01

Three scopes of window work

When discussing the cost of replacingAluminium windowsEstablish the scope first. A hardware repair keeps a sound frame and sash and replaces worn hinges, locks, fasteners or gaskets. A sash replacement retains the frame and installs a new glazed sash with hardware. A complete replacement removes the old frame and installs a new frame, sashes and glass, with associated rendering, sealing and painting around the opening.

The three scopes have different costs. For parts, Buildings Department references give around HK$170–HK$200 per sash for hinges and HK$120–HK$150 for screws and rivets,[1] A full replacement includes measurement and ordering, strip-out, safe access, installation, sealing, statutory filings and repairs around the opening. Its cost cannot be derived from an individual repair rate.

The Buildings Department gives no fixed service life for aluminium windows. Inspect hinges, screws and rivets regularly and maintain them according to condition.[6] Age alone does not determine whether replacement is needed. Hardware may be enough for a sound frame. Distortion or persistent leakage warrants investigation beyond individual components.

Look for stiff operation, a lock that will not engage, corrosion, loose hinges, gaps and water marks. Buildings Department warning signs also include unusual noises, an unstable open sash, distorted or sagging frames, and broken or missing fasteners. Stop using a suspect sash and arrange inspection.[9] If these signs appear, arrange a qualified person's inspection before choosing the repair scope.

  • Count both window openings and sashes per opening
  • Check opening, closing and locking on each sash
  • Photograph visible hinges, rivets and perimeter conditions from inside
  • Quote hardware repair and complete replacement separately
Buildings Department mandatory window inspection cost references, July 2025 to June 2026

You can swipe left or right on your phone to view the complete table.

ItemPricing unitReference cost rangeRemarks
Prescribed inspection with no repair neededQualified person's servicesHK$160–800[1]Includes inspection filings. Repair work is separate
Prescribed inspection and supervision of prescribed repairsQualified person's servicesHK$80–880[1]Highest and lowest 2.5% excluded
Replace 200–400mm hingesPer window sashHK$170–200[1]Highest and lowest 5% excluded
Replace dual lockPer window sashHK$70–100[1]As above
Replace cam lockPer window sashHK$70–100[1]As above
Replace screws and rivetsPer window sashHK$120–150[1]As above
Replace sash gasketPer window sashHK$100–250[1]As above

The Buildings Department publishes indicative costs and charges no processing fee. These repair ranges exclude the registered contractor's minor works submission fee and do not price complete window replacement. [1]

After window replacement: The same window position was replaced with a new dark gray aluminum window and clear glass, the old window grilles were removed, and the wall under the window sill was repaired with white paint.
Design illustration of the replacement aluminium windows. The written quotation specifies the profiles, glazing and hardware supplied. Select an image to enlarge

02

How to interpret Buildings Department reference costs

For itsMandatory window inspection scheme, the Department compiled a cost reference based on 2,387 quotations and advertisements collected from July 2025 through June 2026.[1] The surveyed qualified person's fee is HK$160–HK$800 for a prescribed inspection where no repair is needed and HK$80–HK$880 for inspection and supervision of prescribed repairs. The top and bottom 2.5% were excluded. The fee includes the relevant inspection filing. Repairs are charged separately.[1]

Buildings Department references per sash are HK$170–HK$200 for 200–400mm hinges, HK$70–HK$100 each for a dual or cam lock, HK$120–HK$150 for screws and rivets and HK$100–HK$250 for gaskets. The top and bottom 5% of quoted repair costs were excluded.[1] Compare the quoted items with the same items in the published ranges and check the reason for material differences.

The Buildings Department publishes the figures as reference data. Actual prices depend on condition, quantity and market factors.[1] The repair rates exclude what the registered contractor charges for lodging minor works documents. The Buildings Department itself does not charge a processing fee.[1] The published repair ranges exclude the contractor's submission fee, so a separate filing line may appear in the quotation.

Prescribed repairs must meet at least the original design standard. The Mandatory Window Inspection Scheme's prescribed scope excludes non-safety items such as perimeter weather sealant and gaskets.[6] If you want perimeter seepage addressed at the same time, include it expressly in the quote. See the aluminium window leak repair guide and the separate guide to mandatory inspection.

  • Compare like-for-like quoted items with the Buildings Department reference
  • Ask whether the minor works submissions are included
  • Specify perimeter waterproofing and joint sealing separately
  • Keep the written quote and completion photos
Buildings Department reference costs: upper limit for replacement parts per window(Unit:HK$ per leaf)
Sash gasket
HK$100–250
Replace window hinges
HK$170–200
Screws and rivets
HK$120–150
Dual lock
HK$70–100
Casement window handle
HK$70–100

Bar lengths show the upper end of the surveyed range. The Department does not prescribe a recommended price. [1]

Before window replacement: The window frames of the old unit were rusty and oily, the window grilles were worn out, and there were water stains on the wall under the window sill.
Design illustration showing the condition of the old aluminium windows and sill before replacement. Select an image to enlarge
Aluminium window replacement prices: key figures illustrated | HK Create Design
Aluminium window replacement prices: key figures at a glance | HK Create Design Select an image to enlarge

03

Main factors in aluminium window replacement prices

First, count sashes and measure the opening. Different divisions, fixed panes and opening lights change the amount of aluminium and hardware. Second, specify the glass. Single, insulating, laminated and Low-E options differ in weight and price, and heavier units need suitable hinges and profiles. See ourAluminium window glass selection guide.

Third, opening style affects hardware and weather sealing. Casements use hinges and locks, while sliding windows use tracks and rollers. Fourth, profile series, wall thickness, section size and powder or fluorocarbon coating affect the price. Specify the exact profile and finish.

Fifth, access height and work method matter. The Buildings Department assesses height to the highest point, structural element span and whether the main frame or sub-frame is involved.[2] Upper-floor installation may involve work from inside and from an external platform. External access can add substantial cost. The Labour Department calls for suitable work platforms for work at height.[10]

Sixth, budget for making good the render, weather seals and paint around the old frame. Seventh, count carriage and lawful disposal of frames, glass and debris. Our small-job and rubble minimum charge is HK$2,000.[13] Eighth, scheduling matters, for example coordinating withWhole-flat renovationThe sequence, permitted working hours and number of visits affect the labour needed.

  • Measure the width and height of each opening
  • Choose the opening styles and number of sashes
  • Agree the glazing specification
  • Ask if a truss-out scaffold is required
  • Check extra charges for perimeter repairs and rubble

「Price depends on dimensions, opening style, glass and frame specification. Ask for profile wall thickness and the hardware make for each unit.」

Aluminium Window Works Supervisor, HK Create Design

04

How the minor works class affects cost

Window repair and replacement may fall under Class I item 1.60, Class II item 2.8 or Class III item 3.6 of the Minor Works Control System.[2] For heights over 3.5m and up to 100m, Class II item 2.8 covers qualifying work with a span of at most 6m and a main frame or sub-frame longer than 1.2m. Class III item 3.6 can apply up to 3.5m where the span is at most 6m, or over 3.5m and up to 100m where work involves only a sub-frame no longer than 1.2m.[2]

Class I requires a prescribed building professional and a prescribed registered contractor. Classes II and III require a prescribed registered contractor. Classes I and II need notice at least seven days before work. Class III has no pre-start submission. All three require completion filings within 14 days.[8] Document preparation, certification and supervision form part of the cost.

A complete replacement on an upper floor often involves the main frame and may be Class II. The registered contractor must assess the actual height, span and scope. Ask for the item's number and basis if told there is no submission requirement. Missing records may affect later sale, finance or insurance enquiries.

Window works must meet statutory requirements for daylight, ventilation and fire safety. Openings in exterior walls above ground-floor level generally require a protective barrier at least 1.1m high.[2] Changing the window size or removing a low sill wall can trigger different minor works items or additional approval and cost. Green balconies and utility platforms exempted from gross floor area must not be enclosed.[2] See our guide to the replacement process and Buildings Department minor works submissions.

  • Ask the contractor to specify the expected works class and item number
  • Identify the registered contractor responsible for filings
  • Before work begins, confirm the Class I or II filing has been submitted
  • Ask for copies of the completion filings
Worked example 1

Example 1: budgeting for component replacement after a mandatory window inspection

Assumptions

  • A flat has four casement sashes. The qualified person identifies two needing new hinges, and the owner also wants new gaskets on all four.
  • Calculated using the Buildings Department's indicative ranges. [1]
  • Qualified person's prescribed inspection and supervision of prescribed repairs.

How to calculate quantities

  1. Hinges: two sashes × HK$170–HK$200 = HK$340–HK$400.
  2. Gaskets: four sashes × HK$100–HK$250 = HK$400–HK$1,000.
  3. Qualified person's service: HK$80–HK$880.
  4. Low estimate: HK$340 + HK$400 + HK$80 = HK$820. High estimate: HK$400 + HK$1,000 + HK$880 = HK$2,280.

The example totals around HK$820–HK$2,280 using the official references, excluding the registered contractor's minor works filing fee.

A distorted or corroded frame may need a new sash or a complete replacement, with a different cost from the repair survey. [1]

Use your square footage instead and see a reference budget
Window-side platform bed with tall wardrobe and drawers
Site photo: Window-side platform bed with a tall wardrobe and drawers in Hong Kong. HK Create Design. Select an image to enlarge

05

Access at height and safety measures affect the price

Window replacement presents a fall hazard. The Labour Department identifies it as a common example of work at height and requires appropriate safeguards, including suitable working platforms where there is a risk of a fall of 2m or more.[10] The Labour Department's safety alert specifies a platform at least 400mm wide, top rails 900–1,150mm high, intermediate rails 450–600mm and toe boards at least 200mm. Inspection is required before first use and at intervals of no more than 14 days.[7]

If a suitable platform is not reasonably practicable and work in the hazardous position is unavoidable, the contractor must provide suitable fall protection, including a harness continuously secured to an appropriate anchor or independent lifeline. Workers should wear helmets with chin straps.[7] Safe access needs labour, equipment and time. A low quote may omit it. Labour Department guidance identifies window replacement as high-risk, with the relevant construction safety training card and a suitable platform such as a truss-out scaffold for exterior work.[11]

Ask how the contractor will protect workers and people below from falls and falling glass, and request third-party and employees' compensation insurance details. HK Create Design lists these insurance costs for whole-flat jobs. For small jobs they are included in the relevant labour rates.[13]

Over a pavement or shopfront, timing and protection of the area below need particular attention. Management may ask for advance registration, insurance copies and work hours. Check these before quoting because they affect access dates and staffing.

  • Ask the contractor to explain safe access for high-level work
  • Confirm workers hold the required construction safety training card
  • Ask for the insurance certificate
  • Register the work with building management in advance
Three types of window replacement compared

You can swipe left or right on your phone to view the complete table.

ServicesTypical scopeHow prices are calculatedminor projectsSuitable for the situation
Hardware repairReplace hinges, locks, rivets and gasketsUse the Buildings Department reference per sash for comparable repairs [1]Repairs must meet at least the original design standard. Gaskets and sealants are outside the prescribed mandatory inspection scope [6]Sound frame with worn hardware only
Replace the sashRetain the frame and replace the glazed sash and hardwareBased on sash count, dimensions and glazing, confirmed by measurement and written quoteMay be Class III or II, depending on height and frame elements [2]Sound frame without significant leakage
Complete window replacementRemove the existing frame, install a new frame, sashes and glass and make good the perimeterQuoted by full opening dimensions, glazing, opening style and access platformOften Class II where work above 3.5m involves the main frame and meets the other item conditions [2]Distorted or corroded frame, or prolonged perimeter leakage

The appointed registered minor works contractor or prescribed building professional must confirm the class from the actual site and scope. [1][6][2]

Renovation work in progress on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

06

Using published rates for perimeter repairs and painting

Removing old frames can reveal damaged render or mould on indoor walls. Curtain pelmets may also need replacing. These items fall underMasonry and tilingandPainting, which the aluminium window price may exclude. Use the relevant published rates to estimate perimeter repairs separately.[13]

For local mould or water stains near a window, E05 mould treatment and repainting is HK$1,250 per surface. Leak investigation is separate.[13] For sound walls with local cracks, E02 filling, moisture-resistant primer, sanding and painting is HK$21 per sq ft, minimum HK$4,650. For peeling, mouldy or water-damaged walls needing stripping, E01 full preparation and painting is HK$39 per sq ft, minimum HK$7,450.[13]

B01 cement-sand wall rendering around the opening costs HK$43 per sq ft, minimum HK$2,350.[13] An F04 curtain pelmet costs HK$460 per linear foot, minimum 8 linear ft. For sill storage, FUR02 half-height cabinets cost HK$1,350 per linear foot, minimum 2 linear ft.[13] These are published rates. The written quotation after site measurement confirms the actual price.

Our window partner prepares a written quote for the measured dimensions and specifications. We coordinate windows, rendering, waterproofing and painting. If you are also renovating a bathroom or the whole flat, the surveys can be arranged together.

  • Photograph the surrounding interior wall before old frames are removed
  • Check whether rendering and painting around the windows are separate
  • Find and fix the leak before repainting
  • Measure curtain pelmets and sill cabinets at the same visit
Guide unit rate for replacing a staircase window with a half-hour fire-resisting window(Unit:HK$ per m²)
Lower end of the range
$3,000
Average
$4,450
Upper end of the range
$5,900

First-quarter 2025 prices for works to building common parts. Use them for preliminary planning. [3]

07

Grants and interest-free loans

The Urban Renewal Authority's Integrated Building Rehabilitation Assistance Scheme offers eligible owners financial and technical help. A single application form can cover several kinds of assistance for building and window repairs.[4]

For eligible common parts, the general repair grant is the lower of 20% of approved works cost or HK$3,000 per unit, capped at HK$1,200,000 per application. For eligible green items it is the lower of 20% or HK$1,500 per unit, capped at HK$600,000.[4] Stairwell windows and other common-area work are usually coordinated by the owners' corporation. It can enquire about the relevant funding.

Eligible owners may apply for an interest-free loan of up to HK$50,000 per residential unit for internal repairs, including windows.[4] Eligibility depends on the scheme's approval conditions. Ask whether work may start before approval before ordering or commencing.

For stairwells or other common-area windows, the owners' corporation can consult the Building Rehabilitation Platform's unit rates for an initial estimate. Scope, building size, condition, materials and markets affect the cost. A building professional should assess the work and coordinate competitive tendering.[3]

  • Check eligibility for grants or loans first
  • Check the application conditions before commencing
  • Keep the quotation, invoice and completion records
  • Owners' corporation coordinates common-area work
Worked example 2

Example 2: making good the interior wall around a replacement window

Assumptions

  • Complete replacement is quoted separately in writing by our aluminium window partner.
  • Two interior wall surfaces beside the window need E05 mould treatment and repainting. [13]
  • The example also includes 8 linear ft of curtain pelmet (F04). [13]

How to calculate quantities

  1. E05: two surfaces × HK$1,250 = HK$2,500.
  2. F04: 8 linear ft × HK$460 = HK$3,680.
  3. Associated works: HK$2,500 + HK$3,680 = HK$6,180.

Example perimeter finishing and curtain pelmet around HK$6,180, plus the separately quoted window work.

If the wall needs stripping, E01 is HK$39 per sq ft, minimum HK$7,450. Address the source of the leak first. [13]

Use your square footage instead and see a reference budget
Interior lighting and ceiling finishes | HK Create Design
Project photograph: interior design, HK Create Design Select an image to enlarge

08

Professional and official guidance

The Buildings Department makes owners responsible for maintaining their windows. It states that aluminium windows have no fixed service life. Falling windows are mainly caused by hinge rivets or screws failing through corrosion or wear, with inadequate maintenance and improper use also contributing. If a window falls because it was not maintained, the owner may commit an offence under section 4B of the Summary Offences Ordinance, carrying a fine of HK$10,000 and 6 months' imprisonment, and may also face a civil claim.[6]

The Audit Commission's 2025 report recorded 445 fallen-window incidents between January 2017 and December 2024. Six caused one death and seven injuries.[5] The Public Accounts Committee appendix records 90 fallen-window incidents in 2017, 65 in 2018, 78 in 2019, 47 in 2020, 40 in 2021, 32 in 2022, 50 in 2023 and 43 in 2024. Reported causes include corroded or loose components, broken panes and improper operation.[12]

For a replacement hinge, Buildings Department guidance calls for at least three appropriate rivets or screws and stainless fixings for stainless steel hinges. Replace loose, missing or rusty fasteners and those showing grey-white corrosion deposits.[6] Compare prices for equivalent materials, installation methods and safeguards.

Both the Buildings Department survey and Urban Renewal Authority platform unit rates are indicative. They do not prescribe the price for a particular job.[1][3] Compare the people, work and materials specified: who acts as qualified person, which registered contractor undertakes the repair, what hardware will be used and what warranty applies.

  • Owners are legally responsible for window maintenance
  • Use the required number of compatible hinge fixings
  • Surveyed cost reference only
  • Compare specifications across quotations
Aluminium window replacement quotations: inclusions and possible exclusions

You can swipe left or right on your phone to view the complete table.

ItemWhat the quotation should stateUsually included?What to ask
Window frame profileProfile series, wall thickness, finish and colourDepends on the quotationAre profile series and thickness specified?
GlassSingle, insulating or laminated glass, thickness and Low-E coatingDepends on the quotationIs the build-up of every pane specified?
HardwareMaterials for hinges, locks and handlesDepends on the quotationStainless steel hinges matched with stainless steel rivets or screws [6]
Remove and dispose of existing windowsRemoval, carriage and disposalNot necessarilyIs waste removal separate?
Exterior working platform or truss-out scaffoldTruss-out scaffold, safety harness and independent lifelineNot necessarilyWork-at-height safeguards [7]
Minor works submissionClass I, II and III documentsNot necessarilyWho signs and when is it submitted? [8]
Perimeter waterproofing and sealingExterior weather seal and interior mould-resistant sealantNot necessarilyWhich make and model will be used?
Rendering and painting around the windowMake good and repaint the interior wallsUsually excludedCharged separately by area or surface
WarrantyWarranty period and coverageDepends on the quotationDoes the warranty cover water ingress?

However each company formats its quote, check the specification, quantity and responsible party for every item. [6][7][8]

09

Common questions when replacing aluminium windows

The first pitfall is a quote that says only “one set of aluminium windows, $X”. Without the profile series, glass thickness, hardware material and opening type, it is hard to compare quotes or check the finished work. A clear quote gives the dimensions and specifications of each window and opening sash.

Another common issue is omitting the minor works procedure. Many window replacements fall under the control system,[2] Ask for the expected minor works class and item number if a contractor's quote omits submissions. The applicable procedure depends on the actual work.

Another common omission is leaving perimeter repairs as unpriced extras. Removing a frame often affects render, waterproofing and interior paint. Ask for an allowance using the relevant E05, E02 or B01 rates.[13]

Another common issue is using ordinary interior sealant outdoors. The exterior joint needs a suitable weather seal. We use DOWSIL mould-resistant silicone on the interior and weather sealants such as DOWSIL 791 on the outside, subject to compatibility.Window perimeter sealantSee our window perimeter sealing guide for more detail.

A further omission is safe access and insurance. Ask how external work and fall protection are priced and obtain insurance details, especially if a quote is unusually low.[11] A heavily front-loaded payment schedule can leave the owner exposed if work stops. Link instalments to clearly defined progress.

  • List the specification of every window
  • Ask for the proposed minor works class in writing
  • Budget for making good around the windows
  • Use a weather-resistant sealant outside
  • Link payments to progress

10

What to check at handover after window replacement

At handover check each sash with the installer. A casement should operate smoothly, hold its open position and lock securely. A sliding sash should run smoothly without leaving the track. Failure to lock and instability are listed warning signs.[9]

Check hinge fixings with the installer. Buildings Department guidance calls for at least three appropriate screws or rivets on each replacement hinge, with stainless steel fixings on stainless steel hinges.[6] Ask the installer to show the fixing count and condition at the top and bottom hinges. Photograph only from a safe indoor position and avoid operating a suspect sash.

Check glass and retaining beads. Look for cracks, scratches or moisture inside an insulating unit. Missing aluminium glazing beads are a Buildings Department warning sign.[9] Inspect the perimeter seal for continuity, bubbles, gaps and proper adhesion to the frame and wall.

Collect copies of the minor works filings, warranty, hardware and glass specifications. The Buildings Department requires completion documents for all three classes within 14 days of completion.[8] After rain, look for water marks around the window and sill. Report any defect promptly within the written warranty period.

  • Operate and lock each sash at handover
  • Photograph visible hinge fixings from inside
  • Check glass and glazing beads
  • Check the perimeter sealant joints
  • Collect minor works documents and warranty terms
  • Check again after rain
Worked example 3

Example 3: replacing staircase windows with fire-resisting windows, for owners' corporations

Assumptions

  • One stairwell window opening: 1.2m × 1.0m = 1.2m².
  • Based on the platform reference of HK$3,000–HK$5,900 per m², with an average of HK$4,450. [3]

How to calculate quantities

  1. Lower estimate: 1.2 × HK$3,000 = HK$3,600.
  2. At the average rate: 1.2 × HK$4,450 = HK$5,340.
  3. Upper estimate: 1.2 × HK$5,900 = HK$7,080.

Around HK$3,600–HK$7,080 per example opening, averaging HK$5,340. Ten such openings would be around HK$36,000–HK$70,800.

First-quarter 2025 common-parts rates cannot price ordinary windows inside a flat. Owners' corporations should obtain professional assessment and competitive tenders for the actual work. [3]

Use your square footage instead and see a reference budget
Completed waterproof coating on the external wall canopy at Tai Po Tsai Village, Sai Kung
Site photo: Completed waterproof coating to an external canopy in Tai Po Tsai Village, Sai Kung, May 2026. HK Create Design. Select an image to enlarge
Aluminium window replacement prices: checklist illustrated | HK Create Design
Aluminium window replacement prices: checklist | HK Create Design Select an image to enlarge

11

Window replacement schedule

Typical stages are inspection and measurement, written quote and agreed specifications, ordering the frames and glass, management registration, applicable minor works submissions, removal and installation, joint sealing, making good, handover and completion filings. Classes I and II require notice at least seven days before work on site.[8]

Frame and glazing specification determine manufacturing lead time. Insulating, laminated and Low-E units may take longer. Installation depends on the window count and site, with extra time for building and taking down any scaffold. The written programme confirms the dates.

In a full renovation, place window replacement after strip-out and before rendering and painting. This lets other trades finish around the new frames without reopening newly painted surfaces.

Window removal involves noisy drilling or breaking out. Check the building's working hours and applicable legal restrictions. See our guide to renovation noise and hours.

  • Allow at least seven days after pre-start filing for Class I or II
  • Confirm glass delivery lead time
  • During a full renovation, replace windows before painting
  • Give neighbours advance notice
Published company rates for work around windows

You can swipe left or right on your phone to view the complete table.

No.ItemUnit priceMinimum charge or minimum quantity
E05Treat localised mould and repaintHK$1,250 per surface [13]Leak tracing charged separately
E02Patch the surface, damp-proof, sand and paintHK$21 per sq ft [13]Minimum HK$4,650
E01Strip back, skim, damp-proof, sand and paintHK$39 per sq ft [13]Minimum HK$7,450
B01Apply cement–sand render to wallsHK$43 per sq ft [13]Minimum HK$2,350
F04Form a curtain pelmetHK$460 per linear foot [13]Minimum 8 linear ft
FUR02Half-height window seat cabinetHK$1,350 per linear foot [13]Minimum 2 linear ft

We quote aluminium windows individually in writing after measurement. The company's minimum for small jobs and rubble removal is HK$2,000. [13]

Site photo of bathroom cabinet and sanitaryware installation | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

12

Follow up with the construction team

HK Create Design opened in 2019, and the team has over ten years of project experience. We inspect and measure windows before quoting in writing. Perimeter repairs, painting and curtain pelmets have separate published rates. Work carries a one-year warranty under the written terms.[13]

Measurement arrangements are as follows. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order. For window replacement on its own, a tradesperson's site visit costs HK$500. The full fee is credited against the work once you confirm the order.[13]

For a free quotation from the HK Create Design team, WhatsApp 5243 7747 or visit our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.

Before the survey, gather photos from inside, approximate sizes, floor level, management requirements and any mandatory inspection notice. These details support a more specific quotation.

  • Prepare window photos and approximate dimensions
  • Check for a mandatory window inspection notice
  • Check management's window replacement requirements
  • Book via WhatsApp at 5243 7747

Advice from our tradespeople

「Price depends on dimensions, opening style, glass and frame specification. Ask for profile wall thickness and the hardware make for each unit.」

Aluminium Window Works Supervisor, HK Create DesignHK Create Design project team

「When a frame is removed, its perimeter needs sound weather seals and carefully finished render to prevent the new junction from leaking.」

Partner Aluminium Window Subcontractor, HK Create DesignHK Create Design partner tradesperson with over ten years in the trade

「Most window replacements require minor works submissions by the relevant appointed contractor. We coordinate the documentation with the window contractor.」

Project Manager, HK Create DesignHK Create Design project team

FAQ

12 practical questions answered

01How much does replacing one aluminium window cost in 2026?

There is no official uniform price. The Buildings Department's reference covers individual repairs, such as hinge replacement at HK$170–HK$200 per sash,[1] The written quote for full replacement depends on measurements, glazing, height and minor works class.

02Are the Buildings Department's reference costs recommended prices?

No. The Buildings Department says its reference costs are not recommended prices. Charges depend on window condition, quantity and market factors.[1]

03How do I choose between replacing hinges and replacing the whole window?

If the frame is sound and only the hinges or rivets are worn, new hardware may suffice. For a distorted or badly corroded frame or persistent perimeter leaks, ask a qualified person or window contractor to assess the whole unit.

04Is it necessary to replace aluminum windows?

The window's height above ground, span and frame components affect its minor works classification.[2] Classes I and II require the prescribed notice at least seven days before commencement. All three classes require completion filings within 14 days.[8]

05Does the window replacement quote include painting the surrounds?

Usually priced separately. HK Create Design lists E05 local mould treatment and painting at HK$1,250 per surface and E02 at HK$21 per sq ft, minimum HK$4,650.[13]

06Does HK Create Design publish aluminium window prices?

Aluminium windows have no fixed rate in HK Create Design's published price list. They are quoted after measurement. Published rates are available for associated work around the openings.[13]

07Is there funding for window replacement?

The Integrated Building Rehabilitation Assistance Scheme offers eligible owners an interest-free loan of up to HK$50,000 per flat for internal repairs, including windows.[4] Eligibility is subject to the scheme's approval.

08Why are some quotations unusually low?

Possible exclusions include suspended scaffolding or platforms, insurance, minor works submissions, repairs around windows and debris. The Labour Department identifies window replacement as high-risk work requiring a suitable platform.[11]

09What is the approximate cost of replacing staircase windows with fire-resisting windows?

The platform's preliminary first-quarter 2025 reference is HK$3,000–HK$5,900 per m², with an average of HK$4,450.[3]

10How many rivets does a replacement window hinge need?

The Buildings Department specifies at least three rivets or screws for a new window hinge. Stainless steel hinges require stainless steel fixings.[6]

11What are the legal consequences of failing to maintain windows?

The Buildings Department says an owner whose poorly maintained window falls may breach section 4B of the Summary Offences Ordinance and face a HK$10,000 fine and six months' imprisonment.[6]

12Is there a charge for a site measurement?

Site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against an order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: Mandatory Window Inspection Scheme: Cost Reference (July 2025 to June 2026) Accessed: 2026-11-03
  2. [2]Buildings Department: Minor works related to windows Accessed: 2026-11-03
  3. [3]Urban Renewal Authority Building Rehabilitation Platform — Works Costs Information Centre reference unit rates Accessed: 2026-11-03
  4. [4]Buildings Department — Integrated Building Rehabilitation Assistance Scheme Accessed: 2026-11-03
  5. [5]Audit Commission: Management of Mandatory Window Inspection Scheme by the Buildings Department (Report No. 84, Chapter 4, summary) Accessed: 2026-11-03
  6. [6]Buildings Department: Frequently Asked Questions: Windows Maintenance Accessed: 2026-11-03
  7. [7]Labour Department: Work Safety Alert — fall from height while installing a glass window Accessed: 2026-11-03
  8. [8]Buildings Department: Introduction to the Minor Works Control System Accessed: 2026-11-03
  9. [9]Buildings Department: Important Notes about Window Safety Accessed: 2026-11-03
  10. [10]Labour Department: Overview of Safety at Work at Height Accessed: 2026-11-03
  11. [11]Labour Department: repair, maintenance, alteration and addition works — guidance for owners and tenants Accessed: 2026-11-03
  12. [12]Legislative Council Public Accounts Committee, Report No. 84, Appendix 13 Accessed: 2026-11-03
  13. [13]HK Create Design 2026 detailed project budget and public price list Accessed: 2026-11-03