01

Why the handover inspection matters

The handover inspection is the owner's final opportunity to confirm the quality while the balance is still outstanding. Contractors generally have a stronger incentive to complete snagging before final payment, and follow-up may slow afterwards.

Renovation complaints handled by the Consumer Council have included furniture that differs from the drawings, uncorrected defects and disputes over final payments. The Council advises owners to include design and material requirements in the contract, keep the furniture drawings, agree how defects and the balance will be handled, and prepare a snagging list[2].

Check each item systematically and record any problems. Complete the handover after the contractor has put them right.

  • Final opportunity to check
  • Owners have the most leverage before final payment
  • Inspect systematically
  • Complete handover once defects are rectified
HK Create Design・Illustrated overviewInspection tools
  1. Production drawingsCheck the dimensions.
  2. Colour sample photosCompare the colour.
  3. Spirit levelCheck the level.
  4. TorchIlluminate the interior.
  5. Sticky notesMark the defect.
Boards and hardware in custom furniture | HK Create Design
Site photo: Custom furniture on site. HK Create Design. Select an image to enlarge

02

Prepare for handover

Documents: bring the design drawings, production drawings, quotation and contract. The Consumer Council's report on its quotation trial notes thatBespoke furnitureOnce the quotation is agreed, the contractor should provide drawings, detailed dimensions, material samples and colours for the owner to sign off[3], then check every item against these documents at handover.

Bring a tape measure for dimensions, a spirit level or phone level app to check level and plumb, a phone torch for interiors and corners, colour sample photos, and tape or sticky notes to mark problems.

Allow enough time. Ideally, inspect once in daylight and again with the lights on in the evening. Avoid trying to cover everything in the last ten minutes before the installer leaves. If there are many pieces, finish inspecting one room before starting the next.

If possible, inspect with two people: one checks while the other writes notes and takes photos. Arrange for the installer or project supervisor to attend so you can clarify issues and have simple adjustments made on the spot.

  • Design and production drawings
  • Tape measure and spirit level
  • Phone torch
  • Colour sample photos
  • Inspect in daylight and after dark
HK Create Design・Figures at a glance30 checks in 6 categories
  1. 6 itemsCabinet bodies and doorsEach category
  2. 6 itemsHardwareTest each fitting
  3. 12 itemsWorktops, finishing and lightingTotal

Compiled by HK Create Design.

Fitted furniture inspections: key figures illustrated | HK Create Design
Fitted furniture inspections: key figures at a glance | HK Create Design Select an image to enlarge

03

Category 1: Cabinet bodies (items 1–6)

Item 1: Dimensions. Measure the width, height and depth of each piece against the production drawings, especially full-height cabinets and those beside beams. Item 2: Level. Place a spirit level on cabinet tops and shelves to check for tilt. Item 3: Plumb. Hold the level against the cabinet side to check it is not leaning forwards or backwards.

Item 4: Stability. Gently push the cabinet to check for wobble. Tall cabinets should be secured to the wall. Item 5: Shelves. Compare the number with the quote, check for sagging, and make sure support pins are seated. Move an adjustable shelf to another height and check the holes align and the shelf sits level without movement or noise. Item 6: Interiors. Use a phone torch to check for scratches, chips, wood shavings and adhesive residue.

HK Create Design's FUR05 wardrobe includes 1 hanging rail, 3 shelves and 2 drawers[1], so you can count the items at handover.

  • 1 Dimensions
  • 2 Level
  • 3 Plumb
  • 4 Stability
  • 5 Shelves
  • 6 Cabinet interiors
30-point handover checklist

You can swipe left or right on your phone to view the complete table.

CategoryItemHow to check
Cabinet carcass1–6: Dimensions, level, plumb, stability, shelves and cabinet interiorsTape measure, spirit level and torch
Door panels7–12: Door gaps, alignment, opening and closing, colour, surface finish and sliding doorsInspect visually, test the doors and compare colour samples
Hardware13–18: Soft-close action, brands, runners, handles, hydraulic bed lifts and moving fittingsTest each item
Countertop19–22: Level, cut-outs, joints and edgesUse a spirit level and check by touch
Edges and junctions23–27: Edge banding, cabinet-to-wall gaps, cabinet tops, skirting and silicone sealantCheck by touch and by sight
Lighting28–30: LED strips, spotlights, cable holes and socketsTest opening and closing

Compiled by HK Create Design. [1]

「I prefer clients to check carefully. It is easier to fix a problem on the spot than to discover it a month after moving in and have to arrange another visit.」

Project supervisor, HK Create Design

04

Category 2: Doors (items 7–12)

Item 7: Door gaps. Check the gaps between doors and between each door and the cabinet body. They should be even along the top, bottom and sides. Item 8: Alignment. Close all the doors. Their top and bottom edges should line up without any stepping.

Item 9: Door operation. Open and close each door several times. Check that it moves smoothly without hitting the next door or the wall. Item 10: Colour. Compare the panels with the photo of the colour sample in both daylight and artificial light. Doors along the same wall should match.

Item 11: Surface finish. Shine a phone torch across the panels to reveal scratches, dents, bubbles or stains. Item 12: Sliding doors. Check they travel smoothly, stay on the track and close without gaps.

  • 7 Door gaps
  • 8 Alignment
  • 9 Opening and closing
  • 10 Colour
  • 11 Surface finish
  • 12 Sliding doors
Inspecting cabinet doors (design rendering) | HK Create Design
Design illustration: Inspecting cabinet doors. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

05

Category 3: Hardware (items 13–18)

Item 13: Soft-close hinges. Each hinged door should slow down near the end of its travel and close without slamming. Item 14: Hinge brand. If the quote specifies an upgrade to Blum or Hettich, check for the manufacturer's mark on the hinge[1].

Item 15: Drawer runners. Pull each drawer out and push it back. Check for smooth, quiet movement and test the soft-close action. Full-extension runners should extend all the way. Item 16: Handles. Check each handle for movement and make sure the positions and heights are consistent.

Item 17: Hydraulic storage bed. Raise and lower the bed board several times. Check that the struts support it securely, that the action is not too stiff and that the board does not wobble. Item 18: Other moving fittings. Test each pull-out basket, extending dining table, fold-down bed and similar fitting.

  • 13 Soft-close action
  • 14 Brand markings
  • 15 Drawer runners
  • 16 Handles
  • 17 Hydraulic storage bed
  • 18 Moving fittings
Breakdown of the 30 checks by category (items)(Unit:item)
Cabinet carcass
6
Door panels
6
Hardware
6
Countertop
4
Edges and junctions
5
Lighting
3

Compiled by HK Create Design. [1]

Furniture hardware inspection (design rendering) | HK Create Design
Design illustration: Inspecting furniture hardware. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

06

Category 4: Worktops (items 19–22)

Item 19: Level. Check the worktop front to back and side to side. Water can collect on one side if it is uneven. Item 20: Cut-outs. Check the sink and hob positions and look for chipped edges. HK Create Design's quartz, solid-surface and sintered-stone worktops include 1 sink cut-out and 1 hob cut-out[1].

Item 21: Worktop joints. Check that joints are flush, the pattern lines up and no excess adhesive shows. Item 22: Edges and surface. Feel along the front edge for chips and scratches. If you ordered the FUR23 rounded edge, check that the profile is even along its length[1].

  • 19 Level
  • 20 Cut-outs
  • 21 Worktop joints
  • 22 Edges and surface
Made-to-measure wardrobe after installation | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

07

Category 5: Finishing and edge banding (items 23–27)

Item 23: Edge banding. Run your hand along each board edge and check for lifting, gaps or excess adhesive. Pay particular attention to door bottoms and the sink cabinet. Item 24: Cabinet-to-wall gaps. Check for large gaps and make sure infill strips or sealant have been fitted where needed.

Item 25: Cabinet tops and ceiling. Check that the junction between the ceiling and any full-height cabinet is neat. Item 26: Plinth. Check that it is secure and meets the floor without gaps. Item 27: Silicone. In the kitchen and bathroom, inspect the seals between cabinets and walls and between worktops and walls. The bead should be even and continuous.

Standard finishing is included in the tall cabinet price. Special finishes such as false walls, infill panels up to the ceiling and boxing around beams or columns are FUR44 at HK$250 per metre[1], then check the completed work against the quotation.

  • 23 Edge banding
  • 24 Cabinet-to-wall gaps
  • 25 Finishing at the cabinet top
  • 26 Plinth
  • 27 Silicone sealant
Inspecting finishing details and edge banding (design rendering) | HK Create Design
Design illustration: Inspecting finished joints and edge banding. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

08

Category 6: Electrical fittings and lighting (items 28–30)

Item 28: Cabinet lighting. Open the door and check that the LED strip comes on promptly, that the sensor responds and that the light is even. FUR40 includes the LED strip, driver and a sensor or switch[1]. Item 29: Spotlights. Test each light for flickering and check its angle.

Item 30: Cable holes and sockets. Check that the holes in the TV cabinet and desk are large enough and in the right places. Make sure you can reach and use the sockets behind the cabinets.

  • 28 LED strip lighting
  • 29 Spotlights
  • 30 Cable holes and sockets
Worked example 1

Example: furniture instalments for a 400 sq ft flat

Assumptions

  • Whole-flat furniture: HK$51,800
  • Based on the Consumer Council's recommendation of a first payment no higher than 40%

How to calculate quantities

  1. Maximum first instalment: HK$51,800 × 40% = HK$20,720
  2. Balance: HK$51,800 − HK$20,720 = HK$31,080
  3. Pay the balance in instalments under the contract
  4. Pay the final balance after inspection and completion of snagging

The first payment should not exceed HK$20,720.

The contract determines the number and proportions of instalments. [1][4]

Use your square footage instead and see a reference budget
HK Create Design・Work sequenceDefect rectification process
  1. Mark the spotAdhesive tape
  2. Take photosClose-up and wider photos
  3. Make a listLocation and defect
  4. Send in writingWhatsApp
  5. ReinspectTick off each item
Project photo of bespoke kitchen cabinets with worktop | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

09

How to write a snagging list

Make each snag specific. Record four things: the location (for example, the second door from the left in the main bedroom wardrobe), the problem (the top gap is wider than the bottom), a photo reference and the requested fix (adjust the hinges).

Use tape or a sticky note to mark each defect, then take a close-up and a wider photo so the contractor can find it. Send the snagging list in writing, for example by WhatsApp, and keep a copy.

The Consumer Council advises owners to prepare a snagging list and agree with the contractor how defects and the final balance will be handled[2]. After the repairs, check every item again and tick it off only once it is resolved. If a component must be remade, such as a door in the wrong colour, obtain a completion date and record it.

  • Record the location
  • Describe the defect
  • Attach photos
  • State the requested fix
  • Send in writing
  • Recheck each item
HK Create Design・Illustrated comparisonDefect rectification and extras
  1. leakageWork that differs from the agreed design is the contractor's responsibility
  2. Additional workNew requests require a separate quotation

10

How to distinguish defects from extras

At handover, distinguish defects from new requests. Work that differs from the design drawings or contract, such as uneven door gaps, lifting edge banding or the wrong colour, should be put right by the contractor.

Extras are new owner requests outside the drawings or contract, such as boxing around a beam or adding a cut-out. They are charged separately and need written agreement. The Consumer Council recommends confirming the details of any changes in writing[2].

Example: adding 3 m of beam boxing and 1 extra cut-out at handover. FUR44: 3 × HK$250 = HK$750. FUR24 extra cut-out: HK$330. Total: HK$1,080[1]. These extras need a separate, agreed quotation.

  • Defect: work differs from the agreed design
  • Extras: newly requested work
  • Extras charged separately
  • Confirm in writing

11

Final balance and payments

The Consumer Council recommends limiting the initial deposit to 40% of the total to reduce losses if problems occur early. It also cites the Hong Kong building inspection institute's recommendation to pay in 4 instalments[4]. Pay the balance after the inspection and once all defects have been put right.

Example: furniture throughout a 400 sq ft flat, HK$51,800[1]. At the Consumer Council's suggested maximum of 40%, the first payment would be no more than HK$20,720. Pay the remaining HK$31,080 in instalments under the contract, with the final balance due after inspection and rectification.

Keep receipts and transfer records. Set a condition for each instalment in the contract, such as installation complete or defects rectified. If one or two minor items remain, agree with the contractor on a proportionate sum to retain until they are resolved.

  • First instalment: no more than 40%
  • Pay in 4 instalments
  • Balance due after inspection
  • Keep the receipts
  • State the payment conditions
Defect rectification and extras

You can swipe left or right on your phone to view the complete table.

TypeExampleCost
leakageUneven door gaps, lifting edge banding or the wrong colourContractor's responsibility
Additional workAdd beam boxing or a cut-outQuote separately

Confirm extras in writing. [2]

Custom media wall cabinetry after installation | HK Create Design
Site photo: Custom TV cabinets on site. HK Create Design. Select an image to enlarge

12

Before moving in: airing and cleaning

After handover, open the windows and ventilate the flat before moving in. The Environmental Protection Department notes that building materials, furniture and ventilation all affect indoor air quality[5]. Open cabinet doors and drawers so odours from the board material can disperse.

HK Create Design uses ENF-grade boards as standard. ENF is the strictest formaldehyde emission grade for wood-based panels under GB/T 39600-2021, with a limit of 0.025 mg/m³[7], but ventilation still matters because paints, adhesives and other materials can give off odours.

Wipe wood shavings and dust from cabinet interiors with a damp cloth, then wipe dry. Avoid bleach and strong cleaners. Hong Kong's monthly average relative humidity reaches 83% in April and May[6], and run a dehumidifier in humid weather to help disperse odours and prevent mould.

  • Open windows for ventilation
  • Open the cabinet door
  • ENF-grade boards as standard
  • Wipe with a damp cloth, then dry
  • Use a dehumidifier in humid weather

13

What to check during the warranty period

Pay particular attention during the first few months after moving in. Some issues take time to emerge, such as loosening hinges, drawers that slow down under load, or moisture getting into sealed edges in wet areas.

HK Create Design provides a one-year warranty. If you spot a problem, take a photo, record the date and contact us on WhatsApp at 5243 7747. We will arrange a tradesperson for workmanship or installation issues.

To maintain the furniture, adjust loose hinges gently with a screwdriver, wipe dusty runners with a dry cloth, avoid overloading shelves and dry wet areas after use. Every six months, open and close all doors and drawers and inspect the edge banding and silicone. Report issues while the warranty is still in force.

  • Issues are easiest to spot in the first few months
  • Photograph and record the date
  • One-year warranty
  • Daily maintenance

14

Common handover mistakes

Mistake 1: signing off as soon as the installer finishes. Allow time to check every item and resist pressure to rush. Mistake 2: checking appearance without testing how the furniture works. Open and close every door and drawer. Mistake 7: checking only by daylight. Switch on the lights in the evening to see how the strips look and check for colour differences. Inspect once in daylight and once after dark if possible.

Mistake 3: arriving without production drawings or colour samples. Without them, it is difficult to spot discrepancies. Mistake 4: reporting defects verbally and keeping no written record, which makes any later dispute harder to prove.

Mistake 5: paying the full balance before defects are rectified. Holding the final payment helps ensure the repairs are finished. Mistake 6: confusing rectification with extras. Confirm new requests separately.

  • Signing off immediately
  • Skipping functional checks
  • Arriving without drawings or colour samples
  • No written record
  • Paying the balance before defects are rectified
  • Confusing defects with extras
Worked example 2

Example: extras requested at handover

Assumptions

  • Add 3 m of beam boxing
  • Add 1 extra cut-out

How to calculate quantities

  1. Finishing: 3 × HK$250 = HK$750
  2. Cut-out: HK$330
  3. Total: HK$1,080

The extras come to about HK$1,080. Confirm them separately in writing.

Subject to site conditions and a written quotation. [1]

Use your square footage instead and see a reference budget

15

Kitchen cabinet checks

Kitchen cabinets have more hardware and cut-outs than most furniture, and are exposed to water and heat. Start with the base cabinets: check the feet are adjusted, the cabinets are level and the plinth is fitted. FUR14 includes a moisture-resistant cabinet body, doors, soft-close hinges, adjustable feet and plinth[1], then check each item against it at handover.

Sink cabinet: check that there is space for the pipes, that the cabinet base has moisture protection and that the drain is leak-free. Run the tap and use a phone torch to inspect the underside of the sink and the pipe joints. If FUR18 includes a stone plinth, check its fit against the cabinet body[1].

Wall cabinets: gently check the underside for looseness. Compare the clearance above the base cabinets with the drawings and check for headroom when cooking. At the cooker hood, check the opening dimensions and space for the exhaust duct.

Appliance spaces: check that the fridge, oven and microwave openings allow for both the appliance and its ventilation, and that the sockets are in the right places. Ideally, test-fit the appliances during handover.

  • Base cabinet level and plinth
  • Run water in the sink cabinet
  • Wall cabinet stability
  • Cooker hood opening
  • Test-fit the appliances

16

Wardrobe and platform bed checks

Wardrobe: check the rail height with long garments and coats, compare shelf spacing with the design, and open drawers to check they clear the doors. Slide each door several times, make sure it stays on its track, and check for gaps when closed. If internal strip lighting is fitted, open the door to test the sensor.

Platform beds: walk a few steps on the platform and check for noise or deflection. Open and lower lift-up lids several times and check drawers for sticking. The FUR06 platform bed includes the frame, storage compartments and lift-up lids or drawers[1], then count the storage compartments at handover.

Hydraulic storage bed: test the lift with the mattress in place because its weight changes how the mechanism feels. The raised bed board must stay securely supported and lower without dropping suddenly.

At the head of the bed, check for gaps between the headboard and the wall. Check the positions of the sockets and USB points and make sure the bedside light switch is easy to reach.

  • Hanging rail height
  • Slide the doors back and forth
  • Stand on the platform to test it
  • Test the hydraulic bed with the mattress in place
  • Bedside sockets
Snagging list template

You can swipe left or right on your phone to view the complete table.

locationProblemPhotosrequest
Second wardrobe door from the left in the main bedroomDoor gap wider at the top than the bottom01Adjust the hinges
Bottom edge of the kitchen sink cabinet doorLifting edge banding02Redo the edge banding
Living room TV cabinetCable hole too small03Enlarge the cable hole

Example for reference. [1]

17

Bathroom vanity checks

The bathroom has the highest humidity, so focus on water and moisture protection. Check whether the cabinet body uses moisture-resistant boards. These are now standard for the FUR27 tall bathroom cabinet[1]. Check that the cabinet feet keep it above the floor and there is space for air to circulate underneath.

Washbasin: run the water, check that it drains freely and inspect the pipe joints for leaks. Check the silicone seal between basin and worktop. The FUR25 bathroom base cabinet with seamless stone top includes the top and basin cut-out[1].

Mirror cabinet: check that the doors move smoothly, the mirror is free of scratches and the shelves are secure. Switch on any LED lighting or demister to test it.

In Hong Kong's high humidity, ventilate the bathroom vanity after use. Wipe door bottoms and sealed edges dry to reduce mould and swelling.

  • moisture-resistant board
  • Cabinet clearance above the floor
  • Run water in the washbasin
  • Test mirror cabinet lighting
  • Maintain ventilation
Fitted furniture inspections: checklist illustrated | HK Create Design
Fitted furniture inspections: checklist | HK Create Design Select an image to enlarge

18

TV cabinet, shoe cabinet and desk checks

TV cabinet: check that the cable holes are in the right places and large enough for the TV, set-top box and gaming console cables. Check for ventilation space at the rear. For a wall-mounted TV, compare the gap above the cabinet with the design. The FUR10 low TV cabinet includes drawers or hinged doors and cable holes[1].

Shoe cabinet: check for ventilation holes and make sure the sloping racks or shelves have enough clearance for boots and trainers. Open the cabinet doors to check they clear the front door. The FUR11 half-height shoe cabinet includes sloping racks or shelves and ventilation holes[1]. If there is an open space beneath the shoe cabinet for slippers, check that it is high enough.

Desk: check that the worktop is level and steady. Press gently at the edge to check for movement. Check cable access for the computer and that open drawers clear your legs. FUR08 includes the worktop, 1–2 drawers and cable holes[1].

  • TV cabinet cables and ventilation
  • Shoe cabinet ventilation and shelf height
  • Desk level and stability

19

Order custom furniture from HK Create Design

HK Create Design has worked with Hong Kong homeowners since 2019. Designers and tradespeople with more than 15 years of experience follow up on the work. Our custom furniture service includes design and full-home drawings: floor plans, ventilation, fire services, plumbing and electrical layouts, furniture designs, VR visualisations and production drawings. You can check these item by item at handover. ENF-grade boards are standard.

For two or more work items, complimentary site measurement is offered until 31 December 2026. Showroom: Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. WhatsApp 5243 7747. HK Create Design offers a one-year warranty and has a HK$2,000 minimum charge.

  • Check each item against the production drawings
  • One-year warranty
  • WhatsApp 5243 7747

Advice from our tradespeople

「I prefer clients to check carefully. It is easier to fix a problem on the spot than to discover it a month after moving in and have to arrange another visit.」

Project supervisor, HK Create DesignHK Create Design project team

「Bring the production drawings to the inspection. You can check dimensions and count shelves and drawers against them without relying on memory.」

Furniture Supervisor, HK Create DesignHK Create Design furniture team

FAQ

12 practical questions answered

01What tools should I bring to the inspection?

Production drawings, colour sample photos, a tape measure, a spirit level (or phone level), a phone torch and sticky notes.

02What should I do about uneven door gaps?

The hinges usually need adjusting. Add it to the snagging list and ask the contractor to put it right.

03Does lifting edge banding need repair?

Yes. Lifting edge banding can let moisture into the board core and cause blistering later.

04How should I write a snagging list?

For each item, list the location, problem, photo reference and requested remedy. Send the list in writing[2].

05When should I pay the balance?

Pay after the inspection and once defects have been rectified. The Consumer Council recommends keeping the first instalment at or below 40%[4].

06How are extras requested at handover priced?

This is extra work and needs a separate quote and written confirmation. For example, finishing the boxing around a beam costs HK$250 per metre[1].

07What if new furniture has an odour?

Open the windows, cabinet doors and drawers to ventilate. Use a dehumidifier in humid weather[5].

08How long is the warranty?

HK Create Design provides a one-year warranty.

09How can I check that the upgraded hardware was used?

Compare the brand markings on hinges and drawer runners with the quotation.

10What should I check on kitchen cabinets?

Run water in the sink cabinet to check for leaks. Check wall cabinet stability and make sure appliance openings and ventilation clearances are adequate.

11How do I test a hydraulic storage bed?

Test it with the mattress in place. The lift must support the board when raised and let it descend without dropping suddenly.

12What if I only discover a problem after moving in?

Yes. Take dated photos and contact the contractor within the warranty period.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
  2. [2]Consumer Council, 15 December 2020 — disputes over renovation quality and the value of detailed contracts and regular follow-up Accessed: 2026-11-03
  3. [3]Consumer Council, 16 November 2020 — survey of residential renovation quotes finds unclear scope and calls for better quotations Accessed: 2026-11-03
  4. [4]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03
  5. [5]Environmental Protection Department: Indoor Air Quality Information Centre FAQs Accessed: 2026-11-03
  6. [6]Hong Kong Observatory climatological normals, 1991–2020 Accessed: 2026-11-03
  7. [7]STC: China Market Watch (August 2021) on the new formaldehyde emission grading standard for wood-based panels and finishing products Accessed: 2026-11-03