01
Which measurement comes first when replacing a screen?
Before choosing a door, record both the finished wall-to-wall installation width and the clear width a person can pass through when fully open. They serve different purposes.
Installation width determines whether the screen fits. Clear entry width is the space you can actually pass through after allowing for frames, overlapping glass and projecting hardware. If the catalogue gives only the screen's overall width, ask for a clear-opening drawing for the model.
KOHLER Hong Kong's shower door measuring guideMeasure top width, bottom width and height separately. Give both width readings to the supplier and check the selected model's adjustment range. Photograph both ends of the tape, not just a single reading.
02
Where does each door travel as it opens?
Sliding panels move along the screen and overlap. Hinged doors swing around the hinge. Trace each opening path on the drawing and see whether it intersects the vanity. KOHLER Hong Kong | How sliding and pivot doors open
For a sliding screen, check which side remains open when the panels stack. For an outward-opening hinged screen, trace the whole swing. If the vanity handle projects, mark its closest point to the door on the approval drawing. Use the space beside the manufacturer's drawing for your own site notes.
Manufacturer's buying guide: draw the opening direction first. KOHLER Hong Kong distinguishes overlapping sliding doors from hinged doors that rotate around a pivot.KOHLER Hong Kong | How sliding and pivot doors open
03
How should I record top width, bottom width and opening height?
Measurement field source:KOHLER Hong Kong | Measuring diagram A, B and C. Give the supplier the site readings and request the clear entry width for the selected model when fully open.
You can swipe left or right on your phone to view the complete table.
| Measurement sheet (millimetres) | Site reading | Measurement location |
|---|---|---|
| A. Top opening width | __ mm | Between the upper ends of the left and right finished walls |
| B. Bottom opening width | __ mm | Between the lower ends of the left and right finished walls |
| C. Opening height | __ mm | From the shower base edge to the proposed screen top |
Complete the fields on site in millimetres. [1]
Standard shower screen installation
Assumptions
- The residential site is ready for installation. The example covers one set.
How to calculate quantities
- 1 set × HK$860
Labour subtotal HK$860
Installation labour only. Confirm glass, hardware, removal, handling and making good separately. [3]

04
What should I test with sliding and hinged doors?
Test the remaining entry width and cleaning reach with a sliding door. For a hinged door, test the full swing and the space outside the shower. Choose for the household's actual routine.
Door comparison source:KOHLER Hong Kong | How sliding and pivot doors open. The cleaning and spare part columns list questions to confirm with the supplier.
On-site drawing check: mark the vanity drawers, bathroom door and towel rail positions as used day to day. Even if the shower door opens fully, it may block someone else reaching a towel.
If a family member needs support walking or help showering, allow standing room for both people. Include grab rails and the threshold in the site measurement.Bathroom grab rails and fall prevention for older people
You can swipe left or right on your phone to view the complete table.
| Scenarios to test | Sliding shower screen | Hinged shower screen |
|---|---|---|
| Stepping out after showering | With the sliding door fully open, is there room outside to stand, turn and reach a towel? | Where does someone standing outside need to move for the door to open? |
| Day-to-day cleaning | Can you reach the overlap between the glass panels? How should the bottom guide be cleaned? | Can you reach the hinge and bottom seal? Is there room to clean the outer face with the door open? |
| Replacement parts | Are the roller, guide and handle model numbers recorded? | Are replacement specifications available for hinges, magnetic seals and bottom seals? |
Confirm fittings and cleaning methods with the supplier for the specific model. [2]
05
How should I photograph the measurements for the installer?
Send a front view of the shower, a wide view looking out and a side view of the nearest obstruction. Mark finished dimensions and opening direction on a sketch.
Label the front view as looking into the shower from the bathroom and mark the left and right walls. Include the furthest projecting vanity part, including its handle, in the side photo. If floors or walls will be retiled, keep provisional measurements and remeasure after finishing according to supplier instructions.
Manufacturer's measuring guide: retain both top and bottom widths. KOHLER Hong Kong's diagram labels top width, bottom width and height separately. In site photos, mark the tape endpoints in the same order.KOHLER Hong Kong | Measuring diagram A, B and C
If the quotation says only “one shower screen”, ask the supplier to mark finished installation width and fully open clear entry on the approval drawing. Circle the nearest obstruction from any column or projecting handle. Use the signed drawing to check delivery.
06
What does HK$860 cover for one shower screen?
HK Create Design's published labour-only screen installation is HK$860 per set. Frameless heavy glass installation starts at HK$1,400. Confirm glass and hardware separately.
Our published bathroom price list covers two installation conditions. Each line below gives labour for one set. Check flat size, old screen condition and supply costs for the individual case. HK Create Design public price list | Section 06, sanitaryware and showers: K05 screen installation labour
Price list source:HK Create Design public price list | Section 06, sanitaryware and showers: K05 screen installation labour. The two lines cover different specifications. Select only the applicable one for a single screen.
Installing a frameless heavy-glass shower screen
Assumptions
- The residential site is ready for installation. The example covers one set.
How to calculate quantities
- 1 set × HK$1,400 and up
Labour subtotal from HK$1,400
Installation labour only. Confirm glass, hardware, removal, handling and making good separately. [3]
You can swipe left or right on your phone to view the complete table.
| HK Create Design 2026 indicative prices | Quantity × labour-only rate | Known labour subtotal |
|---|---|---|
| Example one: K05 standard shower screen installation | 1 set × HK$860 | HK$860 |
| Example two: if the supplier confirms frameless heavy glass | 1 set × HK$1,400 and up | From HK$1,400 |
The contractor confirms the applicable specification using site conditions. [3]
07
What needs separate pricing in addition to installation labour?
Exclusions: these examples cover installation labour only. Glass, frame, hardware, delivery, handling, removal and disposal, tile repairs and waterproofing repairs are separate. If the contractor supplies the screen, price glass and hardware by model. Sliding or hinged operation alone does not determine the glass specification or labour rate.Bathroom renovation prices and K05 installation scope
08
What should the owner check after installation?
At handover, compare the model, opening direction and entry dimensions with the signed drawing. Ask the installer to demonstrate operation, cleaning and water containment under normal use.
Enter and exit as you normally would. Check that the door runs smoothly, the handle clears the vanity and the fully open clear passage matches the signed drawing. Allow the installer's specified sealant curing time before testing with the usual shower spray. If water escapes, note whether it comes through the side, bottom or fixed frame.
Owner's handover note: photograph the roller or hinge model on delivery. Keep the approved drawing, supplier contact and warranty scope so you can identify the right replacement seal later.
09
What should I prepare before asking for a quotation?
Once you have the measurements, you can use theOnline renovation budget calculator or 24-hour AI quotation assistantEstimate the known items, then send them with site photos Free shower screen enquiry on WhatsApp. If replacing only the screen, ask about arrangements and fees for site measurement.
FAQ
6 practical questions answered
01Is the width of the old glass enough to order a replacement screen?
Order using finished wall-to-wall dimensions. The old glass only shows the size of the old panel. It does not allow for the new frame, overlap or out-of-plumb walls. Keep it as a reference, then ask the supplier to confirm the installation width for the new model.
02Will a three-panel sliding screen always give a wider entrance than a two-panel screen?
Compare drawings for models with the same installation width and check the clear opening when fully open. Note which side the panels stack on, whether the handle projects into the passage and whether the door is easy to close from inside.
03If top and bottom widths differ, should I use their average?
Give the supplier the separate top and bottom readings and request written confirmation against the selected frame's adjustment range. An average can hide the narrowest point. Mark any sill or column separately.
04If a left hinge hits the vanity, will a right hinge solve it?
Move the hinge to the right on the same drawing, redraw the entire swing and check the toilet, handles, bathroom door and standing room. Confirm the model can be reversed before changing the order.
05If I replace only the screen, can I retain the shower base and wall tiles?
Ask the installer to inspect old frame fixings, the shower base edge and whether the new frame covers existing holes. The quotation should identify finishes to retain, how holes are closed and who approves extra work if loose tiles appear after removal.
06Do I pay both HK$860 and the price starting at HK$1,400?
These are labour-only references for different installation conditions. Have the contractor select the rate that matches the actual screen, then itemise supply, removal and repairs. Align the supply scope before comparing quotations.
CHECK THE BASIS