02
Which drawings and documents should I request from the landlord?
Request a draft lease, existing floor plan, approved restaurant plans and current licence if available. Record differences between proposed use and the plans. FEHD's guide identifies premises, lease and statutory plans among the information to check.[2]
You can swipe left or right on your phone to view the complete table.
| Who it is for | Problem | Documents to keep |
|---|---|---|
| Owner | Permitted use, alteration rights and usable areas? | Drawings and written consent |
| Building management | Building services connections, delivery and working restrictions? | Renovation rules |
| Licensing professional | Do the menu and premises need further checks? | Items and responsibility schedule |
Available documents depend on the premises and case. [2]
03
How do I check an existing licence when taking over?
Check the existing licensee, approved area and actual layout. Ask FEHD whether transfer, plan amendment or a new application applies. List documents still needed from the other party in the pre-takeover checklist.
A café introducing hot food
Assumptions
- A light refreshment shop proposes adding fried and wok-cooked dishes.
How to calculate quantities
- Request the previous drawings and available exhaust routes from the landlord.
- Check cooking methods with FEHD or an appropriate professional and ask a ventilation contractor to assess the work needed.
Identify outstanding questions before signing the lease.
Illustrative example. Results depend on the menu and premises. [1]
04
Review extraction, make-up air and cleaning access together
Ask the landlord or management to identify available shafts, discharge points and maintenance access on site. Have a contractor check cooking positions against extraction, make-up air and future cleaning access. The Environmental Protection Department's restaurant pollution guidance can help.[3]

05
Use the equipment schedule to check power, gas and drainage
List each model, utility needs, position and heat dissipation space. Have the relevant professionals verify capacity, connections and installation requirements. Observe and record during viewing. Do not open electrical panels or test gas equipment yourself.
06
Walk through the shop as if it were lunchtime
Walk each route: deliveries to storage, food to tables and dirty dishes to washing. Ask someone to pull out a chair, queue or collect takeaway food to see where layouts need changing. Verify aisles and seating against the applicable plans.
A mall unit with night-time access only
Assumptions
- Management restricts goods lift use and noisy work to designated hours.
How to calculate quantities
- Ask the factory for the packaged dimensions of the longest item and the delivery date.
- Arrange deliveries within management hours and confirm whether night work costs extra.
This makes delivered and installed prices easier to compare.
Follow written management approval and the latest rules. [4]
07
When does the rent-free period begin?
Ask in writing about keys, permission to enter, goods lift access, renovation deposits and reinstatement terms. Equipment may need custom manufacture. Record landlord signatures, management drawing approval and contractor access dates separately.
You can swipe left or right on your phone to view the complete table.
| Item | Evidence to obtain | Next |
|---|---|---|
| Exhaust route | Drawings annotated by building management | Contractor verification |
| Equipment load | Model numbers and existing utility information | Assessment by a registered contractor |
| Opening date | Access, commissioning and licensing milestones | Owner to follow up item by item |
Owner's worksheet for recording the responsible person and reply date. [4]
08
How do I decide what to do after viewing a shop?
Mark each question “documented”, “awaiting landlord reply” or “professional assessment needed”. If the duct route or power capacity is unconfirmed, record the latest decision date. Visit thePremises-viewing section of the restaurant service pageDownload the handbook and send drawings for an enquiry.
FAQ
6 practical questions answered
01Can I discuss the work before signing a lease?
Document review and preliminary assessment can begin first. The landlord or management must arrange access for inspection.
02Is a light refreshment restaurant licence suitable for every café?
Check the actual cooking method and business model. Send the menu to FEHD for advice.
03Can I reuse the previous operator's ductwork?
Check rights to use the route, its condition, cleaning access and the new menu's requirements.
04Who pays fees for the mall's nominated contractors?
Ask management to list the applicable items and record them in the quotation and lease handover responsibility schedule.
05Do table layout changes require a drawing check?
Have the proposed changes and approved plans reviewed by an appropriate professional and confirm the procedure for the case.
06What can I send if I do not have drawings yet?
Send the district, area, menu, wide photos and details of existing equipment. Request the drawings from the landlord.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Food and Environmental Hygiene Department | Guide to the type of licence required Accessed: 2026-11-24
- [2]Food and Environmental Hygiene Department | Restaurant licence application guides and forms Accessed: 2026-11-24
- [3]Environmental Protection Department | Green restaurants Accessed: 2026-11-24
- [4]HK Create Design | Restaurant premises and quotation handbook Accessed: 2026-11-24