Sika · Waterproofing
Sikadur-Combiflex SG System – Waterproof joint sealing system
Sikadur-Combiflex SG System(Sikadur-Combiflex SG System)
Materials can be purchased separately from HK Create Design. Give us the quantity and district for unit prices, lead times and kerbside or upstairs delivery rates.
For movement or construction joints designated by the project.

Buy materials: kerbside handover or delivery to your floor
The quote lists materials, delivery and any applicable upstairs delivery fee separately. Choose a handover option to request a price.
Add other materials (optional)
For movement or construction joints designated by the project.
HK Create Design · Materials and upstairs delivery quotes · 5243 7747
Sikadur-Combiflex SG System – Waterproof joint sealing system
What should you record before and after waterproofing?
- Before treatment
Mark out the work area and record the positions of joints, corners and penetrations.
- Before covering
Check the details against the design and the manufacturer’s system, keep photographs, and arrange the tests specified for the work.
- Material properties
- Resists chemicals. Check compatibility with the substances it will contact and their concentrations.
Sikadur-Combiflex SG System application steps

- Check the Combiflex tape, adhesive and area that must remain free to move against the movement or construction joint design.
- Lay the tape by the specified system method, detailing overlaps, crossings and corners.
- Before covering, check the bonded edges and joints and keep the movement allowance specified in the design.
Manufacturer’s specifications
Suitable applications
- For movement or construction joints designated by the project.
Sika Other products
Specifications are drawn from the manufacturer’s website or technical data sheets (TDS). Refer to the latest manufacturer’s information for updates. HK Create Design is independent of the brands, whose names and trademarks belong to their respective owners.
