01

Let me make it clear first: Air conditioner installation is a renovation project, not buying electrical appliances and having them installed.

Buyers often assume the shop installation covers everything. Standard installation usually means hanging the unit and connecting refrigerant lines and power, on the assumption that power, drainage and a usable mounting position are already in place. If the flat isOlder flat renovation, new wall openings are needed, the distribution board has no spare capacity, or a window unit is being changed to a split system, this is outside standard installation. Responsibility can then be disputed betweenRenovation tradespeopleand the air-conditioning installer may each say the other is responsible.

Treat air conditioning as a separate item at the measurement stage. For each room, consider cooling capacity, window or split unit, indoor and outdoor locations, pipe routes and power from the distribution board. These choices affect suspended ceiling height, curtain pelmet depth, space for pipes above wardrobes and even the sequence ofwall renderingand painting are carried out in the right order.

For whole-home designs, HK Create Design marks air conditioners, power supplies and pipes on the floor plan and coordinated building services drawings. Air-conditioning installers, electricians and carpenters work from the same drawings. Contact us on WhatsApp for a free design discussion or book a visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Our tradesperson will also check the air conditioner location.

  • List the models and approximate sizes intended for each room
  • Confirm the store installation package and items not included when purchasing the machine
  • Ask the designer to show the air conditioner, power point and pipe positions.
Design rendering showing provision for air conditioner power and pipework during renovation. Final positions require site measurement.
Design rendering showing provision for air conditioner power and pipework during renovation. Final positions require site measurement. Select an image to enlarge

02

When choosing a split machine for a window machine: check the unit conditions before picking the machine.

The biggest advantage of a window machine is that it does not require an external machine bracket or a long pipe, and is relatively simple to repair and replace; however, it relies on the original window position or a hole in the wall, and the noise is directly in the room, and many new buildings have no reserved window machine positions. The split unit is quieter indoors and has a tidy appearance, but it has additional external unit locations, refrigerant hoses, wires and water pipes, and there are many process and coordination points.

If the building has a reserved air-conditioner platform, the outdoor unit swing platform is usually simpler than the exterior wall bracket. If you want to use external wall brackets, you need to consider the minor works requirements of the Buildings Department: For example, Project 3.27 covers brackets that protrude not more than 600 mm from the external wall, bear no more than 100 kilograms, and are more than 3 meters above the ground. They are Class III and must be built by a prescribed registered contractor and submitted MW05 within 14 days after completion.[1] Heavier outdoor units may be treated as 2.49, and MW03 must be submitted 7 days before the start of construction.[2]

Also, pay attention to the building’s deed of mutual covenant and the management office’s rules and regulations. Some buildings stipulate that outdoor units can only be placed in designated locations, or do not allow brackets to be added to the exterior walls; some old buildings have limited window sill structures and are not suitable for adding weight. These restrictions should be clarified before choosing the machine. It is not necessary to find out the position first after buying the machine.

  • Check with the management office about the location of the outdoor unit and the code for exterior wall construction.
  • Measure the actual size of the window or platform
  • When installing outdoor units on exterior walls, ask the contractor to explain that it is a small project.
Window unit vs. split unit: Things to decide before renovating

Most recommended Not recommended, it depends on the situationThe star rating is based on the company's recommendations for general Hong Kong housing, and ultimately depends on the on-site conditions.

You can swipe left or right on your phone to view the complete table.

Compare itemswindow machineSplit machineReserve when renovatingCommon missing items
Recommendation4 stars・Not highly recommendedThe original window position is used to save work steps, but it is noisy.Designer's Pick5 stars・Most recommendedQuieter with more even airflow. Plan the pipe route during renovation.
aircraft seatUse the original window position or wall openingThe indoor unit is mounted on the wall or hidden in the ceiling, and the outdoor unit is placed on a platform or on an exterior wall bracket.Measure the width, height, depth and surrounding maintenance space of the machine positionAfter changing the model, the dimensions are no longer correct, so the wall needs to be cut or the windows modified.
Go to waterTo remove water from the bottom of the fuselage, a pipe needs to be connected to drain it away.The condensate water from the indoor unit must have a sloped pipe to drain it.Route to water pipe, exit location and slopeGo to the water pipe and connect it to a location where there is no trap or it will drip directly out of the exterior wall.
power supplyUsually use a dedicated socketWires are required between the indoor unit and the outdoor unit and connected to the power sourceDedicated circuits, removal of electrical points and socket heightsShared common socket circuit, tripped when turning on the machine
Exterior wall partWindow frames or wall openings should be sealed and waterproofExternal machine bracket, wall hole, hose sleeveWhether the bracket is a small project; the wall hole is waterproofNo minor engineering documents were submitted for the bracket, and future sales or building inspections will be questioned[1]
Renovation coordinationLittle impact on cabinets and curtain boxesPipes may run above a suspended ceiling or cabinetPipe ducts, access hatches and boxingThe pipe is sealed, and the cabinet will need to be dismantled if there is water leakage or machine replacement in the future.

Whether the bracket is a minor project or not, the extension length, load-bearing capacity, height from the ground, etc. must be checked one by one according to the Buildings Department's specifications. This article only lists general comparisons, and the actual decision will be made on site. [1][2] [1][2]

Design rendering of a finished split-system indoor unit and pipe trunking.
Design rendering of a finished split-system indoor unit and pipe trunking. Select an image to enlarge
Air conditioner installation: illustrated facts and figures | HK Create Design
Air conditioner installation: key figures at a glance | HK Create Design Select an image to enlarge

03

Power supply planning: why consider a dedicated circuit?

An air conditioner can draw significant power for long periods. Sharing a circuit with a rice cooker, iron and other appliances can cause tripping and overheating. During renovation, we usually recommend that a registered electrical professional assess and provide a dedicated circuit from the board to the connection point for each main air conditioner.

In Hong Kong a registered electrical contractor must arrange a registered electrical worker to undertake fixed electrical work. After completion and before energising, the work must be inspected and tested and a WR1 work completion certificate. Even for additions or alterations to an existing installation, the affected parts must be inspected and certified.[7] The owner should return a copy of WR1 during acceptance, which will be useful in future replacements, property sales, or insurance claims.

Published item H06 lists a new dedicated circuit at HK$3,350 per circuit. H01 lists a single-visit electrical inspection at HK$770. (see published rates) These figures are preliminary. Check the distribution board position, circuit length, whether concealed chases and making good are needed, and whether the board itself needs replacing.

  • Do a power check first to make sure there is a circuit in the electrical box.
  • Each major air conditioner is marked with edge strip circuits
  • Request a copy of the WR1 Completion Certificate upon acceptance
Project photo of rewiring and conduit replacement at Dandenong Mansion, Wan Chai | HK Create Design
Site photo: Electrical work at Dandenong Mansion, Wan Chai, July 2026. HK Create Design. Select an image to enlarge

04

Remove the water pipe: the most likely to cause trouble and the easiest to ignore

Condensation water is produced when the air conditioner is running. Window units are usually collected at the bottom of the unit, while the indoor units of split units must be drained away through water pipes. The water pipe should have a continuous downward slope, and there should be no water accumulation in the middle, otherwise it will flow back, drip or stink. When the pipe passes through a wall or passes through a false ceiling, an inspection location must be reserved so that the pipe plug can be cleaned in the future.

It's so important to get rid of the water in the end. If it drips directly out of the exterior wall, it will drip onto the windowsill, sidewalk or platform downstairs, which can easily cause complaints. 1823 Information indicates that the nuisance caused by dripping air conditioners will be handled by the Food and Environmental Hygiene Department; after the nuisance is confirmed, a nuisance incident notice will be issued. If the problem is not resolved, prosecution may be carried out, with a maximum fine of NT$25,000 and a daily fine of NT$450.[4] The Food and Environmental Hygiene Department handled approximately 34,700 complaints about dripping air conditioners in 2024, which shows that this is no small problem.[5]

A more stable approach is to connect the water supply pipe to the water supply level approved by the building, such as the balcony floor water supply or the designated air-conditioning water supply pipe. However, you must ask the management office first, and you are not allowed to connect to other residents' pipes without permission. During renovation, it is also necessary to prevent the air-conditioning water pipe from passing through the new waterproof layer without properly closing the opening.

  • It is required to indicate the route to the water pipe, the location of the exit and the slope.
  • When removing the water pipe through the false ceiling or inside the cabinet, an inspection opening must be reserved.
  • When completed, pour water for test drainage and take photos to record
Worked example 1

Example one: initial budget for two dedicated air-conditioning circuits in a two-bedroom flat

Assumptions

  • This is a hypothetical example illustrating the calculation method and is not an actual quote or completed case.
  • Assume two bedrooms each receive one split air conditioner, each on a new dedicated circuit, with sufficient space in the distribution board.
  • First arrange an electrical inspection to confirm existing electrical boxes and total load.

How to calculate quantities

  1. H06 new dedicated circuits: 2 × HK$3,350 = HK$6,700.
  2. H01 Electrical Inspection (single door-to-door visit): 1 × HK$770 = HK$770.
  3. Total electricity cost: HK$6,700 + HK$770 = HK$7,470.

The preliminary reference for the electrical component of this assumption is HK$7,470, excluding air-conditioning, installation, refrigerant pipes, brackets, water pipes and wall repairs.

If the electrical box needs to be replaced or the total load is insufficient, additional assessment is required (e.g. H09 replacement of electrical box HK$6,800/piece); all electrical works must be carried out by a registered electrical contractor and issued a WR1. [7] (see published rates)[7]

Use your square footage instead and see a reference budget

05

Coordinating pipe routes with joinery and suspended ceilings

Split-system refrigerant lines, wiring and condensate drain often share a route concealed in trunking or a suspended ceiling. Coordinate this with full-height cabinets and lighting coves before installation to avoid cutting into finished joinery or ceilings.

Our whole-flat layout, coordinated building services drawings and furniture designs show the air conditioner and pipe routes. VR renderings also show the indoor unit so you can see the arrangement before ordering. With ourBespoke furniture, the design and whole-flat drawings are included without a separate design fee.

Hidden-ceiling or duct-type air conditioners involve problems such as large false ceiling space, inspection openings, and condensate water pumps. It is necessary to check the body size and maintenance requirements with the air-conditioning supplier in the early stages of design. It is not advisable to call for labor after the carpentry is completed.

  • Confirm pipe routes against the joinery drawings
  • The fake ceiling should leave a location for inspection openings
  • To hide the ceiling machine, you must first obtain the body size and maintenance space information.

06

Exterior wall brackets and wall holes: waterproofing and compliance must be done together

Water can enter around new external wall openings, and brackets can corrode. An installer should detail outward drainage at penetrations, seal the pipe sleeve, specify corrosion protection and keep anchors clear of cracks or loose render.

In terms of regulations, the minor works system of the Buildings Department classifies some external wall air-conditioning brackets as minor works, which must be carried out by prescribed registered contractors and documents submitted;[1][2] The Buildings Department also has a category of "brackets used to support air conditioners or lighting devices" that are designated exempted projects. They must meet specified specifications to be exempted.[3] Have the actual dimensions and weight assessed by the appropriate qualified person to establish the classification and filing requirements.

If your building is due for a mandatoryFlat inspectionor external wall repairs, coordinate with building management or the owners' corporation to avoid removing a newly installed bracket. Working at height requires appropriate safety measures. Do not ask a worker to climb outside a window without fall protection.

  • Request the contractor to state in writing the minor works category to which the bracket belongs
  • Save a copy of a file such as MW05 or MW03/MW04
  • For wall holes, sealing materials and waterproofing methods must be stated.
Whole-home renovation on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

07

Picking machine: key points to look at when energy labels are the same size

Hong Kong's mandatory energy efficiency labeling scheme covers air conditioners with a rated cooling capacity of not more than 7.5 kilowatts, that is, window units and split units for general residential use must bear energy labels.[6] When selecting a machine, you can compare the energy efficiency level and power consumption of the same year, as well as the size, noise and maintenance terms of the machine.

The cooling capacity should be considered according to the room area, west to east direction, window area, floor and usage habits. The bigger the better; if it is too large, it will start and stop frequently, and the dehumidification effect will be average. It is recommended to talk to the air-conditioning supplier, they can recommend the model based on the on-site information; we will be responsible for ensuring that the machine position, power supply and water pipes are suitable for the machine you choose.

If a future inverter model or higher-capacity unit is likely, ask the designer to allow space in the power supply and pipe route, including circuit capacity and trunking size, to avoid reopening walls later.

  • Compare energy label levels to electricity consumption in the same year
  • Submit the selected model size to the designer for verification
  • Ask about the maintenance period and scope of maintenance
Items that need to be disassembled and checked in the air conditioner installation quotation

You can swipe left or right on your phone to view the complete table.

Itemshould be written clearlywho is responsibleHandover inspection recordsCompany price list reference
Add a dedicated circuitThe number of circuits, wire diameter and protection devices from the electrical box to the machine locationRegistered electrical contractorWR1 Completion Certificate[7]H06 HK$3,350/circuit[hkcd-pricelist]
Electrical inspectionExisting electrical box capacity and circuit distributionRegistered electrical workerInspection recordsH01 HK$770/time[hkcd-pricelist]
Remove the water pipeRoutes, exits, slopes and fixing methodsAir-conditioning installer or plumberTesting the waters photosQuote on site
Exterior wall bracketBelongs to 3.27, 2.49 or other categoriesPrescribed registered contractorMW05 or MW03/MW04 file[1][2]Quote on site
Wall repair and paintingWall hole sealing and dust holding rangePlaster and paint masterFinished photosE02 Gray oil HK$21/square foot (minimum HK$4,650) [hkcd-pricelist]

The company's price list is only a preliminary reference for the public price list of HK Create Design 2026; the air-conditioner body, refrigerant hose and outdoor unit lifting are not included in the above items and need to be confirmed separately. (see published rates)[7]

Project photo of plumbing work at Yat Man House, Ho Man Tin Estate | HK Create Design
Project photograph: plumbing at Yat Man House, Ho Man Tin Estate, May 2026, HK Create Design Select an image to enlarge

08

Compare quotation points: separate the items and compare the total number first

Air-conditioning related projects involve electricians, air-conditioning installers, plastering, painting, and sometimes prescribed registered contractors. When comparing quotations, first confirm that the renovation company is responsible for some aspects and the air-conditioning supplier is responsible for the other aspects, and then compare item by item. The Consumer Council's study also reminded that general quotations can easily cause disputes, so each item must be clearly stated in terms of scope and quantity.

On our published list, dedicated circuits, electrical inspections, and patching and repainting walls each have their own item code and unit, (see published rates) Use the AI quotation assistant or 117-item calculator for a preliminary range. The written quotation after the tradesperson's site measurement confirms the final price.

Pay special attention to the "extra" items: outdoor unit lifting, high-altitude work, refrigerant hose extension, old unit disassembly, old window sealing panels, etc., which are sometimes not included in the standard quotation. When calling for a quote, ask directly: Will the old window bit be included when the old machine is dismantled and sealed?

  • List the responsibility of each item
  • Ask if there are additional charges for dismantling the old machine, sealing the old holes, and lifting the outdoor machine.
  • Use public prices to estimate the scope first, and then wait for written quotations.
Completed custom floor-to-ceiling wardrobe | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

09

Construction sequence: When is the best time to install air conditioners?

Complete the air-conditioner power supply, wall penetrations and pipe chases during strip-out and first-fix services. Make good and seal before finishes, then mount and connect the unit after painting to protect it from dust and damage. If the outdoor bracket falls under minor works, allow time for submissions. For Class II, the notice is due at least seven days before work starts.[2]

If you install the unit first and then paint, wrap the indoor unit with protective film and make sure the painter does not cover the air outlet. After completion, it is necessary to start the machine for trial operation, check the water, noise and vibration, and confirm that there is no dripping water falling downstairs from the outdoor unit.

After every order is completed, we will remove the trash, sweep, and do basic cleaning. We will also deal with the dust around the air conditioner. If deep cleaning or formaldehyde removal is required, we will follow up with a professional cleaning company.

  • Complete the power supply and pipework at the services stage
  • Hang up after painting
  • After completion, test the machine and test the water.
Worked example 2

Example two: using Buildings Department criteria to check the likely classification of an outdoor unit bracket

Assumptions

  • Assume that the outdoor unit and its bracket are designed to support about 45 kilograms, and the bracket extends about 500 mm from the exterior wall.
  • The highest point of the bracket is more than 3 meters above the ground, which will not cause additional load on the cantilevered slab and does not extend out of the street.
  • This is simply an exercise in comparing specifications and is not legal or engineering advice.

How to calculate quantities

  1. Comparison 3.27: The protrusion does not exceed 600 mm (500 mm complies), the load-bearing capacity does not exceed 100 kg (45 kg complies), and the height above the ground exceeds 3 meters (conforms). [1]
  2. If the external machine is heavier, for example, it is designed to support 120 kilograms, it will exceed the 100 kilogram limit of 3.27. It must be compared with the 150 kilogram limit of 2.49 and the requirement to submit MW03 7 days before the start of construction. [2]
  3. If it is of a simple scale and meets the specifications of designated exempted projects, the Buildings Department also lists "brackets used to support air conditioners or lighting devices" as one of the designated exempted projects, but the specifications still need to be verified by professionals. [3]

This hypothetical scaffold is more likely to fall into Level III 3.27, which requires the registered contractor to submit a MW05 within 14 days after completion; if the specifications are exceeded, it will need to be upgraded.

The actual type must be judged by a qualified person based on the complete specifications of the Building (Minor Works) Regulations and on-site conditions; this article cannot replace the assessment of a registered contractor. [1][2][3]

Use your square footage instead and see a reference budget
Air conditioner installation: illustrated checklist | HK Create Design
Air conditioner installation: checklist | HK Create Design Select an image to enlarge

10

Six common mistakes: we see them most often on renovation sites

First, it is too late to pick the machine. Many owners have planned to go to the electrical appliance store to pick up the unit before the wardrobe and false ceiling are ready. As a result, the size of the new unit is larger than the reserved space, or the location where the indoor unit is to be hung is on the top of the wardrobe door, and the top panel of the cabinet needs to be removed first. Second, keep using the old power supply. Many air conditioners in old buildings use an old socket, and the wires are shared with other sockets. After the new unit is installed, it trips as soon as it is turned on. Finally, a new recess needs to be drilled in the newly oiled wall.

3. A level condensate drain can trap water and cause dripping or gurgling if run beside refrigerant pipes without adequate fall. 4. An inadequately sealed penetration can admit rain around the sleeve after a season or two, causing blistering or mould that looks like an external wall leak.

Fifth, there is no documentation for the outdoor machine bracket. Some craftsmen say that the scaffolding is too delicate and they will not handle small projects. However, when you go to sell a property or do repairs on a building, the buyer's lawyer or consultant may ask whether the scaffolding has been handled according to regulations.[1] 6. Leave service access. If a ceiling unit or pipework is boxed in tightly, filter cleaning, drain clearance or refrigerant servicing may require dismantling the ceiling. An extra half-hour of coordination at design stage can prevent most of these six issues.

  • After selecting the model, make carpentry drawings first
  • ​​Old power supplies need to be evaluated to see if they need new circuits
  • Write the quotation item by item for removing water pipes, wall holes and inspection openings.
Project photo of completed bespoke kitchen cabinets | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

11

Acceptance list and save file

Acceptance of air conditioner installation is not just about whether it is cold enough when it is turned on. Check whether the indoor unit is level, whether there is backflow in the water pipe, whether the pipe insulation is damaged, whether there are gaps in the wall hole seals, whether the screws of the outdoor unit bracket are loose, and whether the wires are exposed. Check again after it rains to see if there are any water stains around the hole.

In terms of documentation, keep the air conditioner maintenance card, installer contact information, and a copy of the WR1 completion certificate.[7] and minor engineering documents for exterior wall brackets.[1] In the future, when the building is replaced, the building is sold, or a neighbor complains about water dripping, it can prove that the construction was carried out according to regulations.

If you want to coordinate the air conditioner position withWhole-flat renovationPlan the work with a designer and a tradesperson with over 15 years of experience. WhatsApp 5243 7747 for a free consultation or book a site visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Turn on the machine and run it for at least 30 minutes and check the water drain.
  • Check the wall holes after it rains
  • Save WR1, minor engineering documents and maintenance cards

FAQ

7 practical questions answered

01Does each air conditioner need a dedicated circuit during renovation?

A dedicated circuit for every air conditioner is not a universal legal requirement. Their sustained load makes dedicated supply worth assessing to reduce tripping and overload. Have a registered electrical contractor carry out the work and obtain the WR1 before energisation.[7] Our published H06 rate for a new dedicated circuit is HK$3,350 per circuit as an initial reference. (see published rates)

02Is it necessary to install brackets for external wall air conditioners?

It is not necessary to comply, but many exterior wall brackets are small projects. For example, a bracket that extends no more than 600 mm, supports no more than 100 kg, and is more than 3 meters above the ground is classified as 3.27 and must be made by a prescribed registered contractor and submitted MW05 within 14 days after completion.[1] The heavier one is probably 2.49.[2]

03How much fine will I get if my air conditioner drips water?

According to 1823 information, it is illegal for air conditioners to drain water in a manner that constitutes a nuisance. The maximum fine is HK$25,000 and HK$450 per day; the FEHD will first issue a nuisance incident notice.[4]

04Can the water from the air conditioner be discharged directly out the window?

Not recommended. It drips directly from the external wall and easily drips downstairs, causing a nuisance. In 2024, the Food and Environmental Hygiene Department handled about 34,700 complaints about water dripping from air conditioners.[5] You should first ask the management office for the approved water level before arranging water pipe removal.

05Should I install the air conditioner first and paint first?

Complete the power supply, wall penetrations and pipe positions before masonry and painting, then mount the unit. This keeps dust and paint off the equipment and allows the openings to be made good.

06Can you help install the air conditioner?

We handle the renovation work, including power supplies, dedicated circuits, pipe layouts, wall repairs and painting. We coordinate the air conditioner position with your chosen supplier. WhatsApp 5243 7747 for a free consultation or book a visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

07Can the AI ​​quotation be directly used as a quotation for air-conditioning projects?

No. The website's AI quotation assistant and calculator give preliminary estimates only. The unit, refrigerant pipework and lifting the outdoor unit may be excluded. The final price comes from a written quotation after site measurement. (see published rates)

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: Minor Works Item 3.27 (Air-conditioning unit supporting bracket protruding from external wall) Accessed: 2026-11-01
  2. [2]Buildings Department: Minor Works Project 2.49 (Air-conditioning unit supporting bracket protruding from external wall) Accessed: 2026-11-01
  3. [3]Buildings Department: Designated exempted projects Accessed: 2026-11-01
  4. [4]1823/Food and Environmental Hygiene Department: 1823: Can you complain to the Food and Environmental Hygiene Department if water dripping from an air conditioner causes a nuisance? Accessed: 2026-11-01
  5. [5]Food and Environmental Hygiene Department Annual Report 2024: Chapter 4, Environmental Hygiene Accessed: 2026-11-01
  6. [6]Electrical and Mechanical Services Department Energy Labeling Website: Frequently Asked Questions (Products covered by the Mandatory Energy Efficiency Labeling Scheme) Accessed: 2026-11-01
  7. [7]Electrical and Mechanical Services Department: Instructions for Registered Electrical Workers (WR1 Completion Certificate) Accessed: 2026-11-01
  8. PricesHK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-01