What is a small project? From removing cabinets to replacing faucets
Minor projects generally refer to projects that are small in scope and short in construction period, such as: removing one or two old cabinets, repairing wall holes, partial painting, replacing light switches and sockets, replacing faucets and showerheads, changing door locks, installing curtain rails, installing chandeliers, and removing local mold. These projects are usually completed in one to two days, but they must be handled professionally. Failure to do it properly may affect safety or leave behind problems.
Many owners think that "such small things can be taken care of by themselves", but some projects actually have regulatory requirements, such as electrical projects. In addition, when removing the cabinets, you may be able to remove the water pipes and wires behind them. If the walls are not protected from moisture, mold will develop again. It will be more expensive to do it yourself.
Large renovation companies may not be willing to accept detailed orders because of the cost of manpower deployment. We take on all projects, big or small. Even if we can dismantle one or two cabinets, we will also clear out the trash and sweep it away before leaving.
For several small jobs, send photos on WhatsApp 5243 7747 for a free initial assessment. If a site visit is needed, published L04 is HK$500 per visit. (see published rates)
Sequence even a small job. Before replacing a cabinet, measure the new unit and locate the wall and sockets behind the old one. Before changing a light, check support and electrical provision. Coordinating the tasks reduces repeat visits.
In addition, many small projects are actually signs of big problems: for example, repeated mold on the wall may be due to water seepage, heating of light switches may be due to aging wiring, and sagging cabinet doors may be due to moisture in the boards. When dealing with small projects, you can avoid small problems from becoming bigger problems by looking at the reasons clearly.
- Make a list of all the small projects you want to do
- Photography records the current situation
- Determine whether electricity or structure is involved

02
Regulation classification: exempt works, minor works and projects requiring approval
The Buildings Department broadly divides construction projects into three categories: projects requiring prior approval, minor works and designated exempted projects. The small projects supervision system covers 187 small projects, which are divided into three levels according to their nature, scale, complexity and safety risks: 58 items in Level I, 68 items in Level II, and 61 items in Level III.[1]
Specified exempted works can be carried out without involving the prior approval of the Buildings Department.[4] The Buildings Department says ordinary interior decoration, including painting, plastering, tiling and replacement of sanitaryware, generally qualifies as exempted work.[2] Most small projects, such as removing cabinets, patching walls, and replacing sanitary ware, fall into this category.
However, it should be noted that demolition or modification of structural walls, window openings and other structural-related projects must be done by appointing an authorized person and a registered structural engineer and obtaining prior approval.[3] Carrying out construction work without approval is punishable by a fine of up to $400,000 and two years' imprisonment.[3]
Therefore, even if you want to "tear down a thin wall", you must first confirm the nature of the wall. The Buildings Department stated that the demolition of non-structural partition walls is generally an exempted project.[3] But to tell the difference, you need to read the drawings or consult professionals.
To put it simply, most minor works within housing estates are prohibited, but "no regulations" does not mean "no rules": the building's deed of mutual covenant and management office regulations must be followed, such as construction time, worker registration, garbage disposal and public area protection.
As for minor works, common examples include the installation or removal of air-conditioner brackets, windows, canopies, etc. These must be carried out by prescribed registered contractors and documents submitted to the Buildings Department according to their grade.[1] If your small project involves exterior walls or overhangs, pay special attention.
- Confirm that the project belongs to the edge category
- Professionals are needed when it comes to structural walls
- If you have any questions, check the Buildings Department’s guidelines
You can swipe left or right on your phone to view the complete table.
| Small projects | General classification | I need to find people like me to do it. | Public price list reference |
|---|---|---|---|
| Remove built-in wardrobes or tall cabinets | Exempted works (not involving structures)[2] | Renovation tradespeople | A07 HK$61/square foot (minimum HK$740) [hkcd-pricelist] |
| Remove kitchen or bathroom cabinets | Exemption project[2] | Decorator, you need to turn off the water first | A06 HK$170 per linear ft [hkcd-pricelist] |
| Repair, patch and repaint the wall | Exemption project[2] | Painter | E02 HK$21/square foot (minimum HK$4,650) [hkcd-pricelist] |
| Partial mildew removal heavy oil | Exemption project[2] | Painter | E05 HK$1,250/face[hkcd-pricelist] |
| Replace light switches and add sockets | Electrical work | Registered electrical engineer[5] | H04 HK$430/piece; H02 HK$640/set[hkcd-pricelist] |
| Replace faucets and sanitary ware | Exempted works (replacement of sanitary equipment) [2] | plumber | K03 HK$970;K01 HK$1,300[hkcd-pricelist] |
| Removal of non-structural partition walls | Exempt project, but must first identify non-structural walls[3] | Renovation tradespeople | A04 HK$69/square foot (minimum HK$2,800) [hkcd-pricelist] |
These are general classifications. Use the applicable Buildings Department guidance for the actual work and confirm prices after a site visit and written quotation. [2][3][5] (see published rates)


03
Cabinet removal: common hazards
Removing old cabinets is the most common small project. Built-in wardrobes and tall cabinets are usually fixed to the wall with screws or glue. When dismantling, be careful not to tear the wall and remove dust. There are usually water pipes and drains behind kitchen cabinets and bathroom cabinets. Be sure to turn off the water before removing them.
A07 removal of fitted wardrobes or tall cabinets costs HK$61 per sq ft, minimum HK$740. A06 kitchen or bathroom cabinet removal costs HK$170 per linear ft. FUR45 old cabinet removal is HK$170 per linear ft. (see published rates)
After removing the cabinets, there are often screw holes, mold, or uneven paint on the wall behind them. You need to budget for wall repairs and paint. If you want to install new cabinets, we can design them together. After measuring, we can produce the furniture design drawings and production drawings.
Dispose of old cabinet boards properly rather than leaving them in common areas. A small amount can be removed with the job. Larger quantities require a debris removal allowance. A11 is HK$4,200 per truckload. (see published rates)
In addition, if there are wires or sockets between the cabinet and the wall, such as lights inside the cabinet or sockets on the back of the cabinet, an electrician must cut off the power supply and seal the wires properly before dismantling the cabinet. It is not recommended to cut them directly. This step is ignored by many unions, but it is related to safety.
If you are replacing a cabinet, discuss the new design while planning removal. Our serviceBespoke furnitureincludes design and whole-flat drawings: layout, coordinated building services, furniture designs, VR renderings and production drawings. Old cabinet removal and new installation can be arranged together.
- Isolate water and electricity before removal
- Budget patchwork
- Arrange removal of old panels

04
Repairing walls is the same as partial painting
Local holes, cracks, mould and peeling can be repaired selectively. Fill small holes and repaint. Treat mould first, then use a moisture-resistant coating. E05 local mould treatment and repainting is HK$1,250 per surface. E02 patching, moisture treatment and painting is HK$21 per sq ft, minimum HK$4,650. (see published rates)
A local paint patch can differ from the existing colour. Repainting the whole wall usually gives a more even result.
For a visible wall crack, first establish whether it affects only the skim coat or may be structural. A wide diagonal crack or a crack withConcrete spalling, seek a professional assessment rather than painting over it.
Before repairing the wall, you should first understand the cause. For example, repeated mold may be related to water seepage or ventilation. If the source is not dealt with, it will reappear after repairing.
If removing a cabinet or picture left holes, consider changing the colour or repainting more widely at the same time. E03 whole-flat repainting costs HK$12 per sq ft, minimum HK$3,700. (see published rates) . For larger areas, the average rate per square foot can be better value than local repairs.
When choosing a paint color, you can first buy a thin can to test the color, apply a small area on the wall, and see the effect under the light during the day and at night. When refinishing parts of an old house, if you don’t know the original color number, you can take a shoveled paint chip to the paint shop to mix the color to reduce the color difference.
- Paint the entire wall to avoid color difference
- Mold must be dealt with first
- If there are obvious cracks, call a professional first
05
Light switches, sockets and lamps: be sure to find registered personnel
Replacing switches, adding sockets and fitting pendant lights are electrical work. EMSD requires a registered electrical contractor to arrange a registered electrical worker to undertake the work and inspect, test and issue a WR1 certificate before energising the fixed installation.[5]
It is easy to replace the light switch yourself, but wiring it incorrectly may lead to electric shock or fire. Especially if it is an old building, the wires may have aged, and you will need to deal with more after dismantling them.
H04 light switch replacement is HK$430 each. H02 adding a 13A single socket is HK$640 per set, H05 pendant light installation HK$670 each and H08 spotlights HK$310 each. (see published rates)
If you want to add sockets, it is best to plan the same number of locations at once to avoid having to dig into the wall and replenish oil every time you add one.
When replacing switches, consider USB sockets, double outlets, or extra switches by the bed or entrance. H03 double, TV or network sockets cost HK$1,200 per set. (see published rates) These details can make everyday use easier.
If the distribution board is old or circuits trip regularly, arrange an electrical inspection before simply replacing a light switch. H01 electrical inspection is HK$770 per visit. (see published rates) After inspection, decide whether theDistribution board replacementor adding a circuit.
Our standard wiring uses Hilly or ei8ht brands with product certifications such as 3C. We commonly use Schneider switches and sockets.
- Use registered electrical workers for electrical work
- Completed WR1
- Plan sockets once
Example one: removing a fitted wardrobe and repairing and repainting the wall
Assumptions
- Assume that the closet is 6 feet wide, 8 feet high, and has a front area of 48 square feet (assumed dimensions).
- The wall behind the removed cabinet needs patching, damp treatment and painting. The small area falls below the minimum charge.
- Prices are from public pricing. [hkcd-pricelist]
How to calculate quantities
- A07 Built-in wardrobe: 48 × HK$61 = HK$2,928 (above the minimum purchase of HK$740).
- E02 patching, damp treatment and painting: 48 × HK$21 = HK$1,008. The minimum charge of HK$4,650 applies.
- Total: HK$2,928 + HK$4,650 = HK$7,578.
Approximately HK$7,578 based on the above assumptions.
If a whole wall or other walls in the room are painted at the same time, the minimum charge can be spread over more work. Small amounts of debris may be handled with the job. Larger volumes are charged under A11. The written quotation after inspection governs. (see published rates)

06
Faucets, showers and sanitary ware
Replacing faucets, showers, toilets, and wash basins is a replacement of sanitary equipment and is generally an exempt project.[2] But pay attention to the size and connection location. For example, the pit distance of the new toilet must be the same as the old one. Otherwise, it will have to be relocated, which will become a larger project.
K03 shower mixer installation is HK$970 per set, K01 toilet installation HK$1,300, K02 basin installation HK$1,150 and K06 sanitaryware and hardware installation HK$5,650. (see published rates) The sanitaryware itself is excluded from the figures above.
After replacement, check for leaks and proper drainage. Allow the silicone to cure before use.
Faulty connections or concealed pipes may need opening up for inspection. G01 opening up to inspect supply or drain pipes is HK$930 per item. (see published rates)
If the household includesOlder residents, consider grab rails, non-slip mats or a taller toilet when replacing sanitaryware. These small changes can improve safety. See our separate guide to home adaptations for older people.
Check management rules before replacing sanitaryware. Some buildings require advance notice of water outages. Prepare the fittings before the visit to keep shutdowns brief.
You can also choose models with water-saving labels on faucets and showerheads, which will save daily water use. Remember to clean the faucet screen after installation. Impurities entering the water pipe in the initial stage may block the water outlet.
You usually select the sanitaryware and taps. We provide installation for a labour charge and use DOWSIL mould-resistant silicone for kitchen and bathroom finishing joints.
- Confirm the size and connection of new sanitary ware
- After replacement, test whether there is any leakage.
- Allow silicone to cure before use
07
Installation of doors, curtains, shelves, etc.
Replacing or painting internal doors, fitting curtain tracks and installing shelving are common small jobs. L03 door replacement is HK$3,000 per door. E04 painting a timber door is HK$1,650 per set. (see published rates)
When installing the shelf, the wall must be made of solid wall and gypsum board wall. The gypsum board wall must be fixed with special screws or fixed at the frame position, otherwise the load-bearing capacity will not be enough.
For curtain rails, check to see if there is enough space at the top of the window. If it is a false ceiling, make sure there is a reserved wooden base.
This kind of small installation project can often be done together with other small projects to save the number of visits.
Locks and hinges are common small repairs. A sticking door or noisy hinge can often be adjusted or the hinge replaced without replacing the whole door. Have it assessed before choosing repair or replacement.
For heavy brackets or wall cabinets, establish both the wall's fixing capacity and the positions of concealed pipes and cables. The installer can scan the area and specify appropriate fixings.
- Confirm wall type
- A wooden base must be reserved for false ceilings
- Combine other small projects and do them together
You can swipe left or right on your phone to view the complete table.
| Grade | Number of projects | Before starting construction | after completion |
|---|---|---|---|
| Level I | 58 items | Submit prescribed plans and documents at least 7 days in advance and appoint prescribed construction professionals | Submit completion documents within 14 days |
| Level II | 68 items | Submit prescribed documents at least 7 days in advance | Submit completion documents within 14 days |
| Level III | 61 items | No prior submission required | Submit completion documents within 14 days |
The information comes from the Brief Introduction to the Minor Works Supervision System of the Buildings Department; [1] Generally, indoor projects such as cabinet removal and painting are not minor works. [1]

08
Looking for people: casual workers, masters and renovation companies
It may be cheaper to hire a casual laborer, but be careful: there is no insurance, you can’t find someone in case of an accident, and you don’t know how to do electricity and other projects that require registration. Renovation companies may charge higher fees, but they usually have insurance, a written quote, and maintenance.
Research by the Consumer Council pointed out that the proportion of quotations mentioning insurance is not high, with only 42% mentioning both labor insurance and contractor's all-risk or third-party liability insurance.[6] Remember to ask clearly when choosing someone.
No matter who you are looking for, you must submit a written quotation, clearly stating the scope of the project, materials provided by the company, price, completion date, handles and cleaning arrangements.
Our tradespeople include specialists with more than 15 years' experience. Quotations list the items and quantities against our published rates. The AI estimator and 117-item calculator are preliminary. Confirm the written quotation after the site survey.
When selecting a person, you can also pay attention to the other party's communication style: does he take the initiative to ask about the situation on site, does he talk about problems he may encounter, and does the quotation list anything that is not included. Masters who are willing to explain the risks clearly are usually more careful in their work.
Another bit to pay attention to is the payment method. Small projects generally require a one-time payment after completion, and large deposits should not be required; if special materials need to be ordered, material documents can be requested. Make payments by transfer and keep records.
- Ask if there is insurance
- Written quotation
- Confirm cleanliness and handle tail
09
Do several things at once: ways to save time and money
Many small jobs have minimum charges or visit fees. E02 patching, moisture treatment and painting has a HK$4,650 minimum. A07 cabinet removal has a HK$740 minimum. (see published rates) Separate bookings for individual items can each trigger a minimum charge.
Group small tasks such as cabinet removal, wall repairs, painting and switching work in one day or week to spread minimum charges and call-out fees.
List the tasks and send photos so the contractor can assess them together and plan the sequence, for example removing the cabinet, repairing the wall and then repainting.
We can arrange for masters of different types of work at once, reducing the number of times you have to ask for leave and wait for appointments.
If you plan to do major renovations within six months to a year, you may also consider leaving the small projects to be done together with the major projects to avoid having to repair the walls and demolish them later. On the contrary, problems that affect safety, such as burnt switches or water leakage, need to be dealt with immediately.
In addition, remember to ask in advance how long each project will take and whether it will affect the daily use of the house, such as how long the toilet will be unused during the toilet replacement, and how long it will take before the furniture can be returned to the home after painting, until you have arranged your family's schedule.
- List all small projects
- Evaluate the same sequence of processes in one go
- Spread the minimum charges

10
Acceptance and maintenance
Small projects must be inspected after completion: whether the wall is damaged after removing the cabinets, whether there is color difference after repairing the wall, whether the light switches and sockets are working properly, and whether the faucets are leaking.
Obtain a WR1 for the electrical work.[5] To replace sanitary ware, a maintenance card is required.
When we are done, we will remove the trash, sweep the area, and do basic cleaning.
Report defects in writing within the warranty period so the installer can follow up.
Small-job warranty terms can differ, so test at handover. Run a new tap for ten minutes and check for leaks, or operate a replaced switch several times. Ask the installer to address any issue promptly.
Finally, keep the quotes, photos and receipts for each small project in the same folder. If it is renovated or resold in the future, these records can help others know what the unit has done and when it was done.
- Inspect each item at handover
- Comes with certificate and maintenance card
- Written notification during maintenance period
Example two: grouping several minor repairs into one visit
Assumptions
- Replace 3 light switches, install 1 chandelier, replace 1 set of shower faucets, and oil 1 set of wooden doors.
- Prices are from public pricing. [hkcd-pricelist]
How to calculate quantities
- H04 Light switch replacement: 3 × HK$430 = HK$1,290.
- H05 Installation of chandelier: 1 × HK$670.
- K03 Install shower faucet: 1 × HK$970.
- E04 wooden door paint: 1 × HK$1,650.
- Total: HK$1,290 + 670 + 970 + 1,650 = HK$4,580.
The total cost of the four minor repairs is approximately HK$4,580 (excluding materials such as lamps and faucets themselves).
Light switches and chandeliers are electrical projects and must be carried out by registered electrical engineers; [5] Materials must be prepared by the customer or quoted separately. (see published rates)[5]

11
Quotation points: small projects must be clearly stated
The most common dispute about small projects is "I thought it was buried": for example, whether the removal package should be included in the removal package, whether the wall repair package should include paint, and whether the faucet replacement package should include the faucet itself. Research by the Consumer Council found that 48% of quotations did not provide unit prices for processes, and 85% mentioned non-included items.[6] In other words, there are still some quotations that are not clearly stated.
A clear small project quotation should include: description of each project, quantity and unit, unit price, who will provide the materials, items not included, construction date, cleaning schedule, and maintenance period. Even if the total is only a few thousand dollars, it's worth writing it down clearly.
We itemise the quotation against published rates, for example “A07 fitted wardrobe removal: 48 sq ft × HK$61”, (see published rates) You can check these figures against the price list.
If extra work appears, such as mould behind a removed cabinet, we photograph it, explain the scope and quote in writing. We proceed after you agree.
State the quotation validity and payment method. If work starts several months later, material costs or available dates may change. Agree how any revised quotation will be handled.
- The quantity of each item is the same as the unit price
- Indicate the items included in the materials
- Please confirm in writing before adding

12
Construction day: What should the owner prepare?
The night before construction, clear away debris near the project area and put away valuables. If you dismantle a cabinet, empty the contents in advance.
Notify the management office and neighbors of the construction time, and register workers as required by the management office. Even if it is a small project, drilling into walls and removing cabinets will cause noise, so it is best to complete it within the time allowed by the building.
When the team arrives, reconfirm the scope, concealed services and any furniture that must stay in place. Inspect completed work together before making the agreed payment.
Our master will lay protective tape to protect the floor and furniture. After the work is completed, we will remove the garbage and sweep it before leaving.
If there are pets or narrow paths in the house, it is best to temporarily arrange for them to go to other rooms or go out during construction to avoid contact with tools, dust and wires. After completion, first check whether there are any screws and debris left on the ground.
- Clear project scope
- Notify management and neighbors
- Payment after completion acceptance
FAQ
10 practical questions answered
01I just want to remove one or two cabinets, will you accept it?
Yes. We take jobs of any size, including removing one or two cabinets. See A06 and A07 on the published list. (see published rates)
02Can I replace the light switch myself?
Not recommended. Electrical works are to be carried out by registered electrical workers and issued a WR1.[5]
03Do you want to take down the partition wall?
The demolition of non-structural partition walls is generally an exempted project, but if structural walls are involved, an authorized person must be appointed and approval must be obtained from the Buildings Department in advance.[3]
04Is it a small project?
The Buildings Department's minor works supervision system covers 187 projects, divided into three levels; documents for Levels I and II must be submitted 7 days before the start of construction, and completion documents must be submitted within 14 days after completion of all levels.[1]
05Do I need to pay for a door-to-door seat inspection?
Published item L04 lists a site assessment by a tradesperson at HK$500 per visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. (see published rates)
06Do I need a quotation for a small project?
want. Write down the scope, materials, price, date, handle and cleaning instructions clearly to avoid disputes in the future.
07Can I get an estimate first?
Use the AI estimator or 117-item calculator for an initial budget. Confirm the final price in writing after the site survey.
08Are minor projects maintained?
Depending on the terms of the project, the quotation should state the maintenance period and scope; on-site testing will be carried out upon completion, and if there are any problems, the engineer will be notified in writing for follow-up.
09Can I do a few small things at once?
Yes. Combining small jobs can spread minimum charges and site visit fees. E02, for example, has a HK$4,650 minimum. (see published rates)
10After tearing down the cabinets and walls, how about checking the protrusions?
Patching, moisture treatment and repainting may suit. Paint the whole wall to help avoid colour differences. E02 is HK$21 per sq ft, minimum HK$4,650. (see published rates)
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Buildings Department: Introduction to the Minor Works Control System Accessed: 2026-11-01
- [2]Buildings Department: Designated exempted projects Accessed: 2026-11-01
- [3]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-11-01
- [4]1823 Government Hotline: 1823: Which construction projects are subject to the minor works control system? Accessed: 2026-11-01
- [5]Electrical and Mechanical Services Department: Code of Practice and Guidelines for Registered Electrical Workers Accessed: 2026-11-01
- [6]Consumer Council: Consumer Council Home Renovation Research Brief Accessed: 2026-11-01
- PricesHK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-01