Mason rates in 2026: worker's wages and contractor daywork charges

People searching for a mason's daily rate may want the worker's earnings or the price an owner pays a contractor. Wages are what the employer pays the worker. The daywork charge also covers organising labour, travel, tools, insurance, site management and follow-up.

The Census and Statistics Department publishes monthly average daily wages for principal occupations on public construction projects. In July 2026 the figures were HK$1,171.3 for bricklayers, HK$1,310.0 for plasterers, HK$1,379.8 for tilers and HK$1,341.4 for waterproofers.[1] The Census and Statistics Department notes that these figures cover public-sector projects only and do not represent wages across the entire construction industry.[1] The figures provide context for trades and wage structures. Comparing them directly with a contractor's customer charge would omit other costs.

HK Create Design lists masonry daywork at HK$2,700 per day, plus materials at cost. The small-job minimum is HK$2,000. Use the rate to compare possible person-days with area-based prices for the same scope.

  • Distinguish the worker's wage from the contractor's daywork charge
  • Official wages provide background
  • Check whether daywork includes materials and debris removal
HK Create Design published prices for wet trades, 2026

You can swipe left or right on your phone to view the complete table.

ItemUnit priceMinimum chargeincludeExcluded or charged separately
B06 Mason’s day rateHK$2,700 per dayMinimum HK$2,000 for a small jobMason's daily labour for general or scattered repairsMaterials at cost; disposal separate
B01 Apply cement–sand render to wallsHK$43 per sq ftHK$2,350Prepare the surface, set out levels and render flat, including labour and base materialsPaint and finish tiles
B02 Screed and level the floorHK$22 per sq ftHK$1,850Level with a cement–sand screed and form falls to drainage in wet areasLevel differences greater than 30 mm require separate agreement
B03 Build masonry wall and render both facesHK$93 per sq ftHK$3,700Lightweight blocks or red bricks, ties and render to both sidesMinor works submissions and painting
D01 Floor tiles, straight-laid up to 600 × 600 mmHK$78 per sq ftHK$3,250Set out, plan the tile layout, lay tiles, grout and finish edgesFinish tiles extra. Diagonal laying adds 24%.
A11 Rubble removalHK$4,200 per truckloadSmall-job bagged debris arrangement: HK$2,000 minimumCarrying down, legal disposal and government disposal fees—

Masonry, waterproofing and tiling rates include labour and base materials unless stated. Finish tiles are extra. Confirm the written quote after measurement. [7]

Site photo of a plasterer repairing a wall, working through the agreed list
Site photo of a plasterer repairing a wall, working through the agreed list Select an image to enlarge

02

What the HK$2,700 mason day rate covers

One day's charge covers one mason and ordinary hand tools. Typical tasks include chipped tiles, damaged corners or sill edges, shallow floor hollows, small drainage falls and making good around other trades. Daywork can suit scattered repairs that are difficult to measure beforehand.

Three main exclusions apply. First, materials such as cement, sand,Tile adhesiveor waterproofing slurry, charged at cost. Ask for receipts or clear quantities. Second, clients choose the finish tiles, sanitaryware and taps, and we charge for installation. Third, debris: small quantities may be bagged under the HK$2,000 small-job minimum. A11 is HK$4,200 per truckload, including carrying down and government disposal fees.

Government construction waste fees depend on weight and facility: HK$71/tonne at public fill reception facilities, HK$175 at sorting facilities and HK$200 at landfills, with a one-tonne minimum.[3] Those are government disposal charges. Carrying, loading and transporting the waste cost extra, so clarify the debris item.

Mason daywork excludes plumbing, electrical work, painting and carpentry. If the repair involvesPipe replacementor wiring, involve the correct trade. We specify copper water pipes and work with a licensed plumber on installation and WSD applications. Fixed electrical work requires a registered electrical worker through a registered electrical contractor.

  • Materials reimbursed against receipts
  • Clients select finish tiles and sanitaryware. Installation is separately priced.
  • Specify disposal by bag or truckload
  • Qualified personnel handle water and electrical work separately
Area priced at the company's unit rates equivalent to one day of labour at HK$2,700(Unit:sq ft)
B02 floor levelling: HK$22/sq ft
About 123 sq ft
B01 wall rendering: HK$43/sq ft
About 63 sq ft
D01 floor tiling: HK$78/sq ft
About 35 sq ft
B03 brick partition: HK$93/sq ft
About 29 sq ft

Conversions divide HK$2,700 by the company rates per square foot. They compare budgets, not daily output. Separate item minimums apply.

Completed project photo showing a levelled floor. A clearly defined area is easier to price by the square foot.
Completed project photo showing a levelled floor. A clearly defined area is easier to price by the square foot. Select an image to enlarge
Mason's day rates: key figures illustrated | HK Create Design
Mason's day rates: key figures at a glance | HK Create Design Select an image to enlarge

03

Daywork or a measured price: a numerical comparison

Divide the day rate by the price per square foot for a budget comparison. At our rates, HK$2,700 is roughly equivalent to 123 sq ft of floor levelling at HK$22/sq ft, or around 63 sq ft ofwall renderingwall rendering at HK$43/sq ft, 35 sq ft of floor tiling at HK$78/sq ft or 29 sq ft of brickwork rendered on both faces at HK$93/sq ft. These are price equivalents, not an installer's expected output.

For whole-flat screeding, wall rendering or a full bathroom retile, an area rate gives an estimate from measured area, unit price and minimum charges, usually including labour and base materials. Daywork depends on the time taken. Unexpectedly widespread hollow bedding can add days.

If you have only a few small patches of a square foot or two each, separate itemised rates can trigger a minimum charge on every item. For example, the minimum for wall rendering is HK$2,350, for floor levelling HK$1,850, and for floor tiling HK$3,250, totalling HK$7,450. One tradesperson working a day at HK$2,700 plus materials might be enough for these small areas. Daywork tends to suit scattered small jobs, while square-foot rates generally suit larger areas.

The Consumer Council also notes thatMasonry and tilingMasonry often represents a substantial part of a renovation and is usually priced per square foot. Specify the work and materials in the quote.[2] Whichever method is used, obtain written inclusions and exclusions alongside the total.

  • Divide the daily charge by the area rate to estimate the crossover
  • Consider measured rates first for large areas
  • Consider daywork for several small repairs
  • Check the minimum charge for each item
Masonry and rendering in Tai Kok Tsui | HK Create Design
Site photo: Masonry and plastering in Tai Kok Tsui, May 2026. HK Create Design. Select an image to enlarge

04

Why do masonry quotations differ?

Contractors' prices for the same description can differ. Here are the cost factors to check when comparing written quotations.

1. Check materials. Some quotes cover labour alone and others include base materials such as cement, sand and adhesive. The Consumer Council found that finish tiles were generally excluded in its exercise.[2] For an unusually low figure, check whether materials have been omitted.

2. Check workers, days and hours. One worker for three days and two for a day and a half have similar labour totals but different programmes. 3. A walk-up takes more time and labour to carry cement and sand. Labour Department guidance favours mechanical aids or trained team lifting where appropriate.[4] These safety arrangements also affect costs.

4. Clarify cleaning and debris transport so waste does not remain in common stairs. 5. Confirm the one-year workmanship warranty and return-visit terms in writing. 6. The Labour Department places priority on controlling dust at source by wet suppression, extraction or enclosure, with suitable respiratory protection where needed.[5] Dust control during tile cutting or breaking out affects labour and time too.

  • Confirm whether the rate includes materials or labour alone
  • Ask about the number of workers, days and hours
  • Check charges for carrying, disposal and cleaning
  • Ask about the warranty and return visits
Worked example 1

Example 1: hiring by the day for local cracked bathroom tiles and a pooling floor

Assumptions

  • Assume a bathroom with three or four chipped tiles and a small area of ponding. The locations are scattered and difficult to measure separately.
  • Assume one mason completes the job in one day. The illustrative materials receipts total HK$380.
  • No complete bathroom strip-out or waterproofing renewal.

How to calculate quantities

  1. Daywork: 1 mason × 1 day × HK$2,700 = HK$2,700.
  2. Materials at cost: HK$380 against receipts.
  3. Total: HK$2,700 + HK$380 = HK$3,080.
  4. Our small-job minimum is HK$2,000 even where work takes less than a day.

About HK$3,080 before disposal. Small quantities may be bagged under the HK$2,000 small-job minimum arrangement. Confirm the written quotation.

If the waterproofing is damaged, obtain a price for waterproofing work instead of relying on patch repairs. [7]

Use your square footage instead and see a reference budget

05

Official guidance on quotation scope and safety

The following points draw on published information from public bodies and government departments.

The Consumer Council recommends specifying the work, materials and pricing method for each category. Masonry such as walls, waterproofing, rendering and tiling is usually measured by area. Ask in advance about extras for diagonal or herringbone laying.[2]

The Census and Statistics Department publishes public-sector daily wages by occupation. These do not represent the entire construction industry.[1] If someone uses government figures showing daily wages of just over HK$1,000 to press for a lower price, remember that the figure is the worker's wage. A contractor's daywork rate also covers project management, insurance, tools and warranty support.

The Buildings Department identifies ordinary plastering, tiling and sanitary fitting repairs or replacement as examples of works exempt from prior approval that must still comply with the Buildings Ordinance. Assess work such as brick partitions under the applicable Minor Works Control System requirements.[6] Ordinary patching generally needs no filing. Adding a partition calls for a separate assessment.

In our experience, daywork disputes often start with an undocumented task list. Photograph the existing defects, agree each task and record it on completion. This links the days charged to work you can inspect.

  • Itemise the work and materials
  • An official wage figure and a company daywork charge measure different things
  • Assess a new wall under the applicable minor works procedure
  • List and photograph the work before starting
Census and Statistics Department: Average daily wages of major trades on public sector construction projects (July 2026)

You can swipe left or right on your phone to view the complete table.

Type of workAverage daily wage (HK$)Relevance to masonry work
Bricklayer1,171.3Build partitions and shower kerbs
Plasterer1,310.0Wall rendering and floor levelling
Tiler1,379.8Lay wall and floor tiles
Waterproofing worker1,341.4Kitchen and bathroom waterproofing
Demolition worker1,342.7Removing tiles and walls
General labourer1,224.8Carrying and site clearance

The department states that these are public-sector project wages. Company management, insurance, tools, travel and aftercare are separate costs, so the data cannot be used directly as a renovation daywork rate. [1] [1]

Floor grinding and levelling at Dandenong Mansion, Wan Chai | HK Create Design
Site photo: Flooring at Dandenong Mansion, Wan Chai, July 2026. HK Create Design. Select an image to enlarge

06

Common questions about hiring a mason on daywork

1. Open-ended daywork. Write down the tasks and estimated days, and require the contractor to obtain agreement before continuing beyond the estimate.

2. Unsupported material charges. Charging at cost means documenting actual quantities and unit prices with receipts or clear brands and amounts. Products we use include Optimix, Sika and Fosroc Nitocote, and we can state the model.

3. A small repair can reveal a wide hollow area once tiles are tapped or removed. Pause and assess a measured strip-out and retiling price before incurring further daywork.

4. Unclear small-job minimums. Our call-out for small works starts at HK$2,000. Bagged waste is dealt with under that minimum-charge arrangement. Agree how it applies even to a short visit.

5. Using the wrong trade. A mason can form and reinstate chases. Have licensed or registered personnel alter pipes and fixed wiring.

  • List tasks and estimated days
  • Ask for receipts or material specifications
  • Pause and reprice if a wider problem appears
  • Confirm minimum charges
  • Use qualified plumbing and electrical trades
Census and Statistics Department average daily wages on public works, July 2026(Unit:HK$ per day)
Bricklayer
HK$1,171.3
Plasterer
HK$1,310.0
Waterproofing worker
HK$1,341.4
Tiler
HK$1,379.8

Official figures cover public-sector projects only. They are neither whole-industry wages nor renovation company charges. [1]

07

Handover checks after daywork

Inspect against the list agreed at the start. Check render patches for loose sand and cracks and use raking light to see unevenness. Lightly tap replacement tiles for hollow spots. For floor repairs, check that a little water flows to the drain without ponding.

For patches at a shower edge or bathroom floor, ask whether the waterproof layer has been breached. Surface mortar alone cannot restore a punctured membrane. Assess a local waterproofing repair and flood test.

Check that debris is removed, shared corridors are clean and no cement residue has entered drains. Hardened cement in a drain is difficult to remove.

Keep completion photographs and receipts. These make it easier to follow up under our one-year workmanship warranty.

  • Inspect against the agreed task list
  • Tap tiles and listen for hollow areas
  • Check the fall with a little water
  • Check drains for cement residue
  • Keep receipts and photographs
Worked example 2

Example 2: floor levelling in a 500 sq ft flat, by day or by square foot?

Assumptions

  • Assume a 500 sq ft floor with a level difference of no more than 30 mm.
  • Use our B02 cement-sand floor screeding rate of HK$22/sq ft for labour and base materials.

How to calculate quantities

  1. Measured price: 500 × HK$22 = HK$11,000.
  2. Equivalent daywork: HK$11,000 ÷ HK$2,700 ≈ 4.07 person-days.
  3. Daywork would have to finish in roughly four person-days to approach the measured price, before adding materials.
  4. A measurable scope makes area rates easier to compare and budget.

The measured price is HK$11,000. The daywork total depends on days worked and materials receipts.

The estimate changes if levels differ by more than 30 mm, old tiles need removal or a wet area needs a drainage fall. Confirm after measurement. [7]

Use your square footage instead and see a reference budget
Whole-home renovation on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

08

From enquiry to completion

For small repairs, send photos and a description by WhatsApp. We assess whether daywork or measured rates suit the job, inspect and measure, then put labour, days, materials and disposal in writing. Confirm estate working hours and access, complete the list, inspect and clean.

Many patch repairs take one or two days, but cement mortar still needs curing. Avoid loading or wetting the repair prematurely. Follow the specified product's curing instructions, including those for Optimix renders, to reduce shrinkage cracking.

If a patch opens up into a whole floor or wall, we pause and explain. We can quote measured screeding or rendering so you can compare the options before authorising more work.

Older flat renovationandWhole-flat renovationis usually priced by area and item. Larger, multi-stage work is easier to programme and budget that way.

  • Send photographs for an initial assessment
  • Site assessment
  • Record the scope in a written quote
  • Allow time for curing
Day rate or area rate: how to choose

You can swipe left or right on your phone to view the complete table.

Point of comparisonDaywork (daily rate)Area rate per square foot
Suitable workScattered repairs with an uncertain measured areaMeasured rendering, screeding, tiling and waterproofing
Budget certaintyDepends on days workedArea × rate is easier to budget
MaterialsMaterials at cost: request receiptsUsually labour and base materials, with finish tiles extra
riskSlower progress adds chargeable daysMismeasured areas or omitted work can add cost
Put these details in writingHeadcount, days, working hours and scopeArea, sequence, thickness and whether removal is included

Both methods have their place. Define the scope and identify inclusions and exclusions in writing. [7]

09

Typical daywork in public rental housing, HOS flats and older buildings

Public rental flat renovationandHome Ownership Scheme flat renovation, work often consists of local repairs: chipped tiles at a sink, uneven bathroom thresholds, loose sill render or patching after cabinet removal. Daywork suits scattered tasks. In public rental housing check Housing Department rules and consult the estate office before altering fixed installations.

In older flats, repeated repainting can hide loose render and uneven floors. We may use daywork to open one or two trial areas, inspect the base and then decide whether to quote measured rendering or screeding. This avoids pricing a large unknown scope at the outset.

Flat inspectionDaywork can group defects from a new-flat handover, such as a few hollow tiles and uneven window reveals, into one or two visits and avoid several minimum charges.

  • Check with the estate office before altering a public rental flat
  • Investigate a trial area in an older flat
  • Group handover defects into one visit
Worked example 3

Example 3: two tradespeople carrying out small repairs over three days

Assumptions

  • Assume an older flat has chipped corners, loose render around door frames and damaged sill edges across several rooms.
  • Assume two masons for three days.

How to calculate quantities

  1. Daywork: 2 masons × 3 days × HK$2,700 = HK$16,200.
  2. Materials charged separately at cost.
  3. Large quantities may require A11 removal at HK$4,200 per load, including government disposal fees.

Labour HK$16,200 plus materials and any debris charges.

The days are illustrative. Agree a task list before starting and mark items complete to keep track of the programme. [7]

Use your square footage instead and see a reference budget

10

When daywork is unsuitable

We usually price kitchen and bathroom waterproofing by room or area, with the agreed flood test, because the scope is measurable. Adding or removing partitions needs a prior check of the wall and the applicable Buildings Department minor works requirements.[6] 3. Whole-flat levelling and tiling have measurable areas, so area rates are generally easier to compare.

Another case is a structural issue in an older building, such asConcrete spallingor exposed reinforcement. Establish the cause and extent before treating it as an ordinary patch repair.

Daywork is flexible but leaves the total open. For larger jobs, waterproofing or regulated alterations, obtain a defined project quotation.

For a free quotation from a construction team, contact HK Create Design on WhatsApp 5243 7747. The Wong Tai Sin showroom opens Monday to Saturday, 10:00–18:00. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

  • Price waterproofing by room or area
  • Check statutory requirements before adding or removing a wall
  • Use area rates for whole-flat work
  • Assess structural concerns first
Custom storage cabinets throughout a flat | HK Create Design
Project photo of bespoke wardrobes | HK Create Design Select an image to enlarge

11

What else can be charged on top of the daily rate?

The Consumer Council distinguishes base materials such as cement, sand and bricks from finishes such as tiles and stone. Most contractors in its exercise excluded finish materials[2]. Ask who supplies the materials when comparing daily rates.

Common extras include carrying materials, debris removal, stairs in a walk-up and a full-day minimum for a half day. We include ordinary lift access, quote separately for walk-ups and record the arrangement in writing.

  • Who supplies the cement, sand and tile adhesive?
  • Who selects and buys the finish tiles?
  • What are the additional charges for carrying materials in and debris out?
  • How is a half-day charged?
Day work versus a lump-sum contract

You can swipe left or right on your phone to view the complete table.

ItemDaywork (daily rate)Measured or fixed-price work
PricingDays × daily rateArea × unit rate, or an agreed lump sum
BenefitsFlexible for small jobsClearer budget; slower progress alone does not change the measured price
riskHarder to predict: longer work costs moreGaps in scope can generate extra charges
Best suited toPatch tiles, cracks and cement finishesWhole-flat rendering, tiling, or kitchen and bathroom renovation

Specify who pays for labour, base materials and finishes. [2] [2]

12

Working hours and waste charges

EPD restricts powered mechanical equipment for construction between 7 pm and 7 am and on general holidays unless covered by a valid construction noise permit[10]. Plan noisy wall chasing and tile cutting within permitted hours.

Demolition waste must go to an authorised facility. Government charges range from HK$71 to HK$200 per tonne[3]. Our HK$4,200 per-load debris item includes carrying down, transport and government disposal fees[7].

  • Powered equipment during permitted hours
  • Include debris removal in the written quotation
Worked example 4

Example 1: replacing six cracked bathroom tiles

Assumptions

  • Hypothetical examples, not actual quotes.
  • Owner supplies the finish tiles.

How to calculate quantities

  1. One mason for one day: HK$2,700 [7]
  2. Materials such as cement, tile adhesive and grout: around HK$200–400, billed at cost

About HK$2,900–3,100

If opening up reveals damaged waterproofing, obtain a separate repair proposal. [7]

Use your square footage instead and see a reference budget
Project photo of bespoke kitchen cabinets with worktop | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge

13

Why use HK Create Design for masonry?

Our online calculator lists masonry rates, inclusions, exclusions and minimum charges so customers can check the scope before work starts.[7] HK Create Design’s quotations list materials, work stages and acceptance checks so you can compare other quotations line by line.

HK Create Design offers a one-year warranty after completion under the terms of the written quotation. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

For a project estimate, send photos and the approximate area to HK Create Design on WhatsApp 5243 7747. You can also see samples and discuss options at our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.

  • Published, itemised prices
  • List inclusions and exclusions in the written quotation
  • One-year workmanship warranty
  • Send photos to WhatsApp 5243 7747 for a quotation

FAQ

12 practical questions answered

01What is a typical daily rate for a plasterer or tiler?

Separate pay from customer charges. July 2026 average daily public-project wages were HK$1,310.0 for plasterers and HK$1,171.3 for bricklayers.[1] Our mason daywork rate is HK$2,700 per day, plus materials at cost.

02Does the HK$2,700 day rate include materials?

No. Materials are charged separately at cost. Ask for receipts or a breakdown of brands, models and quantities.

03How do you charge for less than a full day?

Small on-site jobs have a minimum charge of HK$2,000. The written quotation confirms the actual amount.

04Which is better value, a day rate or a rate per square foot?

Area rates are easier to budget for large, clearly defined work. Day rates can suit scattered small repairs. Divide HK$2,700 by the area rate to compare: at HK$22 per sq ft for levelling, the break-even area is about 123 sq ft.

05Can official daily wage figures be used to negotiate a lower price?

No. The department states that the figures cover public works, rather than wages across the whole construction industry,[1] and the daywork charge covers management, travel, tools, insurance and workmanship follow-up.

06How is rubble removal charged?

Small volumes may be handled by the bag within the small-job minimum. Larger volumes use A11 at HK$4,200 per truckload, including carrying downstairs and government disposal charges. The Environmental Protection Department charges disposal by weight.[3]

07Can a tradesperson also replace water pipes during a day-work booking?

A plasterer or tiler cannot undertake this work. HK Create Design uses copper pipes, arranges installation by a partner licensed plumber and handles the Water Supplies Department application.

08Do I need a written contract for day work?

Yes. At minimum, record crew size, days, work list, material charges, debris handling and warranty period. The Consumer Council also recommends itemised quotations.[2]

09Does day work carry a warranty?

HK Create Design provides a one-year completion warranty, with scope and terms in the written quotation.

10How many square feet of wall can one worker skim-coat in a day?

Output depends on substrate condition, thickness, carrying and curing requirements. The article's 63 sq ft figure is a cost break-even point, not a promised daily output.

11Is there an extra charge for an older building without a lift?

Handling conditions affect labour and time. State them in the quotation. The Labour Department also advises safe manual handling of heavy loads.[4]

12How can I arrange a site visit?

Send photos to WhatsApp 5243 7747 for an initial assessment. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Census and Statistics Department: Average daily wages of workers engaged in public sector construction projects, July 2026 (2021 edition) Accessed: 2026-11-03
  2. [2]Consumer Council, CHOICE issue 529: how to read a renovation quotation across 12 categories Accessed: 2026-11-03
  3. [3]Environmental Protection Department: Construction Waste Disposal Charging Scheme Accessed: 2026-11-03
  4. [4]Labour Department: Manual Handling Operations – A Guide for Employees Accessed: 2026-11-03
  5. [5]Labour Department guidance on preventing silicosis among quarry and construction workers Accessed: 2026-11-03
  6. [6]Buildings Department: Frequently Asked Questions on Alteration and Addition Works to Domestic Premises Accessed: 2026-11-03
  7. [7]HK Create Design’s published 2026 prices: masonry, waterproofing, demolition and miscellaneous work Accessed: 2026-11-03
  8. [8]Consumer Council: First home renovation quotation exercise finds many quotes lacked detail Accessed: 2026-11-03
  9. [9]Buildings Department / Development Bureau: Controlling Officers' Replies on the 2026–27 Estimates, covering private building ages and repair orders Accessed: 2026-11-03
  10. [10]Environmental Protection Department: FAQs on noise from renovation in residential premises Accessed: 2026-11-03