01
Find the water source first: seeing the watermark does not mean that you only need to repair the roof
A frequent mistake is assuming any indoor water mark proves the roof is leaking. The Buildings Department also identifies supply and drainage pipes in the same flat, the flat above or an adjoining flat,leaking pipes, aged floor waterproofing and rain entering through roofs, platforms, balconies, external walls or windows.[1] Therefore, the goal of the first site survey should be to narrow down the water source, rather than immediately determine the brick area.
Homeowners can organize the date of rain, how long it took for watermarks to appear after the rain, whether seepage still occurs on dry days, affected indoor locations, water accumulation on rooftops, and photos of drainage outlets by date. If it is suspected to come from adjacent units or common areas, notify the management office or owners' corporation simultaneously to avoid repairing only on your own side. Rainwater seepage through roofs and other locations generally still requires the owner to arrange inspections by construction professionals and repairs by suitable contractors; government intervention does not mean replacing the owner's repair decision.[1]
- Provide three sets of photos on sunny days, in the rain or after rain, and 24 hours after rain. If a certain time period is not available, please indicate it frankly and do not make a supplementary estimate.
- Mark watermarks, water accumulation, water drains, cracks, wall bases and equipment locations on the rooftop plan or screenshot on your mobile phone.
- First confirm with the management office whether the rooftop is private, shared or governed by special rules, and ask about the application, construction period and transportation route.

02
750 feet is only the horizontal area: when measuring, you must separate the facade and the nodes.
750 square feet is approximately equal to the horizontal datum of 69.68 square meters, but it does not automatically cover parapet overhangs, stairwell skirtings, thresholds, drains, overflows, pipe penetrations and air-conditioning or water tank bases. These locations often require more finishing than large flat surfaces. The Buildings Department's roof guidelines specifically require attention to seams, upturns, downturns and penetrations, and require the use of finishes that protect the waterproofing system for roofs that are accessible for maintenance.[2]
Two sets of numbers should be measured before quoting: the first set is the length × width of each horizontal area; the second set is the perimeter of the wall base × the actual turning height, as well as the individual dimensions of each penetration, drainage outlet and base. Don’t take the 300mm turn-up as an on-site instruction that applies to all old homes. It is the design criteria set out by the Buildings Department for new roofs and must be constructed in accordance with the manufacturer's specifications; the old floor heights, thresholds and selected systems still need to be checked one by one.[2]
- It is required that the scale table be divided into columns for "horizontal plane", "vertical upward", "water outlet/through position" and "equipment base", instead of just writing a total number of feet.
- Take close-up photos of where the base of the wall meets the brick surface and let the contractor explain what will be retained, demolished, or redone.
- If there is a water tank, air conditioner or solar/communication equipment, mark who can access it and how to repair it in the future; do not disassemble or connect mechanical and electrical equipment by yourself.
You can swipe left or right on your phone to view the complete table.
| Plan/application judgment | Project scope and quantity caliber | Common pricing methods | Common unincluded items | Key Risks and Things to Ask |
|---|---|---|---|---|
| Confirmed partial repair of a single minor defect | Measure according to actual cracks, penetrations, corners or local area; additional detection and restoration ranges are listed | Depending on the project, maintenance point or partial area, it is not appropriate to directly use the entire site area of 750 feet | Find water sources, remove finishes, adjacent aging floors, and set up safety facilities | If water enters from pipes, walls or windows, patching the same surface may not stop the leak; the basis for judgment must be recorded first[1] |
| No brick removal or renovation on the original surface | First, confirm that the original surface layer is stable, drains well, and is compatible with new and old materials; measure the water level, wall base, drain outlet, and equipment base. | Add nodes/closing points according to coverage area and list them separately | Brick removal, deep sloping, hidden crack repair, and resurfacing | The new layer cannot replace the judgment of the base layer, drainage and joints; it is required to indicate the protective layer and future maintenance methods[2] |
| Re-waterproofing after removing old bricks | Separately list the quantities of bricks, floor cleaning, base repair, waterproofing, wall turning, protective layer and garbage removal | According to square feet/square meters and each process; closing, threading and transportation can be listed separately | Deep chisels, identification of loose mortar or structural problems, drain pipe repairs, cladding and transportation | Don’t understand “waterproofing” to automatically include tiling; disassembly and installation of the surface layer will affect the legal classification and need to be checked according to the actual project [3] |
| Continuous grading, drainage improvement and resurfacing | Measure the finished surface, number and location of water outlets, parapets and equipment bases one by one based on actual measurements; 750 feet is just a starting point for the horizontal plane | Basement, drainage, waterproofing, protection and finishing sub-items; changes to the project shall be confirmed in writing. | Management office arrangements, equipment relocation, storm water pipe modifications, additional transportation, designated bricks or special closures | Changing drainage or adding components should not be done based on verbal assumptions; first check the deed of mutual covenant, management office and professional opinions[2] [3] |
This table is used to compare different quotes on the same list. It does not suggest that any one plan is necessarily suitable for a 750-foot rooftop. Project selection must first confirm the water seepage source, base layer, drainage and ownership/management requirements. [1][2][3]



03
Partial repair, complete redo, or continuous brick paving: how to choose
Partial repairs are only suitable for water sources, damaged boundaries and when there is a reasonable judgment as to why the original system is still usable. For example, a clearly visible closure failure is a different decision from multiple hollows, long-term water accumulation or general aging of the waterproof layer throughout the site. If the source of the water has not yet been clarified, sweeping the local paint directly over the watermark will only make tracing it more difficult in the future.[1]
When the old bricks, mortar, sloping and drainage are disposed of together, the price depends more on which layer is removed, the amount of base repairs, whether the drainage outlet can be retained and how to protect the new membrane, rather than the unit price of 750 feet. The Buildings Department's guidelines point out that roofs must have adequate drainage slopes and drainage outlets to avoid accumulation of water, and it is recommended to set up overflow arrangements to deal with unexpected blockage of rainwater outlets.[2] The quotation should clearly state whether it is "improved drainage" instead of just "includes slope enhancement".
- Each contractor is required to mark on the same set of photos: presumed waterway, reserved area, demolition area and unknown items.
- For the "partial" solution, ask how to determine the local boundary, how to join the original layers, and what to do when the leakage cannot be stopped.
- For a "comprehensive" plan, ask which layers, which walls, which drainage nodes are included, and the change procedures for each item.
04
A waterproofing system is not a bucket of paint: first check the base layer, material and protective layer
Coatings, membranes and cement-based systems may all be part of the solution, but suitability depends on the original substrate, moisture conditions, crack patterns, finishes and product system, not the brand name. Take Sika® Membrane-1000 as an example. The Hong Kong product data sheet states that it can be used as a roof waterproofing coating, with a dosage of approximately 1.65 kg/square meter/two layers. The same data sheet also requires that the base layer be strong, stable, and clean, and states that construction should not be carried out when rain is approaching.[5] This is just an example of a named product and does not mean it is the only or default choice for this project.
If you will be laying bricks, walking or placing equipment after completion, you should also ask "What protection is there on the waterproof membrane?" and "How can the thermal expansion and contraction of the bricks not damage the membrane?" The Buildings Department's guidelines state that accessible roof cladding should protect the waterproofing system and should prevent the expansion and contraction of roof tiles from damaging the waterproofing layer.[2] Therefore, it is more useful to ask the contractor to provide a complete system approach from the base layer to the surface layer than to only look at one waterproof material model.
- Ask for the brand, complete product model, latest technical information, and compatibility instructions for primer/main material/protective layer, rather than just the four words "waterproof paint".
- Ask clearly when the construction will stop and how to confirm the changes in writing when the base layer is wet, the old film has insufficient adhesion or cracks are expanding.
- If a product is specified, first ask whether it is suitable for future tiling, whether a protective layer is required and who is responsible for the maintenance conditions of the system.
Quantity example one: why a 750 sq ft horizontal roof has a different total waterproofing area
Assumptions
- This is a purely computational demonstration and not a completed company case, design drawing or construction instruction.
- Assume that the horizontal rooftop is 25 feet by 30 feet, so the horizontal area is 750 square feet and the outer perimeter is 110 feet.
- Just to understand the concept of 300 mm wall turning up in the Buildings Department's new roof guidelines, it is assumed that the entire circumference needs to be turned up; doorways, stairwells, equipment bases or actual closings are not considered.
How to calculate quantities
- 750 × 0.09290304 = 69.67728 m², rounded to 69.68 m².
- Perimeter: 2 × (25 + 30) = 110 ft. Upstand height: 300 ÷ 304.8 = 0.984252 ft.
- Assumed vertical upstand area: 110 × 0.984252 = 108.27 sq ft.
Under this assumption, 750 square feet is the horizontal benchmark of 69.68 square meters; if all sides are turned up by 300 mm, there will be about 108.27 square feet of vertical surface that need to be visible within the range. It explains why just reporting "750 feet waterproof" is not enough to compare closing work.
The 300mm comes from the design guidelines for new roofs. The actual height of the old roof, the construction perimeter, the threshold, the brick layer and the system method must be confirmed by the site and the product system; this example cannot be directly regarded as a material order or engineering quantity. [2]

05
The four most commonly missed nodes are: wall base, water outlet, penetration and equipment base.
Water usually doesn't just test a flat surface. The horizontal and vertical junctions, near the top of the parapet wall, thresholds, water levels, rainwater inlets and pipe penetrations are all locations that should be visible in the construction photos and quotations. The Buildings Department's roof guidelines require continuous corner treatment at the intersection of vertical and horizontal planes, with special attention being paid to joints, upturns, downturns and penetrations.[2] Homeowners do not have to specify technical details, but should ask the other party to map out system practices and areas of responsibility for each node.
The base of an air conditioner, water tank or other equipment is not just a "covered place". The Buildings Department reminded that mechanical equipment will affect the integrity of the waterproof layer and mentioned that the impact of equipment vibration on the membrane should be reduced.[2] If you want to move, connect or process electricity, you should make corresponding professional planning and verification. Do not include it in the waterproofing process by default, and you should not disassemble or connect it yourself.
- Take photos of each water outlet before and after it is opened, cleaned and closed, and confirm whether it can be inspected in the future.
- It is required to list the work on each pipe penetration and the four sides of the equipment base, rather than just mentioning it as "miscellaneous".
- If you need to add new components, change pipes, or change the location of equipment, stop using waterproofing quotation as the only basis, and check feasibility and responsibility instead.

06
Acceptance is not just about clean work: leave applicable tests and evidence in front of the cover
Inspect the membrane, upstands, edges and drains before tiling conceals them. The Buildings Department identifies suitable tests, including ponding where applicable, for checking workmanship and waterproofing.[2] This does not mean that all rooftops in Hong Kong have legally unified 24 or 48-hour water closure hours; the test range, water storage height, duration, drainage conditions and witness arrangements must be confirmed first by the site, building conditions and selected product systems.
The most practical acceptance documents include: photos of the base layer before construction, materials and batches of each layer, recent photos of wall bases and penetrations, photos of unobstructed drains, test date and scope, observations during the test, and confirmation before cover. This information does not guarantee that there will be no leaks in the future, but it will allow homeowners, management offices and contractors to know what steps to take when problems arise.
- Before starting work, write "under what circumstances can the cover be used" in the process schedule, and specify who will confirm it.
- The test record is required to indicate which area was tested, start and end time, observation location, results and reasons for failure to test.
- After laying the tiles, keep the drain outlet and key closing points accessible for inspection to avoid permanently sealing all risks under the veneer.
You can swipe left or right on your phone to view the complete table.
| Metric items | How to record | How should the quotation be listed? | What should not be preset | The risk of missing something |
|---|---|---|---|---|
| horizontal roof | Measure the actual construction length × width, and indicate the recess, stairwell and equipment occupancy | List the respective square meters/square feet for waterproofing, protective coatings, finishes, demolition or leveling | Has the 750-foot area deducted the unworkable areas or included the surrounding areas of the equipment? | Different contractors use different area standards, and the total prices cannot be directly compared. |
| Parapet and wall base turned up | Measure the circumference, turn-up height and number of corners respectively, and take photos of the existing closing | Specify the line length, vertical area, and closing/corner position. | Treat wall work as if it were included within the 750-foot horizontal plane | It is most common to have unclear responsibilities between horizontal and vertical interfaces; the Buildings Department’s guidelines specifically remind joints, upturns and threading positions[2] |
| Drain outlets, overflows and rainwater pipe openings | Record the quantity, location, whether it can be cleaned, the location of water accumulation after rain, and photos | Line by line cleaning, closing, protective covers, testing and required drainage improvements | The number of water outlets is sufficient and the pipes are clear. There may be no need to deal with it. | Water still accumulates after the waterproofing surface is completed, or the inspection opening is blocked by the facing in the future[2] |
| Pipe penetrations and bases for air-conditioning/water tanks, etc. | Mark the diameter, four side dimensions, whether it vibrates and whether it will be retained one by one. | Responsibility for sealing, protection, waterproof extension and equipment coordination on the four sides of the column base | Mechanical and electrical equipment can be moved or connected by themselves through the waterproofing process | Equipment vibration or subsequent maintenance may damage the waterproofing; other professional arrangements should be made for mechanical and electrical matters[2] |
| Dismantling, moving and management arrangements | Record existing tile and mortar thickness, lift or stair routes, working-hour limits and debris storage points. | The costs of demolition, bagging, falling off the building, legal disposal, and the protection and management of public places are listed separately. | The word "all-inclusive" includes all garbage, transportation, deposits and procedures | After the construction started, it was discovered that transportation, management or deep demolition would be extra, which would affect the budget and construction schedule. |
Submitting this sheet to the contractor along with photos of the rain, location of interior watermarks and building rules will make it easier to obtain comparable written coverage. The company's online tool is only for preliminary estimates, and the rooftop package still needs to be repriced. General residential rapid solutions should not be used to replace the existing rooftop survey [6]. [2][6]


07
Compare quotes: Put "project scope" before "total price"
Similarly, if you write 750 feet, the A quotation may only cover the flat coating, while the B quotation may include brick removal, bottom cleaning, repair, sloping, drain closing, protective layer and re-paving. The two should not be directly judged based on the total price. Use the bill of quantities in this article to check the clearance, transportation, public area protection, base treatment, waterproofing system, upturn, drainage, protective layer, finish, testing, cleaning and defect follow-up to know what the difference represents.
HK Create Design offers free preliminary estimates and enquiries through its 2026 online tools. Of 117 options, 116 have indicative unit rates. The remaining 1 rooftop package requires a separate quotation.[6] The three residential quick-estimate examples do not provide an all-inclusive price for a 750 sq ft roof. Saleable area × 3 estimates only paint area and has no bearing on roof waterproofing measurements. The basic scheme excludes full kitchen and bathroom reconstruction, services, furniture and finishes.[6]
- Each quotation is required to indicate the actual measured area, units, quantity, materials, labor, protection, removal and uninclusive items, rather than just the total amount.
- When encountering hidden cracks, hollows, deep gouges, drainage problems, or new requirements from the management office, obtain the written scope and amount of the change before proceeding.
- Treat 20% only as a reserve for your own planning, not as an automatic surcharge for the company or a committed project.[6]
08
Does it require approval? Waterproofing, brick removal, drainage and additions cannot be confused
The Buildings Department has listed "the laying/replacement of paint-type or felt-type waterproofing layers on the roof surface of buildings" as a designated exempted project29, provided that the project does not involve the laying or removal of any tile layer or floor layer.[3] Therefore, if the 750-square-foot plan includes laying bricks, digging mortar, redoing the floor, changing drainage, or adding components, you cannot assume that the entire project is of the same category just because the name has "waterproofing."
If the rooftop is a public part or the project may change components, drainage, appearance or equipment, the owner should first check the building's deed of mutual covenant and the requirements of the management office, and then have relevant professionals and contractors check it based on the actual plans and scope. This is a planning reminder, not a legal opinion or statutory conclusion; the written quotation should also clearly state who is responsible for submitting information, notifying the management office and handling additional requirements.
- Attach the management office's renovation regulations, construction period, deposit, lifting and public area protection requirements to the inquiry information.
- Ask the contractor if this plan includes removing bricks, floors, drainage or any new components, and ask for individual answers rather than generalizations like "generally not used".
- If there are any doubts about public areas or project classification, order materials and start construction first, and obtain corresponding professional or management verification.
Quantity example two: estimating membrane quantities from a specific product data sheet without treating the result as a quotation
Assumptions
- This is a materials planning demonstration and not a completed company case, procurement proposal or construction method.
- It is only assumed that Sika® Membrane-1000 is used entirely on the horizontal surface of 750 square feet, excluding wall turning, water removal, overlapping, base absorption, loss, protective layer or other system processes.
- Sika Hong Kong's August 2022 data sheet gives approximately 1.65 kg/m² for two coats and 20 kg per pail. Actual consumption depends on site conditions.
How to calculate quantities
- 750 × 0.09290304 = 69.67728 m².
- 69.67728 × 1.65 = 114.967512 kg, rounded to 114.97 kg.
- 114.967512 ÷ 20 = 5.7483756 pails. Round up to 6 whole pails for the theoretical horizontal-area quantity.
Under extremely simplified assumptions, the amount of data sheet for the two horizontal layers is approximately 114.97 kilograms, which is the total number of packages in 6 barrels of 20 kilograms. This result can only be used to ask the contractor to explain its material plans and loss assumptions, and cannot be used to infer labor, base, protection, drainage, tiling or overall project prices.
This product is not the only system available; the data sheet requires the base to be strong, stable, clean, etc., and states that construction should not be performed when rain is approaching. Any brand, batch, base, wall skirting and finish matching should be verified with the latest local product information, suppliers and on-site solutions. [5]

09
Safety and weather are not a side note: Ask questions next to the quotation for rooftop projects
Roof edges, entrances and exits, slippery roofs and areas near equipment may change the work schedule. The Labor Department points out that if construction site workers are at risk of falling from a height of 2 meters or more, contractors must provide appropriate working platforms and fall prevention measures; even if the height is insufficient and they cannot work safely on the ground or permanent structures, they must also provide a suitable working platform for work.[4] Homeowners do not need to and should not set up these facilities themselves, but they can ask the contractor to explain their risk assessment, access arrangements and inclement weather shutdown criteria before work begins.
The Labor Department's information on building maintenance also points out that before starting roof work, a competent person should conduct a risk assessment of the work content; if work must be done on the roof, safe access and fall prevention arrangements should be planned based on the assessment.[4] Avoid promising a minimum completion time. Do not press for the roof to be covered during rain, before the substrate meets product conditions or before safety measures are confirmed. For electrical work,Aluminium windows, equipment relocation or demolition at height, use the information for professional planning and verification. Do not attempt the work yourself.
- Before starting work, ask who is responsible for rooftop access, edge protection, loading and unloading of materials, enclosure of public areas, and re-inspection after suspension of work on rainy days.
- If the work is close to the edge, a shed or a working platform is required, the contractor is required to provide corresponding safety arrangements and information on the person in charge of the site.
- Don’t assume that safety measures, weather delays, and equipment coordination must be included; ask for them to be listed in the quotation or construction documents.
10
From a free preliminary estimate to a comparable formal offer: What’s next for homeowners
To organise your questions, you can use our free online estimate or send a free enquiry. Site visits can be arranged if needed. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. Send the roof area, photos, dates when leaks occurred, drain positions and building management information to WhatsApp 52437747.[6] The on-site measurement does not automatically approve the start of construction, nor does it mean that the source of water seepage has been found; its value is to spread out the unknown scope.
The formal quotation is required to include at least: actual measurement scale, retention and removal scope, material system and product model, node method, drainage treatment, protective layer and finishing relationship, applicable testing, transportation and management arrangements, uninclusive items, change procedures and defect follow-up methods. The company's public tool explains that its upper limit can include 20% planning reservation, which is not an additional charge.[6] This reservation should be retained at the homeowner's discretion and should not obscure pending work.
- Before issuing an inquiry, provide the two tables in this article together with photos, floor plans, building requirements and equipment you wish to retain in one go.
- After receiving the quotation, circle each "negotiable", "depending on the site" and "not included", and ask for quantification or listing of triggering conditions.
- Payment, changes, testing, document delivery and defect follow-up are confirmed before signing; this article is only for planning and asking questions, and does not replace a contract or professional advice.
FAQ
6 practical questions answered
01Does the 750-foot rooftop have to be completely bricked and redone to be waterproofed?
Not always. The choice depends on the leak source, membrane and tile condition, ponding, hollow bedding, cracks and drainage. A single confirmed defect may suit local repair. Multiple failures or an unknown source need wider investigation. Check roof, wall and window rain ingress as well as supply and waste pipes before deciding what to remove.[1]
02Must waterproofing always be flood-tested for 24 or 48 hours?
It should not be said that 24 or 48 hours are the unified legal hours for all rooftops in Hong Kong. The Buildings Department's roof guidelines mention that applicable compliance tests such as flooding can be carried out to check the construction quality and waterproofing performance, but it does not reduce all old roof repairs to a single fixed number of hours.[2] Test time, scope, water storage conditions, drainage, product curing and whether water can be safely stored should be confirmed in writing by the contractor on site and in the product data sheet before cover.
03Can the tiles be laid as soon as the waterproofing layer is completed?
You cannot judge by just the word "complete". Start by checking the base requirements, curing conditions, applicable test results, and protective coating practices of the selected system. Taking Sika® Membrane-1000 as an example, its data sheet states that construction should not be carried out when rain is approaching. A 10-day drying period is allowed after the final layer at 25°C and 75% relative humidity; it can be longer if the humidity is higher or the temperature is lower.[5] This is specific information for this product and cannot be applied to all materials.
04If we only do roof waterproofing, do we have to ignore the application or management office?
It cannot be generalized. The 29 designated exempted projects of the Buildings Department only cover paint-type or felt-type roof waterproofing layers that do not involve the laying or removal of tile layers or floor layers.[3] Once the plan includes brickwork, floors, drainage, equipment or public parts, the building deed of mutual covenant, management office regulations and corresponding professional opinions should be checked first according to the actual scope of the project. This is not a legal conclusion that this article can draw for you.
05Can the estimated figure on the company's website be regarded as a formal quotation for a 750-foot rooftop?
No. The company's 2026 online estimator and enquiries are free, but the rooftop package is priced separately. Of 117 options, 116 have indicative unit prices and 1 rooftop item awaits a quotation.[6] The quick calculator has three example schemes. It excludes complete kitchen and bathroom reconstruction, services, furniture and finishes. A whole-flat or rooftop quotation requires a written scope based on actual dimensions, substrate, drainage, demolition, materials and building rules.
06Is on-site measurement free? What should I prepare?
Online estimates and enquiries are free. The company publishes the following terms. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[6] Before making a reservation, please prepare the rooftop area, length, width and surrounding dimensions, the number of water outlets, photos after rain and indoors, old maintenance records, whether lifts can be used, management office requirements, and the equipment you want to keep. This makes it easier to clarify unknown items such as waterproofing, drainage, demolition and transportation before quoting.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]Buildings Department: Water Seepage Problem Accessed: 2026-10-21
- [2]Buildings Department: PNAP APP-105 Appendix B Guidelines on Prevention of Water Seepage in New Buildings Accessed: 2026-10-21
- [3]Buildings Department: Designated exempted project 29—Waterproof layer on roof surface Accessed: 2026-10-21
- [4]Labor Department: Overview of Work-at-Height Safety Accessed: 2026-10-21
- [5]Sika Hong Kong:Sika® Membrane-1000 Product Data Sheet Accessed: 2026-10-21
- [6]HK Create Design: Quick estimate of company price in 2026 Accessed: 2026-10-21