01
How do the three tile sizes compare at 20 and 80 sq ft?
Each cell gives one installation cost, calculated as the higher of area × rate and the minimum charge for that item. The three items are alternatives. Finish tiles, removal, extra substrate preparation, fabrication and handling are excluded.[1]
You can swipe left or right on your phone to view the complete table.
| Confirmed applicable item | Line item for 20 sq ft | Line item for 80 sq ft |
|---|---|---|
| D01: straight lay, ≤600 × 600 mm | HK$3,250 minimum charge | HK$6,240 |
| D04:600×1200/800×800mm | HK$3,700 minimum charge | HK$9,600 |
| D05: extra-large tiles or slabs, ≥750 × 1500 mm | HK$4,650 minimum charge | HK$12,000 |
This worked example compares the same scope. It does not represent an actual sale or confirm suitability for your site. [1]
02
Specify the actual dimensions in the quote. “Large-format” alone is too vague.
Specify the actual floor tile size before discussing the laying pattern and installation cost.
Provide the dimensions, thickness, weight and intended use
Tiles sold as large slabs vary. Provide the product model, dimensions per piece, thickness and packaging details, and specify wall or floor use. A rendering alone is insufficient to estimate installation costs.
The layout affects cuts and material quantities
Mark doorways, drains, column corners and fixture cut-outs on the layout. Agree on vein matching, pattern matching and starting points before ordering.
03
How do the company's published rates apply?
HK Create Design currently publishes the following installation items,Company rates are distinct from the Hong Kong market average and your full project quotation. Check what the labour and bedding materials cover, the separate cost of finish tiles and any additional site work.[1]
Confirm any other dimensions, thicknesses, materials or special laying patterns separately. Area alone cannot determine the rate category.
D04 installation line item for 80 sq ft
Assumptions
- This assumes the confirmed tile dimensions and site conditions qualify for D04.
Checks to make
- 80 × HK$120=HK$9,600。
- Compared with the HK$3,700 minimum, HK$9,600 is the higher figure and the reference cost for this item.
This line item covers installation. Confirm finish tiles, removal, levelling, additional fabrication and handling in the written scope.
This hypothetical example illustrates planning only. It represents neither an actual job nor an agreed price or schedule. The site assessment determines the actual plan. [1]
You can swipe left or right on your phone to view the complete table.
| public projects | Reference unit price | Minimum charge |
|---|---|---|
| D01: straight-laid floor tiles of 600 × 600 mm or smaller | HK$78 per sq ft | HK$3,250 |
| D04: large tiles of 600 × 1200 or 800 × 800 mm | HK$120 per sq ft | HK$3,700 |
| D05: extra-large tiles or slabs of 750 × 1500 mm and above | HK$150 per sq ft | HK$4,650 |
The company price list gives indicative rates. The confirmed scope determines the planning checklist and the formal all-inclusive quotation. [1]

04
What affects large-format tiling costs besides the tiles?
Two areas of the same size can take different amounts of work depending on the substrate, fabrication and edge details.
Substrate and adhesive system
Match the materials to the tile and substrate. Optimix lists TA328 as an adhesive suitable for large, heavier tiles. Other projects may require different products, and the substrate still needs proper preparation.[2]
Fabrication, handling and edge finishing
A small room may take more work than a large living room. Door frames, pipes and corners can require extra cuts. The quote should identify cut-outs, cuts, edge treatment and who is responsible if a fabricated piece breaks.
05
If the tiles fit inside the building, will they fit through the flat entrance?
Assess the entire route from unloading to the installation area.
Check the entire route, including the lift doors
Check the entire route from unloading through the lift car and corridor turns to the flat entrance. Verify clearance before assuming a tile can be tilted through a tight space. Resolve difficult handling arrangements before ordering.
Planning to buy large tiles? WhatsApp us the product model, dimensions and photos of the access route so we can identify what needs assessment before agreeing on an installation plan.
You can swipe left or right on your phone to view the complete table.
| Access point | Have these ready for your enquiry |
|---|---|
| Unloading and parking locations | Available times and distance from the entrance |
| Lift and stairs | Dimensions, photos of turns and building management restrictions |
| Flat entrance and corridor | Clear width, turning space and protection requirements |
| Temporary storage and fabrication areas | Available space, site restrictions and arrangements |
The company price list gives indicative rates. The confirmed scope determines the planning checklist and the formal all-inclusive quotation. [1]
06
Which details should you keep before and after completion?
Check the completed work and leftover materials against the details agreed before the order.
Check against the agreed layout as well as the finished appearance
Check joints, layout direction, doorways and edge finishes. Record damage and outstanding work. Agree acceptance requirements before work starts, including any expectations about joint widths or continuous veining.
Keep the product and spare tile details
Record the batch and grout colour, and agree how spare tiles and leftovers will be handed over. Estimate quantities from the layout, cuts and supply arrangements instead of applying a fixed wastage allowance.
Further comparisonsTiling prices, Floor levelling and Masonry and tiling services.
The minimum charge still applies to a small area of 20 sq ft
Assumptions
- This assumes the confirmed tile dimensions and site conditions qualify for D04.
Checks to make
- 20 × HK$120=HK$2,400。
- This falls below the D04 minimum of HK$3,700, so use the minimum as the reference cost for this item.
For small areas the area multiplied by the rate may fall below the minimum. Confirm the full project cost separately.
This hypothetical example illustrates planning only. It represents neither an actual job nor an agreed price or schedule. The site assessment determines the actual plan. [1]
07
Client-supplied large tiles: who orders, checks deliveries and handles replacements?
Record the supplier, delivery date, batch, unloading point and who takes the tiles into the flat. Document damage or shortages and contact the supplier. Set affected tiles aside until a resolution is agreed.
Replacement stock may come from a different batch or take time to arrive. The quote should name who keeps the packaging details, who orders replacements and how work will be rescheduled while waiting.
08
How is the price agreed if the layout changes or extra cut-outs are added?
Mark proposed changes on the layout. Ask the installer to itemise additional fabrication, materials and schedule changes. Approve the revised pattern and price together.
Reassess feasibility if a change exceeds the limits of the original product or installation system. An additional payment cannot guarantee the change is feasible.
09
What to prepare before enquiring about large-format tile installation
Provide the details below together to get comparable scopes of work. Mark unconfirmed dimensions as pending. There is no need to test-carry a slab yourself.
Compare related workCompare tiling over existing tiles.
- Product model, dimensions, thickness and intended use
- Installation area and actual area to be tiled
- Photos of the lift, corridor corners and flat entrance
- Responsibility for removal, levelling, fabrication, edge finishing and supply of finish tiles
FAQ
6 practical questions answered
01Do large tiles always require two installers?
Decide how many people and which tools are needed from the dimensions, weight, access and work risks.
02Can large tiles be laid without joints?
Allow for joints. Confirm the joint and movement provisions for the tile, installation system and location.
03If I supply the tiles, do I pay only for labour?
Check bedding materials, delivery, fabrication, lifting materials to the floor and responsibility for breakage before assuming they are included.
04Is a small area always cheaper when charged by the square foot?
Check the minimum charge, fabrication and handling. Small areas may still have many edges to finish.
05Can work start before the large tiles arrive?
Confirm dimensions, layout, supply and site conditions first. The programme determines which preparatory tasks can start early. Edge details need confirmed measurements.
06If I change to herringbone after ordering, will the original rate still apply?
Possibly. The change may affect the layout, fabrication and materials. Request a revised quote for the same scope first.