01

Kitchen waterproofing prices in 2026: what HK$4,300 covers

HK Create Design’s published kitchen waterproofing price is HK$4,300 per room. Labour and base materials cover the entire floor, 150 mm upstands, reinforcement at the sink and two coats of Sika 107. A ponding test is an extra HK$1,400 per test.

A kitchen has no shower or bath, but the sink, floor cleaning, refrigerator and washing machine all involve water. Over time, water can reach the flat below, particularly around the sink waste and adjoining wall. Once old tiles have been removed during a renovation, the waterproofing is readily accessible for renewal.

In its study of renovation quotations, the Consumer Council recommends setting out the areas, material, height of waterproofing and leak testing.[2] For a kitchen quotation, specify whether the whole floor is covered, the height of wall upstands, reinforcement at the sink and whether a ponding test is included.

This article covers kitchen waterproofing methods and prices. For the overall kitchen renovation budget, see HK Create Design’sKitchen renovationguide.

  • Confirm full floor coverage
  • Confirm the upstand height
  • Confirm reinforcement at the sink
  • Ask about the ponding test
Site photo: removing old kitchen cabinets and tiles before renewing the floor waterproofing.
Site photo: removing old kitchen cabinets and tiles before renewing the floor waterproofing. Select an image to enlarge

02

How kitchen and bathroom waterproofing differ

HK Create DesignBathroom waterproofing C02 costs HK$4,850 and includes waterproofing 6 ft up the walls, full-height coverage in the shower and a 24-hour ponding test. C03 kitchen waterproofing costs HK$4,300, with 150 mm wall upstands and extra attention around the sink. Ponding testing is charged separately for C03.

Bathrooms and kitchens have different exposure to water. Shower spray reaches far up bathroom walls. Kitchen water is usually concentrated on the floor and around the sink. The upper walls rarely stay wet, so a 150 mm upstand at the floor junction can contain water from floor cleaning.

A kitchen containing a washing machine or floor drain, or an open kitchen adjoining the living room, may warrant wider coverage. Examples include the washing machine area and the wall behind the sink. Additional coverage can be priced per sq ft under C01.

Many kitchens have no floor drain. Adjust the ponding test to suit the site, for example with a temporary perimeter barrier. As in a bathroom, tiling before testing leaves leaks undiscovered.

  • Kitchen wall upstand: 150 mm
  • Bathroom wall upstand: 6 ft
  • Consider extra coverage at the washing machine
  • Kitchen ponding testing charged separately
Our kitchen waterproofing and related prices (2026)

You can swipe left or right on your phone to view the complete table.

ItemPriceincludeExclusions and points to check
C03 Waterproof one kitchenHK$4,300Entire floor, 150 mm wall upstands, reinforcement around the sink and two coats of Sika 107Ponding test charged separately
C04 flood test (24–48 hours)HK$1,400 per testSeal the floor drain, pond to a depth of 2–3 cm, monitor the water level, inspect the ceiling below and photograph the results.—
C01 SikaTop Seal-107 waterproofing, priced per sq ftHK$39/sq. ft. (minimum HK$2,350)Clean and dampen the base, reinforce internal corners and pipe penetrations, and apply two coatsAdditional HK$10/sq.ft. for third floor
A09 Strip out and clear one kitchenHK$9,950Remove and transport wall tiles, floor tiles and kitchen cabinetsPrice adjusted to the actual scope for open kitchens
A06 Remove kitchen or bathroom cabinetsHK$170 per linear ftRemove base and wall cabinets and worktop, and safely cap off plumbing and electrical pointsMeasured according to the horizontal length of the cabinet body
B02 Screed and level the floorHK$22/sq. ft. (minimum HK$1,850)Level with a cement–sand screed and form falls to drainage in wet areasLevel differences greater than 30 mm require separate agreement
D01 / D02 Floor and wall tilingHK$78 per sq ft, with a minimum of HK$3,250 for each itemSet out, plan the tile layout, lay tiles, grout and finish edgesFinish tiles priced separately

Labour and base materials are included. Finish tiles and kitchen cabinets are priced separately. The written quotation after site measurement governs. [7]

Kitchen waterproofing prices: key figures illustrated | HK Create Design
Kitchen waterproofing prices: key figures at a glance | HK Create Design Select an image to enlarge

03

Waterproofing products: Sika 107 and OPTIMIX WP515

C03 kitchen waterproofing uses Sika 107. Sika lists SikaTop-107 Seal HK for bathrooms, toilets and balconies. Its guidance calls for at least two coats, about 1.0 kg/m² per coat or about 2.0 kg/m² in critical areas, at +8 to +35°C. Approximate intervals between coats are 12 hours at 10°C, 6 hours at 20°C and 3 hours at 30°C. Protect the curing coating from direct sun, wind and rain.[1]

The manufacturer lists OPTIMIX WP515 waterproofing slurry for bathrooms, kitchens and balconies. Apply at least two coats of about 1 mm each, at approximately 1.60 kg/mm/m². Allow about 1–2 days before applying the finish.[3]

Both are cementitious waterproofing slurries and need time to cure before tiling. C03 is priced for Sika 107. An alternative system requires a written quotation.

Sink reinforcement means a thicker application or an extra coat beneath the sink, on the adjoining wall and around the waste pipe penetration. These areas are frequently exposed to water.

  • At least two coats
  • Check the application temperature
  • Allow the required wait before tiling
  • Reinforce the sink area
Completed project photo: finished kitchen wall and floor tiles, with mould-resistant silicone at the sink edge.
Completed project photo: finished kitchen wall and floor tiles, with mould-resistant silicone at the sink edge. Select an image to enlarge

04

Why do kitchen waterproofing quotations differ?

1. Check whether waterproofing is included. A kitchen quotation may cover only stripping out and retiling. Look for a separate waterproofing item.

2. Check the coverage. Does it include the entire floor or just the sink area? Is there a wall upstand, and how high is it? These choices affect both the cost and the protection.

3. Number of coats and material. Check the specified brand and model and whether there are one or two coats. Sika recommends at least two coats of Sika 107.[1]

4. Base preparation and falls. Clean and dampen the substrate before waterproofing. Kitchen floors with drains need falls towards them. B02 floor screeding costs HK$22 per sq ft, including forming falls to drains in wet areas.

5. Ponding tests. Check whether a test is carried out, how long it lasts and whether a record is kept.

6. Strip-out scope. Ask what happens to the old cabinets and tiles. A09 costs HK$9,950 and includes stripping and transporting wall tiles, floor tiles and kitchen cabinets.

  • Is waterproofing listed?
  • Check the scope
  • Check the material and number of coats
  • Check the substrate falls
  • Check ponding testing
  • Check demolition
Worked example: itemised costs for a 50 sq ft kitchen renovation(Unit:HK$)
C04 flood test
HK$1,400
B02 Floor levelling (minimum charge)
HK$1,850
D01 Floor tiles, 50 sq ft
HK$3,900
C03 Kitchen waterproofing
HK$4,300
D02 Wall tiles, 120 sq ft
HK$9,360
A09 Kitchen strip-out and waste removal
HK$9,950

Using HK Create Design’s published 2026 rates, the total is HK$30,760, excluding finish tiles, cabinets, plumbing and electrical work.

05

Professional and official guidance

The following information comes from the Consumer Council, government departments and product manufacturers.

Consumer Council: a waterproofing quotation should specify the location, material, height and leak test.[2]

Sika’s product data: apply at least two coats at +8 to +35°C. Protect from sun, wind and rain during curing.[1]

According to the OPTIMIX WP515 product data, the slurry is suitable for kitchens. Apply at least two coats and allow about 1–2 days before finishing.[3]

According to 1823, owners are primarily responsible for seepage in private properties. Under the Joint Office procedure effective from 16 July 2026, where there is reason to suspect the flat above, the office issues an advisory repair notice in about 14 working days and asks its owner to investigate and repair within 28 calendar days.[4]

Buildings Department: repair or replacement of sanitary fittings and tile laying are exempt from prior approval but must comply with applicable requirements.[5]

In HK Create Design’s experience, common kitchen leak points are the junction of the sink waste and the wall, and the washing machine drain. We reinforce both areas during renovation.

  • Specify all four items in the quotation
  • Follow the manufacturer’s application requirements
  • Owners’ responsibility for seepage
Project photo of completed bespoke kitchen cabinets | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

06

Kitchen seepage: responsibilities and official procedures

If seepage from a kitchen affects the flat below, 1823 advises that seepage in private property is primarily a building management and maintenance matter for the owners. If a neighbouring flat is suspected, discuss it with the owner promptly and engage a building professional or licensed plumber to identify and repair the source.[4]

Report unresolved seepage to the Joint Office. According to 1823, the revised process allows for an advisory repair notice to the owner of the upper flat in about 14 working days and 28 calendar days for inspection and repair. The office contacts the complainant within 6 working days. With cooperation, investigations usually finish within 90 working days.[4]

FEHD’s frequently asked questions on seepage and dripping also describe the Joint Office’s remit.[6]

A plumbing leak can cause kitchen seepage even when the waterproofing is sound. HK Create Design specifies copper supply pipes, works with licensed plumbers and can handle Water Supplies Department applications on your behalf.

  • Owners are primarily responsible for seepage
  • Act promptly after receiving a notice
  • Distinguish a waterproofing failure from a plumbing leak
Worked example 1

Example one: waterproofing and testing only, with old tiles removed

Assumptions

  • Assume the old kitchen tiles and cabinets have been removed and the substrate is sound.

How to calculate quantities

  1. C03 Kitchen waterproofing: HK$4,300.
  2. C04 Ponding test: HK$1,400.
  3. Total: HK$5,700.

HK$5,700。

In kitchens without a floor drain, adjust the ponding test to suit site conditions. [7]

Use your square footage instead and see a reference budget

07

Options A and B: local or full waterproofing

Localised waterproofing treats only the sink and washing machine areas. It costs less but leaves other areas exposed to floor washing, refrigerator drainage or accidental spills.

Full waterproofing covers the entire floor and turns up the wall at the junction. C03 costs HK$4,300 and includes the whole floor and reinforcement around the sink. When the old tiles have already been removed during renovation, the extra cost of full coverage is modest for the area protected.

For renovation, we recommend full coverage. For a local leak, first use a ponding test to identify the affected area before choosing a repair.

If a downstairs neighbour reports seepage and you are not planning a renovation, start with a ponding test and a plumbing inspection. Identify a waterproofing failure or a pipe leak before deciding between local tile removal and a full renewal. Repairing the wrong source wastes time and money and leaves the leak unresolved.

  • Choose full coverage during renovation
  • Test before deciding on leak repairs
  • Consider extra coverage at the washing machine

08

Common kitchen waterproofing mistakes

1. Assuming a kitchen needs no waterproofing. Over time, water around the sink and floor can seep into the flat below.

2. Skipping the floor under the cabinets. Some installers treat only exposed kitchen flooring, even though the sink waste pipe is inside a cabinet.

3. Tiling without testing. Even in a kitchen without a floor drain, a temporary perimeter barrier can be used for a ponding test.

4. Puncturing the waterproofing. Drilling floors or the base of walls when installing kitchen cabinets can damage the membrane. Plan fixing positions in advance.

5. Leaving joints without mould-resistant silicone. HK Create Design uses DOWSIL mould-resistant silicone around sinks and at worktop-to-wall junctions to reduce mould and water ingress.

  • Kitchens need waterproofing too
  • Waterproof beneath the cabinets
  • Test before tiling
  • Plan fixing holes
  • Finish joints with mould-resistant silicone
Kitchen and bathroom waterproofing compared

You can swipe left or right on your phone to view the complete table.

compareKitchen waterproofing (C03)Bathroom waterproofing (C02)
PriceHK$4,300 per roomHK$4,850 per room, approximately 30–40 sq ft
FloorComprehensiveComprehensive
wall150 mm upstand at the wall-to-floor junctionExtend 6 ft up the walls and to full height in the shower
Reinforce critical areasSink areaInternal corners, pipe penetrations and shower area
Flood testingAn additional HK$1,40024 hours included

HK Create Design’s published prices for 2026. [7]

Renovation work in progress | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

09

Handover checklist

Membrane: check for missed areas, blisters and cracks. Confirm 150 mm upstands at wall-to-floor junctions and reinforcement around the sink.

Testing: check the photographs and the condition of the ceiling below.

After tiling, check the floor for standing water and inspect the silicone around the sink.

Documents: retain material data, installation photographs and test records. The workmanship warranty lasts one year, subject to the written quotation.

In the first few months after moving in, check under the cabinets for water stains and follow up promptly on any reports from the flat below.

  • Check for missed areas
  • Check wall upstand height
  • Check the sink area
  • Check test records
  • Keep the documents
  • Check under the kitchen cabinets after moving in

10

How to schedule kitchen renovation

Typical sequence: remove cabinets and strip out → plumbing, wiring and gas pipework → rendering and levelling → two coats of waterproofing → curing → ponding test → tiling → cabinet installation → fit sink and tap.

Complete plumbing and electrical work before waterproofing. Use a registered gas contractor for gas pipe alterations. Allow the required wait between coats and before tiling,[1] Allow at least two to three days for waterproofing and testing.

Measure for cabinets after tiling where possible. The new wall and floor finishes affect the dimensions. Customers select the sink and tap. HK Create Design installs them for an installation fee.

  • Complete plumbing, electrical and gas work first
  • Allow two to three days for waterproofing and the ponding test
  • Take cabinet measurements after tiling
Worked example 2

Example two: masonry and tiling for a full 50 sq ft kitchen renovation

Assumptions

  • Assume 50 sq ft of kitchen floor and 120 sq ft of wall tiling.
  • Use straight-laid 300 × 600 mm tiles.

How to calculate quantities

  1. A09 Kitchen strip-out and clearance: HK$9,950.
  2. C03 Kitchen waterproofing: HK$4,300.
  3. C04 Ponding test: HK$1,400.
  4. B02 Floor levelling: 50 × HK$22 = HK$1,100. As this is below the minimum charge, HK$1,850 applies.
  5. D01 Floor tiling: 50 × HK$78 = HK$3,900.
  6. D02 Wall tiling: 120 × HK$78 = HK$9,360.
  7. Total: HK$9,950 + HK$4,300 + HK$1,400 + HK$1,850 + HK$3,900 + HK$9,360 = HK$30,760.

HK$30,760, excluding finish tiles, kitchen cabinets, plumbing, electrical and gas work.

A09 is adjusted to the actual scope for an open kitchen. [7]

Use your square footage instead and see a reference budget

11

Kitchens in public rental flats, Home Ownership Scheme flats and older buildings

Public rental flat renovation: alterations to public rental flat kitchens must meet Housing Department requirements. Check with the estate office first.

Home Ownership Scheme flat renovation: check management rules and renovation hours, and coordinate the ponding test with the flat below.

Older flat renovation: older kitchens often lack modern waterproofing and may also have ageing pipes. When renovating, we recommend stripping back to the substrate,Pipe replacement, renew the waterproofing and retile as one job.

  • Check first in public rental housing
  • For Home Ownership Scheme flats, coordinate with the flat below
  • Coordinate the work in one project in an older flat
Four details to specify in a kitchen waterproofing quotation

You can swipe left or right on your phone to view the complete table.

ItemSpecify in writingHow HK Create Design describes C03
Areas to be waterproofedFloor, wall bases, sink and washing machine areaEntire floor and reinforcement around the sink
MaterialBrand and modelSika 107
Height of the waterproofingHow high does the waterproofing extend up the walls?150 mm upstand at the wall-to-floor junction
Leak testingIs a ponding test included, and how long does it run?C04 charged separately, 24–48 hours

These four points draw on the Consumer Council’s guidance on quotations. [2] [2]

Site photo of a completed custom bathroom cabinet | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

12

How to handle an open kitchen

An open kitchen and living room often share one tiled floor, so agree the waterproofing limits in advance. A typical scope covers the sink and hob area and extends some distance beyond the cabinets. A09 kitchen strip-out and clearance is priced per room, with open kitchens adjusted to the actual scope.

A spill in an open kitchen with a level floor can reach the living room. Wider waterproofing may be appropriate. Where the living area has timber or SPC flooring, finish the kitchen-to-living-room junction carefully to keep water from passing underneath.

  • Define the waterproofing coverage
  • Finish at the junction
  • Plan where spilled water will flow

13

Where are kitchen leaks most likely?

1. The sink waste pipe passing through a wall or floor. The gap around the pipe can widen as cement shrinks or the pipe vibrates. Water dripping from the sink or a waste connection then follows the pipe into the wall and floor. This is a common kitchen leak source. C03 specifies extra waterproofing around the sink and a thicker application around the pipe penetration.

2. The washing machine drain. Washing machines can discharge large volumes of hot water. A loose or split waste hose can release water across the floor quickly. If the machine is in the kitchen, include its footprint in the waterproofed area and consider extra wall protection under C01 where required.

3. The wall-to-floor junction. Water can collect at the wall base during mopping or washing. C03 therefore specifies a 150 mm upstand. If omitted, water can pass through the wall base and stain the ceiling near the wall below.

4. Beneath the cabinets. Small leaks can go unnoticed in these concealed spaces until the flat below reports damage. Waterproof the floor under the cabinets before they hide it.

5. Plumbing connections, including inlet valves, filter connections and water heater pipes. Leaks here are usually plumbing faults, but can cause the same seepage. Copper supply pipework installed by a licensed plumber can reduce the risk of leaking joints.

  • Sink waste pipe penetration
  • Washing machine drain connection
  • Wall-to-floor junction
  • Under the kitchen cabinets
  • Pipe connections
Worked example 3

Example three: extra waterproofing by the washing machine and on the wall behind the sink

Assumptions

  • Assume the washing machine is in the kitchen and about 30 sq ft of additional wall waterproofing is wanted behind the sink and washing machine.

How to calculate quantities

  1. C01:30 × HK$39 = HK$1,170。
  2. The calculated amount falls below the minimum, so HK$2,350 applies.
  3. Add HK$4,300 for C03, bringing the total to HK$6,650.

HK$6,650, excluding a ponding test.

Confirm the additional area and pricing in the written quotation. [7]

Use your square footage instead and see a reference budget

14

What to allow for the refrigerator, dishwasher and water filter

A double-door refrigerator with an ice maker needs a water inlet. Defrost water can also collect beneath the appliance. Waterproofing the floor at the refrigerator helps prevent small spills from seeping into the flat below.

Dishwashers need a water supply, waste connection and power. They are usually beside the sink and connect to its waste pipe. Reinforce the waterproofing in both areas together.

Water filters usually sit beneath the sink and have several connections. Secure pipes during installation so vibration cannot loosen them.

Decide equipment positions at the design stage and complete plumbing and electrical work before waterproofing. Registered electrical workers handle electrical work. Our partner licensed plumbers install copper water pipes.

  • Refrigerator water inlet
  • Dishwasher supply, drain and power connections
  • Water filter connections
  • Decide positions at the design stage

15

Does your kitchen need a floor drain and a fall towards it?

Many Hong Kong kitchens have no floor drain and no obvious fall. A level floor makes cabinet and refrigerator installation easier, but spilled water must be wiped up.

If the kitchen already has a floor drain, retain the fall towards it when renovating. B02 floor screeding is HK$22 per sq ft, with a minimum of HK$1,850, and includes forming falls to drains in wet areas.

Adding a floor drain to a kitchen that has none involves changing the drainage and making an opening in the slab. First check feasibility and regulatory requirements. This goes beyondMasonry and tilingThe choice is yours. For a kitchen without a floor drain, HK Create Design generally recommends waterproofing the full floor with wall upstands and avoiding washing the floor with large volumes of water.

Where there is a floor drain, seal it before flooding the floor for the test. Where there is none, arrange a temporary barrier to suit the site.

  • Keep the fall to any existing floor drain
  • Check before adding a floor drain where none exists
  • Avoid flooding the floor during routine cleaning
  • Adapt the test to the site
Kitchen leaks: causes and departments handling reports

You can swipe left or right on your phone to view the complete table.

CauseExampleGovernment referrals (2024)
Supply pipe leakageHot and cold sink supplies and washing machine inletWater Supplies Department: 1,236 cases
Defective drainage pipesSink waste and floor drainBuildings Department: 2,200 cases, including building safety matters
Defective waterproofingWall-to-floor junction and floorJoint Office investigation

Figures supplied by the Development Bureau in its reply to the Legislative Council [8]. [8]

Masonry work in progress | HK Create Design
Site photo of masonry work | HK Create Design Select an image to enlarge

16

Estimating the budget: three scenarios

Scenario one, waterproofing only: with the old tiles removed, C03 at HK$4,300 plus C04 ponding testing at HK$1,400 totals HK$5,700.

Scenario two, masonry for a full renovation: for a 50 sq ft kitchen, allow HK$9,950 for A09 strip-out, HK$4,300 for C03 waterproofing, HK$1,400 for a C04 test, the HK$1,850 B02 levelling minimum, HK$3,900 for D01 tiling of 50 sq ft of floor, and HK$9,360 for D02 tiling of 120 sq ft of walls. Total: HK$30,760, excluding finish tiles, cabinets, plumbing and electrical work.

Scenario three, a kitchen washing machine: add about 30 sq ft of waterproofing at the machine and on the wall behind the sink to scenario two. C01 calculates to HK$1,170, so its HK$2,350 minimum applies. The total is about HK$33,110, subject to written quotation.

The three examples show that waterproofing is only part of the kitchen masonry budget. Demolition and tiling make up most of the cost. Skipping waterproofing or the water test to save a few thousand dollars can mean paying far more to remove and replace tiles if a leak appears later.

  • Waterproofing alone costs about HK$5,700
  • Full renovation example: approximately HK$30,760
  • Extra waterproofing at the washing machine is charged separately
  • Budget for waterproofing and testing

17

Coordinating waterproofing and cabinet installation

Cabinet installation comes late in a kitchen renovation, but can affect the membrane. Cabinet legs usually stand on the tiles without drilling the floor. When fixing a floor-mounted plinth or cabinet to the floor, avoid piercing the membrane or seal the fixing with a compatible material.

2. Wall cabinets. These require wall fixings. The standard C03 upstand is only 150 mm, usually well below the fixing positions. Where waterproofing extends higher, for example behind the sink, plan fixing positions in advance.

3. Sink and worktop. Seal the sink edge and worktop-to-wall joint with mould-resistant silicone. HK Create Design uses DOWSIL. This seal is the first line of protection. Replace blackened or detached silicone before water gets under the worktop.

4. When to measure. Measure for cabinets after tiling, as wall and floor tiles change the finished dimensions. Cabinets measured too early may not fit and may need altering.

  • Avoid puncturing the floor waterproofing
  • Plan drilling positions in advance
  • Use mould-resistant silicone at worktop junctions
  • Measure for kitchen cabinets after tiling
Worked example 4

Example four: estimating Sika 107 quantities

Assumptions

  • Assume a kitchen floor of 5 × 10 ft = 50 sq ft and a wall perimeter of about 30 ft after deducting the doorway.
  • 150 mm wall upstand, approximately 0.49 ft.

How to calculate quantities

  1. Wall upstand area: 30 × 0.49 ≈ 14.7 sq ft.
  2. Total area: 50 + 14.7 ≈ 64.7 sq ft ≈ 6.0 m².
  3. Two coats: 6.0 × 1.0 kg × 2 ≈ 12 kg. [1]

About 12 kg, excluding extra material for reinforcement at the sink.

The manufacturer recommends about 2.0 kg/m² in critical areas, increasing actual consumption. [1]

Use your square footage instead and see a reference budget

18

Hob area: heat resistance and cleaning

The hob area is more about the wall finish than waterproofing. Heat and cooking fumes reach the wall behind the hob, so tiles or another heat-resistant, easy-clean surface are commonly used. If you are replacing a tiled wall with paint, consider how the area around the hob will be cleaned.

Alterations to gas hobs and gas pipes must be carried out by a registered gas contractor. Masonry andWaterproofingmust fit around their work schedule. An induction hob needs a suitably rated supply installed by a registered electrical worker.

Choose the cooker hood position and exhaust duct route before rendering and tiling to avoid cutting openings in the finished work.

  • Use a heat-resistant, easy-clean finish behind the hob
  • Use a registered contractor for gas work
  • Set the cooker hood position first
Kitchen waterproofing prices: checklist illustrated | HK Create Design
Kitchen waterproofing prices: checklist | HK Create Design Select an image to enlarge

19

Site measurement, quotations and appointments

For a kitchen quotation we measure the floor and inspect the sink and washing machine positions, any floor drain, and the condition of old tiles and cabinets.

Before booking, prepare photos of the kitchen, any seepage in the flat below, and the proposed cabinet design if available.

If your project also includes bathroom renovation,Whole-flat renovationor replacing the plumbing, discuss everything together. HK Create Design can schedule demolition, plumbing, waterproofing, testing, tiling and cabinetry together. The quotation shows unit rates, quantities and minimum charges. Our AutoCAD, 3ds Max and SketchUp drawings help confirm cabinet, sink and appliance positions before setting the waterproofing scope.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Measure the area
  • Inspect the sink and washing machine areas
Worked example 5

Example three: replacing cabinets only versus a full strip-out

Assumptions

  • Illustrative example.

How to calculate quantities

  1. Cabinets only, floor tiles sound: new waterproofing is unnecessary
  2. Strip back to the substrate: kitchen demolition HK$9,950 + waterproofing HK$4,300 + ponding test HK$1,400 = HK$15,650 [7]

Renew the waterproofing while the substrate is exposed

In 2025, about 30% of Joint Office investigations into seepage complaints took more than 90 working days [9]. [7][9]

Use your square footage instead and see a reference budget
Site photo of floor channels for pipework at Yat Man House, Ho Man Tin Estate | HK Create Design
Project photograph: plumbing at Yat Man House, Ho Man Tin Estate, May 2026, HK Create Design Select an image to enlarge

20

The figures: nearly 50,000 water seepage complaints in Hong Kong in one year

In 2024 the Joint Office received 47,299 complaints of building seepage. That year it referred 1,236 suspected supply pipe leaks to the Water Supplies Department and 2,200 cases involving defective drainage or building safety to the Buildings Department.[8].

Kitchen sinks, washing machines and their pipes concentrate water supply and drainage in a small area. SikaTop-107 requires at least 2 coats, with 3 potentially needed in areas of severe seepage.[1]. HK Create Design applies two waterproofing coats in kitchens and reinforces the sink area.[7].

  • 47,299 complaints
  • 1,236 supply pipe cases
  • At least 2 waterproofing coats

21

Why choose HK Create Design for kitchen waterproofing?

HK Create Design publishes its kitchen waterproofing prices in the online calculator. Each item states its inclusions, exclusions and minimum charge, so you can check additional costs before work starts.[7] HK Create Design’s quotations list materials, work stages and acceptance checks so you can compare other quotations line by line.

HK Create Design offers a one-year warranty after completion under the terms of the written quotation. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

For a project estimate, send photos and the approximate area to HK Create Design on WhatsApp 5243 7747. You can also see samples and discuss options at our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.

  • Published, itemised prices
  • List inclusions and exclusions in the written quotation
  • One-year workmanship warranty
  • Send photos to WhatsApp 5243 7747 for a quotation

FAQ

15 practical questions answered

01How much does kitchen waterproofing cost?

HK Create Design’s HK$4,300 kitchen waterproofing price includes the whole floor, 150 mm wall upstands, reinforcement around the sink and two coats of Sika 107.

02Is a ponding test included?

No. A C04 ponding test costs HK$1,400 per test and lasts 24–48 hours. We recommend testing before tiling.

03Does every kitchen need waterproofing?

We strongly recommend waterproofing during a renovation. Water from the sink, floor cleaning and washing machine can eventually seep into the flat below.

04How does kitchen waterproofing differ from bathroom waterproofing?

Bathroom waterproofing costs HK$4,850, including 6 ft wall upstands, full-height shower walls and testing. Kitchen waterproofing costs HK$4,300 for 150 mm upstands and reinforcement around the sink, with testing charged separately.

05Does the washing machine area need extra waterproofing?

If the washing machine is in the kitchen, consider extra coverage behind the sink and around the machine. C01 is HK$39 per sq ft, with a minimum charge of HK$2,350.

06How much does kitchen strip-out cost?

A09 kitchen strip-out and clearance costs HK$9,950 per room, including wall and floor tiles, cabinets and transport.

07What does masonry and tiling cost for a 50 sq ft kitchen renovation?

Worked example: demolition, waterproofing, testing, levelling and tiling total HK$30,760, excluding finish tiles, cabinets, plumbing and electrical work.

08How many waterproofing coats are needed?

Sika recommends at least two coats of Sika 107.[1]

09Who is responsible for kitchen seepage?

According to 1823, owners are primarily responsible for seepage in private properties.[4]

10How do you test a kitchen without a floor drain?

A temporary perimeter barrier can hold water for the test, subject to site conditions.

11Does the area under kitchen cabinets need waterproofing?

Yes. The sink waste normally runs inside the cabinet, so the area beneath the cabinet needs particular attention.

12Is there a warranty?

The work carries a one-year warranty after completion, subject to the terms of the written quotation.

13Can cabinet installation damage the waterproofing?

Cabinet legs usually stand on the tiles. Plan any floor or wall fixings in advance to avoid puncturing the waterproofing.

14Can waterproofing be added later if it was skipped?

The membrane lies beneath the tiles, which must be removed to replace it. It is usually most economical to renew the waterproofing and test it while renovating.

15How can I make an appointment?

WhatsApp 5243 7747. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Sika Hong Kong: SikaTop-107 Seal HK product information Accessed: 2026-11-03
  2. [2]Consumer Council, CHOICE issue 529: how to read a renovation quotation across 12 categories Accessed: 2026-11-03
  3. [3]OPTIMIX WP515 waterproofing slurry technical data Accessed: 2026-11-03
  4. [4]1823: How to deal with water seepage in residential flats Accessed: 2026-11-03
  5. [5]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-11-03
  6. [6]Food and Environmental Hygiene Department: frequently asked questions about water seepage and dripping Accessed: 2026-11-03
  7. [7]HK Create Design’s published 2026 prices: masonry, waterproofing, demolition and miscellaneous work Accessed: 2026-11-03
  8. [8]Development Bureau: Legislative Council Question 14, Joint Office for Investigation of Water Seepage Complaints (2 July 2025) Accessed: 2026-11-03
  9. [9]Joint Office for Investigation of Water Seepage Complaints: performance in investigating reports of building seepage Accessed: 2026-11-03