are C8 and generally require no prior approval[2]. Common grab-rail locations are beside the toilet and in the shower, often around 800–900mm above the floor. Choose the height for the user and provide a suitable structural fixing. Seal penetrations in the tiled wall with silicone[2].

Some public rental homes have baths. The Housing Department can convert one to a shower with grab rails free of charge for an older tenant or another resident with an accepted need. The estate manager can approve a genuine need without a medical or Social Welfare Department referral[2]. If an older tenant struggles to step into the bath, ask the estate office about this free adaptation.

Allow enough light in the bathroom. H05 installation of a customer-supplied ceiling light at an existing point costs HK$670 per fitting[1]. Adding a lighting point or altering the wiring is B15 and needs prior approval[2].

  • Elderly households account for around 27% of Housing Authority public rental households
  • Grab rails — Category C
  • Bath-to-shower conversion — free Housing Department adaptations for eligible tenants
  • Additional lighting points or wiring changes are Category B
Common prices for public rental kitchen and bathroom work

You can swipe left or right on your phone to view the complete table.

ItemNo.Unit priceClassification
kitchen base cabinetFUR14HK$1,300 per linear ftBingjiu
Kitchen wall cabinetsFUR15HK$1,250 per linear ftBingjiu
Quartz worktopFUR20HK$1,200 per linear ftC7
Remove old kitchen cabinetsA06HK$170 per linear ftBingjiu
Range hood installationK04HK$860 per unitDepends on the gas connection
Shower mixer installationK03HK$970 per setC8
Shower screen installationK05From HK$860C6
Apply epoxy groutD08HK$21 per sq ftRetain the tiles
Mould treatment and repaintingE05HK$1,250 per wall faceInterior paint colour
Bathroom mirror cabinetFUR26HK$1,150 per linear ftSeal fixings through the wall

HK Create Design published 2026 rates. Minimum job charge HK$2,000. [1][2]

Design rendering of a public rental bathroom with safety features for an older resident | HK Create Design
Design illustration: Bathroom safety features for an older resident in a public rental flat. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

07

How to apply for Category B work

For Category B work such as replacing a toilet, basin or floor tiles, submit the proposed alterations to the estate office, obtain approval and work to the approved scope. Keep photos and receipts. Protect all existing electrical cables, water pipes, drains and ventilation pipes during renovation[2].

The tenant is responsible for future maintenance and replacement of fixtures altered with approval[2]. For example, a tenant who replaces the toilet after approval becomes responsible for its future maintenance. Retaining a serviceable original fitting can make maintenance simpler.

Plumbing work must use materials meeting Water Supplies Department requirements and be carried out by a licensed plumber[2]. A registered electrical contractor must handle fixed wiring and sockets. HK Create Design separates Category C items from Category B items awaiting approval so permitted work can be scheduled separately.

Never pour cement or mortar into toilets or drains inside or outside the flat[2]. Clear renovation waste the same day to avoid estate management penalties.

  • Apply to the estate office
  • Tenant takes responsibility for future repairs after approved alteration
  • Use a licensed plumber for plumbing work
  • Separate Category C and Category B items in the quote
Full renovation in progress at the Wong Tai Sin showroom | HK Create Design
Project photograph: renovation at the Wong Tai Sin showroom, July 2026, HK Create Design Select an image to enlarge

08

Example kitchen and bathroom budgets

These examples use HK Create Design's published 2026 rates[1]. Itemised kitchen example: removal of 6 ft of old cabinets, 6 ft each of new base cabinets, wall cabinets and quartz worktop, one spice pull-out, cooker hood installation and one delivery total around HK$26,040. Old cabinet removal is a separate line item. The HK$28,200 custom design package covers 6 ft each of wall units, base units and quartz worktop in the specified configuration, with premium moisture-resistant ENF-grade board for the cabinets, measurement by a Hong Kong designer, VR renderings and design drawings. The itemised example retains the original sink and pipe positions. Replacing the sink is B11 and requires prior approval[2].

Bathroom example with the tiles retained: a 2 ft mirror cabinet, shower mixer replacement, shower screen, 60 sq ft of epoxy grout, ceiling mould treatment and repainting, plus one delivery. Indicative total HK$7,300. The original floor waterproofing and sanitary fittings remain in place.

Together, the two itemised examples total around HK$33,340 and may take one to two weeks. Retaining tiles and existing fittings can reduce the cost, disruption and scope of approvals required.

We suggest setting aside a 20% planning allowance for issues such as old pipe positions, uneven walls and special finishing. This is money you keep in reserve, separate from our charges.

  • Kitchen example with tiles retained — around HK$26,040
  • Minor bathroom upgrade example — around HK$7,300
  • Total: about HK$33,340
  • Set aside a 20% contingency in your own budget
Items in the kitchen example with tiles retained(Unit:HK$)
base cabinets
HK$7,800
wall cabinets
HK$7,500
Quartz worktop
HK$7,200
Remove old cabinets
HK$1,020
Pull-out basket
HK$1,000
Cooker hood
HK$860
Delivery
HK$660

Based on HK Create Design's published 2026 prices. [1]

HK Create Design・Figures at a glanceTwo example budgets
  1. $26,040Kitchen with existing tiles retainedCabinets, worktop and pull-out basket
  2. $7,300Minor bathroom upgradeEpoxy grouting, shower screen and mirror cabinet
  3. $33,340TotalAround one to two weeks

Examples based on HK Create Design's published 2026 rates.

09

Common mistakes in public rental kitchen and bathroom upgrades

First, avoid removing and relaying tiles without permission. Floor and wall tiles are Category B, and damage to the membrane may cause leaks for which the tenant can be liable[2]. The Housing Department can require reinstatement of unauthorised alterations at the tenant's expense[2].

Second, retaining the kitchen partition is a requirement. Its A1 classification prohibits alterations by tenants[2]. Pale cabinet fronts, glazed wall units and good lighting can make an enclosed kitchen feel more open.

Third, avoid leaving unsealed holes in tiled bathroom walls. The Housing Authority requires wall penetrations to be sealed with silicone[2]. Otherwise water may enter the wall through the fixing and cause mould in the next room.

Fourth, specify moisture-resistant cabinets. Ordinary board can swell in a humid, poorly ventilated kitchen. Fifth, keep the flat ventilated after work. The Environmental Protection Department notes that renovation materials can affect indoor air quality[8]. Run the cooker hood or open a suitable window when cooking.

  • Check with the estate office before lifting tiles
  • Kitchen partition walls may not be altered
  • Seal drilled tile fixings with silicone
  • Use moisture-resistant board
  • Ventilate after renovation
Worked example 2

Example — minor public rental bathroom update retaining the tiles

Assumptions

  • Existing tiles and sanitary fittings retained
  • Dark grout and mould on the ceiling
  • Add a mirrored cabinet and shower screen

How to calculate quantities

  1. FUR26:2 × HK$1,150 = HK$2,300
  2. K03:HK$970;K05:HK$860
  3. D08:60 × HK$21 = HK$1,260
  4. E05:HK$1,250
  5. FUR42:HK$660
  6. Total: HK$7,300

Illustrative total around HK$7,300, with the main work normally taking one to two days.

If the ceiling mould comes from a leak, find the source first. A licensed plumber must handle pipe alterations for taps or showers. [1][2]

Use your square footage instead and see a reference budget
Public housing kitchen and bathroom renovations: checklist illustrated | HK Create Design
Public housing kitchen and bathroom renovations: checklist | HK Create Design Select an image to enlarge

10

Materials and daily care for a longer-lasting finish

Water and heat can damage kitchen materials. Use moisture-resistant board, fully sealed door edges and a waterproof mat under the sink so that if the drainleaking pipes leaks, water does not immediately soak the board. Seal the worktop-to-wall joint with mould-resistant silicone. Check it regularly and renew damaged or mouldy sealant before water reaches the cabinet.

Keep wall cabinets clear of heat above the hob and follow the hood manufacturer's required clearances. Use a trivet for hot pans, even on heat-resistant quartz. Some solid-surface worktops allow light scratches to be refinished according to the supplier's guidance.

After showering, use a squeegee on the glass and walls and ventilate the room for at least 15 minutes to reduce mould on grout and ceilings. Clean epoxy grout regularly with a neutral cleaner. Prolonged contact with strongly acidic toilet cleaner can dull the finish.

Kitchen doors can lose alignment as their hinges loosen and may need adjustment. The FUR31 Blum or Hettich soft-close upgrade costs HK$380 per hinge[1]. For regularly used drawers, FUR32 Blum TANDEMBOX full-extension runners cost HK$1,500 per set[1]. Our work carries a one-year warranty. If a fitting loosens or a door loses alignment during the warranty period, contact us on WhatsApp to arrange an adjustment.

  • Protect the base of the sink cabinet with a waterproof mat
  • Check silicone regularly and renew when needed, often after two or three years
  • Keep the bathroom dry and ventilated
  • FUR31 soft-close hinge upgrade — HK$380 per hinge
  • On-site adjustment during the one-year warranty

11

Ask HK Create Design about a public rental kitchen or bathroom

HK Create Design has worked on public rental flats since 2019. We assess the kitchen and bathroom and distinguish items that can proceed from those needing approval, so the scope can retain sound tiles where possible.

WhatsApp wide views and close-ups of your kitchen and bathroom to 5243 7747 for a free initial estimate. On-site measurement for two or more work items is complimentary until 31 December 2026. The subsequent L04 visit fee of HK$500 is credited in full against a confirmed order[1].

See worktop and cabinet-door samples at Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. Our work carries a one-year warranty and a HK$2,000 minimum charge[1].

  • WhatsApp 5243 7747
  • List permitted works separately from items awaiting approval
  • Free measurement for a limited period, then HK$500 credited against a confirmed order
  • One-year warranty

Advice from our tradespeople

「New cabinets, a worktop and refreshed grout can address many signs of age without lifting tiles or disturbing floor waterproofing. Check each proposed item against the estate rules.」

Public Housing Projects Supervisor, HK Create DesignHK Create Design project team

「Seal each fixing through bathroom wall tiles with silicone when fitting a mirror cabinet or grab rail. Water entering around screws can cause damp and mould in the adjoining room.」

HK Create Design plumber and sanitary fitting installerHK Create Design project team

FAQ

7 practical questions answered

01Do I need approval to replace public rental kitchen cabinets?

Kitchen cupboards and base units under sinks and basins are C9, which does not require prior Housing Authority approval[2]. Replacing the sink itself is B11 and requires approval.

02Can I replace the bathroom floor tiles in a public rental flat?

Floor and wall tiles are Category B. Obtain approval before replacing them[2]. The membrane under the floor tiles can be damaged during removal. Consider regrouting or requesting a repair first.

03Can tenants replace showerheads and taps?

Showerheads and taps are C8 and generally need no prior approval. Alterations to taps or pipework require a licensed plumber and materials meeting Water Supplies Department requirements[2].

04What if an older tenant cannot step into the bath?

Apply to the estate office. Where a need is accepted, the Housing Department can convert a bath to a shower with grab rails free of charge without a medical or Social Welfare Department referral[2].

05Can I remove the wall to create an open kitchen in a public rental flat?

Kitchen, toilet and bathroom partition walls fall under A1 and tenants may not alter them[2].

06How much can a kitchen update cost if the tiles stay?

With the tiles and sink retained, the itemised example totals around HK$26,040, including a separate charge for removing old cabinets. The custom design package for 6 ft each of wall cabinets, base cabinets and quartz worktop is priced separately at HK$28,200. The site survey and written quote confirm the scope[1].

07Can a mirror cabinet be fixed through bathroom wall tiles?

Yes. Seal wall penetrations with silicone to prevent water ingress[2].

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
  2. [2]Hong Kong Housing Authority — Guidelines for Reference List of Decoration Contractors, including decoration conditions Accessed: 2026-11-03
  3. [3]Hong Kong Housing Authority: Performance Pledge Accessed: 2026-11-03
  4. [4]Housing Bureau: Housing in Figures 2026 Accessed: 2026-11-03
  5. [5]Water Supplies Department: Licensed Plumber Accessed: 2026-11-03
  6. [6]Electrical and Mechanical Services Department: Safety Instructions for Residential Gas Cooking Stoves Accessed: 2026-11-03
  7. [7]Department of Health Elderly Health Service: Fall Prevention Accessed: 2026-11-03
  8. [8]Environmental Protection Department: Indoor Air Quality Information Centre FAQs Accessed: 2026-11-03
  9. [9]STC: China Market Watch (August 2021) on the new formaldehyde emission grading standard for wood-based panels and finishing products Accessed: 2026-11-03