01
First judge: Are you comparing the same piece of furniture?
Before placing the two quotes side by side, number each piece of furniture, such as BR-01 wardrobe, LR-02 TV cabinet, KT-01 kitchen base cabinet. Put the same set of information under each number: clear width, clear height, depth, number of doors, door opening direction, number of drawers and shelves, visible surface, back panel, closing, and whether to make way for a window sill, skirting, socket, air-conditioning pipe or access door. If Party A counts a whole wall of modular cabinets as one item, and Party B splits it into three items: high cabinets, floor cabinets and open cabinets, they should be reorganized into the same list before comparison.
“Linear foot” does not define the full specification. On our public list, tall cabinets and wardrobes are measured along the carcass width, with 1 foot of width counting as 1 linear foot.Platform bedsis measured by length × width in square feet. A low linear-foot rate may exclude part of the area, doors or fittings you expected.[1] The quotation should state the measured direction and quantity rather than only “Bespoke furniturea single lot”.
The Consumer Council's Renovation Quotation Guide also lists the calculation unit, main materials, transportation fees and other charges for custom-made furniture as contents that should be clearly stated. After implementation, the drawings, detailed dimensions, material samples and colors should be confirmed by the customer so that there is a basis for future verification.[3]
- Number each piece of furniture and use the same number for quotations, floor plans, and elevations
- Record clear dimensions and site obstructions as well as whether the unit fills a wall or reaches the ceiling.
- It is required to state the calculation basis in linear feet, square feet, per piece or per set
- Align the quantity and configuration first, then look at the total price

02
Three common measurement methods: square feet, square feet, and itemized accessories
High cabinets, wardrobes, and base cabinets are often measured in vertical feet according to their horizontal width; however, this is not a uniform rule for all contractors. Ask whether "8 feet" is the outside width of the cabinet, the clear opening width, or part of the front area. Also ask about the minimum calculated dimensions. The company's 2026 public price list states that each cabinet is measured at least 2 linear feet. For short cabinets, you cannot just multiply the actual width by the unit price.[1]
Platform beds are more suitable to be expressed in square feet of length × width because the bed box covers a flat area. Countertops, stone, or special finishes may also be measured in linear feet, square feet, per meter, or per opening. The key point is not which unit is better, but whether the unit, quantity, unit price and sub-item totals exist at the same time; if there is only total but no quantity, there will be no way to check future increases or decreases.
Hardware should not be hidden in the words "basic accessories". For hinges, rails, clothes rails, baskets, lifts, hydraulic bed hardware, light strips and sensors, the number of sets, brand or series, model if any, function and who supplies them should be written respectively. Even if two brands are called buffer hinges, it should not be assumed that the specifications are the same.
- For direct measurements, you need to ask which width measurement to use and whether there is a minimum size.
- For a platform bed, write down the length, width, bed box height, mattress size and opening direction.
- Each set of hardware lists quantity, function, brand/series and maintenance responsibilities
- Each item is required to have unit, quantity, unit price and subtotal at the same time
You can swipe left or right on your phone to view the complete table.
| Furniture/Project Scope | What to measure or count | Acceptable way to write prices | Uncovered contents that need to be clarified item by item | The main risks of not writing clearly |
|---|---|---|---|---|
| tall wardrobe | Clear width, clear height, depth, number of doors, number of drawers and internal partitions | Total by linear feet, per piece, or by sub-item of the confirmed plan; it must be stated whether the width or front area is measured | Extra-height, sliding or sliding doors, drawers, baskets, light strips, demolition, transportation and upstairs | Both are "8-foot wardrobes" but have different door types, inner hinges and heights. The total prices cannot be directly compared. |
| TV low cabinet/base cabinet | Clear width, height, depth, number of drawers and wiring holes, and whether to hang on the wall | Price by linear foot or item, with drawers, wall fixings and special finishing itemised separately. | Wire arrangement, wall repair, outlet relocation, transportation and on-site protection | Pricing is based on cabinet width only, and it is easy to miss out on back panel openings, fixing methods and closing responsibilities. |
| Desks and open shelves | Countertop length and depth, cabinet bucket, number of shelves, support method, wiring holes and lamp positions | By linear feet, square feet or per piece; with plan and elevation dimensions | Countertop materials, drawer hardware, lamps, socket engineering and wall refilling | The renderings may look the same, but the actual table depth, support and wire locations may be completely different. |
| Platform bed/Hydraulic bed | Length × width area, mattress size, bed box height, number of lifts or drawers and ventilation arrangements | Platform beds can be based on square feet; the number and model of hydraulic hardware should be listed separately. | Mattress, hydraulic hardware upgrade, heightening, dismantling, transporting and taking stairs | The size or opening direction of the mattress has not been confirmed. It may affect access and daily use after installation. |
| kitchen or bathroom cabinets | The respective widths of base cabinets, wall cabinets and countertops; the holes for basins, stoves, pipes and electrical appliances | Break down the cabinet body, countertop, openings and accessories; write the unit, quantity and unit price for each item | Worktop finish, extra cut-outs, sanitaryware, appliances, pipework, plumbing and electrical connections, and removal of existing items | Treating the cabinet price as an all-inclusive package for kitchen and bathroom will confuse the responsibilities of furniture, equipment and regulated trades. |
| Transportation, installation and closing | Number of deliveries, lift size, number of stairs, corridor corners, protection and garbage locations | According to each delivery, each layer, each meter of closing or the included range shall be listed in writing | Management office deposit or procedures, lifting, batch delivery, special protection, wall and floor repairs | Cost, delay and damage liability can become disputes when building restrictions or on-site locker access are not possible |
| Alterations and changes | Drawing version, dimensions before and after changes, materials, hardware, quantity and completion date | Quantity, unit price, total and confirmation date added or subtracted by change order | Panels have been put into production, re-delivery, re-installation, construction period impact and restoration projects | It is difficult to check the difference and the final product by just saying "change a little" through messages or words. |
This is a comparative framework, not a statutory uniform price list. The Consumer Council pointed out that custom-made furniture should list the calculation unit, main materials, transportation fees and other charges piece by piece; after implementation, drawings, detailed dimensions, material samples and color confirmation should be provided. [3]



03
First use the public price to make a budget, then use the measured quotation to make a decision
Our published 2026 fitted furniture rates can help set a budget. Tall cabinets or wardrobes 1,501–2,400 mm high are HK$2,900 per linear ft, half-height units HK$1,350 and low units up to 900 mm high HK$1,250. These rates apply to our standard configurations. They do not establish a market average or other suppliers' prices.[1]
Public information also shows why we cannot just take the price of the container: transportation is listed as HK$660 per time when the elevator can directly access the unit; manual handling without an elevator is listed as HK$300 per floor; removal of old cabinets is listed as HK$170 per square foot. These are not unknown costs, nor are they inevitable costs. Instead, you should decide whether to include them based on your building, delivery batch, and the status of the old cabinets.[1]
Use the rate card as a question list. Which standard fittings apply? Are any cabinets below the minimum size? Are extra height, special trim, removal, separate deliveries or stair carries needed? Confirm the written quotation after the final measurement.
- Note "Company's public price, not market average" next to the budget table
- Itemise each delivery, stair carry, removal and special finish
- Check whether the standard configuration includes the door type, interior trim and hardware you want.
- Only the official quotation after measuring and confirming the drawings will be used as the basis for order placement.
04
Board is not a noun: separate questions about core material, thickness, finish and certification
The quoted plate column must be divided into at least four positions: cabinet body, door panel, back panel and countertop. The core material, thickness, finish, edge sealing and color/number should be written in each position; the door panel and cabinet body may not be the same. When you see "environmental protection board", "moisture-proof board" or "formaldehyde-free", don't just copy the adjectives, but ask for the actual product name, supplier information, applicable location and available technical documents or testing/certification information.
Product documentation is used to verify claims and is not a substitute for a formal quote. For example, the official product page of EGGER's Decorative Particleboards E1E05 TSCA P2 states that its core material is particleboard with double-sided veneer, suitable for dry furniture and indoor use, and lists its formaldehyde emission compliance claim.[6] This is just an example of documentation for a named product. It does not mean that our company supplies this product, nor does it mean that other boards that only say E1, ENF or low formaldehyde have the same composition, testing methods or indoor performance.
From 2026, all our custom furniture includes ENF-grade boards as standard at no extra cost under our “Pure Space” board specification. ENF is a very low formaldehyde emission grade, not zero emissions. Ventilate before moving in. In other quotations, check the materials for carcasses, doors and backs and the product data for the boards delivered. Board or paint claims cannot guarantee immediate safe occupancy. Consider ventilation, quantities, other materials and site conditions.
Our ENF-grade boards come from our own factory in Foshan. Quartz worktops come directly from our partner export factory with a quality guarantee and a range of colours. Whichever provider you choose, specify board grade, thickness and finish in the quotation.
- Separately confirm the core material and thickness of the cabinet body, door panels, back panels and countertops
- Request a swatch and include the color number or finish name on the confirmation form
- If there are any emission or environmental claims, keep the corresponding product documents and applicable scope.
- Don’t treat a single product technical document as a guarantee of whole-home health or occupancy
Worked example one: separate scope and delivery for a standard 8-linear-ft wardrobe. This is hypothetical.
Assumptions
- This is a hypothetical example for the purpose of understanding pricing and is not a representation of the company completing the work, committing to a quote, or a market comparison.
- Assume that a set of standard wardrobes with a cabinet width of 8.0 feet and a height of 2,400mm or less has been confirmed to meet the applicable height of HK$2,900 per linear foot for high cabinets/wardrobes in the company's price list.
- This assumes one delivery with direct lift access and uses the published HK$660 delivery charge. ENF-grade boards are included as standard for 2026 without an extra charge. The example excludes removing old cabinets, stairs, extra height, upgraded hardware, strip lighting and special finishing.
How to calculate quantities
- Cabinet price: 8.0 linear ft × HK$2,900 per linear ft = HK$23,200.
- Example total: HK$23,200 + HK$660 for one delivery = HK$23,860.
- Ask the supplier to record the 8.0 linear ft run, actual height, door style, one hanging rail, three shelves, two drawers, sliding tracks if applicable, delivery conditions and exclusions on the same revision of the drawing and quote.
The calculation under these assumptions is HK$23,860. It separates the cabinet price from delivery, so do not treat the example as an all-inclusive price in every situation.
The public price list gives our October 2026 standard specifications, not Hong Kong market averages. Access, verified measurements, approved drawings, materials, hardware quantities and variations can affect the formal quotation. [1]

05
Hardware and interior hardware: Divide the differences in daily use into a list
Whether a cabinet door can be opened and closed smoothly depends on the combination of door type, hinges, rails, handles, shelf positions and installation adjustments. Start by looking back at the daily items: how many long coats are there, how big is the suitcase, where is the vacuum cleaner charged, should the shoe cabinet be breathable, and whether the drawer stores documents or heavy objects. These answers should be translated into grid sizes and accessory quantities, rather than just left in mood boards or renderings.
The public price list lists upgraded buffer hinges by each unit, drawer rails by each set, and cabinet light strips by square feet, which reminds homeowners that hardware is not a vague total.[1] Even if you don't select these options, you should still ask about the quantity, functionality and maintenance schedule of standard hardware. For sliding doors, ask whether the rails are included, and for closing the door, ask about the number of hinges; for drawers, ask about the rail type, whether it is fully pulled out, and if there is any load-bearing information.
Do not substitute brand names for information. If you quote a certain brand, you still need to compare the series, model, quantity and applicable location; if you are still undecided, write down the options and their unit price rules first. In this way, when you change from standard accessories to designated accessories in the future, you can see the difference.
- List the door type, hardware quantity and function door by door and drawer by drawer.
- Convert storage needs into shelf height, hanging length and drawer size
- It is required that standard hardware and upgraded hardware be written separately, do not just write "hardware included"
- If there is a brand, record the series, model if available and maintenance information at the same time

06
Plans, Overlays, and Changes: Protect Your Budget with Version Management
Check vertical walls, floor levels, skirtings, sills, beams, columns, AC pipes, sockets, switches, door swings and access panels. New flooring, plaster, partitions or services can change finished dimensions. Remeasure before manufacture and date the drawing revision.
The confirmation document should include the floor plan, elevation and interior cutouts of each cabinet; all dimensions, plate and color numbers, door types, hardware locations, closing methods and excluding items should be placed under the same set of numbers. The company's public price list states that it will be produced according to the confirmed drawings. Any changes after confirmation will calculate the difference at the same unit price.[1] This does not mean that every change will only have a one-foot difference; situations where materials have been cut, re-delivered, or require reassembly should also be stated in the change order.
Keep the old version and the new version for each change, and indicate the date of submission, reason for the change, increase or decrease in quantity, materials, price, impact on construction period, and confirmation by both parties. The Consumer Council also recommends that the details, charges, payment methods and completion period of the subsequent work should be included in the quotation in writing, rather than relying solely on verbal promises.[3]
- The final production drawing must have a version number, date and confirmation record from both parties.
- After covering the tape, check the window sill, baseboards, sockets, beams, columns and access openings.
- For any changes, please first check the new layout, difference and construction period before confirming the construction.
- Save quotes, drawings, color swatches, messages and change orders in the same file
You can swipe left or right on your phone to view the complete table.
| public projects | Applicable quantity or height | Open pricing method | Standard configuration/included | Uncovered items and risks that need to be checked |
|---|---|---|---|---|
| Tall cabinet / wardrobe | Height 1,501–2,400mm; measured in direct feet based on cabinet width | HK$2,900 per linear ft | 18mm cabinet body and door panels, back panel, PVC edge banding, standard buffer hinges, shelves, standard installation and basic closing | Check extra height above 2,400 mm, upgraded fittings, lighting, removals, delivery and special finishing separately. |
| half height cabinet | Height 901–1,500mm; measured in direct feet based on cabinet width | HK$1,350 per linear ft | The price list lists the basic cabinet price for sideboards, window cabinets or study storage. | Door type, internal partitions, countertops, transportation and on-site size restrictions will still affect the official quotation |
| Base cabinet/low cabinet | Height 900mm or less; measured in direct feet based on cabinet width | HK$1,250 per linear ft | The price list lists the basic cabinet prices for TV cabinets, bedside tables or low shoe cabinets. | Wall mounting, wiring holes, drawers, special fabrics and wall repairs cannot be judged by just looking at the cabinet width. |
| Delivery and handling without lift | Each delivery; if manpower is required to go upstairs, please do so on each floor. | HK$660/delivery; HK$300/staircase | The listing condition of HK$660 is that the unit is directly accessible by lift | Batch delivery, lift restrictions, corridor corners, management office arrangements and special protection must be confirmed first |
| Remove old cabinets | Measured according to the horizontal length of the old cabinet in direct feet | HK$170 per linear ft | List the old cabinets to be dismantled and disposed of | A linear-foot price alone cannot determine wall or floor repairs, concealed services, wall fixings or whether removal is safe. |
| Boards and hardware | Boards are standard. Hardware upgrades are charged per piece, set or linear foot. | ENF-grade boards are included as standard from 2026 at no extra cost. Optional Blum/Hettich soft-close hinges cost HK$380 each. | Boards are included in the cabinet price. Hardware items shown are the company's optional upgrades and their pricing units. | The actual supply of products, quantity, model, maintenance and suitability for use must be included in the official quotation; do not regard the brand name as the same specification |
These figures are standard configurations from our October 2026 public list, for initial budgeting and scope checks. They are not market averages, all-inclusive prices or a formal quotation. Each cabinet has a minimum of 2 linear ft. The formal amount depends on verified dimensions, boards, hardware brands and quantities, and transport. [1]


07
Transportation, Protection and Building Arrangement: Don’t wait until it’s ready to ask if you can enter the house
After the custom-made cabinet is completed in the factory, it is discovered that the elevator cannot accommodate it. The cost is usually not just the transportation fee. When enquiring, please provide the internal dimensions of the lift, the clear width of the doorway, photos of corridors and corners, the number of stairs, construction period, management office rules and protection requirements. If installation in parts, batches or disassembly is required, who should bear the additional delivery, reassembly and protection needs to be clearly stated before quoting.
The rate card includes standard installation, hinge and runner adjustment and basic finishing. False walls, full-height closure panels and beam or column boxing are special finishing. Delivery is priced per trip.[1] Homeowners should convert the "basic" into identifiable positions, such as which side to close the opening and to which wall surface, instead of assuming that all concave and convex positions will be automatically processed.
Before removing cabinets, photograph adjoining walls, floors, ceilings, sockets and pipes. Agree what stays, packing, haulage, debris disposal and shared-area protection. The Consumer Council advises clarifying demolition and temporary protection costs, retained items and responsibility for damage.[3]
- Measure the net dimensions of elevators, door openings, corridors and corners, and provide them with photos
- Ask about the number of deliveries, conditions for going upstairs, management office hours, protection and batch fees
- Mark basic and special finishing details on the drawings
- Remove old retaining items and take photos. Do not assume that wall and floor repairs are included.
08
Deal with professional boundaries first: Furniture cooperation does not mean that regulated projects can be handled
Adding cabinet lights, moving sockets, altering concealed wiring or providing appliance power points requires more than a mark on a joinery drawing. EMSD states that new installations, additions and alterations must meet current statutory safety standards. Arrange feasibility assessment by a registered electrical contractor. After completion and before energising, a registered electrical worker inspects and tests the installation and issues aWR1completion certificate.[4] The quotation should include who arranged the arrangement, which locations belong to the electrical engineering project, and who will keep the documents.
If cabinets need to be fixed to or require changes to a suspected structural wall, beam or column, or affect an open kitchen, windows, drains, gas,Aluminium windowsor demolition, define the specialist work separately from the furniture. The Buildings Department states that changes to structural walls, beams and columns require assessment by an authorized person and a registered structural engineer and the applicable procedures. Even simple exempt home works must meet fire, structural and drainage requirements.[5] This is general planning information and does not replace professional or legal advice on individual projects.
The most useful furniture plans will mark electrical wiring, sockets, pipes, gas locations, access doors and equipment that cannot be blocked, and separate the responsibilities of carpentry from other trades. Do not open walls, change wiring, remove windows or remove unknown walls to accommodate cabinets.
- Cabinet lighting, sockets or electrical locations should first be evaluated by a suitable electrical professional
- Mark the inspection openings, pipes, gas points, sockets and locations that cannot be blocked on the plan.
- For suspected structural or exterior wall projects, first check the approved plans, deed of mutual covenant and management office requirements.
- Separate responsible parties for carpentry, electricity, gas, windows, demolition and repairs
Worked example two: distinguish the quick calculator's area assumption from a 20% planning allowance. This is hypothetical.
Assumptions
- This is a hypothetical demonstration of the website’s calculation logic and is not the actual project, transaction price or custom-made furniture quotation of any resident.
- Assume that the salable area is 400 square feet; the quick estimator indicates that the paint spread area is only a preliminary calculation, using the salable area × 3.
- Suppose the selected items total HK$77,200 and the owner chooses to keep a 20% contingency. The reserve is optional and does not add unselected kitchen, bathroom, plumbing, electrical, furniture or finish items to the scope.
How to calculate quantities
- Initial paintable area: 400 sq ft × 3 = 1,200 sq ft.
- A 20% planning allowance: HK$77,200 × 0.20 = HK$15,440.
- Upper budget scenario: HK$77,200 + HK$15,440 = HK$92,640.
The result is a preliminary paint spread area of 1,200 square feet, and a "subtotal plus 20% reserve" scenario of HK$92,640. It helps homeowners leave room for comparison and does not equate to formal work quantities, guaranteed caps, or full-house price inclusions.
The actual expansion area of the wall, base treatment, furniture shielding, transportation, management regulations and concealment issues must be verified on site; the three sample plans in the quick version have their own scope and cannot replace measurements and written quotations. [2]

09
Free online estimates are suitable for screening and do not replace on-site measurements.
Our online estimates and enquiries are free. Enter saleable area for three examples: basic whole-flat renovation, repainting or floor tiling. The initial paint area is saleable area × 3.[2] This helps you organize your budget first, but it is not a custom-made furniture plan, nor can it show the door type, interior trim, hardware and on-site obstacles of each cabinet.
The calculator currently displays 117 projects and supporting options in 8 categories. 116 items have reference unit prices, and 1 rooftop package is yet to be revised.[2] A large number does not mean that all items have been selected or included. The express version of basic renovation also clearly does not include complete kitchen and toilet rebuilding, waterproofing and plumbing resurfacing, custom-made furniture, ceramic tile fabrics, etc.; 20% is only a planning reservation and not an additional charge.[2]
Our website and furniture price list specify a HK$500 site measurement fee, credited in full when you confirm the order. Online estimates are free. Through 31 December 2026, on-site measurement is free for two or more work items with no deposit. Send flat photos, dimensions, cabinet requirements and questions to WhatsApp 52437747, then confirm the measurement and formal quotation arrangements.[1] [2]
- Use online estimates to screen the project scope first and do not regard the results as the official contract price.
- The quick version only selects what is put into the budget sheet.
- List furniture dimensions, door styles, interiors and fittings separately from the flat's saleable area.
- Book a site visit. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
10
Acceptance and payment: based on verifiable finished products and documents
On the day of installation, acceptance begins with the number of each cabinet: check the outer dimensions, door panels and color numbers, number of shelves and drawers, door opening direction, handles, hardware, wiring holes, closings, levels, door gaps and whether sockets/inspection positions are available. Open and close door by door and drawer several times and view the visible surfaces in natural light and lighting. When you find a problem, take a panoramic shot, a close-up shot, and a number, and write down the location and how you want to handle it.
Payment arrangements should not be expressed simply as a vague percentage of completion. The Consumer Council recommends that the payment node should be specified in the quotation, and the final amount should be paid after the completion of the project acceptance. There should also be written charges and completion dates for subsequent additions.[3] Actual payment and maintenance terms must be agreed upon by both parties in the contract/quote. This article does not provide a uniform ratio or legal conclusion.
The last thing delivered is not just a receipt. Organize the confirmed quotation, final drawings, color swatches or product information, hardware list, change order, maintenance terms, defective list and completion date in the same folder. These documents are much more reliable than memory when it comes to adding parts, making repairs, or settling disputes later.
- Check the size, color number, door type, hardware, opening and closing, closing and maintenance positions according to the cabinet number
- Take photos of missing items one by one and write down the location, responsibility and completion date.
- Payments and changes will only be processed according to the acceptance points confirmed in writing.
- Save final drawings, quotes, maintenance data and all change orders
FAQ
6 practical questions answered
01Is it only necessary to compare the price per square foot when quoting custom-made furniture?
No. First ask what measurements are measured in feet, applicable height, minimum calculated dimensions, and whether door panels, back panels, edge sealing, interior trim, hardware, installation and delivery are included. The high cabinets/wardrobes in the company's public price list are measured by the width of the cabinet, while the floor beds are measured by square feet. It has been explained that different categories may not be compared with the same unit.[1] The most reliable way is to use the same size and configuration list and ask for itemized quotations from each company.
02Can the HK$2,900/square foot disclosed by the company be regarded as the market price of wardrobes in Hong Kong?
No. These are our October 2026 standard specifications for tall cabinets and wardrobes 1,501–2,400 mm high. They are neither government statistics nor a Hong Kong market average.[1] It can help you understand the company's pricing and standard configuration; when actually comparing, you still need to align the height, door type, interior trim, panels, hardware, transportation and closing, and the official quotation shall prevail after measuring.
03Free online estimation, does that mean you can get free measurements or get a formal quote?
No. The company's online calculator and downloadable estimate are free, and the result is preliminary. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.[1] [2] Online tools are suitable for sorting out the scope of the project first. The official quotation still depends on the site conditions, footprints, drawings and materials.
04If the quotation states 18mm board, ENF or low formaldehyde, can it guarantee the safety of my stay?
This guarantee cannot be made. 18mm is the thickness information; ENF, E1 or other emission claims are meaningful only with the actual product, covered parts and technical documents. The official information of a named product can help to verify its claims and applicable uses, such as the official product information of a certain EGGER veneer particleboard, but it cannot be inferred that all boards are the same, nor can it be inferred about the air conditions of the entire unit.[6] Product information should be kept and arranged according to actual materials, ventilation and professional recommendations.
05After confirming the plans, I want to resize the wardrobe or change the hardware. How should I avoid disputes?
First request a new version of the drawings, clearly indicating the old and new dimensions, door types, plates, hardware and quantities; then use the change order to add or subtract the quantity, unit price, difference, whether it has been put into production, delivery or reassembly arrangements and the impact on the completion date. Don't just say "add two drawers" in the message and get started. The Consumer Council recommends that the details, charges, payment methods and completion dates of subsequent works be recorded in writing.[3]
06If I want to add lights, sockets or cover pipes in the cabinets, can the furniture master handle this as well?
Furniture masters can reserve openings and closings according to the confirmed locations, but new, additional or modified electrical devices must first be evaluated by a registered electrical contractor. After completion, they will be inspected, tested and issued a WR1 as required.[4] Changes to pipes, gas, structural walls, windows or drainage also have their own professional and legal requirements; first clarify the responsible party and documents, and then arrange furniture to cooperate. Do not open walls or change wiring on your own.[5]
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]HK Create Design custom furniture price list, October 2026 Accessed: 2026-10-21
- [2]HK Create Design Quick Estimate 2026 Company Price List and Estimate Instructions Accessed: 2026-10-21
- [3]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-10-21
- [4]Electrical and Mechanical Services Department: Household Electrical Safety Manual - New Installation, Renovation or Renovation Accessed: 2026-10-21
- [5]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-10-21
- [6]EGGER Decorative Particleboards E1E05 TSCA P2 Product Data Sheet Accessed: 2026-10-21